CN106917353A - A kind of open-close type crosses pier box beam maintenance construction trolley and its method of work - Google Patents
A kind of open-close type crosses pier box beam maintenance construction trolley and its method of work Download PDFInfo
- Publication number
- CN106917353A CN106917353A CN201710265931.8A CN201710265931A CN106917353A CN 106917353 A CN106917353 A CN 106917353A CN 201710265931 A CN201710265931 A CN 201710265931A CN 106917353 A CN106917353 A CN 106917353A
- Authority
- CN
- China
- Prior art keywords
- truss
- box beam
- steel wire
- wire rope
- boom frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Pier box beam maintenance construction trolley is crossed the invention discloses a kind of open-close type, chassis truss including being erected on box beam both sides, chassis truss includes the first truss being erected on the outside of box beam and the second truss being erected on the inside of box beam, bottom boom frame is connected between the bottom of the bottom of the first truss and the second truss, the outer end of bottom boom frame is articulated and connected with the bottom of the first truss, the bottom of inner and second truss of bottom boom frame coordinates to be fixed, the inner of bottom boom frame is connected with hoist engine by steel wire rope, steel wire rope includes the first steel wire rope being fixedly connected with the inner of bottom boom frame and the second steel wire rope being wound on the roller of hoist engine, the end of the first steel wire rope is fixedly connected with the end of the second steel wire rope by rope clamp, hoist engine is fixed on the second truss;The walking mechanism walked along box beam axis direction is provided with the top of chassis truss.By being hinged and fixation with the second truss for bottom boom frame and the first truss, realize that big open-close type crosses pier construction, various girder systems constructions can be used for.
Description
Technical field
The present invention relates to equipment for bridge construction technical field, pier box beam maintenance construction trolley is crossed in particular to a kind of open-close type
And its method of work.
Background technology
With continuing to develop for bridge construction, bridge main beam structure type is various, and Common has steel box-girder, steel reinforced concrete to combine
Beam, beams of concrete, construction has erection crane to install, Bridge Erector is installed, support cast-in-place, mostly using overall pier during design
Body, double width separate type bridge deck structure.Separation type box girder section assembling gluing, the construction of wet seam, the modification of beam bottom etc. are required for using
Operation platform is carried out, and has truss monoblock type and girder truss to be disconnected along two ends at middle part currently used for separation type box girder construction trolley
Free end is hinged two kinds.Truss monoblock type maintenance chassis is often constructed and completes next across, it is necessary to rise once across removing, being then mounted to
Heavy equipment coordinates, and procedures are more, construction trouble;Disconnected in the middle part of girder truss along free end radial type construction trolley, Zhi Nengshi
The separation type box girder construction of split type pier shaft is answered, is restricted for monoblock type pier shaft.Box girder construction is substantially work high above the ground,
Difficulty of construction and potential safety hazard are big.Should be easy to operate, economic and practical in construction, can guarantee that safe construction trolley is case again
The key of beam construction.
The content of the invention
A kind of deficiency present invention aim to solve above-mentioned background technology, there is provided monoblock type pier shaft that can be suitably used for
Box beam maintenance construction, can guarantee that the safe, practical property of operating personnel open-close type high crosses pier box beam maintenance construction trolley and its work again
Make method.
In order to achieve this, the open-close type designed by the present invention crosses pier box beam maintenance construction trolley, including it is erected on box beam
The chassis truss of both sides, the chassis truss includes the first truss being erected on the outside of box beam and be erected on the inside of box beam second
Truss, is connected with bottom boom frame between the bottom of first truss and the bottom of the second truss, the outer end of the bottom boom frame and the
The bottom of one truss is articulated and connected, and the bottom of inner and second truss of the bottom boom frame coordinates to be fixed, the bottom boom frame it is interior
End is connected with hoist engine by steel wire rope, and the steel wire rope with the inner of bottom boom frame including being fixedly connected, man-hour manually hand-held crosses pier
First steel wire rope and the second steel wire rope for being wound on the roller of hoist engine, being lifted bottom boom frame, the end of first steel wire rope
End with the second steel wire rope is fixedly connected by rope clamp, and the hoist engine is fixed on the second truss;The chassis truss
Top is provided with the walking mechanism walked along box beam axis direction.
Specifically, top surface is equipped with walking track, the walking along its axial direction respectively inside and outside the box beam
Mechanism includes the walking roller for being arranged at the top of the first truss and the top of the second truss and being engaged with walking track.
