CN106894513A CN201710051470.4A CN201710051470A CN106894513A CN 106894513 A CN106894513 A CN 106894513A CN 201710051470 A CN201710051470 A CN 201710051470A CN 106894513 A CN106894513 A CN 106894513A
Authority
CN
China
Prior art keywords
fixed
fixes sleeve
pole
cleaning
curved roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710051470.4A
Other languages
Chinese (zh)
Inventor
赵换江
刘京城
刘梦溪
杨庆德
谢会雪
张羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN201710051470.4A priority Critical patent/CN106894513A/en
Publication of CN106894513A publication Critical patent/CN106894513A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47LDOMESTIC WASHING OR CLEANING; SUCTION CLEANERS IN GENERAL
    • A47L11/00Machines for cleaning floors, carpets, furniture, walls, or wall coverings
    • A47L11/38Machines, specially adapted for cleaning walls, ceilings, roofs, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/885Curtain walls comprising a supporting structure for flush mounted glazing panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/08Vaulted roofs

Abstract

The invention discloses a kind of cleaning fixed structure of curved roof, including the Kazakhstan sweet smell groove being welded and fixed along the bearing of trend of fixed pole, fixed pole both sides are respectively welded and are fixed with ox pin, ox pin passes through the fixed reinforcing bar of fixed angle steel secured curtain wall plate bottom, and fixed reinforcing bar is fixed by connecting rod with curtain wall panel;The nuts of fixing bolt is in be breathed out in fragrant groove, and fixing bolt is fixed with fastening seat by fixing nut, and fixes sleeve is formed with fastening seat, and fixes sleeve is removably connected with safe rope fixing part, and safe rope fixing part includes the insertion tube coordinated with fixes sleeve.The present invention can as needed be dismantled and installed, and install quick and convenient, according to actual conditions can adjust installation site and overcome that regular screw threads connection produces thrust is excessive or deficiency.

Description

A kind of cleaning fixed structure of curved roof
Technical field
The invention belongs to building field, more particularly to a kind of curved roof cleaning fixed structure.
Background technology
The outer surface of arenas, odeum etc. generally needs suspension curtain wall panel as decorative cover.And decorative panel is typically secured to On fixed pole, fixed pole is fixed on purlin support, and purlin support fixes to form final support with the steel construction of building again.But arenas, Odeum etc. is generally the building of Irregular Boundary Surface.And build outside ornamental curtain wall panel need be frequently necessary to cleaning.As Planar architectural, its cleaning is relatively easy to, but curved-surface building, because its roofing is curved, so workman's inconvenience is stood, therefore need The fixing point of protrusion is fixedly installed, safety rope is connected, it is ensured that the work safety meeting of workman.But can so cause outside fixing point Dew, it is attractive in appearance that influence is built.Therefore a kind of demountable cleaning fixed structure is needed.Additionally, curtain wall panel is sometimes for carrying out Maintenance or inspection waterproof layer below, now need change cleaning fixing point, but existing cleaning fixed structure does not have There is such function.Therefore, this patent has supplied a kind of easy-to-dismount cleaning fixed structure.
But use threaded connection, easily stubborn tension, so as to cause screw thread between extruding force it is excessive, cause dismounting inconvenience or Stubborn is excessively loose, causes fastening not enough, causes cleaning personnel to cause danger..
The content of the invention
To solve the above problems, the invention provides a kind of cleaning fixed structure of curved roof.The present invention can basis Need to dismantle and install, and install quick and convenient, according to actual conditions adjustment installation site and regular screw threads connection can be overcome The thrust of generation is excessive or deficiency.
To reach above-mentioned technique effect, the technical scheme is that:
A kind of cleaning fixed structure of curved roof, including the Kazakhstan sweet smell groove being welded and fixed along the bearing of trend for fixing pole, Fixed pole both sides are respectively welded and are fixed with ox pin, and ox pin passes through the fixed reinforcing bar of fixed angle steel secured curtain wall plate bottom, fixed Reinforcing bar is fixed by connecting rod with curtain wall panel;The nuts of fixing bolt is in be breathed out in fragrant groove, and fixing bolt passes through fixing nut Fastening seat is fixed with, fixes sleeve is formed with fastening seat, fixes sleeve is removably connected with safe rope fixing part, safety Rope fixing part includes the insertion tube coordinated with fixes sleeve;
Fixes sleeve inside both sides are protruded be formed with chuck respectively, and plug joint is formed between chuck;It is lateral in gear platform Lower protrusion is formed with baffle plate;Chuck clamping chamber formed below;
The insertion tube bottom is fixedly connected with the card article of strip by connecting pole, and card article two ends have projected upwards and gear The projection that plate coordinates;Card article lower section is fixed with spring.
Further to improve, the spring is three, and three springs are separately positioned on the two ends and middle part of card article.
Further to improve, the insertion tube top is arranged with safety rope connector integrally formed with retainer ring, in retainer ring.
Further to improve, the fragrant groove and fixing bolt surface spraying breathed out has fluorocarbon layer.
Further to improve, the connecting rod is fixed with arcuation thickening layer with the bearing of curtain wall panel.
Brief description of the drawings
Fig. 1 is the overall structural representation one of the cleaning fixed structure of curved roof;
Fig. 2 is the overall structural representation two of the cleaning fixed structure of curved roof;
Fig. 3 is the supporting construction for sharing border;
Fig. 4 is the structure one of pin joint;
Fig. 5 is the structure two of pin joint;
Fig. 6 is that the Aberration nephogram after moulding bed is removed in B areas when being not provided with sharing border;
Fig. 7 is to set B areas when sharing border to remove the Aberration nephogram after moulding bed;
Fig. 8 is the dimensional structure diagram of double-layer heat insulation waterproof roof;
Fig. 9 is the cross section structure schematic diagram of double-layer heat insulation waterproof roof;
Figure 10 is the waterproof construction schematic diagram that purlin support penetrates place;
Figure 11 is the waterproof construction schematic diagram at closed face;
Figure 12 is the positive structure schematic of purlin holder structure;
Figure 13 is the side structure schematic diagram of purlin holder structure;
Figure 14 is the overlooking the structure diagram of purlin holder structure;
Figure 15 is the structural representation after purlin holder structure angular adjustment;
Figure 16 is side structure schematic diagram of the purlin holder structure according to roofing shape adjustment.
Figure 17 is the structural representation of support member;
Figure 18 cleans the general structure schematic diagram of fixed structure;
Figure 19 is the longitudinal sectional drawing of fixes sleeve;
Figure 20 is the overlooking the structure diagram of fixes sleeve;
Figure 21 is the dimensional structure diagram of insertion tube.
Specific embodiment
Technical scheme is illustrated below by way of specific embodiment and with reference to accompanying drawing.
Embodiment 1
