CN106896420A - A kind of quick surveying method of Geotechnical Engineering - Google Patents

A kind of quick surveying method of Geotechnical Engineering Download PDF

Info

Publication number
CN106896420A
CN106896420A CN201510969579.7A CN201510969579A CN106896420A CN 106896420 A CN106896420 A CN 106896420A CN 201510969579 A CN201510969579 A CN 201510969579A CN 106896420 A CN106896420 A CN 106896420A
Authority
CN
China
Prior art keywords
instrument
engineering
geotechnical
region
detect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510969579.7A
Other languages
Chinese (zh)
Inventor
王凡俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Huabei Engineering Survey And Design Co Ltd
Original Assignee
Tianjin Huabei Engineering Survey And Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Huabei Engineering Survey And Design Co Ltd filed Critical Tianjin Huabei Engineering Survey And Design Co Ltd
Priority to CN201510969579.7A priority Critical patent/CN106896420A/en
Publication of CN106896420A publication Critical patent/CN106896420A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V11/00Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00

Abstract

The invention discloses a kind of quick surveying method of Geotechnical Engineering, comprise the following steps:1) in Engineering Zone by geotechnical investigation region segmentation be several circular work areas;2) annular orientation drilling, including outer shroud and inner ring are carried out in each workspace tested region, the pipeline for being available for engineering geophysics instrument and receiving instrument to walk is laid in the annulus for being formed;3) engineering geophysics instrument is placed in a circulating line wherein, receiving instrument is put into another circulating line, engineering geophysics instrument and receiving instrument are carried out into angular speed identical circulatory motion in the duct, so as to detect geotechnical investigation data in acquisition region.Complete step 3) after, engineering geophysics instrument and receiving instrument are interchangeable, repeat the above steps 3), so as to detect geotechnical investigation data in acquisition region.After completing geotechnical investigation of the engineering geophysics instrument in tested region interior conduit, other physical prospecting instrument and receiving instrument, repeat step 3 are changed) detect geotechnical investigation data in acquisition region.

Description

A kind of quick surveying method of Geotechnical Engineering
Technical field
The present invention relates to technical field of geotechnical investigation, more specifically to a kind of quick surveying method of Geotechnical Engineering.
Background technology
Any civil engineering is all closely related with ground, and they directly contact and interact with rock soil medium.Therefore, sufficient awareness and understanding are carried out for Rock And Soil distribution characteristics, engineering properties etc., is the important prerequisite for carrying out engineering design and construction.And it is then the Main Means for disclosing Rock And Soil spatial distribution (including distribution of the underground water closely related with Rock And Soil) and change to explore.
The form on all kinds of civil engineerings basis be it is different, have in " point " shape, have in " line " shape.The building construction of typical case's such as frame structure, structural column reaches on the ground of relatively independent point building gravity dispersion, now only needs to investigate the foundation soil property of each point, according to the basis of each point soil nature matter design structure;And the engineering such as subway, tunnel is distributed due to its continuity wire, the property of all soil of relevant position most preferably being understood, being design, work foundation is provided especially for construction.
Existing accurate geologic information is obtained by the probing of a position, and is put the geology distribution and point between and be difficult to or cannot understand, and this construction to linear engineering causes very big puzzlement.Such as the jacking construction and the shield-tunneling construction of subway engineering of water supply and sewage work, the unknown pipe network in underground, tree root, timber, ancient stream channel harbour etc. are frequently encountered, the large change of rock and soil properties is also for construction brings very big challenge.Therefore, wire engineering is highly desirable understands engineering completely continuous geology distribution.
The conventional method of geotechnical investigation has probing, probing and the class of geophysical exploration three.Probing is the direct method of engineering investigation, refer to manually or mechanical equivalent of light excavation prospect pit, exploratory trench, vertical shaft, adit etc..The method is limited by underground water, and cutting depth can not be too big, and difficulty of construction is big, and the engineering time is long.
Probing is the semi-direct method of engineering exploration, is one of topmost means of geotechnical engineering investigation.Compared with probing, geophysical exploration, probing has irreplaceable effect, different type, different structure, the building of different scales, structures, different phase of explorations, investigation and prospecting under the conditions of varying environment, typically all uses or part is explored using drilling method.Probing and probing are to understand geology of deep part data, find out the direct approach and reliable method of engineering geological condition.But labor intensive, material resources are more, it is necessary to the time is long.
It is applied to the geophysical exploration method referred to as engineering geophysics in geotechnical engineering investigation.It is the engineering geological condition of building yard, hydrogeologic condition, Characteristics of Geotechnical Engineering, bad geological phenomenon, dynamical stability to be explored using special geophysical instrument and special geophysical prospecting method and building yard wave speed of the earthquake is tested.The advantage of engineering geophysics is:Equipment is light, efficiency high, in ground, aerial, waterborne or drilling, (this is vertical drilling, different from horizontal drilling of the invention) in can carry out physical prospecting, according to research degree and precision and increasing exploration density, depth can be actually needed, realize the gauze of design exploration from different directions, multi-faceted data matrix is constituted, the characteristics of with volume rendering.But, engineering geophysical method often receives the interference of environmental factor and limiting to for Instrument measuring precision, and the result of its analysis is more rough.Therefore, engineering geophysics is usually the householder method of geotechnical engineering investigation.By the measuring method of the different physical field to geologic body, engineering geophysics can be divided into electrical prospecting, seismic prospecting, magnetic prospecting, gravimetric prospecting, radioactivity survey, well logging etc..
In a word, existing geotechnical investigation method has three classes, and probing therein, probing are direct methods, and form is the prospecting of " point " shape, and as a result apparent, engineering geophysics is indirect method, by the interference of environmental factor and limiting to for Instrument measuring precision, as a result roughly.
It is those skilled in that art's technical problem urgently to be resolved hurrily therefore, because there is above-mentioned technological deficiency in the prior art.
The content of the invention
The purpose of the present invention is a kind of quick surveying method of Geotechnical Engineering of offer, it is intended to solve the complexity of surveying method present in prior art, the limited problem of measurement area.
To achieve the above object, the present invention provides following technical scheme:
A kind of quick surveying method of Geotechnical Engineering, comprises the following steps:
1) in Engineering Zone by geotechnical investigation region segmentation be several circular work areas;
2) annular orientation drilling, including outer shroud and inner ring are carried out in each workspace tested region, the pipeline for being available for engineering geophysics instrument and receiving instrument to walk is laid in the annulus for being formed;
3) engineering geophysics instrument is placed in a circulating line wherein, receiving instrument is put into another circulating line, engineering geophysics instrument and receiving instrument are carried out into angular speed identical circulatory motion in the duct, so as to detect geotechnical investigation data in acquisition region.
Preferably, step 3 is completed) after, engineering geophysics instrument and receiving instrument are interchangeable, repeat the above steps 3), so as to detect geotechnical investigation data in acquisition region.
Preferably, after completing geotechnical investigation of the engineering geophysics instrument in tested region interior conduit, the physical prospecting instrument and receiving instrument of other operation principles, repeat step 3 are changed) detect geotechnical investigation data in acquisition region.
Preferably, the circulating line is provided with working pit.
The present invention is advantageous in that:The existing ripe trenchless technology of present invention fusion, the technology that underground utilities, pipeline and buried cable are laid, repaired or changed using crack digging or no-dig technology, multiple border circular areas are classified as in built engineering depth bounds, at least two pipelines of annular trend are buried in each border circular areas, by physical prospecting instrument, in-line carries out physical prospecting, determines the property and underground obstacle of engineering construction Site Soil.The inventive step is simple, and prospecting accuracy is high, solves existing probing, probing form and may be only available for being point-like engineering, and the excessively rough problem of engineering geophysical method analysis result, realize the accurate prospecting to the Geotechnical Engineering of circular engineering.
Specific embodiment
The invention provides a kind of quick surveying method of Geotechnical Engineering, pipe laying is simple, and measuring apparatus are readily available, and is capable of achieving the prospecting of cut zone, and the Data Collection degree of accuracy is high.
A kind of quick surveying method of Geotechnical Engineering, comprises the following steps:
1) in Engineering Zone by geotechnical investigation region segmentation be several circular work areas;
2) annular orientation drilling, including outer shroud and inner ring are carried out in each workspace tested region, the pipeline for being available for engineering geophysics instrument and receiving instrument to walk is laid in the annulus for being formed;
3) engineering geophysics instrument is placed in a circulating line wherein, receiving instrument is put into another circulating line, engineering geophysics instrument and receiving instrument are carried out into angular speed identical circulatory motion in the duct, so as to detect geotechnical investigation data in acquisition region.
Further, step 3 is completed) after, engineering geophysics instrument and receiving instrument are interchangeable, repeat the above steps 3), so as to detect geotechnical investigation data in acquisition region.
Further, after completing geotechnical investigation of the engineering geophysics instrument in tested region interior conduit, the physical prospecting instrument and receiving instrument of other operation principles, repeat step 3 are changed) detect geotechnical investigation data in acquisition region.Described physical prospecting instrument can be the types such as electrical prospecting instrument, seismic prospecting instrument, magnetic prospecting instrument, gravimetric prospecting instrument, radioactivity survey instrument.The data of different physical prospecting instrument collections are analyzed, Geotechnical Engineering Properties, underground obstacle of engineering etc. is determined, for engineering design, arrangement and method for construction provide foundation.
Further, the circulating line is provided with working pit.
The existing ripe trenchless technology of present invention fusion, the technology that underground utilities, pipeline and buried cable are laid, repaired or changed using crack digging or no-dig technology, multiple border circular areas are classified as in built engineering depth bounds, at least two pipelines of annular trend are buried in each border circular areas, by physical prospecting instrument, in-line carries out physical prospecting, determines the property and underground obstacle of engineering construction Site Soil.The inventive step is simple, and prospecting accuracy is high, solves existing probing, probing form and may be only available for being point-like engineering, and the excessively rough problem of engineering geophysical method analysis result, realize the accurate prospecting to the Geotechnical Engineering of circular engineering.
Each embodiment is described by the way of progressive in this specification, and what each embodiment was stressed is the difference with other embodiment, between each embodiment identical similar portion mutually referring to.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or uses the present invention.Various modifications to these embodiments are for those skilled in the art it will be apparent that generic principles defined herein can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, the present invention is not intended to be limited to the embodiments shown herein, and is to fit to the most wide scope consistent with principles disclosed herein and features of novelty.

Claims (4)

1. the quick surveying method of a kind of Geotechnical Engineering, it is characterised in that:Comprise the following steps:
1) in Engineering Zone by geotechnical investigation region segmentation be several circular work areas;
2) annular orientation drilling, including outer shroud and inner ring are carried out in each workspace tested region, is being formed Annulus in lay the pipeline for being available for that engineering geophysics instrument and receiving instrument walk;
3) engineering geophysics instrument is placed in a circulating line wherein, reception is put into another circulating line Instrument, carries out angular speed identical circulatory motion, so as to detect acquisition in the duct by engineering geophysics instrument and receiving instrument Geotechnical investigation data in region.
2. the quick surveying method of Geotechnical Engineering as claimed in claim 1, it is characterised in that:Complete step 3) Afterwards, engineering geophysics instrument and receiving instrument are interchangeable, are repeated the above steps 3), so as to detect in acquisition region Geotechnical investigation data.
3. the quick surveying method of Geotechnical Engineering as claimed in claim 2, it is characterised in that:Complete the work After geotechnical investigation of the journey physical prospecting instrument in tested region interior conduit, change the physical prospecting instrument of other operation principles and receive Instrument, repeat step 3) detect geotechnical investigation data in acquisition region.
4. the quick surveying method of Geotechnical Engineering as described in any one of claims 1 to 3, it is characterised in that: The circulating line is provided with working pit.
CN201510969579.7A 2015-12-20 2015-12-20 A kind of quick surveying method of Geotechnical Engineering Pending CN106896420A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510969579.7A CN106896420A (en) 2015-12-20 2015-12-20 A kind of quick surveying method of Geotechnical Engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510969579.7A CN106896420A (en) 2015-12-20 2015-12-20 A kind of quick surveying method of Geotechnical Engineering

Publications (1)

Publication Number Publication Date
CN106896420A true CN106896420A (en) 2017-06-27

Family

ID=59191150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510969579.7A Pending CN106896420A (en) 2015-12-20 2015-12-20 A kind of quick surveying method of Geotechnical Engineering

Country Status (1)

Country Link
CN (1) CN106896420A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10718683B2 (en) * 2017-12-05 2020-07-21 Inventec (Pudong) Technology Corporation Pipeline leakage detection system and method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10718683B2 (en) * 2017-12-05 2020-07-21 Inventec (Pudong) Technology Corporation Pipeline leakage detection system and method thereof

Similar Documents

Publication Publication Date Title
Bellefleur et al. Vertical seismic profiling using distributed acoustic sensing with scatter‐enhanced fibre‐optic cable at the Cu–Au New Afton porphyry deposit, British Columbia, Canada
CN110018528B (en) Curtain source oil-gas comprehensive geological analysis method
CN103335169B (en) A kind of geotechnical investigation method
CN113960695A (en) Fine exploration method for water-rich karst in complex urban environment
CN107703551A (en) A kind of great burying concrete drain tile line detection method with pressure
Gao et al. Water detection within the working face of an underground coal mine using 3D electric resistivity tomography (ERT)
CN106896412A (en) A kind of geotechnical engineering investigation method of wire engineering
Su et al. Detection method of pile foundation on subway lines based on cross-hole resistivity computed tomography
EVALUATE Automatic measurement of drilling parameters to evaluate the mechanical properties of soils
Karagkounis et al. Geology and geotechnical evaluation of Doha rock formations
Li et al. The detection of the boulders in metro tunneling in granite strata using a shield tunneling method and a new method of coping with boulders
CN206959798U (en) Exploring Loose Rock Country in Tunnels range test system
CN106896420A (en) A kind of quick surveying method of Geotechnical Engineering
McCann et al. Setting the standard for geophysical surveys in site investigation
Kovačević et al. Application of geophysical investigations in underground engineering
CN104631418A (en) Method for checking underground pipeline through simple manpower device in urban geology exploration
Yanjun et al. Deformation damage of shallow tunnels and cave-induced ground collapse in archeozoic gneissic granites-the jining tunnel as case example
Aati et al. Detection of karstic limestone bedrock by shallow seismic refraction in an area west of Assiut, Middle Egypt
CN110847142A (en) Exploration method for geotechnical engineering geophysical prospecting
Martinez et al. Investigation of the utility of Gulf Coast salt domes for the storage or disposal of radioactive wastes
Ceryan Handbook of research on trends and digital advances in engineering geology
Gao et al. Development status of digital detection technology for unfavorable geological structure of submarine tunnel
Darracott et al. Planning engineering geophysical surveys
Setchell et al. The use of Non-Invasive Geophysical Techniques to build 3-Dimensional ground models and reduce the cost and risk of site investigation
Li et al. The Whole-Space Modeling of the Hazardous Geological Body ahead of the Tunnel Face by the Transient Electromagnetic Method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170627

WD01 Invention patent application deemed withdrawn after publication