CN106921458A - Intelligent substation SV sampling step-out monitoring methods based on SV messages - Google Patents

Intelligent substation SV sampling step-out monitoring methods based on SV messages Download PDF

Info

Publication number
CN106921458A
CN106921458A CN201710051853.1A CN201710051853A CN106921458A CN 106921458 A CN106921458 A CN 106921458A CN 201710051853 A CN201710051853 A CN 201710051853A CN 106921458 A CN106921458 A CN 106921458A
Authority
CN
China
Prior art keywords
sampling
sampling step
out monitoring
intelligent substation
messages
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710051853.1A
Other languages
Chinese (zh)
Inventor
蒋正威
常乃超
章立宗
杜奇伟
屈刚
肖艳炜
刘永新
陆承宇
洪道鉴
许伟国
吴栋萁
阮黎翔
吴新华
江波
陈晓雷
钱海东
郑翔
窦中山
张秀娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
XJ Electric Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
XJ Electric Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, XJ Electric Co Ltd, Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710051853.1A priority Critical patent/CN106921458A/en
Publication of CN106921458A publication Critical patent/CN106921458A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04JMULTIPLEX COMMUNICATION
    • H04J3/00Time-division multiplex systems
    • H04J3/02Details
    • H04J3/06Synchronising arrangements
    • H04J3/0635Clock or time synchronisation in a network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04JMULTIPLEX COMMUNICATION
    • H04J3/00Time-division multiplex systems
    • H04J3/02Details
    • H04J3/06Synchronising arrangements
    • H04J3/0635Clock or time synchronisation in a network
    • H04J3/0638Clock or time synchronisation among nodes; Internode synchronisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention discloses a kind of intelligent substation SV sampling step-out monitoring methods based on SV messages, and step is as follows:1)The relevant configuration information of reading device;2)Sampled data is read, sync id is judged, sentenced once per frame;When sample-synchronous be designated false be judged as it is asynchronous, the SV links do not perform sampling step-out monitoring criterion, otherwise then carry out sampling step-out monitoring;3)When carrying out sampling step-out monitoring, to every group of sampling sequence number of SV links in the same second for the markers of the sampled point of N is compared.The above-mentioned intelligent substation SV sampling step-out monitoring methods based on SV messages; real-time diagnosis alarm is carried out to SV samplings step-out in intelligent substation; intelligent substation operation maintenance personnel thereby can in time find abnormal conditions of sampling, and reduce or even avoid that false protection or the serious consequence caused by tripping occur so as to take necessary measure.

Description

Intelligent substation SV sampling step-out monitoring methods based on SV messages
Technical field
The invention belongs to intelligent substation technical field, and in particular to a kind of intelligent substation SV samplings based on SV messages Step-out monitoring method.
Background technology
Since 2010, the intelligent substation of each voltage class puts into operation in succession.With intelligent substation construction Deeply, more old station carries out intellectualized reconstruction, and digital sample is being realized on the spot by routine transformer.By combining unit Time synchronized is carried out to multi-path digital collection capacity and merges output to use for other equipment.
Intelligent substation master clock typically uses triones navigation system and global positioning system (GPS) conduct simultaneously at this stage Clock source, and use master/backup clock redundancy of effort mode.Even so, satellite clock source often also suffers from ambient weather, barrier Hindering thing and electromagnetic interference etc. influences, add clock on when internal system hardware or the influence such as link failure, it may appear that clock is lost Become estranged abnormal saltus step the problems such as.
If when saltus step occurs in clock satellite-signal, or before synchronizing signal recovery, combining unit is in punctual state In the case of, just very likely there is step-out, to protection in the disunity on to synchronous mark treatment and pulse per second (PPS) affirmation mechanism Normal operation brings and has a strong impact on.
Intelligent substation merging unit is configured by interval, at present both at home and abroad for the analog quantity channel in interval, is closed And unit has been achieved with the sample-synchronous in time series, but for the combining unit across compartment, but lack necessary prison Survey means, can only could often find after false protection.
In view of this, the present inventor is studied this, specially develops a kind of intelligent substation SV based on SV messages Thus sampling step-out monitoring method, this case produces.
The content of the invention
It is an object of the invention to provide a kind of intelligent substation SV sampling step-out monitoring methods based on SV messages, to solve Different interval sampled data step-out causes to influence the problem of power system security reliability service.
In order to realize the above object the technical solution adopted in the present invention is:
A kind of intelligent substation SV sampling step-out monitoring methods based on SV messages, step is as follows:
(1)The relevant configuration information of reading device;
(2)Sampled data is read, sync id is judged, sentenced once per frame;It is judged as difference when sample-synchronous are designated false Step, the SV links do not perform sampling step-out monitoring criterion, otherwise then carry out sampling step-out monitoring;
(3)When carrying out sampling step-out monitoring, to every group of sampling sequence number of SV links in the same second for the markers of the sampled point of N is carried out Compare, the link identification max_SvAppid of record maximum time stamp value maxnsec and the sampled point, the minimum time stamp value of record The link identification min_SvAppid of minnsec and the sampled point, if(maxnsec-minnsec)>2ms, then judge SV samplings Step-out;
When two groups of SV links sampling step-outs are taken office in monitoring, that is, provide SV sampling step-out warning information and record link identification, while Record correlation SV original sampling datas;
Preferably, the step(1)In relevant configuration information include sampling step-out monitoring criterion throw move back control word.
Intelligent substation SV sampling step-out monitoring methods based on SV messages of the present invention, it is uninterrupted to differentiate SV synchronizations State, if criterion puts into, to every group of sync id for the SV sampled datas of true carry out step-out judgement.The method is to intelligent change SV samplings step-out carries out real-time diagnosis alarm in power station, and intelligent substation operation maintenance personnel thereby can in time find abnormal feelings of sampling Condition, reduces or even avoids that false protection or the serious consequence caused by tripping occur so as to take necessary measure.
The present invention is described in further detail below in conjunction with drawings and the specific embodiments.
Brief description of the drawings
Fig. 1 is the flow chart of the sampling step-out monitoring method of the present embodiment.
Specific embodiment
The flow chart of the intelligent substation SV sampling step-out monitoring methods of SV messages is based on for the present invention as shown in Figure 1, by Figure understands, as follows the step of the method:
(1)Reading device relevant configuration information, relevant configuration information here includes that control word is moved back in sampling step-out monitoring criterion throwing Deng the settable information of correlation;
(2)Read SV sampled datas and judge whether SV is synchronous, is calculated once per frame, when sample identification for false is judged as difference Step, the SV links do not perform sampling step-out monitoring criterion, otherwise then carry out sampling step-out monitoring;
(3)If sampling step-out monitoring criterion input, when carrying out sampling step-out monitoring, only adopts to each SV link in the same second The markers of the sampled point of sample serial number N is compared, the link identification max_ of record maximum time stamp value maxnsec and the sampled point The link identification min_SvAppid of SvAppid, record minimum time stamp value minnsec and the sampled point.If(maxnsec- minnsec)>2ms, then judge SV sampling step-outs.
Wherein, the same second refer to sampling markers absolute time date Hour Minute Second all same, for example:Sampled data when be marked on 2016-04-28 10:39:20.000000~2016-04-28 10:39:It is considered between 20.999999 in the same second.
As long as in addition, when two groups of SV links sampling step-outs are taken office in monitoring, that is, providing SV sampling step-out warning information and recording Link information, while recording correlation SV original sampling datas.
The above-mentioned intelligent substation SV sampling step-out monitoring methods based on SV messages, it is uninterrupted to differentiate SV synchronous regimes, if Criterion puts into, then to every group of sync id for the SV sampled datas of true carry out step-out judgement.The method is in intelligent substation SV samplings step-out carries out real-time diagnosis alarm, and intelligent substation operation maintenance personnel thereby can in time find abnormal conditions of sampling, so that Take necessary measure and false protection or the serious consequence caused by tripping occur to reduce or even avoid.
Above-described embodiment and schema and non-limiting product form of the invention and style, any art it is common Appropriate change or modification that technical staff is done to it, all should be regarded as not departing from patent category of the invention.

Claims (2)

1. it is a kind of based on SV messages intelligent substation SV sampling step-out monitoring method, it is characterised in that step is as follows:
(1)The relevant configuration information of reading device;
(2)Sampled data is read, sync id is judged, sentenced once per frame;It is judged as difference when sample-synchronous are designated false Step, the SV links do not perform sampling step-out monitoring criterion, otherwise then carry out sampling step-out monitoring;
(3)When carrying out sampling step-out monitoring, to every group of sampling sequence number of SV links in the same second for the markers of the sampled point of N is carried out Compare, the link identification max_SvAppid of record maximum time stamp value maxnsec and the sampled point, the minimum time stamp value of record The link identification min_SvAppid of minnsec and the sampled point, if(maxnsec-minnsec)>2ms, then judge SV samplings Step-out;
When two groups of SV links sampling step-outs are taken office in monitoring, that is, provide SV sampling step-out warning information and record link identification, while Record correlation SV original sampling datas.
2. a kind of intelligent substation SV sampling step-out monitoring methods based on SV messages as claimed in claim 1, its feature exists In the step(1)In relevant configuration information include sampling step-out monitoring criterion throw move back control word.
CN201710051853.1A 2017-01-21 2017-01-21 Intelligent substation SV sampling step-out monitoring methods based on SV messages Pending CN106921458A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710051853.1A CN106921458A (en) 2017-01-21 2017-01-21 Intelligent substation SV sampling step-out monitoring methods based on SV messages

