CN106917353A CN201710265931.8A CN201710265931A CN106917353A CN 106917353 A CN106917353 A CN 106917353A CN 201710265931 A CN201710265931 A CN 201710265931A CN 106917353 A CN106917353 A CN 106917353A
Authority
CN
China
Prior art keywords
truss
box beam
steel wire
wire rope
boom frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710265931.8A
Other languages
Chinese (zh)
Other versions
CN106917353B (en
Inventor
曾宪柳
潘文铭
孙晓伟
余登文
徐洲
许哲
黄节华
付猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201710265931.8A priority Critical patent/CN106917353B/en
Publication of CN106917353A publication Critical patent/CN106917353A/en
Application granted granted Critical
Publication of CN106917353B publication Critical patent/CN106917353B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Pier box beam maintenance construction trolley is crossed the invention discloses a kind of open-close type, chassis truss including being erected on box beam both sides, chassis truss includes the first truss being erected on the outside of box beam and the second truss being erected on the inside of box beam, bottom boom frame is connected between the bottom of the bottom of the first truss and the second truss, the outer end of bottom boom frame is articulated and connected with the bottom of the first truss, the bottom of inner and second truss of bottom boom frame coordinates to be fixed, the inner of bottom boom frame is connected with hoist engine by steel wire rope, steel wire rope includes the first steel wire rope being fixedly connected with the inner of bottom boom frame and the second steel wire rope being wound on the roller of hoist engine, the end of the first steel wire rope is fixedly connected with the end of the second steel wire rope by rope clamp, hoist engine is fixed on the second truss;The walking mechanism walked along box beam axis direction is provided with the top of chassis truss.By being hinged and fixation with the second truss for bottom boom frame and the first truss, realize that big open-close type crosses pier construction, various girder systems constructions can be used for.

