CN106910000A - A kind of emergency disposal flow dynamic creation method and system based on time shaft - Google Patents

A kind of emergency disposal flow dynamic creation method and system based on time shaft Download PDF

Info

Publication number
CN106910000A
CN106910000A CN201710016796.3A CN201710016796A CN106910000A CN 106910000 A CN106910000 A CN 106910000A CN 201710016796 A CN201710016796 A CN 201710016796A CN 106910000 A CN106910000 A CN 106910000A
Authority
CN
China
Prior art keywords
task
emergency
time shaft
execution
organizations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710016796.3A
Other languages
Chinese (zh)
Inventor
陈学东
查俊
范志超
吕运容
朱建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei General Machinery Research Institute Co Ltd
Original Assignee
Hefei General Machinery Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei General Machinery Research Institute Co Ltd filed Critical Hefei General Machinery Research Institute Co Ltd
Priority to CN201710016796.3A priority Critical patent/CN106910000A/en
Publication of CN106910000A publication Critical patent/CN106910000A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Security & Cryptography (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a kind of emergency disposal flow dynamic creation method based on time shaft and system, belong to field of computer technology, method includes setting up the task member collection of emergency disposal flow according to emergency preplan, performs organizational member collection and emergency resources member collection;Task member in task-set is added to time shaft to show currently performed task member;The emergency resources member that execution organizational member and the emergency resources concentration in set of organizations will be performed is dragged to currently performed task member, and dynamically generation emergency disposal flow match with currently performed task member.Still further provides a kind of emergency disposal flow dynamic generating system based on time shaft.Scheme disclosed by the invention can provide flexible, visual, easy-operating emergency disposal flow dynamic creation method for emergency command personnel, to aid in emergency command personnel to formulate Emergency decision, instruct emergency management and rescue to work, meet emergent scene actual conditions complicated and changeable.

Description

A kind of emergency disposal flow dynamic creation method and system based on time shaft
Technical field
The present invention relates to field of computer technology, more particularly to a kind of emergency disposal flow based on time shaft is dynamically generated Method and system.
Background technology
Traditional, it is that emergency preplan in the form of text entirely should to reflect when the emergency disposal of accident is carried out Anxious disposal process.This form has the shortcomings that more serious:One is, is difficult to by the emergency preplan of textual form intuitively anti- Mirror whole emergency disposal flow.Two are, it is difficult to be applicable the emergency command management system of informationization.These shortcomings cause in reality Implementation emergency disposal when, emergency command personnel are difficult to transfer in time suitable prediction scheme and know emergency disposal knowledge therein, So that miss carrying out emergent " prime time " rescued.Therefore, technical staff is by building digitized emergency disposal flow, To improve the efficiency of emergency disposal, set up information-based emergency commading system.
At present, digitlization is built generally by based on the modeling method such as entity-relation model or Petri net model Emergency disposal flow, but these modeling methods still suffer from clearly disadvantageous part:The logic of emergency disposal flow cannot be changed Structure, also cannot be to the generation of the fortuitous events such as the failure of reply tasks carrying or termination.And during actual emergency disposal, Emergency command personnel generally require to adjust temporarily Emergency decision with the scene of tackling the condition of a disaster complicated and changeable and the hair of emergency case It is raw, therefore, above-mentioned use modeling pattern builds digitlization emergency disposal flow cannot meet actual emergency disposal Need.
The content of the invention
It is an object of the invention to provide a kind of emergency disposal flow dynamic creation method based on time shaft and system, with Solve existing modeling pattern and build digitlization emergency disposal flow that asking the need for actual emergency disposal flow cannot be met Topic.
To realize object above, the technical solution adopted by the present invention is:A kind of first aspect, there is provided answering based on time shaft Anxious disposal process dynamic creation method, the method includes:
The task member collection of emergency disposal flow is set up according to emergency preplan, organizational member collection and emergency resources member is performed Collection;
Task member in task-set is added to time shaft to show currently performed task member;
The emergency resources member that executions organizational member and the emergency resources concentration in set of organizations will be performed is dragged to and is currently held Row task member, dynamically generation emergency disposal flow match with currently performed task member.
Second aspect, there is provided a kind of emergency disposal flow dynamic generating system based on time shaft, the system includes:
Task-set comprising task information about firms, comprising perform organizational member information execution set of organizations, comprising emergency resources into The emergency resources collection and dynamic processing elements of member's information;
Dynamic processing elements respectively with task-set, perform set of organizations and emergency resources collection and be connected, with based on time shaft by task The task member of concentration, the emergency resources member of executions organizational member and the emergency resources concentration performed in set of organizations are carried out Match somebody with somebody, with dynamic generation emergency disposal flow.
Compared with prior art, there is following technique effect in the present invention:The present invention is first according to a certain item emergency preplan point Task-set is not set up, set of organizations and emergency resources collection is performed, and some members are included in each set.In emergency disposal stream During Cheng Shengcheng, the task member performed the need in task-set is dragged to time shaft first, then again currently to hold Capable task member matches related emergency resources and performs tissue.Can for emergency command personnel provide flexibly, visualization , easy-operating emergency disposal setup time axle come aid in emergency command personnel formulate Emergency decision, instruct emergency management and rescue work Make, meet emergent scene actual conditions complicated and changeable.
Brief description of the drawings
Fig. 1 is a kind of flow of the emergency disposal flow dynamic creation method based on time shaft in one embodiment of the invention Schematic diagram;
Fig. 2 is a kind of application process of the emergency disposal flow dynamic creation method based on time shaft in one embodiment of the invention Schematic diagram;
Fig. 3 is the schematic diagram of the task-set, execution set of organizations and emergency resources collection in one embodiment of the invention;
Fig. 4 is a kind of dynamic schematic diagram of the emergency disposal flow generation based on time shaft in one embodiment of the invention;
Fig. 5 be in one embodiment of the invention perform organizational member to task member and emergency resources member is matched shows It is intended to;
Fig. 6 is a kind of structural representation of the emergency disposal flow dynamic generating system based on time shaft in one embodiment of the invention Figure.
Specific embodiment
With reference to shown in Fig. 1 to Fig. 6, the present invention is described in further detail.
As shown in Figure 1 to Figure 2, present embodiment discloses a kind of emergency disposal flow dynamic generation side based on time shaft Method, the method comprises the following steps S1 to S3:
S1, the task member collection that emergency disposal flow is set up according to emergency preplan, perform organizational member collection and emergency resources into Member's collection;
S2, by the task member in task-set added to time shaft showing currently performed task member;
The emergency resources member that S3, the execution organizational member and emergency resources that will be performed in set of organizations are concentrated is dragged to current institute Execution task member, dynamically generation emergency disposal flow match with currently performed task member.
If it should be noted that the task-set, execution set of organizations and emergency resources collection China in the present embodiment are included A member is done, after matching is completed, by mouse as the execution tissue and meet an urgent need that on task member, will show that the task is matched Resource information.
Specifically, with certain petroleum chemical enterprise's fire explosion emergency preplan as embodiment, set up according to the emergency preplan and appointed Business collection, execution set of organizations and emergency resources collection, each set member are as shown in Figure 3.The emergency disposal flow that the prediction scheme specifies is as follows:
(1)Cut-out source of leaks;
(2)Optionally(Reveal on bottom leakage/top)Disposal container reveals thing;
(3)Alarmed to fire-fighting group and hospital, and the condition of a disaster is reported to company's total activation room;
(4)Start emergency management and rescue program;
(5)Personnel rescue;
(6)Evacuating personnel;
(7)Warning;
(8)Technique adjustment;
(9)Fire-fighting, medical aid system security;
(10)Fire suppression;
(11)Leakage is blocked and reclaimed;
(12)It is emergent to terminate.
Specifically, the method disclosed in above-described embodiment also comprises the following steps:
Modify and/or add member to described task-set, execution set of organizations and emergency resources collection, with to the generation Emergency disposal flow enter Mobile state adjustment.
It is added or changes by the individual member that task-set, execution set of organizations and emergency resources are concentrated, to emergent Disposal process is dynamically adjusted, and changes the logical construction of emergency disposal flow to be applicable emergency environmental complicated and changeable, because This, the method has preferable applicability and practicality, the need for can meeting practical application scene.
Specifically, the step S2 in above-described embodiment also comprises the following steps:
When task member in task-set is added into time shaft, the beginning of side's display current execution task on a timeline Time, the current execution task lower section show tasks carrying duration.
Specifically, method disclosed in above-described embodiment also includes:
State to the current execution task is configured, wherein, the state of setting includes that task is completed, fails or terminated;
When the state of the current execution task is provided with, stop counting the duration that the current task is performed When.
It should be noted that after the state of task member is provided with, the duration of the task will stop timing, this When, by mouse as on personage member, the execution state set by the task will be shown.
Specifically, above-mentioned step S2, specifically includes:
By the task member in task-set added on time shaft one rear for performing task member, with the order below time shaft Add the currently performed task member;
Or, the task member in task-set is performed into task member lower section added on time shaft one, with below time shaft The currently performed task member is added parallel.
It should be noted that in actual application process, when the task member in task-set is added into time shaft, bag Include two kinds of addition manners:Order addition and parallel addition.As shown in figure 4, every in showing whole emergency disposal flow appoint Between at the beginning of order or concurrency relation and task between business and the duration.Wherein, " cut-out source of leaks " and " disposal appearance Reveal device bottom " for order is added, " leakage of disposal container bottom " and Alarm are parallel addition.By mouse as any of which On task member, the match information and set state of task member will be shown.Wherein, the detailed letter of fire suppression task Breath is as shown in Figure 5.
Specifically, as shown in Fig. 2 dynamically generating the process bag of emergency disposal flow according to method disclosed in the present embodiment Include:
It is concentrated be dragged to below time shaft first by task 1 as first being performed for task in task, while display should Between at the beginning of task and the duration, and for task 1 matches the emergency resources of correlation and performs tissue;Treat that task 1 has been performed Bi Hou, the state of task 1 is set to complete and stop timing;It is suitable task 2 to be dragged to after task 1 again to show between them Order relation;After the completion for the treatment of task 2, after task 3 is dragged into task 2, while task 4 is dragged to the lower section of task 3, to show After task 2 is finished, task 3 and task 4 can be performed simultaneously;Subsequent operation by that analogy.
As shown in fig. 6, present embodiment discloses a kind of dynamic generating system of the emergency disposal flow based on time shaft, should System includes:
Task-set 10 comprising task information about firms, comprising perform organizational member information execution set of organizations 20, comprising emergent money The emergency resources collection 30 and dynamic processing elements 40 of source member's information;
Dynamic processing elements 40 are connected with task-set 10, execution set of organizations 20 and emergency resources collection 30 respectively, with based on the time Axle will be emergent in the task member in task-set 10, the execution organizational member in execution set of organizations 20 and emergency resources collection 30 Resources member is matched, with dynamic generation emergency disposal flow.
Specifically, dynamic processing elements 40 include task add module 41, matching module 42, time showing module 43 and Task status setup module 44;
Task add module 41 is connected with task-set 10 to be worked as added to time shaft with by the task member in task-set 10 with showing Preceding performed task member;
Matching module 42 is connected with execution set of organizations 20 and emergency resources collection 30 respectively, for that will perform the execution in set of organizations 20 Emergency resources member in organizational member and emergency resources collection 30 is matched with currently performed task member;
Currently held between time showing module 43 is used at the beginning of side's display current execution task on a timeline, described The lower section of row task shows the duration of tasks carrying;
Task status setup module 44 is used to be configured the state of the current execution task, wherein, the state bag of setting Task is included to complete, fail or terminate;
Correspondingly, time showing module 43 is additionally operable to, when the state of the current execution task is provided with, stop display institute State the duration of current task execution.
Specifically, the system disclosed in the present embodiment also includes:Respectively with task-set 10, perform set of organizations 20 and emergent The adjustment unit 50 of the connection of resource set 30;
Adjustment unit 50 to task 10, perform set of organizations 20 and emergency resources collection 30 and modify and/or add member.
Specifically, the task add module 41 in the system specifically for:
By the task member in task-set 10 added on time shaft one rear for performing task member, with suitable below time shaft Sequence adds the currently performed task member;
Or, the task member in task-set 10 is performed into task member lower section added on time shaft one, with time shaft Fang Binghang adds the currently performed task member.
It should be noted that a kind of emergency disposal flow dynamic generating system based on time shaft disclosed in the present embodiment, There is identical or corresponding technique effect with the foregoing emergency disposal flow dynamic creation method based on time shaft, at this no longer Repeat.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all it is of the invention spirit and Within principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.

Claims (9)

1. a kind of emergency disposal flow dynamic creation method based on time shaft, it is characterised in that including:
S1, the task member collection that emergency disposal flow is set up according to emergency preplan, perform organizational member collection and emergency resources into Member's collection;
S2, by the task member in task-set added to time shaft showing currently performed task member;
The emergency resources member that S3, the execution organizational member and emergency resources that will be performed in set of organizations are concentrated is dragged to current institute Execution task member, dynamically generation emergency disposal flow match with currently performed task member.
2. the method for claim 1, it is characterised in that also include:
Modify and/or add member to described task-set, execution set of organizations and emergency resources collection, with to the generation Emergency disposal flow enter Mobile state adjustment.
3. method as claimed in claim 2, it is characterised in that described step S2 also includes:
When task member in task-set is added into time shaft, the beginning of side's display current execution task on a timeline Time, the current execution task lower section show tasks carrying duration.
4. method as claimed in claim 2, it is characterised in that described step S2, specifically includes:
By the task member in task-set added on time shaft one rear for performing task member, with the order below time shaft Add the currently performed task member;
Or, the task member in task-set is performed into task member lower section added on time shaft one, with below time shaft The currently performed task member is added parallel.
5. method as claimed in claim 4, it is characterised in that also include:
State to the current execution task is configured, wherein, the state of setting includes that task is completed, fails or terminated;
When the state of the current execution task is provided with, stop counting the duration that the current task is performed When.
6. a kind of emergency disposal flow dynamic generating system based on time shaft, it is characterised in that including:Comprising task member letter The task-set of breath(10), comprising perform organizational member information execution set of organizations(20), comprising emergency resources information about firms should Anxious resource set(30)And dynamic processing elements(40);
Dynamic processing elements(40)Respectively with task-set(10), perform set of organizations(20)And emergency resources collection(30)Connection, with Based on time shaft by task-set(10)In task member, perform set of organizations(20)In execution organizational member and emergency resources Collection(30)In emergency resources member matched, with dynamic generation emergency disposal flow.
7. system as claimed in claim 6, it is characterised in that described dynamic processing elements(40)Including task add module (41), matching module(42), time showing module(43)And task status setup module(44);
Task add module(41)With task-set(10)Connection is with by task-set(10)In task member added to time shaft with The currently performed task member of display;
Matching module(42)Respectively with execution set of organizations(20)With emergency resources collection(30)Connection, for set of organizations will to be performed(20) In execution organizational member and emergency resources collection(30)In emergency resources member carried out with currently performed task member Matching;
Time showing module(43)Between at the beginning of for side's display current execution task on a timeline, described current The lower section of execution task shows the duration of tasks carrying;
Task status setup module(44)It is configured for the state to the current execution task, wherein, the state of setting Completed including task, failed or terminated;
Correspondingly, time showing module(43)It is additionally operable to, when the state of the current execution task is provided with, stop display The duration that the current task is performed.
8. system as claimed in claim 7, it is characterised in that also include:Respectively with task-set(10), perform set of organizations(20) And emergency resources collection(30)The adjustment unit of connection(50);
Adjustment unit(50)To task-set(10), perform set of organizations(20)And emergency resources collection(30)Modify and/or add Addition person.
9. system as claimed in claim 7, it is characterised in that described task add module(41)Specifically for:
By task-set(10)In task member added on time shaft one rear for performing task member, with below time shaft Order adds the currently performed task member;
Or, by task-set(10)In task member perform task member lower section added on time shaft one, with time shaft The currently performed task member is added parallel in lower section.
CN201710016796.3A 2017-01-10 2017-01-10 A kind of emergency disposal flow dynamic creation method and system based on time shaft Pending CN106910000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710016796.3A CN106910000A (en) 2017-01-10 2017-01-10 A kind of emergency disposal flow dynamic creation method and system based on time shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710016796.3A CN106910000A (en) 2017-01-10 2017-01-10 A kind of emergency disposal flow dynamic creation method and system based on time shaft

Publications (1)

Publication Number Publication Date
CN106910000A true CN106910000A (en) 2017-06-30

Family

ID=59206450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710016796.3A Pending CN106910000A (en) 2017-01-10 2017-01-10 A kind of emergency disposal flow dynamic creation method and system based on time shaft

Country Status (1)

Country Link
CN (1) CN106910000A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108563483A (en) * 2018-04-12 2018-09-21 深圳市中电数通智慧安全科技股份有限公司 Method for visualizing, device, server and the storage medium of fire-fighting event procedure
CN109462573A (en) * 2018-09-20 2019-03-12 视联动力信息技术股份有限公司 A kind of method for operating traffic thereof and device based on time shaft

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1770852A (en) * 2004-08-31 2006-05-10 索尼株式会社 Event management device and method therefor, recording medium and program thereof
CN101764927A (en) * 2009-12-21 2010-06-30 深圳市同洲电子股份有限公司 Method and device for arranging broadcasting content
CN102385893A (en) * 2010-08-31 2012-03-21 腾讯科技(北京)有限公司 System and method for generating time shaft of multi-media playing
CN103220396A (en) * 2012-01-18 2013-07-24 华为终端有限公司 Terminal and method of schedule displaying
CN104156815A (en) * 2014-08-06 2014-11-19 成都国科海博信息技术股份有限公司 Intelligent emergency event handling method based on timer shaft
CN104468137A (en) * 2013-09-12 2015-03-25 华为技术有限公司 Web conference control method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1770852A (en) * 2004-08-31 2006-05-10 索尼株式会社 Event management device and method therefor, recording medium and program thereof
CN101764927A (en) * 2009-12-21 2010-06-30 深圳市同洲电子股份有限公司 Method and device for arranging broadcasting content
CN102385893A (en) * 2010-08-31 2012-03-21 腾讯科技(北京)有限公司 System and method for generating time shaft of multi-media playing
CN103220396A (en) * 2012-01-18 2013-07-24 华为终端有限公司 Terminal and method of schedule displaying
CN104468137A (en) * 2013-09-12 2015-03-25 华为技术有限公司 Web conference control method and device
CN104156815A (en) * 2014-08-06 2014-11-19 成都国科海博信息技术股份有限公司 Intelligent emergency event handling method based on timer shaft

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108563483A (en) * 2018-04-12 2018-09-21 深圳市中电数通智慧安全科技股份有限公司 Method for visualizing, device, server and the storage medium of fire-fighting event procedure
CN109462573A (en) * 2018-09-20 2019-03-12 视联动力信息技术股份有限公司 A kind of method for operating traffic thereof and device based on time shaft

Similar Documents

Publication Publication Date Title
US8341600B2 (en) Tagging and logical grouping of items in source code change lists
CN104461743A (en) Device and method for automatically generating resources and configuration
CN108053144A (en) Open operation flow implementation method and workflow engine
CN106777960A (en) A kind of application of Ros distributed system architectures in medical care
Bachmann et al. Architectural tactics to support rapid and agile stability
CN107430497B (en) Method and system for adjusting visual appearance of apparel
CN110083503A (en) Knowledge base information sensing method based on data center's O&M
CN109802881A (en) A kind of orientation prompting processing method and processing device of group chat message
CN106201472A (en) The method for scheduling task of software development and device
CN111045791A (en) Big data containerization central scheduling system and method
CN106910000A (en) A kind of emergency disposal flow dynamic creation method and system based on time shaft
CN109828708A (en) A kind of task management method and intelligent terminal
CN106250989A (en) Electric power first-aid drill plan dynamic creation method and system
CN106779413A (en) Information processing method and equipment in a kind of flow of task
CN106296043A (en) Unmanned plane dispatching patcher
CN109814840A (en) A kind of customizable collaborative design and development platform for supporting resource quickly to apply and method
CN104881307B (en) Download implementation method and device
CN107466467A (en) The method, apparatus and system of a kind of remote synchronization
Meng et al. Cross-organization task coordination patterns of urban emergency response systems
CN103631594B (en) Asynchronous scheduling method and asynchronous scheduling system for general flow
CN103902325A (en) Method and device for achieving window synchronization
CN106354370A (en) Emergency drilling system interaction method
CN106293361A (en) A kind of information replying method and device
US20070136097A1 (en) Risk reduction method for surgical procedures
CN104133675B (en) A kind of multi-threaded application interface integrated approach of distribution based on Dynamic Reconfiguration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170630