As depicted in figs. 1 and 2, it is a steel construction for grand theater 1, due to building during theater, the duration is very urgent, in order to subtract Influence of the fetal membrane to the duration is removed less, it is necessary to carry out subregion construction, but because whole theater is that a design is overall, divided Constructed as completely self-contained region, each region can be caused to close up due to the deformation of steel construction 1 in unloading process. In order to solve the above problems, the creative a-quadrant that theater is divided into middle part of designer, and surrounding B, C, D, E tetra- Border region.The boundary of adjacent area sets and shares border 12, shares the purlin 13 that each area is fixed on border 12.In order that must be total to There is certain elasticity with the structure on border 12 such that it is able to adapt to remove moulding bed after, the overall deformation of steel construction, purlin 13 with Share border 12 and fixation is slided by pin joint 14.Pin joint is what can freely be discharged along rod length direction in engineering field Hinged joint.
As shown in Fig. 4 or Fig. 5, pin joint 14 includes the first steel disc 141 being welded on shared border 12 and is welded on purlin The second steel disc 142 on bar 13, the first steel disc 141 and the second steel disc 142 pass through the adjustable fixation of slotted hole 143.That is, the first steel 141 and second steel disc of piece, 142 1 setting slotted holes, a setting circular hole is then adjustable by bolt or other fixed structures Formula is fixed.The slippage of wherein slotted hole 143 is defined to 20 ㎜, so as to after ensureing that moulding bed is removed completely, can be welded and fixed.The One steel disc 141 and the second steel disc 142 be respectively provided with slotted hole also can, as long as ensure slippage in the range of restriction.First steel disc 141 Arc groove 144 is equipped with the second steel disc 142, wherein the arc groove 144 on the first steel disc 141 is quadrant, Arc groove 144 on second steel disc 142 is semicircle.Two mutual lappings of arc groove 144 form the slow of prevention vertical deformation Punching.
Its specific subregion construction procedure is as follows:First remove a-quadrant moulding bed, then can simultaneously or in batches remove B, C, D, The moulding bed in E regions, then carries out subsequent construction to each region.It is preferred that the moulding bed of symmetrical region is unloaded simultaneously, i.e. B, D region Moulding bed dismantle simultaneously, the moulding bed in C, E region is dismantled simultaneously, so that can to the stress that a-quadrant produces when opposed area is dismantled Cancel out each other most.
Its principle is as follows:The purlin 13 of a-quadrant is fixed by pin joint 14 with shared border, due to depositing for pin joint 14 The a certain degree of deformation of steel construction can tolerated, therefore form buffer space, purlin 13 and the shared border 12 in remaining region Can be fixed by pin joint, also solderable fixation, if being fixed by pin joint, subsequent construction be carried out again after needing first to weld.By Acted in the buffer space of a-quadrant, therefore tetra- dismountings of region moulding bed of B, C, D, E, will not produce and influence each other.So as to realize Subregion unloads construction simultaneously.Tetra- purlins of peripheral region of B, C, D, E preferably fix company with shared border in above-described embodiment again Connect, from without follow-up welding again.
As shown in figure 3, sharing the bottom of border 12 is fixed with Formwork Support for External 18, Formwork Support for External 18 is fixed on concrete structure 19 On, purlin 13 forms umbrella-shaped structure, so that larger space stiffness is formed, to meet the construction requirement of roof waterproof layer.
As shown in Figure 6 and Figure 7, to setting is with border and is not provided with sharing the Aberration nephogram that the B areas steel construction on border is carried out, It can be seen that the stressing influence that common edge bound pair shares boundary is larger, but to the stressing influence at remaining position compared with It is small.
Above-described embodiment is the form of petal construction.The shared border 12 of this patent is also extended in strip Building or the architectural application of ring-type.Shared boundary demarcation isolated area is first passed through, be then spaced is carried out to the moulding bed of isolated area Remove.
Embodiment 2
On the basis of above-mentioned patent, curved roof is built with above steel construction.As shown in Figure 8 and Figure 9, in order to solve The functions such as waterproof, insulation, the sound insulation of building, the structure of curved roof is as follows:Including contour plate 201, the lower section of contour plate 201 passes through Zinc-plated folding piece 208 is fixed with steel structure connection;Waterproof trapping film 202, the top of waterproof trapping film 202 are equipped with contour plate 201 For the first heat-insulation layer that the first rotary glass silk floss 217 is formed;The top of first rotary glass silk floss 217 is equipped with one side aluminium foil guarantor Warm rock wool 203;One side aluminium foil heat preservation rock 203 is fixedly arranged above main purlin 204, and connecting plate 205 is fixed with main purlin 204, Connecting plate 205 is provided with upper and lower two the first slotted holes 206, and connecting plate 205 is fixedly connected with time purlin by the first slotted hole 206 Bar 207;First slotted hole 206 is used for a regulation of the alignment error with temperature deformation.Wherein welded on steel construction through first Main purlin 204 is fixed and forms support by the strong point (221) of rotary glass silk floss 217, the strong point (221).
Main purlin 204 and the top of time purlin 207 are provided with short stile roof boarding 210, are provided with short stile roof boarding 210 The second heat-insulation layer that second rotary glass silk floss 211 is formed;Between the rotary glass silk floss 211 of short stile roof boarding 210 and second Liquid rubber waterproof layer 212 is coated with, liquid rubber waterproof layer 212 forms flexible waterproof layer.Main purlin 204 and time purlin 207 On be fixed with self-adhesive coiled material 213, self-adhesive coiled material 213 is fixed with the aluminium alloy bearing 214 through the second rotary glass silk floss 211. Second rotary glass silk floss 211 is fixedly arranged above ventilated membrane 215, and ventilated membrane 215 is fixedly arranged above the shape of standing seam roof slabs 216 Into rigid waterproof layer.Aluminium alloy bearing 214 fixes rigid waterproof layer, that is, fix the lock seaming of standing seam roof slabs 216. Standing seam roof slabs 216 are Al-Mg-Mn metal roofing board.
Separate space 218 between short stile roof boarding 210 and the formation of one side aluminium foil heat preservation rock 203.
Above-mentioned roof is employed using double heat-insulation layers and double waterproof layers, it is ensured that the heat-insulating property and water resistance of building, Rotary glass silk floss also has sound-absorbing, silencing function simultaneously, increased the soundproof effect of building.And a separate space 218 not only enters one Step increased the heat-proof quality on roof, and increased the soundproof effect of building.And the flexibility that liquid rubber waterproof layer 212 is formed Waterproof layer has certain shrinkage, is difficult to be damaged due to expanding with heat and contract with cold for building.It is laid in the standing-seam room at top The rigid waterproof layer that panel 216 is formed, with rigidity, and also has certain contraction or extension surplus by the lock seaming for bending. Having simultaneously prevents mechanical damage, the function such as antiultraviolet.
Embodiment 3
It is outer in building, curtain wall panel can be typically installed additional as decorative layer, decorative layer needs to be overlapped on fixed pole, Ran Houzai Decorative layer is fixed.And in order to ensure fixed stability, the strong point of decorative layer needs to be arranged on steel construction.I.e. in steel knot Purlin holder structure 3 is welded and fixed on structure,
As shown in Figure 10, purlin holder structure 3 includes the copper sleeve 301 being welded on steel construction 1, is provided with copper sleeve 301 Internal thread, copper sleeve 301 is threaded with purlin support 302, and the two ends of fixed pole 303 are connected with purlin support 302.Then it is solid Determine pole 303 to fix decorative layer.But purlin holder structure 3, so as to wear out the waterproof layer on roof, can cause waterproof layer through roof Failure.To solve the above problems, this patent is set just like the waterproof construction shown in body 10 in purlin support 302 through place, and purlin support 302 is worn After crossing roof, the surrounding on top pastes tack waterproof layer 219, and tack waterproof layer 219 includes pasting in standing-seam roofing The lower flange 2191 of the bottom of plate 216 and paste the upper overturning 2192 on the outer wall of purlin holder structure 3;Screening is fixed with purlin support 302 Lid 220, the upper covering 220 includes the ring sets 2201 being fixedly connected with purlin support 302, and ring set 2201 is on upper overturning 2192 Side, integrally formed with the block surface 2202 for setting obliquely, the edge of block surface 2202 forms the V-arrangement flanging of infolding to ring set 2201 2203;The purlin support 302 is surrounded with vertical drip ring 2161, and the top of vertical drip ring 2161 is formed with the inverted V-shaped of rolled over Flanging 2162;Inverted V-shaped flanging 2162 is in the inner side of V-arrangement flanging 2203.The vertical bottom of drip ring 2161 stretches out to form ring-type Closed face 2163, the contact position of closed face 2163 and standing seam roof slabs 216 pastes sealing water proof strip 2164, seals waterproof Bar 2164 is that the spraying of liquid rubber waterproof layer is formed.As shown in figure 11, closed face 2163 close at standing seam roof slabs 216 into Shape has raised 2165, so as to increase the thickness of sealing water proof strip 2164.It is upper to cover 220, the upper purlin support 302, close for covering 220 tops Close the top of face 2163 and paste flexible waterproof material such as rubber waterproof layer formation waterproof jacket 222, waterproof jacket 222 is provided with fold shape Into flexible surplus.Upper covering 220 and vertical drip ring 2161 are consistent with the material of standing seam roof slabs 216.On waterproof jacket 222 Side is fixed with hold-down ring bar 223, and screw 224 passes through hold-down ring bar 223 by waterproof jacket 222 and the heat-insulation layer of closed face 2163 and second Connection compresses connection, so as to prevent the periphery of waterproof jacket 222 from tilting.The top of hold-down ring bar 223 and surrounding paste rubber waterproof material again Material forms seal convexity 224.The periphery evagination of purlin support 302 is formed with the support ring 225 for supporting the second waterproof layer, so as to keep The stabilization of place's stress is penetrated, is prevented because deformation causes waterproof layer to fail.
In said structure, tack waterproof layer 219 forms one layer of waterproof of inside, upper covering 220 and vertical drip ring 2161 and inverted V-shaped flanging 2162 form second layer waterproof, the waterproof jacket 222 that the flexible waterproof material pasted is formed is anti-for third layer Water layer, is sealed.If breakage occurs for some reason in waterproof jacket 222, when causing water penetration to be entered, 220 are covered up Formation is blocked, and prevents water from falling directly into the gap between purlin support 302 and roof, vertical drip ring 2161 prevent water fall roof it The gap between purlin support 302 and roof is flowed into afterwards;And V-arrangement flanging 2203 and inverted V-shaped flanging 2162 cooperate, anti-falling stop is in room The gap that the water sputtering on top is entered between purlin support 302 and roof.
Because upper covering 220, vertical drip ring 2161 and inverted V-shaped flanging 2162 are rigid waterproofing structure, therefore have Long service life, not the characteristics of cracky.Because upper covering set gap, and waterproof jacket between 220 and vertical drip ring 2161 222 have flexible surplus, therefore will not be pulled open waterproof jacket due to expanding with heat and contract with cold for building.Tack waterproof layer 219 is formed Sealing, further prevention roof infiltration.So by special design so that being easy to the place of penetrating of purlin support 302 of infiltration becomes ratio The water resistance of roof remainder is more superior.The top of copper sleeve 301 sets the first air-vent 226, under copper sleeve 301 Who knows the second air-vent 227 in portion, and the first air-vent 226 is connected with a separate space 218;Second air-vent 227 is connected with interior;So as to So that a separate space 218 leaves to cause to cause stress to roof because gas expands with heat and contract with cold with the indoor venting channels for connecting, mode Pressure, influences roof life.
Embodiment 4
Due to this patent be related to for arenas, odeum etc. outer surface for Irregular Boundary Surface building.Therefore its branch is big Most fixed poles 303 is not that the plane on parallel ground is set, but is needed according to arenas or the shape of odeum outer surface Carry out the three-dimensional skewed design of various angle adjustments.This cause the purlin support 302 being fixed to fixed pole 303 height, The inclined angle of purlin support 302, the corner of purlin support 302 are intended to accurate fixation, once one of parameter is not right, then need to remove purlin Support 302, reinstalls.But in the actual construction of building, it is impossible to and the model of simulation is completely the same, wherein can be wrong Difference, when installation personnel installs purlin support 302, it is also difficult to point-device to install purlin support 302, it is easy to some errors occur, I.e. in embodiment 3, purlin holder structure as shown in Figure 10 is not high for the applicability of curved-surface building.Error is carried out for convenience Regulation is adapted to, this patent is improved purlin support as follows:As shown in Figure 12,13 and 14, the top of purlin support 302 is fixed with supporting plate 304, The periphery of supporting plate 304 is evenly arranged with four the second slotted holes 305, and the second bolt 306 is fixed with angle through the second slotted hole 305 Iron 307;The angle bar 307 be respectively provided with the vertical slotted hole 308 of fixing fixed pole 303 and with the second slotted hole The 305 horizontal slotted holes 309 being equipped with.
Fixed pole 303 is clamped and fixed between two angle bar 307;The fixed both sides of pole 303 are respectively fixed with clamping Piece 310, the inner side of holding piece 310 is the arc coordinated with fixed pole 303, and the outside of holding piece 310 is flat with what angle bar 307 coordinated Face;3rd bolt 311 is connected through the vertical slotted hole 308 gripped on the angle bar 307 of pole 303 with nut, nut and Steel plate washer 313 is provided between angle steel;Fixed pole 303 is gripped.It is firmly excessive during in order to prevent from fixing, by fixed branch Bar 303 is extruded parallel, and support bar 312 is placed with fixed pole 303.In order to increase damping, the lateral surface of holding piece 310 and The medial surface of angle bar 307 does impedance bundary.
It is above-mentioned to be the step of grip pole 303, purlin support 302 is rotated first, due to purlin support 302 and the spiral shell of copper sleeve 301 Line is connected, therefore purlin support 302 can move up and down, and the height to purlin support 302 is tentatively adjusted, and after regulation in place, welding is solid It is fixed.Then according to the direction of fixed pole 303, the angle of angle bar 307 is adjusted.Due to the second slotted hole 305 and horizontal slotted hole Also can be into other angles, hence in so that two angle bar being oppositely arranged can be rotated, while two after regulation at a right angle between 309 Vertical slotted hole 308 on angle bar is still mutually oppositely arranged, and keeps the distance between two angle bar adjustable.So, adjust The angle bar 307 that section is oppositely arranged so that fixed pole 303 is between two angle bar 307.Then the 3rd bolt 311 is passed through The perforation on vertical slotted hole 308 and fixed pole 303 and attaching nut on two angle bar clamp fixed pole 303 solid It is fixed, it is put into support bar 312 in fixed pole 303 before fixing.Wherein vertical slotted hole 308 is used for fixed pole 303 Level altitude is finely adjusted.Screw bolt and nut is reused to divide two angle bar through the second slotted hole 305 and horizontal slotted hole 309 The accurate fixation to fixed pole 303 Gu Ding not be completed, wherein steel plate washer is provided between nut and angle bar.Such as Figure 15 and 16 Shown, above-mentioned fixed form can in height carry out first positioning by a relatively large margin, and height, it is horizontal and vertical on carry out essence Thin three-dimensional regulation, such that it is able to adjust purlin holder structure according to actual conditions, improves the serious forgiveness of purlin holder structure installation, improves Building efficiency.
Copper sleeve 301 is provided with ribs 314 with the junction of steel construction.
Quickly purlin support 302 is carried out for convenience can be smooth structure, purlin support in upper and lower quick regulation, copper sleeve 301 After 302 move to Primary Location position, a point will be welded between purlin support and copper sleeve 301 or two points are pre-fixed.When After fixed pole 303 installs, then purlin support and the junction of copper sleeve 301 are welded, finally fixed.It is fixed in order to increase Effect, the top of copper sleeve 301 is provided with inclined-plane 315.The angle of inclination on inclined-plane 315 is preferably 45 °.
Embodiment 5
In example 4, deform to prevent from fixing pole 303, support bar 312 is installed in it.But support bar 312 It is straight-bar, and is steel tube.This causes that support bar 312 will have machining accuracy very high, is otherwise easily not placed into, Huo Zhewu Method is effectively supported.Further, since fixed pole 303 is often obliquely installed, support bar 312 is easy to be occurred being slipped to admittedly Determine the inside of pole 303 or place not straight, lead to not the problem of effective support.And support bar two ends supporting surface is smaller, It is a support, and the extruding of the fixed pole 303 of holding piece 310 pairs is face extruding, this causes the position outside the strong point still may It is deformed.In order to solve the above problems, support bar 312 is improved to form support member 316 as shown in figure 17;Institute Adjustment disk 317 of the support member 316 including middle part is stated, adjustment disk 317 is provided with screwed hole 318, and screw thread is passed through on adjustment disk 317 Hole 318 is threaded with some symmetrically arranged adjusting rods 319, and the end of adjusting rod 319 is connected with matches somebody with somebody with the fixed inwall of pole 303 The curved support plate 320 of conjunction.Adjusting rod 319 is preferably arranged to four, and is symmetrically formed crosswise two-by-two.
Embodiment 6
Ornamental curtain wall panel 5 outside building needs to be frequently necessary to cleaning.Used as planar architectural, its cleaning is more held Easily, but curved-surface building, because its roofing is for curved, so workman's inconvenience is stood, it is therefore desirable to the fixation of protrusion is fixedly installed Point, connects safety rope, it is ensured that the work safety meeting of workman.But can so cause fixing point to expose, it is attractive in appearance that influence is built.For This, there is provided a kind of easy-to-dismount cleaning fixed structure 4.Concrete structure is as shown in figure 18:Along the extension side of fixed pole 303 Fragrant groove 401 is breathed out to fixed, the fixed both sides of pole 303 are respectively welded and are fixed with ox pin 402, ox pin 402 passes through fixed angle steel 403 and consolidates Determine the fixed reinforcing bar 404 of the bottom of curtain wall panel 5, fixed reinforcing bar 404 is fixed by connecting rod 405 with curtain wall panel 5, connecting rod 405 and The bearing of curtain wall panel 5 is fixed with the tightness that arcuation thickening layer 406 keeps connecting rod 405 to be connected with curtain wall panel 5.Fixed spiral shell The nuts of bolt 407 is in be breathed out in fragrant groove 401, and fixing bolt 407 is fixed with fastening seat 409 by fixing nut 408, fastens seat Fixes sleeve 410 is formed with 409, fixes sleeve 410 is between the gap 411 that adjacent curtain wall panel 5 is formed, fixed cover Cylinder 410 is removably connected with safe rope fixing part.Fixing bolt 407 is in the both sides of fixes sleeve 410.Safe rope fixing part includes The insertion tube 412 coordinated with fixes sleeve 410, the top of insertion tube 412 is arranged with peace integrally formed with retainer ring 413 in retainer ring 413 Full rope connector 414.The settable internal thread in the inside of fixes sleeve 410, insertion tube 412 is outer to set external screw thread, so that fixes sleeve 410 It is detachably connected with the screw thread of insertion tube 412.Breathing out fragrant groove 401 and the surface spraying of fixing bolt 407 has fluorocarbon layer.Fluorocarbon layer is from inside to outside Including epoxy zinc rich primer, epoxy resin coating and fluorine carbon finishing paint, fluorocarbon layer gross thickness is not less than 240 μm.
But use threaded connection, easily stubborn tension, so as to cause screw thread between extruding force it is excessive, cause dismounting inconvenience or Stubborn is excessively loose, causes fastening not enough, causes cleaning personnel to cause danger.It is thus provided that a kind of clamping knot of Fast Installation dismounting Structure:As shown in Figures 19 and 20, the inside both sides of fixes sleeve 410 are protruded be formed with chuck 415 respectively, are formed between chuck 415 and inserted Seam 416;The inner side of gear platform 415 is downwardly projecting to be formed with baffle plate 417;The clamping chamber 420 formed below of chuck 415;
As shown in figure 21, the bottom of the insertion tube 412 is fixedly connected with the card article 418 of strip, card article by connecting pole 417 418 two ends project upwards raised 419 coordinated with baffle plate 417;The lower section of card article 418 is fixed with spring 421.Card article 418 Length is identical with the length of plug joint 416 and the internal diameter of insertion tube 412;Raised 419 outside is to coordinate with the inwall of fixes sleeve 410 Arc, raised 419 inner side is plane with what baffle plate 417 coordinated.Spring 421 can set three, be separately positioned on card article 418 two ends and middle part.
When using, insertion tube 412 is inserted into fixes sleeve 410 so that card article 418 passes through plug joint 416, while spring 421 By the compression of the bottom of fixes sleeve 410, card article 418 is then rotated 90 °, loosed one's grip, spring upsprings card article 418 so that raised 419 Coordinate with baffle plate 417 and connect and fix insertion tube 412.During dismounting, with above method contrary operation.Using this method, not only Insertion tube 412 can be rapidly assembled and disassembled, while fastening is connected, and with position-limiting action.The external diameter and fixes sleeve of insertion tube 412 410 internal diameter is consistent, so as to form rock-steady structure, reduction insertion tube is pullled the displacement or deformation during power by the external world.In insertion tube 412 Portion outside is arranged with resilient sleeve, so that it is to pull pressure when producing deformation to curtain wall panel to reduce insertion tube 412, can prevent it from damaging Curtain wall panel.
Fixed along the bearing of trend of fixed pole 303 due to breathing out fragrant groove 401, therefore can as needed remove fixes sleeve 410, retighten, so as to change fixing point as needed.
One of the invention specific guiding implementation method is above are only, but design concept of the invention is not limited thereto, All changes for carrying out unsubstantiality to the present invention using this design, all should belong to the behavior for invading protection scope of the present invention.

Claims (5)

1. the cleaning fixed structure of a kind of curved roof, it is characterised in that including being welded along the bearing of trend of fixed pole (303) Fixed Kazakhstan sweet smell groove (401), fixed pole (303) both sides are respectively welded and are fixed with ox pin (402), and ox pin 402 passes through fixed angles The fixed reinforcing bar (404) of steel (403) secured curtain wall plate (5) bottom, fixed reinforcing bar (404) is by connecting rod (405) and curtain wall panel (5) it is fixed;The nuts of fixing bolt (407) is in be breathed out in fragrant groove (401), and fixing bolt (407) is by fixing nut (408) Fastening seat (409) is fixed with, fixes sleeve (410) is formed with fastening seat (409), fixes sleeve (410) detachably connects Safe rope fixing part is connected to, safe rope fixing part includes the insertion tube (412) coordinated with fixes sleeve (410);
The internal both sides of the fixes sleeve (410) are protruded be formed with chuck (415) respectively, and chuck forms plug joint between (415) (416);Gear platform (415) inner side is downwardly projecting to be formed with baffle plate (417);Chuck (415) clamping chamber (420) formed below;
Insertion tube (412) bottom is fixedly connected with the card article (418) of strip, card article (418) two ends by connecting pole (417) Project upwards the projection (419) coordinated with baffle plate (417);Card article (418) lower section is fixed with spring (421).
2. the cleaning fixed structure of curved roof as claimed in claim 1, it is characterised in that the spring (421) is three, Three springs (421) are separately positioned on the two ends and middle part of card article (418).
3. the cleaning fixed structure of curved roof as claimed in claim 1, it is characterised in that insertion tube (412) top one It is body formed to have retainer ring (413), safety rope connector (414) is arranged with retainer ring (413).
4. the cleaning fixed structure of curved roof as claimed in claim 1, it is characterised in that Kazakhstan sweet smell groove (401) and consolidate Determining bolt (407) surface spraying has fluorocarbon layer.
5. the cleaning fixed structure of curved roof as claimed in claim 1, it is characterised in that the connecting rod (405) and curtain The bearing of wallboard (5) is fixed with arcuation thickening layer (406).
CN201710051470.4A 2017-01-20 2017-01-20 A kind of cleaning fixed structure of curved roof Pending CN106894513A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710051470.4A CN106894513A (en) 2017-01-20 2017-01-20 A kind of cleaning fixed structure of curved roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710051470.4A CN106894513A (en) 2017-01-20 2017-01-20 A kind of cleaning fixed structure of curved roof

Publications (1)

Publication Number Publication Date
CN106894513A true CN106894513A (en) 2017-06-27

Family

ID=59198997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710051470.4A Pending CN106894513A (en) 2017-01-20 2017-01-20 A kind of cleaning fixed structure of curved roof

Country Status (1)

Country Link
CN (1) CN106894513A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030182893A1 (en) * 2000-08-15 2003-10-02 Arvo Poldmaa Roof anchor method and apparatus
CN201200734Y (en) * 2008-06-13 2009-03-04 来旭 Safety binding device for safety rope of aloft work
CN202497073U (en) * 2012-04-06 2012-10-24 成都嘉泽正达金属制造有限公司 Windproof device for fixing suspended working platform of window cleaning machine
CN202569241U (en) * 2012-05-17 2012-12-05 南通华新建工集团有限公司 Novel safety belt fixing device
CN203617587U (en) * 2013-10-23 2014-05-28 国家电网公司 Portable safety belt inserted link fixing pedestal
US20150196785A1 (en) * 2013-11-05 2015-07-16 Mark A. Borchardt Fall Protection Tie-Off Anchor Point and Method
CN205134774U (en) * 2015-11-26 2016-04-06 山东雅百特科技有限公司 Abnormal shape hyperbolic building roof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030182893A1 (en) * 2000-08-15 2003-10-02 Arvo Poldmaa Roof anchor method and apparatus
CN201200734Y (en) * 2008-06-13 2009-03-04 来旭 Safety binding device for safety rope of aloft work
CN202497073U (en) * 2012-04-06 2012-10-24 成都嘉泽正达金属制造有限公司 Windproof device for fixing suspended working platform of window cleaning machine
CN202569241U (en) * 2012-05-17 2012-12-05 南通华新建工集团有限公司 Novel safety belt fixing device
CN203617587U (en) * 2013-10-23 2014-05-28 国家电网公司 Portable safety belt inserted link fixing pedestal
US20150196785A1 (en) * 2013-11-05 2015-07-16 Mark A. Borchardt Fall Protection Tie-Off Anchor Point and Method
CN205134774U (en) * 2015-11-26 2016-04-06 山东雅百特科技有限公司 Abnormal shape hyperbolic building roof

Similar Documents

Publication Publication Date Title
CN106703274B (en) A kind of waterproof heat insulating roof for being provided with disassembling cleaning part
CN113982198B (en) Lotus leaf molding roof
KR20160107402A (en) Swimming pool
CN207017442U (en) A kind of cleaning fixed structure of curved roof
CN106760121B (en) A kind of purlin holder structure of curved roof
CN206681233U (en) A kind of double heat-insulation waterproof roofs
CN106639107B (en) A kind of curved-surface building structure
CN216475513U (en) Metal roof
CN206495390U (en) A kind of curved roof cleaning fixed structure of Fast Installation dismounting
CN206495389U (en) A kind of curved surface waterproof heat insulating roof
CN206495387U (en) A kind of roof penetrates the waterproof construction at place
CN106894513A (en) A kind of cleaning fixed structure of curved roof
CN106760120B (en) A kind of roof penetrates the waterproof construction at place
CN106639109B (en) A kind of curved surface waterproof heat insulating roof
CN206681231U (en) A kind of purlin holder structure of curved roof
CN206681228U (en) A kind of waterproof heat insulating roof for being provided with disassembling cleaning part
CN108193813B (en) Open type unit stone curtain wall
CN206681232U (en) A kind of curved-surface building structure
CN216276498U (en) Gutter structure arranged on metal roof
CN212897232U (en) Roofing pipeline, equipment support antiseep node structure
CN205153244U (en) Metal roof waterproof people pore structure
CN207568091U (en) A kind of steel tank ditch and the connection structure of design of glass lighting roof
CN110778036B (en) Combined roof system of metal tiles and metal eaves rafters
KR101533675B1 (en) Cover for joint of membrane structure
JP7005870B2 (en) Water stop structure of the building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhao Huanjiang

Inventor after: Geng Deyu

Inventor after: Zhang Yu

Inventor after: Liu Jingcheng

Inventor after: Su Liyuan

Inventor after: Li Fangyi

Inventor after: Xie Huixue

Inventor after: Wang Bo

Inventor after: Wang Zilong

Inventor before: Zhao Huanjiang

Inventor before: Liu Jingcheng

Inventor before: Liu Mengxi

Inventor before: Yang Qingde

Inventor before: Xie Huixue

Inventor before: Zhang Yu

CB03 Change of inventor or designer information
AD01 Patent right deemed abandoned

Effective date of abandoning: 20230811

AD01 Patent right deemed abandoned