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710051853.1A CN106921458A (en) 2017-01-21 2017-01-21 Intelligent substation SV sampling step-out monitoring methods based on SV messages

Publications (1)

Publication Number Publication Date
CN106921458A true CN106921458A (en) 2017-07-04

Family

ID=59454054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710051853.1A Pending CN106921458A (en) 2017-01-21 2017-01-21 Intelligent substation SV sampling step-out monitoring methods based on SV messages

Country Status (1)

Country Link
CN (1) CN106921458A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107395306A (en) * 2017-07-06 2017-11-24 中国南方电网有限责任公司 A kind of network samples data syn-chronization method of discrimination based on temporal quality
CN114089038A (en) * 2021-11-16 2022-02-25 许昌许继软件技术有限公司 Time scale second-bit jump processing method and system for dynamic data of synchrophasor measuring device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103236893A (en) * 2013-03-22 2013-08-07 南京南瑞继保电气有限公司 Network message synchronizing method for process levels of intelligent substation
CN104297593A (en) * 2014-10-13 2015-01-21 国家电网公司 Punctuality error detection method for intelligent substation merging unit
CN104333426A (en) * 2014-09-25 2015-02-04 国电南瑞科技股份有限公司 Pulse per second synchronization method based on merging unit SV message sampling sequence number learning

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103236893A (en) * 2013-03-22 2013-08-07 南京南瑞继保电气有限公司 Network message synchronizing method for process levels of intelligent substation
CN104333426A (en) * 2014-09-25 2015-02-04 国电南瑞科技股份有限公司 Pulse per second synchronization method based on merging unit SV message sampling sequence number learning
CN104297593A (en) * 2014-10-13 2015-01-21 国家电网公司 Punctuality error detection method for intelligent substation merging unit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107395306A (en) * 2017-07-06 2017-11-24 中国南方电网有限责任公司 A kind of network samples data syn-chronization method of discrimination based on temporal quality
CN107395306B (en) * 2017-07-06 2019-06-21 中国南方电网有限责任公司 A kind of network samples data synchronization method of discrimination based on temporal quality
CN114089038A (en) * 2021-11-16 2022-02-25 许昌许继软件技术有限公司 Time scale second-bit jump processing method and system for dynamic data of synchrophasor measuring device
CN114089038B (en) * 2021-11-16 2024-04-16 许昌许继软件技术有限公司 Time scale second bit jump processing method and system for dynamic data of synchronous phasor measurement device

Similar Documents

Publication Publication Date Title
CN103969526B (en) Electric energy quality collecting device and application thereof in electric energy quality comprehensive analysis system
CN105093033B (en) A kind of analysis method of the comprehensive analysis of fault system based on power network multi-source information
CN102055544B (en) System and method for synchronously monitoring secondary equipment time of power supply system
US10375108B2 (en) Time signal manipulation and spoofing detection based on a latency of a communication system
CN103823361B (en) Multi-source dynamic self-adapting clock synchronizing method and device
CN103199944B (en) automatic dependent surveillance broadcast signal detecting method and device
CN106850115A (en) A kind of Multi-channel data acquisition synchronization system and method
CN203909162U (en) Electric energy quality collection apparatus
CN105487448A (en) Sensing data acquisition device on the basis of GPS synchronization time service
CN101609145A (en) The all-lightning positioning system that very low frequency (VLF) combines with very high frequency(VHF)
JP5373260B2 (en) Accident point location method and system for transmission and distribution systems
CN203465541U (en) Beidou/GPS double-time service source-based failure time recording device
CN111984059B (en) PPS (polyphenylene sulfide) jump detection method and system for timing by time service module
CN106921458A (en) Intelligent substation SV sampling step-out monitoring methods based on SV messages
CN106254022A (en) Time supervision based on clock synchronization apparatus and time delay query software system platform
CN105699789A (en) Identification method of fault indicator installation phase sequence
CN102004441A (en) Adaptive crystal oscillator frequency timekeeping method
CN102522741A (en) Synchronous data acquisition method applied to direct current power grid
CN104467186A (en) Full network fault recording data parameter-free accurate synchronizing method
CN106341212A (en) Device and method for realizing multi-type time signal automatic identification and detection
CN105245015A (en) Layered expansion power grid fault information processing system and method based on multiple AGENTs
CN205375082U (en) Sensing data collection system based on synchronous time service of GPS
CN113960413A (en) Time synchronization method for collecting unit and collecting unit in fault indicator
CN201555946U (en) Full-lightning positioning system of combination of extremely low frequency and extremely high frequency
CN106647228B (en) Converter station master clock fault judgment system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170704

RJ01 Rejection of invention patent application after publication