Specifically, being respectively fixedly connected with the top of the outermost end girder truss top of the bottom boom frame and inner terminal girder truss hinged
Fishplate bar and fixed plate, are provided with hinging pin shaft via on the articulated slab, fixed pin shaft via and steel wire are provided with the fixed plate
Rope fixing hole, is provided with axis hole corresponding with hinging pin shaft via on the girder truss of the bottom outermost end of first truss, described
Connected by hinging pin shaft between hinging pin shaft via and axis hole;It is provided with the most girder truss of inner side of the bottom of second truss
Axis hole corresponding with fixed pin shaft via, is connected between the fixed pin shaft via and axis hole by fixed pin shaft.
Preferably, the outside and inner side of the top truss beam of the bottom boom frame have been respectively fixedly connected with the first location-plate and
Two location-plates, have the first bearing pin location hole and the second bearing pin location hole on first location-plate and the second location-plate,
Axis hole corresponding with the first bearing pin location hole is provided with the most inner side girder truss of the bottom of first truss, first bearing pin is determined
Connected by alignment pin between position hole and axis hole, be provided with and the second bearing pin on the bottom outermost girder truss of second truss
The corresponding axis hole of location hole, is connected between the second bearing pin location hole and axis hole by alignment pin.
Further, the top of first truss is located at positioned at the top of side and the second truss in box beam upper truss body
Joist body outside above box beam is respectively arranged with the first balancing weight and the second balancing weight, and the weight of first balancing weight compares the
The weight of two balancing weights is big.
Further, the top of the bottom of first truss and bottom, the bottom of the second truss and bottom and bottom boom frame
Portion is equipped with operation platform, and the operation platform of the first truss bottom and the first truss top are located at the joist body above box beam
Between be connected with the first cat ladder, the operation platform of the second truss bottom and the first truss top are located at the truss above box beam
The second cat ladder is connected between body, is connected between the operation platform of the bottom boom top of the trellis and the operation platform of the first truss bottom
There is the 3rd cat ladder, being connected with the 4th between the operation platform of the bottom boom top of the trellis and the operation platform of the second truss bottom climbs
Ladder.
The method of work that pier box beam overhauls construction trolley is crossed based on a kind of open-close type described above, is comprised the following steps:
1) walking track, is laid inside and outside the edge of a wing plate face of box beam, using crane gear from inside and outside box beam two
Side loads the first truss and the second truss, and the top at the top of the first truss and the second truss is fixed temporarily, in the first purlin
The first balancing weight and the second balancing weight are respectively mounted at the top of the top of frame and the second truss, and the first balancing weight and second are matched somebody with somebody
Pouring weight fixation, wire rope hoist is installed in the top outer of the second top truss, is distinguished in the top and bottom of the second cat ladder
Pulley is installed;
2), lift by crane bottom boom frame using crane gear, hinging pin shaft, alignment pin and fixed pin shaft be installed, by bottom boom frame with
First truss and the connection of the second truss are integral, and man-hour manually hand-held steel wire rope bypasses the pulley of the top and bottom of the second cat ladder successively
After be fixed in steel wire rope fixing hole;
3) axial advancement of the maintenance chassis along box beam, is drawn by electric hoist, workmen is via the first cat ladder and the 3rd
Cat ladder carries out box girder construction via the operation platform after the second cat ladder and the 4th cat ladder into bottom boom frame;
4) one, being completed across after box girder construction, maintenance chassis being rested in by bridge pier, the first truss and the second purlin are fixed temporarily
Frame, opens alignment pin and fixed pin shaft, by opening rope clamp, man-hour manually hand-held first after hoist engine decentralization bottom boom frame to vertical state
Steel wire rope bypasses box beam bearing, the first steel wire rope and bottom boom frame is located at the same side, reach maintenance chassis by after bridge pier, temporarily
The first truss and the second truss are fixed, the steel wire rope of man-hour manually hand-held first bypasses box beam bearing and returns to the second truss side, by rope clamp
The first steel wire rope and the second steel wire rope are connected, steel wire rope is tightened up using hoist engine, lifting bottom boom frame plugs positioning to horizontality
Bearing pin and fixed pin shaft, make the first truss, the second truss and bottom boom frame form hands-off operation platform.
5) 3-4, are repeated the above steps until whole box girder constructions is completed.
Specifically, it is the separation type box girder being set up on monoblock type bridge pier that the bridge pier is monoblock type bridge pier, the box beam
When, walking track can be respectively laid in the box beam of monoblock type bridge pier both sides and frame is distinguished in the box beam of monoblock type bridge pier both sides
If maintenance chassis, the box beam to monoblock type bridge pier both sides carries out maintenance construction simultaneously.
The beneficial effects of the invention are as follows:1st, being hinged and fixation with the second truss by bottom boom frame and the first truss, real
Now big open-close type crosses pier construction, and construction applicability is good, can be used for the construction of various girder systems, particularly to single pier separation type box girder and double
The split type box girder construction of pier has preferable applicability.2nd, side truss, bottom boom frame operating platform are tubular object extruding making, weight
Gently, rigidity is big, adapts to the main girder construction compared with large span.3rd, construction trolley is provided with tackling system and automatically walk system, platform
Car crosses pier conveniently, simple to operate, effectively shortens the construction period.4th, it is equipped with railing on chassis hanger, side truss, operating platform
And closed platform, can guarantee that the safety of workmen.
Brief description of the drawings
Fig. 1 is chassis front view when midsole truss of the present invention is closed;
Fig. 2 is chassis front view when midsole truss of the present invention is opened;
Fig. 3 is the front view of midsole truss of the present invention;
Fig. 4 is construction of wire rope figure in the present invention;
Wherein, the 1-the first truss (the 1.1-the first top truss, the 1.2-the first vertical girder truss, the 1.3-the first side truss,
1.4-the first cat ladder, the 1.5-the three cat ladder), the 2-the second truss (the 2.1-the second top truss, the 2.2-the second vertical girder truss,
2.3-the second side truss, the 2.4-the second cat ladder, the 2.5-the four cat ladder), 3-box beam, 4-bottom boom frame, 5-hoist engine, 6-
First steel wire rope, the 7-the second steel wire rope, 8-rope clamp, 9-walking roller, 10-vertical supporting leg, 11-articulated slab, 12-fixed
Plate, 13-hinging pin shaft via, 14-fixed pin shaft via, 15-steel wire rope fixing hole, 16-hinging pin shaft, 17-steady pin
Axle, the 18-the first location-plate, the 19-the second location-plate, 20-alignment pin, the 21-the first bearing pin location hole, the 22-the second bearing pin
Location hole, 23-first pulley, 24-second pulley, the 25-the first balancing weight, the 26-the second balancing weight, 27-operation platform,
28-box beam bearing, 29-bridge pier, 30-guard rail, 31-protective cover, 32-walking track.
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Open-close type as shown in Fig. 1-4 crosses pier box beam maintenance construction trolley, including the chassis purlin for being erected on the both sides of box beam 3
Frame, chassis truss include being erected on first truss 1 in the outside of box beam 3 and be erected on the second truss 2 of the inner side of box beam 3 (with away from
The side of the axis of bridge pier 29 outside alleged by the present invention, with the side near the axis of bridge pier 29 as of the invention alleged interior
Side, similarly hereinafter), it is connected with bottom boom frame 4 between the bottom of the bottom of the first truss 1 and the second truss 2, the outer end of bottom boom frame 4 and the
The bottom of one truss 1 is articulated and connected, and the bottom of inner and second truss 2 of bottom boom frame 4 coordinates to be fixed, and the inner of bottom boom frame 4 leads to
Cross steel wire rope and be connected with hoist engine 5, steel wire rope includes the first steel wire rope 6 being fixedly connected with the inner of bottom boom frame 4 and is wound in
The end of the second steel wire rope 7 on the roller of hoist engine 5, the end of the first steel wire rope 6 and the second steel wire rope 7 is solid by rope clamp 8
Fixed connection, hoist engine 5 is fixed on the second truss 2;The vehicle with walking machine walked along the axis direction of box beam 3 is provided with the top of chassis truss
Structure.Top surface is equipped with walking track 32 along its axial direction respectively inside and outside box beam 3, and walking mechanism includes being arranged at first
The top of the top of truss 1 and the second truss 2 and the walking roller 9 being engaged with walking track 32.
First truss 1 includes the first hanger and positioned at the first hanger lower section and towards the inclined first side truss 1.3 of box beam 3,
First hanger includes horizontally disposed and the first top truss 1.1 above the outer top surface of box beam 3 and is vertically disposed to the first top
The first vertical girder truss 1.2 that the outside of truss 1.1 and the first top truss 1.1 are connected as one, the first vertical girder truss 1.2
It is axially arranged with the first cat ladder 1.4 along it, the outside girder truss of the first side truss 1.3 is fixedly connected with the first vertical girder truss 1.2,
The bottom of the first top truss 1.1 is fixedly connected with vertical supporting leg 10, and walking roller 9 is arranged at the bottom of vertical supporting leg 10;
Second truss 2 includes the second hanger and positioned at the second hanger lower section and towards the inclined second side truss 2.3 of box beam 3,
Second hanger includes horizontally disposed and the second top truss 2.1 positioned at the inner side top face of box beam 3 and is vertically disposed to the second top
The second vertical girder truss 2.2 that the inner side of truss 2.1 and the second top truss 2.1 are connected as one, the second side truss 2.2 is along it
It is axially arranged with the second cat ladder 2.4, the inner side girder truss of the second side truss 2.3 is fixedly connected with the second vertical girder truss 2.2, second
The bottom of top truss 2.1 is fixedly connected with vertical supporting leg 10, and walking roller 9 is arranged at the bottom of vertical supporting leg 10, and hoist engine 5 is consolidated
Due to the outside top of the second top truss 2.1;
The bottom of the first side truss 1.3 is articulated and connected with the outer end of bottom boom frame 4, the bottom of the second side truss 2.3 and bottom boom
The inner of frame 4 coordinates fixation.The outermost end girder truss top and inner terminal girder truss top of bottom boom frame 4 are respectively fixedly connected with hinged
Fishplate bar 11 and fixed plate 12, are provided with hinging pin shaft via 13 on articulated slab 11, the He of fixed pin shaft via 14 is provided with fixed plate 12
Steel wire rope fixing hole 15, is provided with corresponding with hinging pin shaft via 13 on the girder truss of the bottom outermost end of the first side truss 1.3
Axis hole, is connected between hinging pin shaft via 13 and axis hole by hinging pin shaft 16;The purlin of the bottom of the second side truss 2.3 most inner side
Be provided with setting a roof beam in place with the corresponding axis hole of fixed pin shaft via 14, connected by fixed pin shaft 17 between fixed pin shaft via 14 and axis hole
Connect.
The outside and inner side of the top truss beam of bottom boom frame 4 have been respectively fixedly connected with the first location-plate 18 and the second location-plate
19, the first bearing pin location hole 21 and the second bearing pin location hole 22 are had on the first location-plate 18 and the second location-plate 19, the
It is provided with the most inner side girder truss of the bottom of side truss 1.3 and the corresponding axis hole of the first bearing pin location hole 21, the first bearing pin positioning
Connected by alignment pin 20 between hole 21 and axis hole, be provided with and second on the bottom outermost girder truss of the second side truss 2.3
The corresponding axis hole of bearing pin location hole 22, is connected between the second bearing pin location hole 22 and axis hole by alignment pin 20.
The top and bottom of the second cat ladder 2.4 are respectively equipped with first pulley 23 and second pulley 24, and steel wire rope is bypassed successively
First pulley 23 and second pulley 24 are fixed with steel wire rope fixing hole 15.
The outside of the inner side of the first top truss 1.1 and the second top truss 2.1 is respectively arranged with the first balancing weight 25 and second
Balancing weight 26, the weight of the first balancing weight 25 is bigger than the weight of the second balancing weight 26.
The top at the middle part and bottom, the middle part of the second side truss 2.3 and bottom and bottom boom frame 4 of the first side truss 1.3
Operation platform 27 is equipped with, the bottom of the first cat ladder 1.4 is fixed on the operation platform 27 at the middle part of the first side truss 1.3, the
The bottom of two cat ladders 2.4 is fixed on the operation platform 27 at the middle part of the second side truss 2.3, the operation platform at the top of bottom boom frame 4
The 3rd cat ladder 1.5, the operation platform at the top of bottom boom frame 4 are connected between 27 and the operation platform 27 at the middle part of the first side truss 1.3
The 4th cat ladder 2.5 is connected between 27 and the operation platform 27 at the middle part of the second side truss 2.3.
The method of work that pier box beam overhauls construction trolley is crossed based on above-mentioned open-close type, is comprised the following steps:
1) the first truss 1 and the second truss 2, are made in factory process, the first truss 1 and the second truss 2 is transported to scene
The first vertical girder truss 1.2 is welded integral with the first side truss 1.3 afterwards, by the second vertical girder truss 2.2 and the second side purlin
Frame 2.3 welds integral;
2) walking track 32, is laid inside and outside the edge of a wing plate face of box beam 3, using crane gear from box beam 3
Outer both sides load the first truss 1 and the second truss 2, and the first truss 1 and the second truss 2 is interim fixed, in the first top truss
1.1 and second are respectively mounted the first balancing weight 25 and the second balancing weight 26 in top truss 2.1, and by the first balancing weight 25 and second
The fixation of balancing weight 26, installs wire rope hoist 5, at the top of the second cat ladder 2.4 in the top outer of the second top truss 2.1
First pulley 23 and second pulley 24 are respectively mounted with bottom;
3), using crane gear lifting bottom boom frame 4, hinging pin shaft 16, alignment pin 20 and fixed pin shaft 17 are installed, the bottom of by
Truss 4 is connected integral with the first side truss 1.3 and the second side truss 2.3, and man-hour manually hand-held steel wire rope bypasses first pulley successively
23rd, it is fixed in steel wire rope fixing hole 15 after second pulley 24;
4) axial advancement of the maintenance chassis along box beam 3, is drawn by electric hoist, workmen is via the He of the first cat ladder 1.4
3rd cat ladder 1.5 carries out box girder construction via the operation platform after the second cat ladder 2.4 and the 4th cat ladder 2.5 into bottom boom frame 4;
5) one, being completed across after box girder construction, maintenance chassis being rested in by bridge pier, the first truss 1 and second is fixed temporarily
Truss 2, opens alignment pin 20 and fixed pin shaft 17, and rope clamp 8, people are opened after transferring bottom boom frame 4 to vertical state by hoist engine 5
Hand-held first steel wire rope 6 of work bypasses box beam bearing 28, the first steel wire rope 6 and bottom boom frame 4 is located at the same side, reach maintenance chassis
After by bridge pier 29, the first truss 1 and the second truss 2 are fixed temporarily, the first steel wire rope of man-hour manually hand-held 6 bypasses box beam bearing 28 times
To the side of the second truss 2, the first steel wire rope 6 and the second steel wire rope 7 are connected by rope clamp 8, steel wire rope is tightened up using hoist engine 5, carried
Bottom boom frame 4 is risen to horizontality, alignment pin 20 and fixed pin shaft 17 is plugged, makes the first truss 1, the second truss 2 and bottom boom frame 4
Form hands-off operation platform.
6) 4-5, are repeated the above steps until whole box girder constructions is completed.
When bridge pier 29 is that monoblock type bridge pier, box beam 3 are the separation type box girder for being set up on monoblock type bridge pier, can be in entirety
Laying walking track 32 and the erection maintenance respectively in the box beam 3 of monoblock type bridge pier both sides respectively in the box beam 3 of formula bridge pier both sides
Chassis, the box beam 3 to monoblock type bridge pier both sides carries out maintenance construction simultaneously.
A kind of open-close type disclosed by the invention is crossed in pier box beam maintenance construction construction trolley and its method of work, the hanger
Upper end hangs over Liang Mianshang, lower end and side truss welding.Hanger is steel truss, and hanger is supported on walking rail by walking roller 9
On road 32;Hanger beam face platform is provided with counterweight, is used to balance out-of-balance force of the operation platform in different operating modes;It is close to
Bridge axle line side hanger is provided with a hoist engine 5 and leading block.The side truss profile is diamond structure, using tubular object extruding
Make, node is connected using steel plate, lower end is connected with the operating platform of bottom boom frame 4 by bearing pin, it is flat that side truss is provided with construction
Platform 27 and guard rail 30.
The operation platform 27 of the bottom boom frame 4 is made using tubular object extruding, and node is connected using steel plate;Bottom boom frame 4 is applied
Work platform 27 is connected with the side truss in outside by hinging pin shaft 16, and bottom boom frame 4 can be vertically free around hinging pin shaft 16
Rotate;Bottom boom frame 4 is connected with the side truss of inner side by fixed pin shaft 17.Bearing pin, 4, bottom boom frame and side truss are plugged during construction
Form overall;Bearing pin is extracted when crossing pier, bottom boom frame 4 is disconnected with the side truss of inner side, and bottom boom frame 4 is transferred around swivel pin by hoist engine
Axle turns to pier shaft outside, and construction trolley crosses pier.Artificial easy to operate, structure is readily produced manufacture, practical.
The above, is only presently preferred embodiments of the present invention, not does any formal to structure of the invention
Limitation.Every any simple modification, equivalent variations and modification made to above example according to technical spirit of the invention,
Still fall within the range of technical scheme.
Claims (8)
1. a kind of open-close type crosses pier box beam maintenance construction trolley, including is erected on the chassis truss of box beam (3) both sides, and its feature exists
In:The chassis truss includes being erected on the first truss (1) on the outside of box beam (3) and the second purlin being erected on the inside of box beam (3)
Frame (2), is connected with bottom boom frame (4), the bottom boom frame between the bottom of first truss (1) and the bottom of the second truss (2)
(4) outer end is articulated and connected with the bottom of the first truss (1), and the inner of the bottom boom frame (4) is matched somebody with somebody with the bottom of the second truss (2)
Close and fix, the inner of the bottom boom frame (4) is connected with hoist engine (5) by steel wire rope, and the steel wire rope includes and bottom boom frame (4)
The inner be fixedly connected, man-hour manually hand-held crosses first steel wire rope (6) of pier and is wound on the roller of hoist engine (5), lifts bottom boom
Second steel wire rope (7) of frame (4), the end of first steel wire rope (6) and the end of the second steel wire rope (7) pass through rope clamp (8)
It is fixedly connected, the hoist engine (5) is fixed on the second truss (2);It is provided with the top of the chassis truss along box beam (3) axis
The walking mechanism of direction walking.
2. a kind of open-close type as claimed in claim 1 crosses pier box beam maintenance construction trolley, it is characterised in that:The box beam (3)
Inside and outside top surface respectively along its axial direction be equipped with walking track (32), the walking mechanism include be arranged at the first purlin
The top of frame (1) and the top of the second truss (2) and the walking roller (9) being engaged with walking track (32).
3. a kind of open-close type as claimed in claim 1 crosses pier box beam maintenance construction trolley, it is characterised in that:The bottom boom frame
(4) outermost end girder truss top and inner terminal girder truss top has been respectively fixedly connected with articulated slab (11) and fixed plate (12),
Hinging pin shaft via (13) is provided with the articulated slab (11), fixed pin shaft via (14) and steel are provided with the fixed plate (12)
Cord fixing hole (15), it is right with hinging pin shaft via (13) to be provided with the girder truss of the bottom outermost end of first truss (1)
The axis hole answered, the hinging pin shaft via (13) is connected between axis hole by hinging pin shaft (16);Second truss (2)
Axis hole corresponding with fixed pin shaft via (14), the fixed pin shaft via (14) and axle are provided with the most girder truss of inner side of bottom
Connected by fixed pin shaft (17) between hole.
4. a kind of open-close type as claimed in claim 3 crosses pier box beam maintenance construction trolley, it is characterised in that:The bottom boom frame
(4) outside and inner side of top truss beam have been respectively fixedly connected with the first location-plate (18) and the second location-plate (19), described
The first bearing pin location hole (21) and the second bearing pin location hole are had on first location-plate (18) and the second location-plate (19)
(22) axis hole corresponding with the first bearing pin location hole (21), institute, are provided with the most inner side girder truss of the bottom of first truss (1)
State the first bearing pin location hole (21) to be connected by alignment pin (20) between axis hole, the bottom outermost of second truss (2)
Axis hole corresponding with the second bearing pin location hole (22) is provided with the girder truss of side, the second bearing pin location hole (22) is and axis hole between
Connected by alignment pin (20).
5. a kind of open-close type as claimed in claim 1 crosses pier box beam maintenance construction trolley, it is characterised in that:First truss
(1) top is located at the joist body that the top of side and the second truss (2) in box beam (3) upper truss body is located above box beam (3)
Outside is respectively arranged with the first balancing weight (25) and the second balancing weight (26), and the weight of first balancing weight (25) is matched somebody with somebody than second
The weight of pouring weight (26) is big.
6. a kind of open-close type as claimed in claim 1 crosses pier box beam maintenance construction trolley, it is characterised in that:First truss
(1) operation platform (27) is equipped with the top of bottom and bottom, the bottom of the second truss (2) and bottom and bottom boom frame (4),
Operation platform (27) and the first truss (1) top of the first truss (1) bottom are located between the joist body above box beam (3)
The first cat ladder (1.4) is connected with, operation platform (27) and the first truss (1) top of the second truss (2) bottom are located at case
The second cat ladder (2.4) is connected between joist body above beam (3), the operation platform (27) at the top of the bottom boom frame (4) and the
The 3rd cat ladder (1.5) is connected between the operation platform (27) of one truss (1) bottom, the construction at the top of the bottom boom frame (4) is put down
The 4th cat ladder (2.5) is connected between the operation platform (27) of platform (27) and the second truss (2) bottom.
7. the method for work that pier box beam overhauls construction trolley, its feature are crossed based on a kind of open-close type described in the claims 6
It is:Comprise the following steps:
1) walking track (32), is laid inside and outside the edge of a wing plate face of box beam (3), using crane gear from box beam (3)
Inside and outside load the first truss (1) and the second truss (2), it is and the first truss (1) and the second truss (2) is temporarily fixed,
The first balancing weight (25) and the second balancing weight (26) are respectively mounted at the top of the top of the first truss (1) and the second truss (2), and
By the first balancing weight (25) and the second balancing weight (26) fixation, fixation winding is installed in the top outer of the second truss (2)
Machine (5), pulley is respectively mounted at the top and bottom of the second cat ladder (2.4);
2) bottom boom frame (4), is lifted by crane using crane gear, hinging pin shaft (16), alignment pin (20) and fixed pin shaft (17) is installed,
Bottom boom frame (4) is connected integral with the first truss (1) and the second truss (2), man-hour manually hand-held steel wire rope bypasses second and climbs successively
It is fixed on after the pulley of the top and bottom of terraced (2.4) in steel wire rope fixing hole (15);
3) axial advancement of the maintenance chassis along box beam (3), is drawn by electric hoist, workmen via the first cat ladder (1.4) and
3rd cat ladder (1.5) is carried out into the operation platform of bottom boom frame (4) afterwards via the second cat ladder (2.4) and the 4th cat ladder (2.5)
Box girder construction;
4) one, being completed across after box girder construction, maintenance chassis being rested in by bridge pier, the first truss (1) and the second purlin are fixed temporarily
Frame (2), opens alignment pin (20) and fixed pin shaft (17), is opened after transferring bottom boom frame (4) to vertical state by hoist engine (5)
Rope clamp (8), the steel wire rope of man-hour manually hand-held first (6) bypasses box beam bearing (28), is located at the first steel wire rope (6) and bottom boom frame (4)
The same side, reach maintenance chassis by after bridge pier (29), fixing the first truss (1) and the second truss (2) temporarily, man-hour manually hand-held the
One steel wire rope (6) bypasses box beam bearing (28) and returns to the second truss (2) side, and the first steel wire rope (6) and the are connected by rope clamp (8)
Two steel wire ropes (7), steel wire rope is tightened up using hoist engine (5), and lifting bottom boom frame (4) plugs alignment pin (20) to horizontality
With fixed pin shaft (17), the first truss (1), the second truss (2) and bottom boom frame (4) is set to form hands-off operation platform.
5) 3-4, are repeated the above steps until whole box girder constructions is completed.
8. a kind of open-close type as claimed in claim 7 crosses the method for work that pier box beam overhauls construction trolley, it is characterised in that:Institute
State bridge pier (29) for monoblock type bridge pier, the box beam (3) be the separation type box girder being set up on monoblock type bridge pier when, can be in entirety
Walking track (32) is laid in the box beam (3) of formula bridge pier both sides respectively and frame is distinguished in the box beam (3) of monoblock type bridge pier both sides
If maintenance chassis, to the box beam (3) of monoblock type bridge pier both sides while carrying out maintenance construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710265931.8A CN106917353B (en) | 2017-04-21 | 2017-04-21 | A kind of open-close type crosses pier box beam maintenance construction trolley and its working method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710265931.8A CN106917353B (en) | 2017-04-21 | 2017-04-21 | A kind of open-close type crosses pier box beam maintenance construction trolley and its working method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106917353A true CN106917353A (en) | 2017-07-04 |
CN106917353B CN106917353B (en) | 2019-05-17 |
Family
ID=59567337
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710265931.8A Active CN106917353B (en) | 2017-04-21 | 2017-04-21 | A kind of open-close type crosses pier box beam maintenance construction trolley and its working method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106917353B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107604814A (en) * | 2017-09-05 | 2018-01-19 | 重庆红岩建设机械制造有限责任公司 | A kind of concrete railway bridge is special to check car and its implementation |
CN107859005A (en) * | 2017-11-07 | 2018-03-30 | 武大巨成结构股份有限公司 | A kind of aqueduct overhauls unwheeling |
CN108560510A (en) * | 2018-07-13 | 2018-09-21 | 江苏龙安电力设备有限公司 | Surface low road movable overhaul platform in a kind of power station |
CN108824194A (en) * | 2018-06-12 | 2018-11-16 | 中铁十二局集团有限公司 | Bent cap post-stretching blocks construction trolley |
CN109881590A (en) * | 2019-04-18 | 2019-06-14 | 中冶建工集团有限公司 | Bridge steel box girder high altitude operation operating platform and building method |
CN110528398A (en) * | 2019-09-30 | 2019-12-03 | 中信国安建工集团有限公司 | Across empty van beam construction method |
CN111549673A (en) * | 2020-05-15 | 2020-08-18 | 贵州路桥集团有限公司 | Appearance modification equipment for concrete cast-in-place box girder |
CN113136804A (en) * | 2021-04-23 | 2021-07-20 | 安徽华骅桥梁设备制造有限公司 | Appearance modification platform for bottom of segmental box girder |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201753436U (en) * | 2010-07-12 | 2011-03-02 | 武桥重工集团股份有限公司 | Detachable lift type bridge inspection vehicle |
KR20130050676A (en) * | 2011-11-08 | 2013-05-16 | 현대중공업 주식회사 | Platform structure |
CN103306199A (en) * | 2013-06-21 | 2013-09-18 | 重庆运安机电制造有限责任公司 | Mounting method of bottom width overhaul hanging basket of bridge |
CN205369028U (en) * | 2015-12-24 | 2016-07-06 | 中交一公局第二工程有限公司 | Intelligence self -propelled bridge overhauls device |
CN106368122A (en) * | 2016-10-18 | 2017-02-01 | 湖北华舟重工应急装备股份有限公司 | Self-propelled dual-beam bridge maintenance platform |
CN206721675U (en) * | 2017-04-21 | 2017-12-08 | 中交第二航务工程局有限公司 | A kind of open-close type crosses pier box beam maintenance construction trolley |
-
2017
- 2017-04-21 CN CN201710265931.8A patent/CN106917353B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201753436U (en) * | 2010-07-12 | 2011-03-02 | 武桥重工集团股份有限公司 | Detachable lift type bridge inspection vehicle |
KR20130050676A (en) * | 2011-11-08 | 2013-05-16 | 현대중공업 주식회사 | Platform structure |
CN103306199A (en) * | 2013-06-21 | 2013-09-18 | 重庆运安机电制造有限责任公司 | Mounting method of bottom width overhaul hanging basket of bridge |
CN205369028U (en) * | 2015-12-24 | 2016-07-06 | 中交一公局第二工程有限公司 | Intelligence self -propelled bridge overhauls device |
CN106368122A (en) * | 2016-10-18 | 2017-02-01 | 湖北华舟重工应急装备股份有限公司 | Self-propelled dual-beam bridge maintenance platform |
CN206721675U (en) * | 2017-04-21 | 2017-12-08 | 中交第二航务工程局有限公司 | A kind of open-close type crosses pier box beam maintenance construction trolley |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107604814A (en) * | 2017-09-05 | 2018-01-19 | 重庆红岩建设机械制造有限责任公司 | A kind of concrete railway bridge is special to check car and its implementation |
CN107859005A (en) * | 2017-11-07 | 2018-03-30 | 武大巨成结构股份有限公司 | A kind of aqueduct overhauls unwheeling |
CN108824194A (en) * | 2018-06-12 | 2018-11-16 | 中铁十二局集团有限公司 | Bent cap post-stretching blocks construction trolley |
CN108560510A (en) * | 2018-07-13 | 2018-09-21 | 江苏龙安电力设备有限公司 | Surface low road movable overhaul platform in a kind of power station |
CN108560510B (en) * | 2018-07-13 | 2024-05-31 | 江苏龙安电力设备有限公司 | Movable overhaul platform for surface runner of hydropower station |
CN109881590A (en) * | 2019-04-18 | 2019-06-14 | 中冶建工集团有限公司 | Bridge steel box girder high altitude operation operating platform and building method |
CN110528398A (en) * | 2019-09-30 | 2019-12-03 | 中信国安建工集团有限公司 | Across empty van beam construction method |
CN111549673A (en) * | 2020-05-15 | 2020-08-18 | 贵州路桥集团有限公司 | Appearance modification equipment for concrete cast-in-place box girder |
CN113136804A (en) * | 2021-04-23 | 2021-07-20 | 安徽华骅桥梁设备制造有限公司 | Appearance modification platform for bottom of segmental box girder |
Also Published As
Publication number | Publication date |
---|---|
CN106917353B (en) | 2019-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106917353A (en) | A kind of open-close type crosses pier box beam maintenance construction trolley and its method of work | |
JP6749573B1 (en) | Construction method based on mobile work platform for steel box girder overpass construction | |
CN106744351A (en) | The method that cable-stayed bridge main-beam lifting is carried out using cable crane | |
CN111139743A (en) | Method for improving speed of highway beam frame and installation method of gantry crane | |
CN104652813A (en) | Tower crane construction technology used for super high-rise building steel structure | |
CN107022958B (en) | Use the method across girder in cable crane installation cable-stayed bridge | |
CN206721675U (en) | A kind of open-close type crosses pier box beam maintenance construction trolley | |
AU2009222526A1 (en) | Lifting apparatus for a building under construction | |
CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
CN111039130A (en) | Bearing beam self-elevating hoistway construction elevator | |
CN106193621A (en) | Fabricated construction superimposed sheet string hangs construction method | |
CN211769642U (en) | Bearing beam self-elevating hoistway construction elevator | |
JP3349463B2 (en) | How to install additional girder | |
KR101077092B1 (en) | Girder installation method using trolly without closing nor detouring existing road | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
JP2023000184A (en) | Mobile protective device and method for dismantling construction scaffold | |
CN113235460A (en) | Prefabricated segment swinging method for bridge cantilever assembly | |
KR20220000699A (en) | variable cable crane system for constructing bridge and building method of the same | |
CN111453630A (en) | Bridge deck crane and using method thereof | |
CN217104777U (en) | Interim landing stage demolishs device | |
RU2806378C2 (en) | Prefabricated support for power lines and method of its construction | |
CN117513764B (en) | Sliding method with installation position lower than sliding rail | |
CN215366847U (en) | Construction platform under portable foldable roof beam | |
CN211769676U (en) | Foldable bearing beam type self-lifting shaft construction elevator | |
CN219637681U (en) | Hanging platform type beam bottom overhauling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |