CN106903664B - A kind of auxiliary line drawing of hydropower installation takes device - Google Patents

A kind of auxiliary line drawing of hydropower installation takes device Download PDF

Info

Publication number
CN106903664B
CN106903664B CN201710294453.3A CN201710294453A CN106903664B CN 106903664 B CN106903664 B CN 106903664B CN 201710294453 A CN201710294453 A CN 201710294453A CN 106903664 B CN106903664 B CN 106903664B
Authority
CN
China
Prior art keywords
pedestal
slot
motion bar
shaft
control mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710294453.3A
Other languages
Chinese (zh)
Other versions
CN106903664A (en
Inventor
李华为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou tuomai Hardware Tool Manufacturing Co.,Ltd.
Original Assignee
Zhongshan Eastern Xin Rui Hydropower Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan Eastern Xin Rui Hydropower Installation Engineering Co Ltd filed Critical Zhongshan Eastern Xin Rui Hydropower Installation Engineering Co Ltd
Priority to CN201710294453.3A priority Critical patent/CN106903664B/en
Publication of CN106903664A publication Critical patent/CN106903664A/en
Application granted granted Critical
Publication of CN106903664B publication Critical patent/CN106903664B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H7/00Marking-out or setting-out work
    • B25H7/04Devices, e.g. scribers, for marking
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H7/00Marking-out or setting-out work
    • B25H7/04Devices, e.g. scribers, for marking
    • B25H7/045Devices, e.g. scribers, for marking characterised by constructional details of the marking elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Coating Apparatus (AREA)

Abstract

The present invention discloses a kind of auxiliary line drawing of hydropower installation and takes device, it include pedestal, it is characterized by: being equipped with the straight line control mechanism that can draw cut-off line above the pedestal, the straight line control mechanism includes the control cabinet being located above pedestal, shaft is equipped on control cabinet top, locate to be equipped with central turnplate with one heart in the shaft, central turnplate surface one end is equipped with eccentric shaft, crank slot is equipped in the control cabinet, motion bar is equipped in the control cabinet, the eccentric loose slot through motion bar is equipped at motion bar center, the bias loose slot is cooperated with each other with eccentric shaft and shaft, crank slot axis is equipped in movable boom end, the crank slot axis is along crank slot activity, the elastic pen stand for preventing from excessively compressing and paintbrush being caused to damage is equipped on the motion bar top, after the present invention is equipped with straight line control mechanism, it can be easily in wall Locate picture cut-off line, facilitates constructor to construct, improve construction quality, and structure is simple, it is easy to use.

Description

A kind of auxiliary line drawing of hydropower installation takes device
Technical field
The present invention relates to hydropower installation field, in particular to a kind of hydropower installation auxiliary line drawing takes device.
Background technique
Before groover is slotted, the picture for carrying out auxiliary line to wall or ground etc. is needed to take, to reach picture fluting Reasonable purpose, but it is askew due to being easy picture when drawing cut-off line, and aloft draw cut-off line on wall and be not easy, give constructor It brings inconvenience, hinders one's work, reduce construction quality.
So existing hydropower installation equipment needs further to improve.
Summary of the invention
Place that purpose of the invention is to overcome the shortcomings in the prior art provides a kind of auxiliary line drawing of hydropower installation and takes Device.
In order to achieve the above object, the present invention uses following scheme:
A kind of auxiliary line drawing of hydropower installation takes device, includes pedestal, it is characterised in that: being equipped with above the pedestal can draw The straight line control mechanism of cut-off line, the straight line control mechanism includes the control cabinet being located above pedestal, on control cabinet top Equipped with shaft, locate to be equipped with central turnplate with one heart in the shaft, central turnplate surface one end is equipped with eccentric shaft, described It is equipped with crank slot in control cabinet, motion bar is equipped in the control cabinet, the bias through motion bar is equipped at motion bar center Loose slot, the bias loose slot are cooperated with each other with eccentric shaft and shaft, are equipped with crank slot axis, the song in movable boom end Fluted shaft is equipped with the elastic pen stand for preventing from excessively compressing and paintbrush being caused to damage on the motion bar top along crank slot activity.
A kind of hydropower installation auxiliary line drawing takes device as described above, it is characterised in that in the pedestal and straight line control mechanism Between be equipped with and be adjustable the regulating device of straight line control mechanism height, the regulating device includes to be located at straight line control mechanism bottom The telescopic rod at end is equipped with rack gear in the telescopic rod, and the bar slot through pedestal top is equipped in the pedestal, described flexible Bar and bar slot cooperate with each other, and the through-hole extended through in bar slot is equipped at the outer wall of pedestal side, is provided in the through-hole Flexible handle is equipped with gear, the gear and rack gear cooperating in flexible handle inner end.
A kind of line drawing of hydropower installation auxiliary takes device as described above, it is characterised in that the base bottom sets that there are four supports The supporting leg of the present apparatus.
A kind of hydropower installation auxiliary line drawing takes device as described above, it is characterised in that central turnplate outer surface two sides are set There is the pull rod that can control central turnplate rotation.
A kind of hydropower installation auxiliary line drawing takes device as described above, it is characterised in that is equipped with and can draw in the elasticity pen stand The paintbrush of auxiliary line.
In conclusion the present invention compared with the existing technology the beneficial effect is that:
After the present invention is equipped with straight line control mechanism, cut-off line can be drawn at wall easily, facilitates constructor to construct, improves Construction quality, and structure is simple, it is easy to use.
Detailed description of the invention
Fig. 1 is perspective view of the invention;
Fig. 2 is structural schematic diagram of the invention;
Fig. 3 is schematic diagram of internal structure of the invention;
Fig. 4 is rearview of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, the present invention provides a kind of technical solution:
A kind of auxiliary line drawing of hydropower installation takes device, includes pedestal 1, it is characterised in that energy is equipped with above the pedestal 1 The straight line control mechanism 2 of cut-off line is drawn, the straight line control mechanism 2 includes the control cabinet 21 for being located at 1 top of pedestal, is being controlled 21 top of case is equipped with shaft 22, is equipped with central turnplate 23, the 23 surface one end of central turnplate in place with one heart in the shaft 22 Equipped with eccentric shaft 24, it is equipped with crank slot 25 in the control cabinet 21, motion bar 26 is equipped in the control cabinet 21, in motion bar The eccentric loose slot 27 through motion bar 26 is equipped at 26 centers, the bias loose slot 27 and eccentric shaft 24 and shaft 22 are mutual Cooperating is equipped with crank slot axis 28 in 26 end of motion bar, and the crank slot axis 28 is along 25 activity of crank slot, in the motion bar 26 Top is equipped with the elastic pen stand 29 for preventing from excessively compressing and paintbrush being caused to damage.
The adjusting dress for being adjustable 2 height of straight line control mechanism is equipped between pedestal 1 and straight line control mechanism 2 of the present invention 4 are set, the regulating device 4 includes the telescopic rod 41 for being located at 2 bottom end of straight line control mechanism, and tooth is equipped in the telescopic rod 41 Item 42 is equipped with the bar slot 43 through 1 top of pedestal in the pedestal 1, and the telescopic rod 41 and bar slot 43 cooperate with each other, It is equipped with the through-hole 44 extended through in bar slot 43 at 1 side outer wall of pedestal, flexible handle 45 is provided in the through-hole 44, in work Dynamic 45 inner end of handle is equipped with gear 46,42 cooperating of the gear 46 and rack gear.
1 bottom of pedestal of the present invention set there are four support the present apparatus supporting leg 11.
23 outer surface two sides of central turnplate of the present invention are equipped with the pull rod 30 that can control the rotation of central turnplate 23.
The paintbrush 3 that can draw auxiliary line is equipped in elasticity pen stand 29 of the present invention.
In conjunction with as described above:
Height is taken by the setting picture of controling adjustment device 4, constructor pulls both ends pull rod 30 to make 2 turns of straight line control mechanism Dynamic, the paintbrush 3 at 2 top of straight line control mechanism draws cut-off line in the corresponding position of wall.
Basic principles and main features and advantages of the present invention of the invention, the skill of the industry has been shown and described above Art personnel it should be appreciated that the present invention is not limited to the above embodiments, the above embodiments and description only describe The principle of the present invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these Changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and Its equivalent thereof.

Claims (5)

  1. It include pedestal (1), it is characterised in that: be equipped with above the pedestal (1) 1. a kind of hydropower installation auxiliary line drawing takes device The straight line control mechanism (2) of cut-off line can be drawn, the straight line control mechanism (2) includes the control cabinet being located above pedestal (1) (21), shaft (22) are equipped on control cabinet (21) top, in the concentric place of the shaft (22) is equipped with central turnplate (23), is described Heart turntable (23) surface one end is equipped with eccentric shaft (24), crank slot (25) is equipped in the control cabinet (21), in the control Motion bar (26) are equipped in case (21), the eccentric loose slot (27) through motion bar (26) is equipped at motion bar (26) center, The bias loose slot (27) cooperates with each other with eccentric shaft (24) and shaft (22), is equipped with crank slot in motion bar (26) end Axis (28), the crank slot axis (28) along crank slot (25) activity, the motion bar (26) top be equipped with prevent from excessively compressing and The elastic pen stand (29) for causing paintbrush to damage.
  2. 2. a kind of hydropower installation auxiliary line drawing takes device according to claim 1, it is characterised in that in the pedestal (1) and directly The regulating device (4) for being adjustable straight line control mechanism (2) height, regulating device (4) packet are equipped between line traffic control mechanism (2) The telescopic rod (41) for being located at straight line control mechanism (2) bottom end is included, rack gear (42) are equipped in the telescopic rod (41), described The bar slot (43) through pedestal (1) top is equipped in pedestal (1), the telescopic rod (41) and bar slot (43) cooperate with each other, It is equipped with the through-hole (44) extended through in bar slot (43) at the outer wall of pedestal (1) side, is provided with movable handle in the through-hole (44) Hand (45) is equipped with gear (46), the gear (46) and rack gear (42) cooperating in flexible handle (45) inner end.
  3. 3. a kind of hydropower installation auxiliary line drawing takes device according to claim 1, it is characterised in that pedestal (1) bottom is set There are four the supporting legs (11) of the support present apparatus.
  4. 4. a kind of hydropower installation auxiliary line drawing takes device according to claim 1, it is characterised in that the central turnplate (23) Outer surface two sides are equipped with the pull rod (30) that can control central turnplate (23) rotation.
  5. 5. a kind of hydropower installation auxiliary line drawing takes device according to claim 1, it is characterised in that the elasticity pen stand (29) It is interior to be equipped with the paintbrush (3) that draw auxiliary line.
CN201710294453.3A 2017-04-28 2017-04-28 A kind of auxiliary line drawing of hydropower installation takes device Active CN106903664B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710294453.3A CN106903664B (en) 2017-04-28 2017-04-28 A kind of auxiliary line drawing of hydropower installation takes device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710294453.3A CN106903664B (en) 2017-04-28 2017-04-28 A kind of auxiliary line drawing of hydropower installation takes device

Publications (2)

Publication Number Publication Date
CN106903664A CN106903664A (en) 2017-06-30
CN106903664B true CN106903664B (en) 2019-05-10

Family

ID=59210698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710294453.3A Active CN106903664B (en) 2017-04-28 2017-04-28 A kind of auxiliary line drawing of hydropower installation takes device

Country Status (1)

Country Link
CN (1) CN106903664B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110095040B (en) * 2019-06-05 2024-06-18 中建八局第四建设有限公司 Multi-functional water and electricity installation positioner

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5515617A (en) * 1995-01-03 1996-05-14 Canfield; Gerald Measuring, marking, and cutting tool
CN204800186U (en) * 2015-06-18 2015-11-25 陈辉 Marking off of inner rail cantilever straight line, cutting, welding auxiliary device
CN205674383U (en) * 2016-06-16 2016-11-09 黄冈师范学院 A kind of ceramic tile perforate line positioner
CN106584414B (en) * 2016-12-22 2019-04-12 六安永贞匠道机电科技有限公司 Three-dimension curved surface line drawing device

Also Published As

Publication number Publication date
CN106903664A (en) 2017-06-30

Similar Documents

Publication Publication Date Title
CN204162177U (en) A kind of folding pay-off stand
CN106903664B (en) A kind of auxiliary line drawing of hydropower installation takes device
CN204087049U (en) A kind of graphoscope bracing frame
CN211747808U (en) Special drawing desk of architectural design personnel
CN207574116U (en) A kind of grape upright post stand
CN208621068U (en) A kind of countryside portable mapping tool stand
CN207364614U (en) A kind of camera self-timer bar
CN204950071U (en) Detachable multifunctional book stand
CN203355766U (en) Folding iron support for chemical teaching
CN109954765A (en) A kind of apparatus for leveling
CN211024947U (en) Ground trampoline convenient to adjust elasticity size
CN104595649A (en) Sun umbrella base convenient to move
CN208531918U (en) It is a kind of easily to adjust spinning support frame
CN208215283U (en) A kind of overturning tooling of blade of wind-driven generator
CN207279207U (en) A kind of display/panel bracket of rotation lock
CN207188503U (en) Batch ironing roller device
CN209474265U (en) A kind of adjustable model
CN209286581U (en) A kind of novel fast portable Spinning of quick-detach
CN201870131U (en) Multifunctional art easel
CN205845412U (en) A kind of hospital financial statistic device
CN207362494U (en) A kind of packaged type printing and dyeing baking box
CN205900303U (en) Upset stand up device of coil winding former for sleeping in
CN206986465U (en) A kind of adjustable hemmer for vamp production
CN205890321U (en) Conveniently change compasses of pencil
CN206593883U (en) A kind of environmental monitoring sampler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201117

Address after: No.01 CHUANGYOU Road, hardware machinery industrial park, nianzhuang Town, Pizhou City, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou tuomai Hardware Tool Manufacturing Co.,Ltd.

Address before: 528400, 1, 1 Sports street, three East Sports street, Zhongshan, Guangdong, Zhongshan

Patentee before: Zhongshan Eastern Xin Rui hydropower installation engineering Co.,Ltd.