Description

A kind of open-close type crosses pier box beam maintenance construction trolley and its method of work
Technical field
The present invention relates to equipment for bridge construction technical field, pier box beam maintenance construction trolley is crossed in particular to a kind of open-close type And its method of work.
Background technology
With continuing to develop for bridge construction, bridge main beam structure type is various, and Common has steel box-girder, steel reinforced concrete to combine Beam, beams of concrete, construction has erection crane to install, Bridge Erector is installed, support cast-in-place, mostly using overall pier during design Body, double width separate type bridge deck structure.Separation type box girder section assembling gluing, the construction of wet seam, the modification of beam bottom etc. are required for using Operation platform is carried out, and has truss monoblock type and girder truss to be disconnected along two ends at middle part currently used for separation type box girder construction trolley Free end is hinged two kinds.Truss monoblock type maintenance chassis is often constructed and completes next across, it is necessary to rise once across removing, being then mounted to Heavy equipment coordinates, and procedures are more, construction trouble;Disconnected in the middle part of girder truss along free end radial type construction trolley, Zhi Nengshi The separation type box girder construction of split type pier shaft is answered, is restricted for monoblock type pier shaft.Box girder construction is substantially work high above the ground, Difficulty of construction and potential safety hazard are big.Should be easy to operate, economic and practical in construction, can guarantee that safe construction trolley is case again The key of beam construction.
The content of the invention
A kind of deficiency present invention aim to solve above-mentioned background technology, there is provided monoblock type pier shaft that can be suitably used for Box beam maintenance construction, can guarantee that the safe, practical property of operating personnel open-close type high crosses pier box beam maintenance construction trolley and its work again Make method.
In order to achieve this, the open-close type designed by the present invention crosses pier box beam maintenance construction trolley, including it is erected on box beam The chassis truss of both sides, the chassis truss includes the first truss being erected on the outside of box beam and be erected on the inside of box beam second Truss, is connected with bottom boom frame between the bottom of first truss and the bottom of the second truss, the outer end of the bottom boom frame and the The bottom of one truss is articulated and connected, and the bottom of inner and second truss of the bottom boom frame coordinates to be fixed, the bottom boom frame it is interior End is connected with hoist engine by steel wire rope, and the steel wire rope with the inner of bottom boom frame including being fixedly connected, man-hour manually hand-held crosses pier First steel wire rope and the second steel wire rope for being wound on the roller of hoist engine, being lifted bottom boom frame, the end of first steel wire rope End with the second steel wire rope is fixedly connected by rope clamp, and the hoist engine is fixed on the second truss;The chassis truss Top is provided with the walking mechanism walked along box beam axis direction.
Specifically, top surface is equipped with walking track, the walking along its axial direction respectively inside and outside the box beam Mechanism includes the walking roller for being arranged at the top of the first truss and the top of the second truss and being engaged with walking track.
Specifically, being respectively fixedly connected with the top of the outermost end girder truss top of the bottom boom frame and inner terminal girder truss hinged Fishplate bar and fixed plate, are provided with hinging pin shaft via on the articulated slab, fixed pin shaft via and steel wire are provided with the fixed plate Rope fixing hole, is provided with axis hole corresponding with hinging pin shaft via on the girder truss of the bottom outermost end of first truss, described Connected by hinging pin shaft between hinging pin shaft via and axis hole;It is provided with the most girder truss of inner side of the bottom of second truss Axis hole corresponding with fixed pin shaft via, is connected between the fixed pin shaft via and axis hole by fixed pin shaft.
Preferably, the outside and inner side of the top truss beam of the bottom boom frame have been respectively fixedly connected with the first location-plate and Two location-plates, have the first bearing pin location hole and the second bearing pin location hole on first location-plate and the second location-plate, Axis hole corresponding with the first bearing pin location hole is provided with the most inner side girder truss of the bottom of first truss, first bearing pin is determined Connected by alignment pin between position hole and axis hole, be provided with and the second bearing pin on the bottom outermost girder truss of second truss The corresponding axis hole of location hole, is connected between the second bearing pin location hole and axis hole by alignment pin.
Further, the top of first truss is located at positioned at the top of side and the second truss in box beam upper truss body Joist body outside above box beam is respectively arranged with the first balancing weight and the second balancing weight, and the weight of first balancing weight compares the The weight of two balancing weights is big.
Further, the top of the bottom of first truss and bottom, the bottom of the second truss and bottom and bottom boom frame Portion is equipped with operation platform, and the operation platform of the first truss bottom and the first truss top are located at the joist body above box beam Between be connected with the first cat ladder, the operation platform of the second truss bottom and the first truss top are located at the truss above box beam The second cat ladder is connected between body, is connected between the operation platform of the bottom boom top of the trellis and the operation platform of the first truss bottom There is the 3rd cat ladder, being connected with the 4th between the operation platform of the bottom boom top of the trellis and the operation platform of the second truss bottom climbs Ladder.
The method of work that pier box beam overhauls construction trolley is crossed based on a kind of open-close type described above, is comprised the following steps:
1) walking track, is laid inside and outside the edge of a wing plate face of box beam, using crane gear from inside and outside box beam two Side loads the first truss and the second truss, and the top at the top of the first truss and the second truss is fixed temporarily, in the first purlin The first balancing weight and the second balancing weight are respectively mounted at the top of the top of frame and the second truss, and the first balancing weight and second are matched somebody with somebody Pouring weight fixation, wire rope hoist is installed in the top outer of the second top truss, is distinguished in the top and bottom of the second cat ladder Pulley is installed;
2), lift by crane bottom boom frame using crane gear, hinging pin shaft, alignment pin and fixed pin shaft be installed, by bottom boom frame with First truss and the connection of the second truss are integral, and man-hour manually hand-held steel wire rope bypasses the pulley of the top and bottom of the second cat ladder successively After be fixed in steel wire rope fixing hole;
3) axial advancement of the maintenance chassis along box beam, is drawn by electric hoist, workmen is via the first cat ladder and the 3rd Cat ladder carries out box girder construction via the operation platform after the second cat ladder and the 4th cat ladder into bottom boom frame;
4) one, being completed across after box girder construction, maintenance chassis being rested in by bridge pier, the first truss and the second purlin are fixed temporarily Frame, opens alignment pin and fixed pin shaft, by opening rope clamp, man-hour manually hand-held first after hoist engine decentralization bottom boom frame to vertical state Steel wire rope bypasses box beam bearing, the first steel wire rope and bottom boom frame is located at the same side, reach maintenance chassis by after bridge pier, temporarily The first truss and the second truss are fixed, the steel wire rope of man-hour manually hand-held first bypasses box beam bearing and returns to the second truss side, by rope clamp The first steel wire rope and the second steel wire rope are connected, steel wire rope is tightened up using hoist engine, lifting bottom boom frame plugs positioning to horizontality Bearing pin and fixed pin shaft, make the first truss, the second truss and bottom boom frame form hands-off operation platform.
5) 3-4, are repeated the above steps until whole box girder constructions is completed.
Specifically, it is the separation type box girder being set up on monoblock type bridge pier that the bridge pier is monoblock type bridge pier, the box beam When, walking track can be respectively laid in the box beam of monoblock type bridge pier both sides and frame is distinguished in the box beam of monoblock type bridge pier both sides If maintenance chassis, the box beam to monoblock type bridge pier both sides carries out maintenance construction simultaneously.
The beneficial effects of the invention are as follows:1st, being hinged and fixation with the second truss by bottom boom frame and the first truss, real Now big open-close type crosses pier construction, and construction applicability is good, can be used for the construction of various girder systems, particularly to single pier separation type box girder and double The split type box girder construction of pier has preferable applicability.2nd, side truss, bottom boom frame operating platform are tubular object extruding making, weight Gently, rigidity is big, adapts to the main girder construction compared with large span.3rd, construction trolley is provided with tackling system and automatically walk system, platform Car crosses pier conveniently, simple to operate, effectively shortens the construction period.4th, it is equipped with railing on chassis hanger, side truss, operating platform And closed platform, can guarantee that the safety of workmen.
Brief description of the drawings
Fig. 1 is chassis front view when midsole truss of the present invention is closed;
Fig. 2 is chassis front view when midsole truss of the present invention is opened;
Fig. 3 is the front view of midsole truss of the present invention;
Fig. 4 is construction of wire rope figure in the present invention;
Wherein, the 1-the first truss (the 1.1-the first top truss, the 1.2-the first vertical girder truss, the 1.3-the first side truss, 1.4-the first cat ladder, the 1.5-the three cat ladder), the 2-the second truss (the 2.1-the second top truss, the 2.2-the second vertical girder truss, 2.3-the second side truss, the 2.4-the second cat ladder, the 2.5-the four cat ladder), 3-box beam, 4-bottom boom frame, 5-hoist engine, 6- First steel wire rope, the 7-the second steel wire rope, 8-rope clamp, 9-walking roller, 10-vertical supporting leg, 11-articulated slab, 12-fixed Plate, 13-hinging pin shaft via, 14-fixed pin shaft via, 15-steel wire rope fixing hole, 16-hinging pin shaft, 17-steady pin Axle, the 18-the first location-plate, the 19-the second location-plate, 20-alignment pin, the 21-the first bearing pin location hole, the 22-the second bearing pin Location hole, 23-first pulley, 24-second pulley, the 25-the first balancing weight, the 26-the second balancing weight, 27-operation platform, 28-box beam bearing, 29-bridge pier, 30-guard rail, 31-protective cover, 32-walking track.
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Open-close type as shown in Fig. 1-4 crosses pier box beam maintenance construction trolley, including the chassis purlin for being erected on the both sides of box beam 3 Frame, chassis truss include being erected on first truss 1 in the outside of box beam 3 and be erected on the second truss 2 of the inner side of box beam 3 (with away from The side of the axis of bridge pier 29 outside alleged by the present invention, with the side near the axis of bridge pier 29 as of the invention alleged interior Side, similarly hereinafter), it is connected with bottom boom frame 4 between the bottom of the bottom of the first truss 1 and the second truss 2, the outer end of bottom boom frame 4 and the The bottom of one truss 1 is articulated and connected, and the bottom of inner and second truss 2 of bottom boom frame 4 coordinates to be fixed, and the inner of bottom boom frame 4 leads to Cross steel wire rope and be connected with hoist engine 5, steel wire rope includes the first steel wire rope 6 being fixedly connected with the inner of bottom boom frame 4 and is wound in The end of the second steel wire rope 7 on the roller of hoist engine 5, the end of the first steel wire rope 6 and the second steel wire rope 7 is solid by rope clamp 8 Fixed connection, hoist engine 5 is fixed on the second truss 2;The vehicle with walking machine walked along the axis direction of box beam 3 is provided with the top of chassis truss Structure.Top surface is equipped with walking track 32 along its axial direction respectively inside and outside box beam 3, and walking mechanism includes being arranged at first The top of the top of truss 1 and the second truss 2 and the walking roller 9 being engaged with walking track 32.
First truss 1 includes the first hanger and positioned at the first hanger lower section and towards the inclined first side truss 1.3 of box beam 3, First hanger includes horizontally disposed and the first top truss 1.1 above the outer top surface of box beam 3 and is vertically disposed to the first top The first vertical girder truss 1.2 that the outside of truss 1.1 and the first top truss 1.1 are connected as one, the first vertical girder truss 1.2 It is axially arranged with the first cat ladder 1.4 along it, the outside girder truss of the first side truss 1.3 is fixedly connected with the first vertical girder truss 1.2, The bottom of the first top truss 1.1 is fixedly connected with vertical supporting leg 10, and walking roller 9 is arranged at the bottom of vertical supporting leg 10;
Second truss 2 includes the second hanger and positioned at the second hanger lower section and towards the inclined second side truss 2.3 of box beam 3, Second hanger includes horizontally disposed and the second top truss 2.1 positioned at the inner side top face of box beam 3 and is vertically disposed to the second top The second vertical girder truss 2.2 that the inner side of truss 2.1 and the second top truss 2.1 are connected as one, the second side truss 2.2 is along it It is axially arranged with the second cat ladder 2.4, the inner side girder truss of the second side truss 2.3 is fixedly connected with the second vertical girder truss 2.2, second The bottom of top truss 2.1 is fixedly connected with vertical supporting leg 10, and walking roller 9 is arranged at the bottom of vertical supporting leg 10, and hoist engine 5 is consolidated Due to the outside top of the second top truss 2.1;
The bottom of the first side truss 1.3 is articulated and connected with the outer end of bottom boom frame 4, the bottom of the second side truss 2.3 and bottom boom The inner of frame 4 coordinates fixation.The outermost end girder truss top and inner terminal girder truss top of bottom boom frame 4 are respectively fixedly connected with hinged Fishplate bar 11 and fixed plate 12, are provided with hinging pin shaft via 13 on articulated slab 11, the He of fixed pin shaft via 14 is provided with fixed plate 12 Steel wire rope fixing hole 15, is provided with corresponding with hinging pin shaft via 13 on the girder truss of the bottom outermost end of the first side truss 1.3 Axis hole, is connected between hinging pin shaft via 13 and axis hole by hinging pin shaft 16;The purlin of the bottom of the second side truss 2.3 most inner side Be provided with setting a roof beam in place with the corresponding axis hole of fixed pin shaft via 14, connected by fixed pin shaft 17 between fixed pin shaft via 14 and axis hole Connect.
The outside and inner side of the top truss beam of bottom boom frame 4 have been respectively fixedly connected with the first location-plate 18 and the second location-plate 19, the first bearing pin location hole 21 and the second bearing pin location hole 22 are had on the first location-plate 18 and the second location-plate 19, the It is provided with the most inner side girder truss of the bottom of side truss 1.3 and the corresponding axis hole of the first bearing pin location hole 21, the first bearing pin positioning Connected by alignment pin 20 between hole 21 and axis hole, be provided with and second on the bottom outermost girder truss of the second side truss 2.3 The corresponding axis hole of bearing pin location hole 22, is connected between the second bearing pin location hole 22 and axis hole by alignment pin 20.
The top and bottom of the second cat ladder 2.4 are respectively equipped with first pulley 23 and second pulley 24, and steel wire rope is bypassed successively First pulley 23 and second pulley 24 are fixed with steel wire rope fixing hole 15.
The outside of the inner side of the first top truss 1.1 and the second top truss 2.1 is respectively arranged with the first balancing weight 25 and second Balancing weight 26, the weight of the first balancing weight 25 is bigger than the weight of the second balancing weight 26.
The top at the middle part and bottom, the middle part of the second side truss 2.3 and bottom and bottom boom frame 4 of the first side truss 1.3 Operation platform 27 is equipped with, the bottom of the first cat ladder 1.4 is fixed on the operation platform 27 at the middle part of the first side truss 1.3, the The bottom of two cat ladders 2.4 is fixed on the operation platform 27 at the middle part of the second side truss 2.3, the operation platform at the top of bottom boom frame 4 The 3rd cat ladder 1.5, the operation platform at the top of bottom boom frame 4 are connected between 27 and the operation platform 27 at the middle part of the first side truss 1.3 The 4th cat ladder 2.5 is connected between 27 and the operation platform 27 at the middle part of the second side truss 2.3.
The method of work that pier box beam overhauls construction trolley is crossed based on above-mentioned open-close type, is comprised the following steps:
1) the first truss 1 and the second truss 2, are made in factory process, the first truss 1 and the second truss 2 is transported to scene The first vertical girder truss 1.2 is welded integral with the first side truss 1.3 afterwards, by the second vertical girder truss 2.2 and the second side purlin Frame 2.3 welds integral;
2) walking track 32, is laid inside and outside the edge of a wing plate face of box beam 3, using crane gear from box beam 3 Outer both sides load the first truss 1 and the second truss 2, and the first truss 1 and the second truss 2 is interim fixed, in the first top truss 1.1 and second are respectively mounted the first balancing weight 25 and the second balancing weight 26 in top truss 2.1, and by the first balancing weight 25 and second The fixation of balancing weight 26, installs wire rope hoist 5, at the top of the second cat ladder 2.4 in the top outer of the second top truss 2.1 First pulley 23 and second pulley 24 are respectively mounted with bottom;
3), using crane gear lifting bottom boom frame 4, hinging pin shaft 16, alignment pin 20 and fixed pin shaft 17 are installed, the bottom of by Truss 4 is connected integral with the first side truss 1.3 and the second side truss 2.3, and man-hour manually hand-held steel wire rope bypasses first pulley successively 23rd, it is fixed in steel wire rope fixing hole 15 after second pulley 24;
4) axial advancement of the maintenance chassis along box beam 3, is drawn by electric hoist, workmen is via the He of the first cat ladder 1.4 3rd cat ladder 1.5 carries out box girder construction via the operation platform after the second cat ladder 2.4 and the 4th cat ladder 2.5 into bottom boom frame 4;
5) one, being completed across after box girder construction, maintenance chassis being rested in by bridge pier, the first truss 1 and second is fixed temporarily Truss 2, opens alignment pin 20 and fixed pin shaft 17, and rope clamp 8, people are opened after transferring bottom boom frame 4 to vertical state by hoist engine 5 Hand-held first steel wire rope 6 of work bypasses box beam bearing 28, the first steel wire rope 6 and bottom boom frame 4 is located at the same side, reach maintenance chassis After by bridge pier 29, the first truss 1 and the second truss 2 are fixed temporarily, the first steel wire rope of man-hour manually hand-held 6 bypasses box beam bearing 28 times To the side of the second truss 2, the first steel wire rope 6 and the second steel wire rope 7 are connected by rope clamp 8, steel wire rope is tightened up using hoist engine 5, carried Bottom boom frame 4 is risen to horizontality, alignment pin 20 and fixed pin shaft 17 is plugged, makes the first truss 1, the second truss 2 and bottom boom frame 4 Form hands-off operation platform.
6) 4-5, are repeated the above steps until whole box girder constructions is completed.
When bridge pier 29 is that monoblock type bridge pier, box beam 3 are the separation type box girder for being set up on monoblock type bridge pier, can be in entirety Laying walking track 32 and the erection maintenance respectively in the box beam 3 of monoblock type bridge pier both sides respectively in the box beam 3 of formula bridge pier both sides Chassis, the box beam 3 to monoblock type bridge pier both sides carries out maintenance construction simultaneously.
A kind of open-close type disclosed by the invention is crossed in pier box beam maintenance construction construction trolley and its method of work, the hanger Upper end hangs over Liang Mianshang, lower end and side truss welding.Hanger is steel truss, and hanger is supported on walking rail by walking roller 9 On road 32;Hanger beam face platform is provided with counterweight, is used to balance out-of-balance force of the operation platform in different operating modes;It is close to Bridge axle line side hanger is provided with a hoist engine 5 and leading block.The side truss profile is diamond structure, using tubular object extruding Make, node is connected using steel plate, lower end is connected with the operating platform of bottom boom frame 4 by bearing pin, it is flat that side truss is provided with construction Platform 27 and guard rail 30.
The operation platform 27 of the bottom boom frame 4 is made using tubular object extruding, and node is connected using steel plate;Bottom boom frame 4 is applied Work platform 27 is connected with the side truss in outside by hinging pin shaft 16, and bottom boom frame 4 can be vertically free around hinging pin shaft 16 Rotate;Bottom boom frame 4 is connected with the side truss of inner side by fixed pin shaft 17.Bearing pin, 4, bottom boom frame and side truss are plugged during construction Form overall;Bearing pin is extracted when crossing pier, bottom boom frame 4 is disconnected with the side truss of inner side, and bottom boom frame 4 is transferred around swivel pin by hoist engine Axle turns to pier shaft outside, and construction trolley crosses pier.Artificial easy to operate, structure is readily produced manufacture, practical.
The above, is only presently preferred embodiments of the present invention, not does any formal to structure of the invention Limitation.Every any simple modification, equivalent variations and modification made to above example according to technical spirit of the invention, Still fall within the range of technical scheme.

Claims (8)

1. a kind of open-close type crosses pier box beam maintenance construction trolley, including is erected on the chassis truss of box beam (3) both sides, and its feature exists In:The chassis truss includes being erected on the first truss (1) on the outside of box beam (3) and the second purlin being erected on the inside of box beam (3) Frame (2), is connected with bottom boom frame (4), the bottom boom frame between the bottom of first truss (1) and the bottom of the second truss (2) (4) outer end is articulated and connected with the bottom of the first truss (1), and the inner of the bottom boom frame (4) is matched somebody with somebody with the bottom of the second truss (2) Close and fix, the inner of the bottom boom frame (4) is connected with hoist engine (5) by steel wire rope, and the steel wire rope includes and bottom boom frame (4) The inner be fixedly connected, man-hour manually hand-held crosses first steel wire rope (6) of pier and is wound on the roller of hoist engine (5), lifts bottom boom Second steel wire rope (7) of frame (4), the end of first steel wire rope (6) and the end of the second steel wire rope (7) pass through rope clamp (8) It is fixedly connected, the hoist engine (5) is fixed on the second truss (2);It is provided with the top of the chassis truss along box beam (3) axis The walking mechanism of direction walking.
2. a kind of open-close type as claimed in claim 1 crosses pier box beam maintenance construction trolley, it is characterised in that:The box beam (3) Inside and outside top surface respectively along its axial direction be equipped with walking track (32), the walking mechanism include be arranged at the first purlin The top of frame (1) and the top of the second truss (2) and the walking roller (9) being engaged with walking track (32).
3. a kind of open-close type as claimed in claim 1 crosses pier box beam maintenance construction trolley, it is characterised in that:The bottom boom frame (4) outermost end girder truss top and inner terminal girder truss top has been respectively fixedly connected with articulated slab (11) and fixed plate (12), Hinging pin shaft via (13) is provided with the articulated slab (11), fixed pin shaft via (14) and steel are provided with the fixed plate (12) Cord fixing hole (15), it is right with hinging pin shaft via (13) to be provided with the girder truss of the bottom outermost end of first truss (1) The axis hole answered, the hinging pin shaft via (13) is connected between axis hole by hinging pin shaft (16);Second truss (2) Axis hole corresponding with fixed pin shaft via (14), the fixed pin shaft via (14) and axle are provided with the most girder truss of inner side of bottom Connected by fixed pin shaft (17) between hole.
4. a kind of open-close type as claimed in claim 3 crosses pier box beam maintenance construction trolley, it is characterised in that:The bottom boom frame (4) outside and inner side of top truss beam have been respectively fixedly connected with the first location-plate (18) and the second location-plate (19), described The first bearing pin location hole (21) and the second bearing pin location hole are had on first location-plate (18) and the second location-plate (19) (22) axis hole corresponding with the first bearing pin location hole (21), institute, are provided with the most inner side girder truss of the bottom of first truss (1) State the first bearing pin location hole (21) to be connected by alignment pin (20) between axis hole, the bottom outermost of second truss (2) Axis hole corresponding with the second bearing pin location hole (22) is provided with the girder truss of side, the second bearing pin location hole (22) is and axis hole between Connected by alignment pin (20).
5. a kind of open-close type as claimed in claim 1 crosses pier box beam maintenance construction trolley, it is characterised in that:First truss (1) top is located at the joist body that the top of side and the second truss (2) in box beam (3) upper truss body is located above box beam (3) Outside is respectively arranged with the first balancing weight (25) and the second balancing weight (26), and the weight of first balancing weight (25) is matched somebody with somebody than second The weight of pouring weight (26) is big.
6. a kind of open-close type as claimed in claim 1 crosses pier box beam maintenance construction trolley, it is characterised in that:First truss (1) operation platform (27) is equipped with the top of bottom and bottom, the bottom of the second truss (2) and bottom and bottom boom frame (4), Operation platform (27) and the first truss (1) top of the first truss (1) bottom are located between the joist body above box beam (3) The first cat ladder (1.4) is connected with, operation platform (27) and the first truss (1) top of the second truss (2) bottom are located at case The second cat ladder (2.4) is connected between joist body above beam (3), the operation platform (27) at the top of the bottom boom frame (4) and the The 3rd cat ladder (1.5) is connected between the operation platform (27) of one truss (1) bottom, the construction at the top of the bottom boom frame (4) is put down The 4th cat ladder (2.5) is connected between the operation platform (27) of platform (27) and the second truss (2) bottom.
7. the method for work that pier box beam overhauls construction trolley, its feature are crossed based on a kind of open-close type described in the claims 6 It is:Comprise the following steps:
1) walking track (32), is laid inside and outside the edge of a wing plate face of box beam (3), using crane gear from box beam (3) Inside and outside load the first truss (1) and the second truss (2), it is and the first truss (1) and the second truss (2) is temporarily fixed, The first balancing weight (25) and the second balancing weight (26) are respectively mounted at the top of the top of the first truss (1) and the second truss (2), and By the first balancing weight (25) and the second balancing weight (26) fixation, fixation winding is installed in the top outer of the second truss (2) Machine (5), pulley is respectively mounted at the top and bottom of the second cat ladder (2.4);
2) bottom boom frame (4), is lifted by crane using crane gear, hinging pin shaft (16), alignment pin (20) and fixed pin shaft (17) is installed, Bottom boom frame (4) is connected integral with the first truss (1) and the second truss (2), man-hour manually hand-held steel wire rope bypasses second and climbs successively It is fixed on after the pulley of the top and bottom of terraced (2.4) in steel wire rope fixing hole (15);
3) axial advancement of the maintenance chassis along box beam (3), is drawn by electric hoist, workmen via the first cat ladder (1.4) and 3rd cat ladder (1.5) is carried out into the operation platform of bottom boom frame (4) afterwards via the second cat ladder (2.4) and the 4th cat ladder (2.5) Box girder construction;
4) one, being completed across after box girder construction, maintenance chassis being rested in by bridge pier, the first truss (1) and the second purlin are fixed temporarily Frame (2), opens alignment pin (20) and fixed pin shaft (17), is opened after transferring bottom boom frame (4) to vertical state by hoist engine (5) Rope clamp (8), the steel wire rope of man-hour manually hand-held first (6) bypasses box beam bearing (28), is located at the first steel wire rope (6) and bottom boom frame (4) The same side, reach maintenance chassis by after bridge pier (29), fixing the first truss (1) and the second truss (2) temporarily, man-hour manually hand-held the One steel wire rope (6) bypasses box beam bearing (28) and returns to the second truss (2) side, and the first steel wire rope (6) and the are connected by rope clamp (8) Two steel wire ropes (7), steel wire rope is tightened up using hoist engine (5), and lifting bottom boom frame (4) plugs alignment pin (20) to horizontality With fixed pin shaft (17), the first truss (1), the second truss (2) and bottom boom frame (4) is set to form hands-off operation platform.
5) 3-4, are repeated the above steps until whole box girder constructions is completed.
8. a kind of open-close type as claimed in claim 7 crosses the method for work that pier box beam overhauls construction trolley, it is characterised in that:Institute State bridge pier (29) for monoblock type bridge pier, the box beam (3) be the separation type box girder being set up on monoblock type bridge pier when, can be in entirety Walking track (32) is laid in the box beam (3) of formula bridge pier both sides respectively and frame is distinguished in the box beam (3) of monoblock type bridge pier both sides If maintenance chassis, to the box beam (3) of monoblock type bridge pier both sides while carrying out maintenance construction.
CN201710265931.8A 2017-04-21 2017-04-21 A kind of open-close type crosses pier box beam maintenance construction trolley and its working method Active CN106917353B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710265931.8A CN106917353B (en) 2017-04-21 2017-04-21 A kind of open-close type crosses pier box beam maintenance construction trolley and its working method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710265931.8A CN106917353B (en) 2017-04-21 2017-04-21 A kind of open-close type crosses pier box beam maintenance construction trolley and its working method

Publications (2)

Publication Number Publication Date
CN106917353A true CN106917353A (en) 2017-07-04
CN106917353B CN106917353B (en) 2019-05-17

Family

ID=59567337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710265931.8A Active CN106917353B (en) 2017-04-21 2017-04-21 A kind of open-close type crosses pier box beam maintenance construction trolley and its working method

Country Status (1)

Country Link
CN (1) CN106917353B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604814A (en) * 2017-09-05 2018-01-19 重庆红岩建设机械制造有限责任公司 A kind of concrete railway bridge is special to check car and its implementation
CN107859005A (en) * 2017-11-07 2018-03-30 武大巨成结构股份有限公司 A kind of aqueduct overhauls unwheeling
CN108560510A (en) * 2018-07-13 2018-09-21 江苏龙安电力设备有限公司 Surface low road movable overhaul platform in a kind of power station
CN108824194A (en) * 2018-06-12 2018-11-16 中铁十二局集团有限公司 Bent cap post-stretching blocks construction trolley
CN109881590A (en) * 2019-04-18 2019-06-14 中冶建工集团有限公司 Bridge steel box girder high altitude operation operating platform and building method
CN110528398A (en) * 2019-09-30 2019-12-03 中信国安建工集团有限公司 Across empty van beam construction method
CN111549673A (en) * 2020-05-15 2020-08-18 贵州路桥集团有限公司 Appearance modification equipment for concrete cast-in-place box girder
CN113136804A (en) * 2021-04-23 2021-07-20 安徽华骅桥梁设备制造有限公司 Appearance modification platform for bottom of segmental box girder

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201753436U (en) * 2010-07-12 2011-03-02 武桥重工集团股份有限公司 Detachable lift type bridge inspection vehicle
KR20130050676A (en) * 2011-11-08 2013-05-16 현대중공업 주식회사 Platform structure
CN103306199A (en) * 2013-06-21 2013-09-18 重庆运安机电制造有限责任公司 Mounting method of bottom width overhaul hanging basket of bridge
CN205369028U (en) * 2015-12-24 2016-07-06 中交一公局第二工程有限公司 Intelligence self -propelled bridge overhauls device
CN106368122A (en) * 2016-10-18 2017-02-01 湖北华舟重工应急装备股份有限公司 Self-propelled dual-beam bridge maintenance platform
CN206721675U (en) * 2017-04-21 2017-12-08 中交第二航务工程局有限公司 A kind of open-close type crosses pier box beam maintenance construction trolley

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201753436U (en) * 2010-07-12 2011-03-02 武桥重工集团股份有限公司 Detachable lift type bridge inspection vehicle
KR20130050676A (en) * 2011-11-08 2013-05-16 현대중공업 주식회사 Platform structure
CN103306199A (en) * 2013-06-21 2013-09-18 重庆运安机电制造有限责任公司 Mounting method of bottom width overhaul hanging basket of bridge
CN205369028U (en) * 2015-12-24 2016-07-06 中交一公局第二工程有限公司 Intelligence self -propelled bridge overhauls device
CN106368122A (en) * 2016-10-18 2017-02-01 湖北华舟重工应急装备股份有限公司 Self-propelled dual-beam bridge maintenance platform
CN206721675U (en) * 2017-04-21 2017-12-08 中交第二航务工程局有限公司 A kind of open-close type crosses pier box beam maintenance construction trolley

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604814A (en) * 2017-09-05 2018-01-19 重庆红岩建设机械制造有限责任公司 A kind of concrete railway bridge is special to check car and its implementation
CN107859005A (en) * 2017-11-07 2018-03-30 武大巨成结构股份有限公司 A kind of aqueduct overhauls unwheeling
CN108824194A (en) * 2018-06-12 2018-11-16 中铁十二局集团有限公司 Bent cap post-stretching blocks construction trolley
CN108560510A (en) * 2018-07-13 2018-09-21 江苏龙安电力设备有限公司 Surface low road movable overhaul platform in a kind of power station
CN108560510B (en) * 2018-07-13 2024-05-31 江苏龙安电力设备有限公司 Movable overhaul platform for surface runner of hydropower station
CN109881590A (en) * 2019-04-18 2019-06-14 中冶建工集团有限公司 Bridge steel box girder high altitude operation operating platform and building method
CN110528398A (en) * 2019-09-30 2019-12-03 中信国安建工集团有限公司 Across empty van beam construction method
CN111549673A (en) * 2020-05-15 2020-08-18 贵州路桥集团有限公司 Appearance modification equipment for concrete cast-in-place box girder
CN113136804A (en) * 2021-04-23 2021-07-20 安徽华骅桥梁设备制造有限公司 Appearance modification platform for bottom of segmental box girder

Also Published As

Publication number Publication date
CN106917353B (en) 2019-05-17

Similar Documents

Publication Publication Date Title
CN106917353A (en) A kind of open-close type crosses pier box beam maintenance construction trolley and its method of work
JP6749573B1 (en) Construction method based on mobile work platform for steel box girder overpass construction
CN106744351A (en) The method that cable-stayed bridge main-beam lifting is carried out using cable crane
CN111139743A (en) Method for improving speed of highway beam frame and installation method of gantry crane
CN104652813A (en) Tower crane construction technology used for super high-rise building steel structure
CN107022958B (en) Use the method across girder in cable crane installation cable-stayed bridge
CN206721675U (en) A kind of open-close type crosses pier box beam maintenance construction trolley
AU2009222526A1 (en) Lifting apparatus for a building under construction
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN111039130A (en) Bearing beam self-elevating hoistway construction elevator
CN106193621A (en) Fabricated construction superimposed sheet string hangs construction method
CN211769642U (en) Bearing beam self-elevating hoistway construction elevator
JP3349463B2 (en) How to install additional girder
KR101077092B1 (en) Girder installation method using trolly without closing nor detouring existing road
CN209924407U (en) Combined working platform for steel structure high-altitude installation
JP2023000184A (en) Mobile protective device and method for dismantling construction scaffold
CN113235460A (en) Prefabricated segment swinging method for bridge cantilever assembly
KR20220000699A (en) variable cable crane system for constructing bridge and building method of the same
CN111453630A (en) Bridge deck crane and using method thereof
CN217104777U (en) Interim landing stage demolishs device
RU2806378C2 (en) Prefabricated support for power lines and method of its construction
CN117513764B (en) Sliding method with installation position lower than sliding rail
CN215366847U (en) Construction platform under portable foldable roof beam
CN211769676U (en) Foldable bearing beam type self-lifting shaft construction elevator
CN219637681U (en) Hanging platform type beam bottom overhauling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant