CN106906411A - A kind of public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building and preparation method thereof - Google Patents
A kind of public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building and preparation method thereof Download PDFInfo
- Publication number
- CN106906411A CN106906411A CN201710187058.5A CN201710187058A CN106906411A CN 106906411 A CN106906411 A CN 106906411A CN 201710187058 A CN201710187058 A CN 201710187058A CN 106906411 A CN106906411 A CN 106906411A
- Authority
- CN
- China
- Prior art keywords
- steel
- molten
- remaining
- amount
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/02—Ferrous alloys, e.g. steel alloys containing silicon
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C1/00—Refining of pig-iron; Cast iron
- C21C1/02—Dephosphorising or desulfurising
- C21C1/025—Agents used for dephosphorising or desulfurising
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/28—Manufacture of steel in the converter
- C21C5/30—Regulating or controlling the blowing
- C21C5/35—Blowing from above and through the bath
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C7/00—Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
- C21C7/0006—Adding metallic additives
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C7/00—Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
- C21C7/0056—Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00 using cored wires
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C7/00—Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
- C21C7/04—Removing impurities by adding a treating agent
- C21C7/06—Deoxidising, e.g. killing
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C7/00—Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
- C21C7/04—Removing impurities by adding a treating agent
- C21C7/072—Treatment with gases
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C7/00—Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
- C21C7/04—Removing impurities by adding a treating agent
- C21C7/076—Use of slags or fluxes as treating agents
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D8/00—Modifying the physical properties by deformation combined with, or followed by, heat treatment
- C21D8/005—Modifying the physical properties by deformation combined with, or followed by, heat treatment of ferrous alloys
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C21/00—Alloys based on aluminium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C22/00—Alloys based on manganese
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C27/00—Alloys based on rhenium or a refractory metal not mentioned in groups C22C14/00 or C22C16/00
- C22C27/02—Alloys based on vanadium, niobium, or tantalum
- C22C27/025—Alloys based on vanadium, niobium, or tantalum alloys based on vanadium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C27/00—Alloys based on rhenium or a refractory metal not mentioned in groups C22C14/00 or C22C16/00
- C22C27/04—Alloys based on tungsten or molybdenum
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C33/00—Making ferrous alloys
- C22C33/04—Making ferrous alloys by melting
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C37/00—Cast-iron alloys
- C22C37/10—Cast-iron alloys containing aluminium or silicon
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/002—Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/04—Ferrous alloys, e.g. steel alloys containing manganese
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/12—Ferrous alloys, e.g. steel alloys containing tungsten, tantalum, molybdenum, vanadium, or niobium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/14—Ferrous alloys, e.g. steel alloys containing titanium or zirconium
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Manufacturing & Machinery (AREA)
- Treatment Of Steel In Its Molten State (AREA)
Abstract
The invention discloses a kind of public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building and preparation method thereof, the preparation method of the earthquake-resistant hot rolled angle steel of described fire resisting is comprised the following steps:A, molten iron pretreatment desulfurizing;B, smelting molten steel;C, deoxidation alloying;D, the refining of molten steel LF stoves;E, molten steel casting;F, heating steel billet;G, steel billet high-pressure water tank de-scaling;H, big mill are preforming;I, universal mill tandem rolling;The online appearance and size detection of J, angle steel;K, finishing.The present invention is by Alternative integrated innovation, microalloy element precipitation strength and refined crystalline strengthening mechanism are given full play to, produce that poker dimensional accuracy is high, stable mechanical property, 345MPa grades of No. 14 No. 18 hot-rolled angle steels with excellent fire resisting shock resistance and low-temperature impact toughness, meet public steel building(Such as automobile yard, train waiting hall, motor-car platform)Fire resisting antidetonation use requirement.
Description
Technical field
The invention belongs to metal material and ferrous metal pressure processing technology field, and in particular to a kind of public steel builds to be built
With earthquake-resistant hot rolled angle steel of Q345FRD fire resistings and preparation method thereof, further, it is related to a kind of for public steel building(Such as vapour
Station, train Waiting Lounge, motor-car platform)With No. 14-No. 18 hot-rolled angle steels of fire resisting Q345FRD and preparation method thereof.
Background technology
Current China infrastructure is still relatively backward, and capital construction will be the field of state key investment construction.With intercity
The propulsion that motor-car, expressway construction, comprehensive passenger transport hub, coastal port harbour, urban transit bus yard are built, matches somebody with somebody therewith
The public steel of set builds and builds(Such as waiting hall, yard)In a large amount of newly-built or reorganization and expansion.In view of communal facility construction timber and disappearing
The strict and lifting of anti-standard, in the urgent need to the high-quality steel new material for developing supporting is adapted therewith.Public steel construction is built
Build generally using hot rolled H-shaped, big-and-middle-sized hot-rolled angle steel etc., country is existing at present《Fire resisting is hot rolled H-shaped》Standard, but without fire resisting
With other section bars of feature(Angle steel, channel-section steel)Standards and norms, a roof structure of an essay is arranged and uses Q235, Q345 hot-rolled angle steel mostly.
The production technology equipment of the medium-sized hot-rolled angle steel of current No. 14 and the above differs, mostly using the open-train mill of low cost or half
Continuous rolling process bar and shape mill is produced, and product poker size and Mechanical Fluctuation be larger, is unfavorable for next procedure punching, at anti-corrosion
Reason and Fast Installation.
, generally using hot rolled H-shaped, big-and-middle-sized hot-rolled angle steel etc., country is existing at present for public steel building《It is resistance to burning hot
Roll H profile steel》Standard, but other section bars without fire resisting feature(Angle steel, channel-section steel)Standards and norms, a roof structure of an essay is arranged and adopted mostly
With Q235, Q345 hot-rolled angle steel.The production technology equipment of the medium-sized hot-rolled angle steel of current No. 14 and the above differs, mostly using low
Open-train mill or semi-tandem rolling technique the bar and shape mill production of cost, product poker size and Mechanical Fluctuation are larger, unfavorable
In next procedure punching, preservative treatment and Fast Installation.
It is main in domestic prior art at present to be produced using bar mill or small sectionproduction line, and product is small-size angle iron
(Less than No. 10), it is mainly used in steel tower and manufactures, product does not have fire resistance.Yet there are no the document of the earthquake-resistant hot rolled angle steel of fire resisting
And relevant report.
The content of the invention
The first object of the present invention is to provide a kind of public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, this
Second purpose of invention is to provide a kind of preparation method of the public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building.
The first object of the present invention is achieved in that described fire resisting hot-rolled angle steel is pre-processed by molten iron by molten iron
Desulfurization, smelting molten steel, deoxidation alloying, the refining of molten steel LF stoves, molten steel casting, heating steel billet, the de-scaling of steel billet high-pressure water tank, cogging
Milling train is preforming, the online appearance and size detection of universal mill tandem rolling, angle steel, finishing are prepared, with following weight percent
The chemical composition of ratio:C 0.16~0.21 wt%, Si 0.23~0.33 wt%, Mn 0.85~1.05 wt%, V 0.017~
0.015~0.030wt% of 0.032wt%, Ti, 0.080~0.100wt% of Mo, S≤0.015wt%, P≤0.020 wt%, remaining
It is Fe and inevitable impurity.
The second object of the present invention is achieved in that and comprises the following steps:
A, molten iron pretreatment desulfurizing:The blast-melted KR methods molten iron preprocessing unit that is transported to is carried out into desulfurization process, stirring-head insertion
Severity control is 2500 ~ 2800mm, by the amount of 10.0~12.0 kg/t steel, adds CaO matter desulfurizing agent to carry out desulfurization process, is stirred
Time control is mixed for 6 minutes;Stirring terminate after carry out taking off rear slag operation, it is ensured that in ladle molten iron face it is exposed >=3/4, scratch clean desulfurization
Slag, obtains pretreated molten iron;
B, smelting molten steel:By in the pretreated molten iron of step A, high-quality steel scrap and the pig iron 120 tons of LD converters of addition, top bottom is carried out
Top-bottom blowing, respectively by 30.0~33.0kg/t steel, 22.0~26.0kg/t steel, 2.0~4.0kg/t steel addition, add
Lime, light dolomite, magnesite ball slag making, control endpoint carbon content >=0.08wt%, tapping temperature≤1650 DEG C;Tapping before to
Ladle bottom adds lime and refining slag carries out wash heat, and lime adding amount is 2.0kg/t steel, and refining slag addition is 1.0kg/t
Steel;Using whole bottom argon blowing technology during tapping, argon flow amount is controlled to 20~40NL/min;
C, deoxidation alloying:Step B is smelted the molten steel tapping for finishing, when the molten steel amount in ladle is more than 1/4, by following de-
Oxygen alloyization is sequentially:Ferro-aluminum → Si-Ca-Ba → silicomangan → molybdenum-iron → VN alloy, successively to adding following alloy in ladle:
By the amount of 0.8~1.5kg/t steel, ferro-aluminum is added;By the amount of 1.0kg/t steel, Si-Ca-Ba is added;By 11.5~15.7kg/t steel
Amount, adds silicomangan;By the amount of 1.4~1.7kg/t steel, molybdenum-iron is added;By the amount of 0.18~0.38 kg/t steel, vanadium is added
Nitrogen alloy;Above-mentioned alloy is added when ladle molten steel amount reaches 3/4;After tapping is finished, molten steel is hung and delivers to LF stove refining procedures;
D, the refining of molten steel LF stoves:Step C tapping is finished into molten steel it is hung to LF stoves refining station and connect argon gas band, opens argon gas and use
15~25NL/min Argons 2 minutes, then bottom electrode is using 7~9 grades of sluggings of gear;After being powered 3 minutes, in lift electrode observation stove
Slugging situation, afterwards thermometric determine oxygen and sampling;Aluminum shot 0.5~0.8kg/t steel is added, molten steel oxygen activity≤10ppm is controlled, afterwards
By the amount of 0.7~1.3kg/t steel, the ferrotianium of following mass ratio is added:Ti 32.5wt%, remaining be Fe and inevitably it is impure
Thing;At the same time, residue adjustment is carried out according to slag condition, if slag condition is diluter, adds lime 4.0~6.0kg/t steel, add calcium carbide 1.0
Kg/t steel residue adjustments, it is 5.0~6.0 to control basicity of slag;Carried out at line feeding after liquid steel temperature is heated into 1570~1580 DEG C afterwards
Reason, silicon-calcium wire of the feeding with following mass ratio:Si 53.5wt%, Ca 28.2wt%, remaining be Fe and inevitably it is impure
Thing, wire-feeding velocity is 3.0m/s, and line feeding amount is 100m;It is the small argon gas amount of 15~25NL/min to steel that line feeding terminates to use flow
Water carries out soft blow argon, and soft blow time >=6 minute add molten steel covering agent afterwards, and addition is controlled to 1.0 kg/t steel, then will
Molten steel is hung to casting station;
E, molten steel casting:It it is 1560~1570 DEG C in tundish temperature, pulling rate is 1.2~1.4m/min, and Water Rate for Secondary Cooling Water is 0.5
~0.6L/kg, M-EMS Current intensity be 350A, running frequency be 2.5HZ under conditions of, using the straight arcs of R12m
The molten steel whole process protection of D steps is cast into the stream bloom casting machine of 5 machine of continuous straightening 5 steel billet of section 200mm × 200mm;
F, heating steel billet:The steel billet of E steps is added through rollgang feeding side inlet side outlet walking beam double-regenerative heating furnace
Heat, blast furnace gas and air preheating temperature are all higher than 1000 DEG C, and burner hearth is adopted as micro-pressure operation, and pressure is 10 ~ 15Pa;Heating
Stove soaking zone temperature control is 1170 ~ 1200 DEG C, and the heat time is 80 ~ 100 minutes, and steel billet temperature is controlled to 1120 ~ 1150 DEG C;
G, steel billet high-pressure water tank de-scaling:F-step steel billet is delivered to the water under high pressure that length is 1.2m from after heating furnace tapping through roller-way
Case removes removing iron scale, and the steel billet speed of service is controlled to 1.0m/s, and nozzle hydraulic pressure is 16-18MPa;After high-pressure water descaling, steel
Base temperature is down to 1020 ~ 1050 DEG C;
H, big mill are preforming:G steps steel billet feeding two-roller reversible big mill is preforming, and start rolling temperature is controlled to 1020 ~
1050 DEG C, mill speed is controlled to 3.8 ~ 4.0m/s, and rolling pass is 7 roads, and pass schedule uses the pre- knifing pass system of butterfly,
Obtain preforming rolled piece;
I, universal mill tandem rolling:The preforming rolled piece of H steps is sent into 10 frame universal mill tandem rollings, rolled piece enters Continuous mill train
Temperature control is 920 ~ 950 DEG C, and total rolling pass is 10 roads, and per the road of frame 1, universal mill is adjusted to two roller die formulas, rolling speed
Degree is controlled to 4.5 ~ 4.8m/s;Finishing temperature control be 860 ~ 890 DEG C, finished frame outlet rolling speed control be 4.5 ~
4.8m/s;
The online appearance and size detection of J, angle steel:The rolled piece that I steps are obtained delivers to Zaser contourgraph and carries out profile chi through runout table
Very little accuracy detection, after after online shaping blades flying shear upper cold bed;
K, finishing:J step process finish after angle steel through the roller-way upper cold bed of conveying, rolled piece naturally cooled on cold bed 80 DEG C with
Under;On-line straightening afterwards, aligning speed control is 4.6 ~ 4.9m/s;After angle steel is through aligning, carry out scale sawing, collection, stacking,
Automatic bundling, mark, obtain final product.
Beneficial effects of the present invention:
1st, the present invention pre-processed by molten iron, the refining of converter smelting, deoxidation alloying, LF stoves, bloom whole process protection continuous casting,
Bloom heating, preforming steel billet cogging, tandem rolling controlled rolling, finishing etc. carry out Alternative integrated innovation, have given full play to micro-
Alloying element precipitation strength and refined crystalline strengthening mechanism, produce that poker dimensional accuracy is high, stable mechanical property, with excellent fire resisting
345MPa grades of No. 14-No. 18 hot-rolled angle steels of shock resistance and low-temperature impact toughness, the hot-rolled angle steel performance inconsistency for being produced is small, tool
There is good fire resisting shock resistance and excellent low-temperature impact toughness, meet public steel building(As automobile yard, train are waited
Car hall, motor-car platform)Fire resisting antidetonation use requirement.
2nd, steel making working procedure of the invention uses combined microalloying technique, adds VN alloy, ferrotianium, molybdenum-iron etc. micro- in steel
Alloy strengthening element, steel rolling process controls relatively low finishing temperature and mill speed, promotes the microalloy carbon of small and dispersed
The formation and precipitation of the second phase of (nitrogen) compound, plasticity and toughness are significantly improved while improving hardness of steel;Steel rolling process uses section
The generous blank of 200mm × 200mm, is controlled rolling, the angle for being produced by preforming+10 frame universal mill of two roller coggings
Steel dimensions high precision, mechanical performance stabilization, the lower yield strength R under 600 DEG C of high temperaturep0.2>=280MPa, 600 DEG C of surrenders are strong
Degree and normal temperature condition yield strength ratio >=0.75, strong flexor ratio Rm/ReL >=1.35, -20 DEG C of Impact energy Ak v >=70J, steel tool
There is excellent fire resisting shock resistance and low-temperature impact toughness, meet public steel and build the fire resistant requirements built to steel.
Specific embodiment
With reference to embodiment, the present invention is further illustrated, but the present invention is any limitation as never in any form,
Based on present invention teach that any conversion or replacement made, belong to protection scope of the present invention.
Public steel structure fire resisting hot-rolled angle steel for building of the present invention, is by molten iron pretreatment desulfurizing, steel by molten iron
Hydrometallurgy refining, deoxidation alloying, the refining of molten steel LF stoves, molten steel casting, heating steel billet, the de-scaling of steel billet high-pressure water tank, big mill are pre-
Shaping, universal mill tandem rolling, the online appearance and size detection of angle steel, finishing are prepared, the change with following weight percents
Study point:C 0.16~0.21 wt%, Si 0.23~0.33 wt%, Mn 0.85~1.05 wt%, V 0.017~
0.015~0.030wt% of 0.032wt%, Ti, 0.080~0.100wt% of Mo, S≤0.015wt%, P≤0.020 wt%, remaining
It is Fe and inevitable impurity.
The specification of described public steel structure fire resisting hot-rolled angle steel for building(Length of side mm × length of side mm × side thickness mm) be:140
×140×(12-16)mm、160×160×(12-16)mm、180×180×(12-16)mm。
The preparation method of public steel structure fire resisting hot-rolled angle steel for building of the present invention, comprises the following steps:
A, molten iron pretreatment desulfurizing:The blast-melted KR methods molten iron preprocessing unit that is transported to is carried out into desulfurization process, stirring-head insertion
Severity control is 2500 ~ 2800mm, by the amount of 10.0~12.0 kg/t steel, adds CaO matter desulfurizing agent to carry out desulfurization process, is stirred
Time control is mixed for 6 minutes;Stirring terminate after carry out taking off rear slag operation, it is ensured that in ladle molten iron face it is exposed >=3/4, scratch clean desulfurization
Slag, obtains pretreated molten iron;
B, smelting molten steel:By in the pretreated molten iron of step A, high-quality steel scrap and the pig iron 120 tons of LD converters of addition, top bottom is carried out
Top-bottom blowing, respectively by 30.0~33.0kg/t steel, 22.0~26.0kg/t steel, 2.0~4.0kg/t steel addition, add
Lime, light dolomite, magnesite ball slag making, control endpoint carbon content >=0.08wt%, tapping temperature≤1650 DEG C;Tapping before to
Ladle bottom adds lime and refining slag carries out wash heat, and lime adding amount is 2.0kg/t steel, and refining slag addition is 1.0kg/t
Steel;Using whole bottom argon blowing technology during tapping, argon flow amount is controlled to 20~40NL/min;
C, deoxidation alloying:Step B is smelted the molten steel tapping for finishing, when the molten steel amount in ladle is more than 1/4, by following de-
Oxygen alloyization is sequentially:Ferro-aluminum → Si-Ca-Ba → silicomangan → molybdenum-iron → VN alloy, successively to adding following alloy in ladle:
By the amount of 0.8~1.5kg/t steel, ferro-aluminum is added;By the amount of 1.0kg/t steel, Si-Ca-Ba is added;By 11.5~15.7kg/t steel
Amount, adds silicomangan;By the amount of 1.4~1.7kg/t steel, molybdenum-iron is added;By the amount of 0.18~0.38 kg/t steel, vanadium is added
Nitrogen alloy;Above-mentioned alloy is added when ladle molten steel amount reaches 3/4;After tapping is finished, molten steel is hung and delivers to LF stove refining procedures;
D, the refining of molten steel LF stoves:Step C tapping is finished into molten steel it is hung to LF stoves refining station and connect argon gas band, opens argon gas and use
15~25NL/min Argons 2 minutes, then bottom electrode is using 7~9 grades of sluggings of gear;After being powered 3 minutes, in lift electrode observation stove
Slugging situation, afterwards thermometric determine oxygen and sampling;Aluminum shot 0.5~0.8kg/t steel is added, molten steel oxygen activity≤10ppm is controlled, afterwards
By the amount of 0.7~1.3kg/t steel, the ferrotianium of following mass ratio is added:Ti 32.5wt%, remaining be Fe and inevitably it is impure
Thing;At the same time, residue adjustment is carried out according to slag condition, if slag condition is diluter, adds lime 4.0~6.0kg/t steel, add calcium carbide 1.0
Kg/t steel residue adjustments, it is 5.0~6.0 to control basicity of slag;Carried out at line feeding after liquid steel temperature is heated into 1570~1580 DEG C afterwards
Reason, silicon-calcium wire of the feeding with following mass ratio:Si 53.5wt%, Ca 28.2wt%, remaining be Fe and inevitably it is impure
Thing, wire-feeding velocity is 3.0m/s, and line feeding amount is 100m;It is the small argon gas amount of 15~25NL/min to steel that line feeding terminates to use flow
Water carries out soft blow argon, and soft blow time >=6 minute add molten steel covering agent afterwards, and addition is controlled to 1.0 kg/t steel, then will
Molten steel is hung to casting station;
E, molten steel casting:It it is 1560~1570 DEG C in tundish temperature, pulling rate is 1.2~1.4m/min, and Water Rate for Secondary Cooling Water is 0.5
~0.6L/kg, M-EMS Current intensity be 350A, running frequency be 2.5HZ under conditions of, using the straight arcs of R12m
The molten steel whole process protection of D steps is cast into the stream bloom casting machine of 5 machine of continuous straightening 5 steel billet of section 200mm × 200mm;
F, heating steel billet:The steel billet of E steps is added through rollgang feeding side inlet side outlet walking beam double-regenerative heating furnace
Heat, blast furnace gas and air preheating temperature are all higher than 1000 DEG C, and burner hearth is adopted as micro-pressure operation, and pressure is 10 ~ 15Pa;Heating
Stove soaking zone temperature control is 1170 ~ 1200 DEG C, and the heat time is 80 ~ 100 minutes, and steel billet temperature is controlled to 1120 ~ 1150 DEG C;
G, steel billet high-pressure water tank de-scaling:F-step steel billet is delivered to the water under high pressure that length is 1.2m from after heating furnace tapping through roller-way
Case removes removing iron scale, and the steel billet speed of service is controlled to 1.0m/s, and nozzle hydraulic pressure is 16 ~ 18MPa;After high-pressure water descaling, steel
Base temperature is down to 1020 ~ 1050 DEG C;
H, big mill are preforming:G steps steel billet feeding two-roller reversible big mill is preforming, and start rolling temperature is controlled to 1020 ~
1050 DEG C, mill speed is controlled to 3.8 ~ 4.0m/s, and rolling pass is 7 roads, and pass schedule uses the pre- knifing pass system of butterfly,
Obtain preforming rolled piece;Different rolling specs control different preforming rolled piece leg side thickness and rolled piece overall breadth dimensions;
I, universal mill tandem rolling:The preforming rolled piece of H steps is sent into 10 frame universal mill tandem rollings, rolled piece enters Continuous mill train
Temperature control is 920 ~ 950 DEG C, and total rolling pass is 10 roads, and per the road of frame 1, universal mill is adjusted to two roller die formulas, rolling speed
Degree is controlled to 4.5 ~ 4.8m/s;Finishing temperature control be 860 ~ 890 DEG C, finished frame outlet rolling speed control be 4.5 ~
4.8m/s;The operation of rolling follows that " rolled piece temperature is high, appropriate to reduce tandem rolling speed;Rolled piece temperature is low, properly increases tandem rolling speed "
Principle;
The online appearance and size detection of J, angle steel:The rolled piece that I steps are obtained delivers to Zaser contourgraph and carries out profile chi through runout table
Very little accuracy detection, after after online shaping blades flying shear upper cold bed;
K, finishing:J step process finish after angle steel through the roller-way upper cold bed of conveying, rolled piece naturally cooled on cold bed 80 DEG C with
Under;On-line straightening afterwards, aligning speed control is 4.6 ~ 4.9m/s;After angle steel is through aligning, carry out scale sawing, collection, stacking,
Automatic bundling, mark, obtain final product.
Blast-melted chemical composition described in step A is 4.2 ~ 4.8wt% of C, 0.30 ~ 0.55wt% of Si, Mn 0.50
~ 0.70wt%, 0.090 ~ 0.110wt% of P, S≤0.030wt%, remaining is Fe and inevitable impurity.
The chemical composition of the pretreated molten iron described in step A is:C 4.2~4.8wt%、Si 0.30~0.55wt%、
0.50 ~ 0.70wt% of Mn, 0.090 ~ 0.110wt% of P, S≤0.008wt%, remaining is Fe and inevitable impurity.
The chemical composition of the steel scrap described in step B is C 0.20-0.25wt%, Si 0.30-0.55wt%, Mn 1.15-
1.35wt%, P 0.020-0.037wt%, S 0.022-0.036wt%, remaining is Fe and inevitable impurity;Described
The chemical composition of the pig iron be 3.0 ~ 3.3wt% of C, the 0.40 ~ 0.60wt% of wt%, Mn of Si 0.30 ~ 0.50, P 0.060 ~
0.015 ~ 0.025wt% of 0.085wt%, S, remaining is Fe and inevitable impurity.
The chemical composition of the ferro-aluminum described in step C is Al 60.0wt%, and remaining is Fe and inevitable impurity.
The chemical composition of the Si-Ca-Ba described in step C is Si 52.4wt%, Ca 11.5wt%, Ba 13.5wt%, Al
4.2wt%, remaining is Fe and inevitable impurity.
The chemical composition of the silicomangan described in step C is Mn 65.7wt%, Si 17.2wt%, and remaining is Fe and can not
The impurity for avoiding.
The chemical composition of the molybdenum-iron described in step C is Mo 57.2wt%, and remaining is Fe and inevitable impurity.
The chemical composition of the VN alloy described in step C is V 77.8wt%, N 15.8wt%, C 3.6wt%, and remaining is
Fe and inevitable impurity.
No. 14-No. 18 hot-rolled angle steel chemical compositions (mass fraction) of fire resisting Q345FRB and technologic mechanicses that the present invention is provided
Performance (is shown in Table 1~table 2).
The public steel structure Q345FRD fire resistings hot-rolled angle steel chemical composition for building of the invention of table 1
The public steel structure Q345FRD fire resistings for building hot-rolled angle steel technologic mechanicses performance of the invention of table 2
Embodiment 1
A, molten iron pretreatment desulfurizing:By blast-melted (chemical composition C 4.2wt%, Si 0.30wt%, Mn 0.50wt%, P
0.110wt%, S0.030wt%, remaining is Fe and inevitable impurity) it is transported to KR methods molten iron preprocessing unit and carries out desulfurization
Treatment, stirring-head insertion depth is controlled to 2500mm, by 10.0 kg/tSteelAmount, add routine CaO matter desulfurizing agent carry out desulfurization
Treatment, mixing time is controlled to 6 minutes;Stirring terminate after carry out taking off rear slag operation, it is ensured that in ladle molten iron face it is exposed >=3/4,
Scratch clean desulfurization slag;Hot metal composition is controlled to after pretreatment:C 4.2wt%、Si 0.30wt%、Mn 0.50wt% 、P 0.110wt%、
S 0.008wt%, remaining is Fe and inevitable impurity.
B, smelting molten steel:By the pretreated molten iron of step A (C 4.2wt%, Si 0.30wt%, Mn 0.50wt%, P
0.110wt%, S 0.008wt%, remaining is Fe and inevitable impurity), high-quality steel scrap (chemical composition C 0.25wt%, Si
0.55wt%, Mn 1.35wt%, P 0.037wt%, S 0.036wt%, remaining is Fe and inevitable impurity) and the pig iron
(chemical composition C 3.3wt%, Si 0.50 wt%, Mn 0.60wt%, P 0.085wt%, S 0.025wt%, remaining is for Fe and not
Evitable impurity) add 120 tons of LD converters in, conventional top bottom blowing is carried out, respectively by 30.0kg/tSteel、22.0kg/
tSteel、2.0kg/tSteelAddition, add lime, light dolomite, magnesite ball slag making, control endpoint carbon content 0.08wt%, tapping
1640 DEG C of temperature;Wash heat is carried out to ladle bottom addition lime and refining slag before tapping, lime adding amount is:2.0kg/tSteel, essence
Refining slag addition is:1.0kg/tSteel;Using whole bottom argon blowing technology during tapping, argon flow amount is controlled to 20NL/min.
C, deoxidation alloying:Step B is smelted the molten steel tapping for finishing, when the molten steel amount in ladle is more than 1/4, is pressed
Row deoxidation alloying is sequentially:Ferro-aluminum → Si-Ca-Ba → silicomangan → molybdenum-iron → VN alloy, it is following to being added in ladle successively
Material:By 0.8kg/tSteelAmount, add following mass ratio ferro-aluminum:Al 60.0wt%, remaining be Fe and inevitably it is impure
Thing;By 1.0kg/tSteelAmount, add following mass ratio calsibar alloy:Si 52.4wt%, Ca 11.5wt%, Ba
13.5wt%, Al 4.2wt%, remaining is Fe and inevitable impurity;By 11.5kg/tSteelAmount, add following mass ratio
Silicomangan:Mn 65.7wt%, Si 17.2wt%, remaining is Fe and inevitable impurity;By 1.4kg/tSteelAmount, add
The molybdenum-iron of following mass ratio:Mo 57.2wt%, remaining is Fe and inevitable impurity;By 0.18 kg/tSteelAmount, add
The VN alloy of following mass ratio:V 77.8wt%, N 15.8wt%, C 3.6wt%, remaining is Fe and inevitable impurity;
Above-mentioned alloy is added when ladle molten steel amount reaches 3/4;After tapping is finished, molten steel is hung and delivers to LF stove refining procedures.
D, the refining of molten steel LF stoves:Step C tapping is finished into molten steel it is hung to LF stoves refining station and connect argon gas band, opens argon gas
Using small argon amount (15NL/min) Argon 2 minutes, then bottom electrode used 7~9 grades of sluggings of gear;After being powered 3 minutes, lift electrode
Slugging situation in stove is observed, thermometric determines oxygen and sampling afterwards;Add aluminum shot 0.5kg/tSteel, molten steel oxygen activity 10ppm is controlled, afterwards
By 0.7kg/tSteelAmount, add following mass ratio ferrotianium:Ti 32.5wt%, remaining is Fe and inevitable impurity;With
This carries out residue adjustment according to slag condition simultaneously, if slag condition is diluter, adds lime 4.0kg/tSteel, add the kg/t of calcium carbide 1.0SteelResidue adjustment, control
Basicity of slag processed is 5.0;Wire feeding process, silicon of the feeding with following mass ratio are carried out after liquid steel temperature is heated into 1580 DEG C afterwards
Calcium line:Si 53.5wt%, Ca 28.2wt%, remaining be Fe and inevitable impurity, wire-feeding velocity is 3.0m/s, line feeding
It is 100m to measure;Line feeding terminates to use the flow carry out soft blow argon to molten steel for the small argon gas amount of 15NL/min, 6 minutes soft blow time,
Molten steel covering agent is added afterwards, and addition is controlled to 1.0 kg/t steel, molten steel then is hung into casting station.
E, molten steel casting:It is 1570 DEG C in tundish temperature, pulling rate is 1.4m/min, and Water Rate for Secondary Cooling Water is 0.6L/kg, knot
Brilliant device electromagnetic agitation current strength be 350A, running frequency be 2.5HZ under conditions of, using the straight machines 5 of arc continuous straightening 5 of R12m
The whole process protection of D steps is cast into stream bloom casting machine the steel billet of section 230mm × 230mm.
F, heating steel billet:The steel billet of E steps is entered through rollgang feeding side inlet side outlet walking beam double-regenerative heating furnace
Row heating.Blast furnace gas and air preheating temperature are all higher than 1000 DEG C, and burner hearth is adopted as micro-pressure operation, and pressure is 10Pa;Plus
Hot stove soaking zone temperature control is 1200 DEG C, and the heat time is 100 minutes, and steel billet temperature is controlled to 1150 DEG C.
G, steel billet high-pressure water tank de-scaling:By F-step steel billet from after heating furnace tapping, it is 1.2m's to be delivered to length through roller-way
High-pressure water tank removes removing iron scale, and the steel billet speed of service is controlled to 1.0m/s, and nozzle hydraulic pressure is 16MPa;After through high-pressure water descaling,
Steel billet temperature is down to 1050 DEG C.
H, big mill are preforming:G steps steel billet feeding two-roller reversible big mill is preforming, and start rolling temperature is controlled to
1050 DEG C, mill speed is controlled to 4.0m/s, and rolling pass is 7 roads, and pass schedule uses the pre- knifing pass system of butterfly, preformation
Type rolled piece leg side thickness and rolled piece beam overall are strictly controlled by code.
I, universal mill tandem rolling:H steps rolled piece is sent into 10 frame universal mill tandem rollings.Using butterfly hole type system, roll
The temperature control that part enters Continuous mill train is 950 DEG C, and total rolling pass is 10 roads (per the road of frame 1), and universal mill is adjusted to two
Roller die formula, mill speed is controlled to 4.8m/s;Finishing temperature control is 890 DEG C, and mill speed (finished frame outlet) is controlled to
4.6m/s.The operation of rolling follows that " rolled piece temperature is high, appropriate to reduce tandem rolling speed;Rolled piece temperature is low, properly increases tandem rolling speed "
Principle.
The online appearance and size detection of J, angle steel:The rolled piece of I steps delivers to Zaser contourgraph and carries out profile chi through runout table
Very little accuracy detection, after after online shaping blades flying shear upper cold bed.
K, finishing:Angle steel after the detection of I steps appearance and size is finished through the roller-way upper cold bed of conveying, rolled piece on cold bed from
So it is cooled to 76 DEG C;On-line straightening afterwards, aligning speed control is 4.9m/s;After angle steel is through aligning, carries out scale sawing, receive
Collection, stacking, automatic bundling, mark, that is, obtaining has 345MPa grades 14 of good anti-corrosion weatherability and superior low temperature impact flexibility
Number hot-rolled angle steel, the specification (length of side × length of side × side is thick) of steel is 140mm × 140mm × 12mm, with following weight percents
Chemical composition:C 0.16 wt%、Si 0.23wt%、Mn 0.85wt%、V 0.017wt%、Ti 0.015wt%、Mo
The wt% of 0.080wt%, S 0.015wt%, P 0.020, remaining is Fe and inevitable impurity.
345MPa grades of No. 14 hot-rolled angle steels with excellent fire resisting shock resistance and low-temperature impact toughness that the present embodiment is provided
With following process mechanical property (being shown in Table 3);
The public steel that the present embodiment of table 3 is provided builds and builds Q345FRD fire resistings antidetonation with No. 14 hot-rolled angle steel technologic mechanicses performances
Embodiment 2
A, molten iron pretreatment desulfurizing:By blast-melted (chemical composition C 4.6wt%, Si 0.42wt%, Mn 0.60wt%, P
0.100wt%, S0.025wt%, remaining is Fe and inevitable impurity) it is transported to KR methods molten iron preprocessing unit and carries out desulfurization
Treatment, stirring-head insertion depth is controlled to 2700mm, by 11.0 kg/tSteelAmount, add routine CaO matter desulfurizing agent carry out desulfurization
Treatment, mixing time is controlled to 6 minutes;Stirring terminate after carry out taking off rear slag operation, it is ensured that in ladle molten iron face it is exposed >=3/4,
Scratch clean desulfurization slag;Hot metal composition is controlled to after pretreatment:Chemical composition C 4.6wt%, Si 0.42wt%, Mn 0.60wt%, P
0.100wt%, S0.005wt%, remaining is Fe and inevitable impurity.
B, smelting molten steel:By the pretreated molten iron of step A (chemical composition C 4.6wt%, Si 0.42wt%, Mn
0.60wt%, P 0.100wt%, S0.005wt%, remaining is Fe and inevitable impurity), high-quality steel scrap (chemical composition C
0.22wt%, Si 0.42wt%, Mn 1.25wt%, P 0.029wt%, S 0.029wt%, remaining be Fe and inevitably it is impure
Thing) and the pig iron (chemical composition C 3.1wt%, Si 0.40 wt%, Mn 0.50wt%, P 0.072wt%, S 0.020wt%, remaining
Be Fe and inevitable impurity) add 120 tons of LD converters in, conventional top bottom blowing is carried out, respectively by 32.0kg/
tSteel、24.0kg/tSteel、3.0kg/tSteelAddition, add lime, light dolomite, magnesite ball slag making, control endpoint carbon content
0.10wt%, 1646 DEG C of tapping temperature;Wash heat is carried out to ladle bottom addition lime and refining slag before tapping, lime adding amount is:
2.0kg/tSteel, refining slag addition is:1.0kg/tSteel;Using whole bottom argon blowing technology during tapping, argon flow amount is controlled to 30NL/
min。
C, deoxidation alloying:Step B is smelted the molten steel tapping for finishing, when the molten steel amount in ladle is more than 1/4, is pressed
Row deoxidation alloying is sequentially:Ferro-aluminum → Si-Ca-Ba → silicomangan → molybdenum-iron → VN alloy, it is following to being added in ladle successively
Material:By 1.2kg/tSteelAmount, add following mass ratio ferro-aluminum:Al 60.0wt%, remaining be Fe and inevitably it is impure
Thing;By 1.0kg/tSteelAmount, add following mass ratio calsibar alloy:Si 52.4wt%, Ca 11.5wt%, Ba
13.5wt%, Al 4.2wt%, remaining is Fe and inevitable impurity;By 13.6kg/tSteelAmount, add following mass ratio
Silicomangan:Mn 65.7wt%, Si 17.2wt%, remaining is Fe and inevitable impurity;By 1.6kg/tSteelAmount, add
The molybdenum-iron of following mass ratio:Mo 57.2wt%, remaining is Fe and inevitable impurity;By 0.29 kg/tSteelAmount, add
The VN alloy of following mass ratio:V 77.8wt%, N 15.8wt%, C 3.6wt%, remaining is Fe and inevitable impurity;
Above-mentioned alloy is added when ladle molten steel amount reaches 3/4;After tapping is finished, molten steel is hung and delivers to LF stove refining procedures.
D, the refining of molten steel LF stoves:Step C tapping is finished into molten steel it is hung to LF stoves refining station and connect argon gas band, opens argon gas
Using small argon amount (20NL/min) Argon 2 minutes, then bottom electrode used 7~9 grades of sluggings of gear;After being powered 3 minutes, lift electrode
Slugging situation in stove is observed, thermometric determines oxygen and sampling afterwards;Add aluminum shot 0.6kg/tSteel, molten steel oxygen activity 8ppm is controlled, afterwards
By 1.0kg/tSteelAmount, add following mass ratio ferrotianium:Ti 32.5wt%, remaining is Fe and inevitable impurity;With
This carries out residue adjustment according to slag condition simultaneously, if slag condition is diluter, adds lime 5.0kg/tSteel, add the kg/t of calcium carbide 1.0SteelResidue adjustment, control
Basicity of slag processed is 5.5;Wire feeding process, silicon of the feeding with following mass ratio are carried out after liquid steel temperature is heated into 1575 DEG C afterwards
Calcium line:Si 53.5wt%, Ca 28.2wt%, remaining be Fe and inevitable impurity, wire-feeding velocity is 3.0m/s, line feeding
It is 100m to measure;Line feeding terminates to use the flow soft blow argon, 7 points of soft blow time are carried out to molten steel for the small argon gas amount of 15~25NL/min
Clock, adds molten steel covering agent afterwards, and addition is controlled to 1.0 kg/t steel, molten steel then is hung into casting station.
E, molten steel casting:It is 1565 DEG C in tundish temperature, pulling rate is 1.3m/min, and Water Rate for Secondary Cooling Water is 0.55L/kg,
M-EMS Current intensity be 350A, running frequency be 2.5HZ under conditions of, using the straight arc continuous straightenings 5 of R12m
The whole process protection of D steps is cast into the stream bloom casting machine of machine 5 steel billet of section 230mm × 230mm.
F, heating steel billet:The steel billet of E steps is entered through rollgang feeding side inlet side outlet walking beam double-regenerative heating furnace
Row heating.Blast furnace gas and air preheating temperature are all higher than 1000 DEG C, and burner hearth is adopted as micro-pressure operation, and pressure is 13Pa;Plus
Hot stove soaking zone temperature control is 1185 DEG C, and the heat time is 90 minutes, and steel billet temperature is controlled to 1135 DEG C.
G, steel billet high-pressure water tank de-scaling:By F-step steel billet from after heating furnace tapping, it is 1.2m's to be delivered to length through roller-way
High-pressure water tank removes removing iron scale, and the steel billet speed of service is controlled to 1.0m/s, and nozzle hydraulic pressure is 17MPa;After through high-pressure water descaling,
Steel billet temperature is down to 1035 DEG C.
H, big mill are preforming:G steps steel billet feeding two-roller reversible big mill is preforming, and start rolling temperature is controlled to
1035 DEG C, mill speed is controlled to 3.9m/s, and rolling pass is 7 roads, and pass schedule uses the pre- knifing pass system of butterfly, preformation
Type rolled piece controls leg side thickness and rolled piece overall width.
I, universal mill tandem rolling:H steps rolled piece is sent into 10 frame universal mill tandem rollings.Using butterfly hole type system, roll
The temperature control that part enters Continuous mill train is 935 DEG C, and total rolling pass is 10 roads (per the road of frame 1), and universal mill is adjusted to two
Roller die formula, mill speed is controlled to 4.6m/s;Finishing temperature control is 875 DEG C, and mill speed (finished frame outlet) is controlled to
4.7m/s.Because material molded breadth is flat, rapid heat dissipation, the operation of rolling follows that " rolled piece temperature is high, appropriate to reduce tandem rolling speed;Rolled piece temperature
Low, properly increase tandem rolling speed " principle.
The online appearance and size detection of J, angle steel:The rolled piece of I steps is delivered into Zaser contourgraph through runout table carries out profile
Dimensional accuracy detects, after after online shaping blades flying shear upper cold bed.
K, finishing:Angle steel after the detection of J steps appearance and size is finished through the roller-way upper cold bed of conveying, rolled piece on cold bed from
So it is cooled to 72 DEG C;On-line straightening afterwards, aligning speed control is 4.7m/s;After angle steel is through aligning, carries out scale sawing, receive
Collection, stacking, automatic bundling, mark, that is, obtaining has 345MPa grades 16 of good anti-corrosion weatherability and superior low temperature impact flexibility
Number hot-rolled angle steel, the specification (length of side × length of side × side is thick) of steel is 160mm × 160mm × 14mm, with following weight percents
Chemical composition:C 0.18 wt%、Si 0.28wt%、Mn 0.95 wt%、V 0.025wt%、Ti 0.022wt%、Mo
0.090wt%, S0.012wt%, P0.017 wt%, remaining is Fe and inevitable impurity.
345MPa grades of No. 16 hot-rolled angle steels with excellent fire resisting shock resistance and low-temperature impact toughness that the present embodiment is provided
With following process mechanical property (being shown in Table 4);
The public steel that the present embodiment of table 4 is provided builds and builds Q345FRD fire resistings, No. 16 hot-rolled angle steel technologic mechanicses performances of antidetonation
Embodiment 3
A, molten iron pretreatment desulfurizing:By blast-melted (chemical composition C 4.8wt%, Si 0.55wt%, Mn 0.70wt%, P
0.090wt%, S0.020wt%, remaining is Fe and inevitable impurity) it is transported to KR methods molten iron preprocessing unit and carries out desulfurization
Treatment, stirring-head insertion depth is controlled to 2800mm, by 12.0 kg/tSteelAmount, add routine CaO matter desulfurizing agent carry out desulfurization
Treatment, mixing time is controlled to 6 minutes;Stirring terminate after carry out taking off rear slag operation, it is ensured that in ladle molten iron face it is exposed >=3/4,
Scratch clean desulfurization slag;Hot metal composition is controlled to after pretreatment:C 4.8wt%、Si 0.55wt%、Mn 0.70wt% 、P 0.090wt%、
S0.003wt%, remaining is Fe and inevitable impurity.
B, smelting molten steel:By the pretreated molten iron of step A (C 4.8wt%, Si 0.55wt%, Mn 0.70wt%, P
0.090wt%, S0.003wt%, remaining is Fe and inevitable impurity), high-quality steel scrap (chemical composition C 0.20wt%, Si
0.30wt%, Mn 1.15wt%, P 0.020wt%, S 0.022wt%, remaining is Fe and inevitable impurity) and the pig iron
(chemical composition C 3.0wt%, Si 0.30 wt%, Mn 0.40wt%, P 0.060wt%, S 0.015wt%, remaining is for Fe and not
Evitable impurity) add 120 tons of LD converters in, conventional top bottom blowing is carried out, respectively by 33.0kg/tSteel、26.0kg/
tSteel、4.0kg/tSteelAddition, add lime, light dolomite, magnesite ball slag making, control endpoint carbon content 0.12wt%, tapping
1650 DEG C of temperature;Wash heat is carried out to ladle bottom addition lime and refining slag before tapping, lime adding amount is:2.0kg/tSteel, essence
Refining slag addition is:1.0kg/tSteel;Using whole bottom argon blowing technology during tapping, argon flow amount is controlled to 40NL/min.
C, deoxidation alloying:Step B is smelted the molten steel tapping for finishing, when the molten steel amount in ladle is more than 1/4, is pressed
Row deoxidation alloying is sequentially:Ferro-aluminum → Si-Ca-Ba → silicomangan → molybdenum-iron → VN alloy, it is following to being added in ladle successively
Material:By 1.5kg/tSteelAmount, add following mass ratio ferro-aluminum:Al 60.0wt%, remaining be Fe and inevitably it is impure
Thing;By 1.0kg/tSteelAmount, add following mass ratio calsibar alloy:Si 52.4wt%, Ca 11.5wt%, Ba
13.5wt%, Al 4.2wt%, remaining is Fe and inevitable impurity;By 15.7kg/tSteelAmount, add following mass ratio
Silicomangan:Mn 65.7wt%, Si 17.2wt%, remaining is Fe and inevitable impurity;By 1.7kg/tSteelAmount, add
The molybdenum-iron of following mass ratio:Mo 57.2wt%, remaining is Fe and inevitable impurity;By 0.38 kg/tSteelAmount, add
The VN alloy of following mass ratio:V 77.8wt%, N 15.8wt%, C 3.6wt%, remaining is Fe and inevitable impurity;
Above-mentioned alloy is added when ladle molten steel amount reaches 3/4;After tapping is finished, molten steel is hung and delivers to LF stove refining procedures.
D, the refining of molten steel LF stoves:Step C tapping is finished into molten steel it is hung to LF stoves refining station and connect argon gas band, opens argon gas
Using small argon amount (25NL/min) Argon 2 minutes, then bottom electrode used 7~9 grades of sluggings of gear;After being powered 3 minutes, lift electrode
Slugging situation in stove is observed, thermometric determines oxygen and sampling afterwards;Add aluminum shot 0.8kg/tSteel, molten steel oxygen activity 6ppm is controlled, afterwards
By 1.3kg/tSteelAmount, add following mass ratio ferrotianium:Ti 32.5wt%, remaining is Fe and inevitable impurity;With
This carries out residue adjustment according to slag condition simultaneously, if slag condition is diluter, adds lime 6.0kg/tSteel, add the kg/t of calcium carbide 1.0SteelResidue adjustment, control
Basicity of slag processed is 6.0;Wire feeding process, silicon of the feeding with following mass ratio are carried out after liquid steel temperature is heated into 1570 DEG C afterwards
Calcium line:Si 53.5wt%, Ca 28.2wt%, remaining be Fe and inevitable impurity, wire-feeding velocity is 3.0m/s, line feeding
It is 100m to measure;Line feeding terminates to use the flow carry out soft blow argon to molten steel for the small argon gas amount of 25NL/min, 8 minutes soft blow time,
Molten steel covering agent is added afterwards, and addition is controlled to 1.0 kg/t steel, molten steel then is hung into casting station.
E, molten steel casting:It is 1560 DEG C in tundish temperature, pulling rate is 1.2m/min, and Water Rate for Secondary Cooling Water is 0.5L/kg, knot
Brilliant device electromagnetic agitation current strength be 350A, running frequency be 2.5HZ under conditions of, using the straight machines 5 of arc continuous straightening 5 of R12m
The whole process protection of D steps is cast into stream bloom casting machine the steel billet of section 230mm × 230mm;
F, heating steel billet:The steel billet of E steps is added through rollgang feeding side inlet side outlet walking beam double-regenerative heating furnace
Heat.Blast furnace gas and air preheating temperature are all higher than 1000 DEG C, and burner hearth is adopted as micro-pressure operation, and pressure is 15Pa;Heating furnace
Soaking zone temperature control is 1170 DEG C, and the heat time is 80 minutes, and steel billet temperature is controlled to 1120 DEG C.
G, steel billet high-pressure water tank de-scaling:By F-step steel billet from after heating furnace tapping, it is 1.2m's to be delivered to length through roller-way
High-pressure water tank removes removing iron scale, and the steel billet speed of service is controlled to 1.0m/s, and nozzle hydraulic pressure is 18MPa;After through high-pressure water descaling,
Steel billet temperature is down to 1020 DEG C.
H, big mill are preforming:G steps steel billet feeding two-roller reversible big mill is preforming, and start rolling temperature is controlled to
1020 DEG C, mill speed is controlled to 3.8m/s, and rolling pass is 7 roads, and pass schedule uses the pre- knifing pass system of butterfly, preformation
The good leg side thickness of type rolled piece priority control and rolled piece beam overall.
I, universal mill tandem rolling:H steps rolled piece is sent into 10 frame universal mill tandem rollings.Using butterfly hole type system, roll
The temperature control that part enters Continuous mill train is 920 DEG C, and total rolling pass is 8 roads (two frame F9, F10 are empty after wherein crosses), omnipotent to roll
Machine is adjusted to two roller die formulas, and mill speed is controlled to 4.5m/s;Finishing temperature control is 860 DEG C, and (finished frame goes out mill speed
Mouthful) it is controlled to 4.8m/s;Because material molded breadth is flat, rapid heat dissipation, the operation of rolling follows that " rolled piece temperature is high, appropriate to reduce tandem rolling speed;
Rolled piece temperature is low, properly increases tandem rolling speed " principle.
The online appearance and size detection of J, angle steel:The rolled piece of I steps is delivered into Zaser contourgraph through runout table carries out profile
Dimensional accuracy detects, after after online shaping blades flying shear upper cold bed.
K, finishing:Angle steel after the detection of J steps appearance and size is finished through the roller-way upper cold bed of conveying, rolled piece on cold bed from
So it is cooled to 65 DEG C;On-line straightening afterwards, aligning speed control is 4.6m/s;After angle steel is through aligning, carries out scale sawing, receive
Collection, stacking, automatic bundling, mark, that is, obtaining has 345MPa grades 18 of good anti-corrosion weatherability and superior low temperature impact flexibility
Number hot-rolled angle steel, the specification (length of side × length of side × side is thick) of steel is 180mm × 180mm × 16mm, with following weight percents
Chemical composition:C 0.21 wt%、Si 0.33 wt%、Mn 1.05 wt%、V 0.032wt%、Ti 0.030wt%、Mo
The wt% of 0.100wt%, S 0.010wt%, P 0.014, remaining is Fe and inevitable impurity.
345MPa grades of No. 18 hot-rolled angle steels with excellent fire resisting shock resistance and low-temperature impact toughness that the present embodiment is provided
With following process mechanical property (being shown in Table 5);
The public steel that the present embodiment of table 5 is provided builds and builds Q345FRD fire resistings, No. 18 hot-rolled angle steel technologic mechanicses performances of antidetonation
Claims (10)
1. a kind of public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, it is characterised in that described fire resisting is earthquake-resistant hot rolled
Angle steel is by molten iron pretreatment desulfurizing, smelting molten steel, deoxidation alloying, the refining of molten steel LF stoves, molten steel casting, steel billet by molten iron
Heating, the de-scaling of steel billet high-pressure water tank, preforming big mill, universal mill tandem rolling, the online appearance and size detection of angle steel, finishing system
For what is obtained, the chemical composition with following weight percents:C 0.16~0.21 wt%, Si 0.23~0.33 wt%, Mn
0.85~1.05 0.017~0.032wt% of wt%, V, 0.015~0.030wt% of Ti, 0.080~0.100wt% of Mo, S≤
0.015wt%, P≤0.020 wt%, remaining is Fe and inevitable impurity.
2. a kind of preparation method of the public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building according to claim 1,
It is characterized in that comprising the following steps:
A, molten iron pretreatment desulfurizing:The blast-melted KR methods molten iron preprocessing unit that is transported to is carried out into desulfurization process, stirring-head insertion
Severity control is 2500 ~ 2800mm, by the amount of 10.0~12.0 kg/t steel, adds CaO matter desulfurizing agent to carry out desulfurization process, is taken off
Sulphur mixing time is controlled to 6 minutes;Stirring terminate after carry out taking off rear slag operation, it is ensured that in ladle molten iron face it is exposed >=3/4, scratch clean
Desulfurization slag, obtains pretreated molten iron;
B, smelting molten steel:By in the pretreated molten iron of step A, high-quality steel scrap and the pig iron 120 tons of LD converters of addition, top bottom is carried out
Top-bottom blowing, respectively by 30.0~33.0kg/t steel, 22.0~26.0kg/t steel, 2.0~4.0kg/t steel addition, add
Lime, light dolomite, magnesite ball slag making, control endpoint carbon content >=0.08wt%, tapping temperature≤1650 DEG C;Tapping before to
Ladle bottom adds lime and refining slag carries out wash heat, and lime adding amount is 2.0kg/t steel, and refining slag addition is 1.0kg/t
Steel;Using whole bottom argon blowing technology during tapping, argon flow amount is controlled to 20~40NL/min;
C, deoxidation alloying:Step B is smelted the molten steel tapping for finishing, when the molten steel amount in ladle is more than 1/4, by following de-
Oxygen alloyization is sequentially:Ferro-aluminum → Si-Ca-Ba → silicomangan → molybdenum-iron → VN alloy, successively to adding following alloy in ladle:
By the amount of 0.8~1.5kg/t steel, ferro-aluminum is added;By the amount of 1.0kg/t steel, Si-Ca-Ba is added;By 11.5~15.7kg/t steel
Amount, adds silicomangan;By the amount of 1.4~1.7kg/t steel, molybdenum-iron is added;By the amount of 0.18~0.38 kg/t steel, vanadium is added
Nitrogen alloy;Above-mentioned alloy is added when ladle molten steel amount reaches 3/4;After tapping is finished, molten steel is hung and delivers to LF stove refining procedures;
D, the refining of molten steel LF stoves:Step C tapping is finished into molten steel it is hung to LF stoves refining station and connect argon gas band, opens argon gas and use
15~25NL/min Argons 2 minutes, then bottom electrode is using 7~9 grades of sluggings of gear;After being powered 3 minutes, in lift electrode observation stove
Slugging situation, afterwards thermometric determine oxygen and sampling;Aluminum shot 0.5~0.8kg/t steel is added, molten steel oxygen activity≤10ppm is controlled, afterwards
By the amount of 0.7~1.3kg/t steel, the ferrotianium of following mass ratio is added:Ti 32.5wt%, remaining be Fe and inevitably it is impure
Thing;At the same time, residue adjustment is carried out according to slag condition, if slag condition is diluter, adds lime 4.0~6.0kg/t steel, add calcium carbide 1.0
Kg/t steel residue adjustments, it is 5.0~6.0 to control basicity of slag;Carried out at line feeding after liquid steel temperature is heated into 1570~1580 DEG C afterwards
Reason, silicon-calcium wire of the feeding with following mass ratio:Si 53.5wt%, Ca 28.2wt%, remaining be Fe and inevitably it is impure
Thing, wire-feeding velocity is 3.0m/s, and line feeding amount is 100m;It is the small argon gas amount of 15~25NL/min to steel that line feeding terminates to use flow
Water carries out soft blow argon, and soft blow time >=6 minute add molten steel covering agent afterwards, and addition is controlled to 1.0 kg/t steel, then will
Molten steel is hung to casting station;
E, molten steel casting:It it is 1560~1570 DEG C in tundish temperature, pulling rate is 1.2~1.4m/min, and Water Rate for Secondary Cooling Water is 0.5
~0.6L/kg, M-EMS Current intensity be 350A, running frequency be 2.5HZ under conditions of, using the straight arcs of R12m
The molten steel whole process protection of D steps is cast into the stream bloom casting machine of 5 machine of continuous straightening 5 steel billet of section 200mm × 200mm;
F, heating steel billet:The steel billet of E steps is added through rollgang feeding side inlet side outlet walking beam double-regenerative heating furnace
Heat, blast furnace gas and air preheating temperature are all higher than 1000 DEG C, and burner hearth is adopted as micro-pressure operation, and pressure is 10 ~ 15Pa;Heating
Stove soaking zone temperature control is 1170 ~ 1200 DEG C, and the heat time is 80 ~ 100 minutes, and steel billet temperature is controlled to 1120 ~ 1150 DEG C;
G, steel billet high-pressure water tank de-scaling:F-step steel billet is delivered to the water under high pressure that length is 1.2m from after heating furnace tapping through roller-way
Case removes removing iron scale, and the steel billet speed of service is controlled to 1.0m/s, and nozzle hydraulic pressure is 16 ~ 18MPa;After high-pressure water descaling, steel
Base temperature is down to 1020 ~ 1050 DEG C;
H, big mill are preforming:G steps steel billet feeding two-roller reversible big mill is preforming, and start rolling temperature is controlled to 1020 ~
1050 DEG C, mill speed is controlled to 3.8 ~ 4.0m/s, and rolling pass is 7 roads, and pass schedule uses the pre- knifing pass system of butterfly,
Obtain preforming rolled piece;
I, universal mill tandem rolling:The preforming rolled piece of H steps is sent into 10 frame universal mill tandem rollings, rolled piece enters Continuous mill train
Temperature control is 920 ~ 950 DEG C, and total rolling pass is 10 roads, and per the road of frame 1, universal mill is adjusted to two roller die formulas, rolling speed
Degree is controlled to 4.5 ~ 4.8m/s;Finishing temperature control be 860 ~ 890 DEG C, finished frame outlet rolling speed control be 4.5 ~
4.8m/s;The operation of rolling follows that " rolled piece temperature is high, appropriate to reduce tandem rolling speed;Rolled piece temperature is low, properly increases tandem rolling speed "
Principle;
The online appearance and size detection of J, angle steel:The rolled piece that I steps are obtained delivers to Zaser contourgraph and carries out profile chi through runout table
Very little accuracy detection, after after online shaping blades flying shear upper cold bed;
K, finishing:J step process finish after angle steel through the roller-way upper cold bed of conveying, rolled piece naturally cooled on cold bed 80 DEG C with
Under;On-line straightening afterwards, aligning speed control is 4.6 ~ 4.9m/s;After angle steel is through aligning, carry out scale sawing, collection, stacking,
Automatic bundling, mark, obtain final product.
3. the preparation method of the public steel structure according to claim 2 earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, it is special
Levy be blast-melted chemical composition described in step A for 4.2 ~ 4.8wt% of C, 0.30 ~ 0.55wt% of Si, Mn 0.50 ~
0.090 ~ 0.110wt% of 0.70wt%, P, S≤0.030wt%, remaining is Fe and inevitable impurity.
4. the preparation method of the public steel structure according to claim 2 earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, it is special
Levy is that the chemical composition of pretreated molten iron described in step A is:C 4.2~4.8wt%、Si 0.30~0.55wt%、Mn
0.50 ~ 0.70wt%, 0.090 ~ 0.110wt% of P, S≤0.008wt%, remaining is Fe and inevitable impurity.
5. the preparation method of the public steel structure according to claim 2 earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, it is special
Levy is that the chemical composition of steel scrap described in step B is C 0.20-0.25wt%, Si 0.30-0.55wt%, Mn 1.15-
1.35wt%, P 0.020-0.037wt%, S 0.022-0.036wt%, remaining is Fe and inevitable impurity;Described
The chemical composition of the pig iron be 3.0 ~ 3.3wt% of C, the 0.40 ~ 0.60wt% of wt%, Mn of Si 0.30 ~ 0.50, P 0.060 ~
0.015 ~ 0.025wt% of 0.085wt%, S, remaining is Fe and inevitable impurity.
6. the preparation method of the public steel structure according to claim 2 earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, it is special
It is that the chemical composition of ferro-aluminum described in step C is Al 60.0wt% to levy, and remaining is Fe and inevitable impurity.
7. the preparation method of the public steel structure according to claim 2 earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, it is special
Levy is that the chemical composition of Si-Ca-Ba described in step C is Si 52.4wt%, Ca 11.5wt%, Ba 13.5wt%, Al
4.2wt%, remaining is Fe and inevitable impurity.
8. the preparation method of the public steel structure according to claim 2 earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, it is special
It is that the chemical composition of silicomangan described in step C is Mn 65.7wt%, Si 17.2wt% to levy, and remaining is Fe and can not keep away
The impurity exempted from.
9. the preparation method of the public steel structure according to claim 2 earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, it is special
It is that the chemical composition of molybdenum-iron described in step C is Mo 57.2wt% to levy, and remaining is Fe and inevitable impurity.
10. the preparation method of the public steel structure according to claim 2 earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building, its
The chemical composition of the VN alloy being characterised by described in step C is V 77.8wt%, N 15.8wt%, C 3.6wt%, and remaining is
Fe and inevitable impurity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710187058.5A CN106906411B (en) | 2017-03-27 | 2017-03-27 | A kind of public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710187058.5A CN106906411B (en) | 2017-03-27 | 2017-03-27 | A kind of public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building and preparation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106906411A true CN106906411A (en) | 2017-06-30 |
CN106906411B CN106906411B (en) | 2018-10-09 |
Family
ID=59195353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710187058.5A Active CN106906411B (en) | 2017-03-27 | 2017-03-27 | A kind of public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106906411B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108251597A (en) * | 2018-01-31 | 2018-07-06 | 舞阳钢铁有限责任公司 | Improve the production method that A/B grades of Q235/Q345 steel connect the property poured |
CN109487029A (en) * | 2018-11-26 | 2019-03-19 | 山东钢铁股份有限公司 | A kind of method of deoxidation of primary converter production low-carbon low-silicon steel |
WO2019218653A1 (en) * | 2018-05-17 | 2019-11-21 | 常熟市龙腾特种钢有限公司 | Method for producing angle steel for use in low-temperature high-toughness steel pylon |
CN115612925A (en) * | 2022-09-19 | 2023-01-17 | 包头钢铁(集团)有限责任公司 | Rare earth yttrium-treated 345 MPa-grade low-cost refractory hot-rolled steel plate and preparation method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102605287A (en) * | 2012-03-09 | 2012-07-25 | 武汉钢铁(集团)公司 | Steel for high-ductility anti-seismic structure with yield ratio smaller than or equal to 0.70 and production method of steel |
CN102952994A (en) * | 2011-08-25 | 2013-03-06 | 宝山钢铁股份有限公司 | Fire-resistant and earthquake-resistant steel for construction and production method thereof |
CN103981459A (en) * | 2014-05-30 | 2014-08-13 | 武汉钢铁(集团)公司 | High-strength refractory anti-seismic structure steel and production method thereof |
CN105132826A (en) * | 2015-09-30 | 2015-12-09 | 河南理工大学 | Thick low-yield-ratio high-strength structural steel for buildings and preparing method of thick low-yield-ratio high-strength structural steel |
CN105543677A (en) * | 2015-12-21 | 2016-05-04 | 武钢集团昆明钢铁股份有限公司 | 345MPa-grade No.14 hot rolling angle steel used for electric power telecommunication tower of plateau mountain area and preparation method of 345MPa-grade No.14 hot rolling angle steel |
CN105543704A (en) * | 2015-12-29 | 2016-05-04 | 钢铁研究总院 | High-strength, shock-resistant, fire-proof and corrosion-proof steel plate and manufacturing method |
-
2017
- 2017-03-27 CN CN201710187058.5A patent/CN106906411B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102952994A (en) * | 2011-08-25 | 2013-03-06 | 宝山钢铁股份有限公司 | Fire-resistant and earthquake-resistant steel for construction and production method thereof |
CN102605287A (en) * | 2012-03-09 | 2012-07-25 | 武汉钢铁(集团)公司 | Steel for high-ductility anti-seismic structure with yield ratio smaller than or equal to 0.70 and production method of steel |
CN103981459A (en) * | 2014-05-30 | 2014-08-13 | 武汉钢铁(集团)公司 | High-strength refractory anti-seismic structure steel and production method thereof |
CN105132826A (en) * | 2015-09-30 | 2015-12-09 | 河南理工大学 | Thick low-yield-ratio high-strength structural steel for buildings and preparing method of thick low-yield-ratio high-strength structural steel |
CN105543677A (en) * | 2015-12-21 | 2016-05-04 | 武钢集团昆明钢铁股份有限公司 | 345MPa-grade No.14 hot rolling angle steel used for electric power telecommunication tower of plateau mountain area and preparation method of 345MPa-grade No.14 hot rolling angle steel |
CN105543704A (en) * | 2015-12-29 | 2016-05-04 | 钢铁研究总院 | High-strength, shock-resistant, fire-proof and corrosion-proof steel plate and manufacturing method |
Non-Patent Citations (1)
Title |
---|
刘玠: "《炼钢生产自动化技术》", 30 November 2006, 冶金工业出版社 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108251597A (en) * | 2018-01-31 | 2018-07-06 | 舞阳钢铁有限责任公司 | Improve the production method that A/B grades of Q235/Q345 steel connect the property poured |
WO2019218653A1 (en) * | 2018-05-17 | 2019-11-21 | 常熟市龙腾特种钢有限公司 | Method for producing angle steel for use in low-temperature high-toughness steel pylon |
CN109487029A (en) * | 2018-11-26 | 2019-03-19 | 山东钢铁股份有限公司 | A kind of method of deoxidation of primary converter production low-carbon low-silicon steel |
CN115612925A (en) * | 2022-09-19 | 2023-01-17 | 包头钢铁(集团)有限责任公司 | Rare earth yttrium-treated 345 MPa-grade low-cost refractory hot-rolled steel plate and preparation method thereof |
CN115612925B (en) * | 2022-09-19 | 2024-02-23 | 包头钢铁(集团)有限责任公司 | Rare earth yttrium treated 345 MPa-level low-cost refractory hot rolled steel plate and preparation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106906411B (en) | 2018-10-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113061805B (en) | 600 MPa-grade corrosion-resistant rare earth reinforcing steel bar and production method thereof | |
CN111101079B (en) | Large-specification phi 28-36mm HRB600 high-strength controlled rolling steel bar for hydropower station engineering and preparation method thereof | |
CN106929623B (en) | A kind of preparation method of 10.9 grade high-strength bolt steel hot rolling wire rod | |
CN111455261B (en) | Nitrogen-rich vanadium microalloyed large-specification 400MPa high-strength-toughness anti-seismic steel bar and preparation method thereof | |
CN106906411B (en) | A kind of public steel structure earthquake-resistant hot rolled angle steel of Q345FRD fire resistings for building and preparation method thereof | |
CN106917033B (en) | A kind of preparation method of high-quality 40Cr alloy structures vertical bar round steel | |
CN102796961B (en) | 600MPa high-performance fire-resistant aseismic reinforcing steel bar for concrete and production thereof | |
CN113981312B (en) | Hot-rolled wire rod for high-strength low-relaxation prestressed steel strand and preparation method thereof | |
CN110066904B (en) | High-strength high-toughness lightweight tool steel and preparation method thereof | |
CN104294162B (en) | A kind of 785MPa grade high-strength prestressed structure spiral and preparation method thereof | |
CN114000048B (en) | SWRH82B hot-rolled wire rod for prestressed steel strand with nominal diameter of 12.5mm and preparation method thereof | |
CN101654760B (en) | Unalloyed structural steel S355J2 steel plate and production method thereof | |
CN105018839B (en) | 420 MPa grade high-performance anti-shock H-type steel and preparation method thereof | |
CN105603320B (en) | Method for producing container plate by means of thin slab casting and rolling | |
CN102418048A (en) | Steel for hollow axle of high-speed bullet train and manufacturing method thereof | |
CN105734418A (en) | Low-temperature-resistant hot-rolled angle steel and preparation method thereof | |
CN109252105A (en) | The 500MPa grades of high yield ratio anti-seismic steel bar bars of microalloy containing V and its production method | |
CN103805868B (en) | A kind of corrosion-resistant high-performance H profile steel of antidetonation and working method thereof | |
CN112779460A (en) | Production method of HRB500E fine-grain high-strength anti-seismic anti-corrosion reinforcing steel bar | |
CN114000050A (en) | Nitrogen-rich vanadium-chromium microalloyed ultrafine-grain corrosion-resistant HRB400E wire rod anti-seismic steel bar and preparation method thereof | |
CN115141979A (en) | High-cleanliness boron-containing high-hardenability hot-rolled I-shaped steel and preparation method thereof | |
CN109468534A (en) | The 500MPa grades of high yield ratio anti-seismic steel bar wire rods of microalloy containing V and its production method | |
CN114086062B (en) | Steel for high-speed rail axle and production method thereof | |
CN105543677B (en) | A kind of plateau mountain area power communication pylon No. 14 hot-rolled angle steels of 345MPa levels and preparation method thereof | |
CN107099735B (en) | A kind of weather-proof pillar of electrification rail contacting net of vanadium Nb-microalloying is with hot rolled H-shaped and preparation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |