CN106894348A - The reparation remodeling method of bridge central partition - Google Patents

The reparation remodeling method of bridge central partition Download PDF

Info

Publication number
CN106894348A
CN106894348A CN201710224679.6A CN201710224679A CN106894348A CN 106894348 A CN106894348 A CN 106894348A CN 201710224679 A CN201710224679 A CN 201710224679A CN 106894348 A CN106894348 A CN 106894348A
Authority
CN
China
Prior art keywords
bridge
lightweight concrete
ground floor
central partition
crash bearer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710224679.6A
Other languages
Chinese (zh)
Other versions
CN106894348B (en
Inventor
蔡硕果
宋晓梅
刘晓晨
段文志
纪国睦
王瑞升
罗向荣
王生
刘文明
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Texida Transportation Survey And Design Institute Co Ltd
Original Assignee
Beijing Texida Transportation Survey And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Texida Transportation Survey And Design Institute Co Ltd filed Critical Beijing Texida Transportation Survey And Design Institute Co Ltd
Priority to CN201710224679.6A priority Critical patent/CN106894348B/en
Publication of CN106894348A publication Critical patent/CN106894348A/en
Application granted granted Critical
Publication of CN106894348B publication Critical patent/CN106894348B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of reparation remodeling method of bridge central partition, it comprises the following steps:Remove face brick, antiglare shield, crash bearer and the former fill concrete of former bridge central partition to girder top surface;Both sides are installed by crash bearer, the built-in drainpipe of crash bearer;The first plank is set on two width bridge preset slot tops, is poured ground floor lightweight concrete and is formed two-way horizontal wall inscription, toe position is alignd with the spilled water hole lower edge of the drainpipe of crash bearer;In ground floor lightweight concrete upper berth ground floor SBS waterproof rolls;The second plank is set on ground floor SBS waterproof rolls;Then second layer lightweight concrete is poured;Second layer lightweight concrete is wrapped up with second layer SBS waterproof rolls;French drain is set in second layer lightweight concrete both sides, french drain Bian wraps up big particle diameter gravel with geotextiles;Laying planted agent mortar and Footpath brick.Improved central partition not ponding, impermeable, lifts bridge durability in the method.

Description

The reparation remodeling method of bridge central partition
Technical field
The present invention relates to bridge technology field, more particularly to a kind of reparation remodeling method of bridge central partition.
Background technology
In existing highway bridge central partition structure, with benzene plate is embedded, waterproof layer is neoprene to two width bridge beam body preset slots Newborn pitch, is filled, last upper berth Footpath brick with foam concrete.Benzene plate is only leaned in the built-in gap of compression of itself in itself, with Two width bridges deform the changing of the relative positions up and down, and benzene plate material in itself is aging, and gap cannot effectively be filled up.Foam concrete itself hole Rate is larger, and permeability rate is larger, and is not provided with preset slot in the middle of two width bridges, it can be caused to ftracture in the presence of mobile load, thus Present situation beam body preset slot is caused to seep water.
The content of the invention
In order to solve the above technical problems, the present invention provides a kind of reparation remodeling method of bridge central partition.
The present invention provides a kind of reparation remodeling method of bridge central partition, and it comprises the following steps:
Step 1), face brick, antiglare shield, crash bearer and the former fill concrete of removing former bridge central partition to girder top Face;
Step 2), both sides crash bearer is installed, the built-in drainpipe of crash bearer, the drainpipe dips down in the horizontal direction Tiltedly set;The preset slot of crash bearer is closed with polyurethane sealant;
Step 3), two width bridge preset slots, the continuous gap and beam body expansion joint between of beam body bridge floor are used into asphalt mixtures modified by epoxy resin Fat glue vinylacetic acid cellucotton is jumped a queue closing;
Step 4), two width bridge preset slot tops set the first plank, pour ground floor lightweight concrete and formed Two-way horizontal wall inscription, toe position is alignd with the spilled water hole lower edge of the drainpipe of crash bearer, the seam of the reserved 1 × 1cm of concrete at toe, Clogged with polyurethane sealant;
Step 5), in ground floor lightweight concrete upper berth ground floor SBS waterproof rolls;
Step 6), the second plank is set on ground floor SBS waterproof rolls, the second plank and the first plank are vertically Alignment is set;Then second layer lightweight concrete is poured, and gap is clogged with vinylacetic acid cellucotton;
Step 7), with second layer SBS waterproof rolls by second layer lightweight concrete wrap up;
Step 8), in second layer lightweight concrete both sides, french drain is set, french drain Bian wraps up big particle diameter gravel with geotextiles;
Step 9), laying planted agent mortar and Footpath brick, and on Footpath brick reserve concrete longitudinal direction anchor band, install it is anti-dazzle Plate.
Further,
The thickness of the ground floor lightweight concrete is 20cm~40cm, and the top surface gradient is not less than 2%;
The gradient of the drainpipe is not less than 1%.
The reparation remodeling method of the bridge central partition for providing of the invention, the method presses down by way of stifled row combines Side bar flange plate processed, web are produced by water erosion disease, effectively improve bridge member durability.The method by center every Ethylene vinyl acetate cellucotton is pasted from band inside beam body movement joint, while release beam body deforms, effectively suppresses the infiltration of water;Centering Isolation strip interior construction seam in centre forms two-way horizontal wall inscription using the closing of polyurethane closed glue by pouring lightweight concrete, and laying is anti- Water coiled material, sets up the system of french drain, and water leaking-in is discharged into central partition, and bridge zone is discharged on slope in length and breadth along deck paving, in making Entreat isolation strip not ponding, impermeable, lifting bridge durability.
Brief description of the drawings
Fig. 1 isolates for the bridge center repaired after remodeling method is constructed of the bridge central partition provided according to the present invention Band structure schematic diagram.
Description of reference numerals:
1- crash bearers
2- drainpipes
The planks of 3- first
4- ground floor lightweight concretes
5- ground floor SBS waterproof rolls
The planks of 6- second
7- second layer lightweight concretes
8- second layer SBS waterproof rolls
9- french drains
10- planted agent's mortars
11- Footpath bricks
12- antiglare shields
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, with reference to the accompanying drawings and detailed description The present invention is described in further detail.
For problems of the prior art, the present invention provides a kind of reparation remodeling method of bridge central partition, The method is effectively sealed not only for gap so that whole central partition turns into a closed space, more passes through The water guiding discharge central partition that effective manner will be penetrated into.Fig. 1 is referred to, the figure shows the bridge provided according to the present invention The bridge central partition structural representation repaired after remodeling method construction of beam central partition.
In a kind of specific embodiment, the invention provides a kind of reparation remodeling method of bridge central partition, It comprises the following steps:
Step 1), face brick, antiglare shield 12, crash bearer 1 and the former fill concrete of removing former bridge central partition to master Top surface of the beam;
Step 2), both sides install crash bearer 1, the built-in drainpipe 2 of the crash bearer 1, the drainpipe 2 in the horizontal direction to Under be obliquely installed;The preset slot of crash bearer 1 is closed with polyurethane sealant;
Step 3), two width bridge preset slots, the continuous gap and beam body expansion joint between of beam body bridge floor are used into asphalt mixtures modified by epoxy resin Fat glue vinylacetic acid cellucotton is jumped a queue closing;
Step 4), on two width bridge preset slot tops, the first plank 3 is set, pour ground floor lightweight concrete 4 and shape In pairs to horizontal wall inscription, toe position is alignd with the spilled water hole lower edge of the drainpipe 2 of crash bearer 1, the reserved 1 × 1cm of concrete at toe Seam, clogged with polyurethane sealant;
Step 5), in the upper berth ground floor SBS waterproof roll 5 of ground floor lightweight concrete 4;
Step 6), the second plank 6 is set on ground floor SBS waterproof rolls 5, the second plank 6 is with the first plank 3 along vertical Direction alignment is set;Then second layer lightweight concrete 7 is poured, and gap is clogged with vinylacetic acid cellucotton;
Step 7), second layer lightweight concrete 7 is wrapped up with second layer SBS waterproof rolls 8;
Step 8), in the both sides of second layer lightweight concrete 7, french drain 9 is set, the Bian of french drain 9 wraps up big particle diameter sand with geotextiles Gravel;
Step 9), laying planted agent mortar 10 and Footpath brick 11, and on Footpath brick 11 reserve concrete longitudinal direction anchor band, peace Dress antiglare shield 12.
Further, the thickness of the ground floor lightweight concrete 4 is 20cm~40cm, and the top surface gradient is not less than 2%;Institute The gradient for stating drainpipe 2 is not less than 1%.
In the reparation modification scheme that the present invention is provided, former central partition face brick, antiglare shield, crash bearer and concrete are removed To girder top surface;Bridge floor is continuous, gap is jumped a queue closing using epoxy resin glue vinylacetic acid cellucotton between expansion joint; Crash bearer is installed, space is closed using polyurethane sealant between crash bearer.One layer of lightweight concrete is poured in central partition, Bidirectional horizontal domatic into charge for remittance point is set, SBS waterproof rolls are laid, levelling lightweight concrete is poured, SBS waterproof rolls are re-layed, Both sides set the gravel of geotextiles parcel, form closing waterproof system, install face brick and antiglare shield.
As shown in the above, the reparation remodeling method of the bridge central partition that the present invention is provided, is combined by stifled row Mode, suppress side bar flange plate, web and produced by water erosion disease, effectively improve bridge member durability.The method is led to Cross and ethylene vinyl acetate cellucotton is pasted to central partition inside beam body movement joint, while release beam body deforms, effectively suppress water Infiltration;To central partition interior construction seam using the closing of polyurethane closed glue, form two-way by pouring lightweight concrete Horizontal wall inscription, laying water-proof coiled material sets up the system of french drain, and water leaking-in is discharged into central partition, and slope is arranged in length and breadth along deck paving Go out bridge zone, make central partition not ponding, impermeable, lifting bridge durability.
The reparation remodeling method to bridge central partition provided by the present invention is described in detail above.Herein Apply specific case to be set forth principle of the invention and implementation method, the explanation of above example is only intended to help Understand the method for the present invention and its core concept.It should be pointed out that for those skilled in the art, not taking off On the premise of the principle of the invention, some improvement and modification can also be carried out to the present invention, these are improved and modification also falls into this In invention scope of the claims.

Claims (2)

1. a kind of reparation remodeling method of bridge central partition, it is characterised in that comprise the following steps:
Step 1), face brick, antiglare shield, crash bearer and the former fill concrete of removing former bridge central partition to girder top surface;
Step 2), both sides install crash bearer, the built-in drainpipe of crash bearer, the drainpipe is downward-sloping in the horizontal direction to be set Put;The preset slot of crash bearer is closed with polyurethane sealant;
Step 3), two width bridge preset slots, the continuous gap and beam body expansion joint between of beam body bridge floor are used into epoxide-resin glue Vinylacetic acid cellucotton is pasted to jump a queue closing;
Step 4), two width bridge preset slot tops set the first plank, pour ground floor lightweight concrete and form two-way Horizontal wall inscription, toe position is alignd with the spilled water hole lower edge of the drainpipe of crash bearer, the seam of the reserved 1 × 1cm of concrete at toe, with poly- Urethane fluid sealant is clogged;
Step 5), in ground floor lightweight concrete upper berth ground floor SBS waterproof rolls;
Step 6), the second plank is set on ground floor SBS waterproof rolls, the second plank is vertically aligned with the first plank Set;Then second layer lightweight concrete is poured, and gap is clogged with vinylacetic acid cellucotton;
Step 7), with second layer SBS waterproof rolls by second layer lightweight concrete wrap up;
Step 8), in second layer lightweight concrete both sides, french drain is set, french drain Bian wraps up big particle diameter gravel with geotextiles;
Step 9), laying planted agent mortar and Footpath brick, and on Footpath brick reserve concrete longitudinal direction anchor band, install antiglare shield.
2. the reparation remodeling method of bridge central partition according to claim 1, it is characterised in that
The thickness of the ground floor lightweight concrete is 20cm~40cm, and the top surface gradient is not less than 2%;
The gradient of the drainpipe is not less than 1%.
CN201710224679.6A 2017-04-07 2017-04-07 The reparation remodeling method of bridge central partition Expired - Fee Related CN106894348B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710224679.6A CN106894348B (en) 2017-04-07 2017-04-07 The reparation remodeling method of bridge central partition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710224679.6A CN106894348B (en) 2017-04-07 2017-04-07 The reparation remodeling method of bridge central partition

Publications (2)

Publication Number Publication Date
CN106894348A true CN106894348A (en) 2017-06-27
CN106894348B CN106894348B (en) 2019-04-05

Family

ID=59193644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710224679.6A Expired - Fee Related CN106894348B (en) 2017-04-07 2017-04-07 The reparation remodeling method of bridge central partition

Country Status (1)

Country Link
CN (1) CN106894348B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100075419A (en) * 2010-01-18 2010-07-02 (주)백제건설 Method and apparatus for improving safety fence structure along a roadside
JP4618731B2 (en) * 2006-09-22 2011-01-26 ケイコン株式会社 Precast concrete guard fence for the median strip of motorway viaduct and its construction method
KR20120133877A (en) * 2011-06-01 2012-12-11 남원길 Bridge protection partition reform molding apparatus and its reform method
CN203346829U (en) * 2013-05-29 2013-12-18 重庆中设工程设计股份有限公司 Medial strip
CN203613487U (en) * 2013-11-27 2014-05-28 湖北大成空间建筑科技有限公司 Changeable emergency median strip
CN204266150U (en) * 2014-11-28 2015-04-15 大连市市政设计研究院有限责任公司 A kind of hard isolated column for old bridge dividing strip

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4618731B2 (en) * 2006-09-22 2011-01-26 ケイコン株式会社 Precast concrete guard fence for the median strip of motorway viaduct and its construction method
KR20100075419A (en) * 2010-01-18 2010-07-02 (주)백제건설 Method and apparatus for improving safety fence structure along a roadside
KR20120133877A (en) * 2011-06-01 2012-12-11 남원길 Bridge protection partition reform molding apparatus and its reform method
CN203346829U (en) * 2013-05-29 2013-12-18 重庆中设工程设计股份有限公司 Medial strip
CN203613487U (en) * 2013-11-27 2014-05-28 湖北大成空间建筑科技有限公司 Changeable emergency median strip
CN204266150U (en) * 2014-11-28 2015-04-15 大连市市政设计研究院有限责任公司 A kind of hard isolated column for old bridge dividing strip

Also Published As

Publication number Publication date
CN106894348B (en) 2019-04-05

Similar Documents

Publication Publication Date Title
CN106223360B (en) Using the open cut cast in place and precast construction subway station construction method of stake supporting system
CN107326940B (en) basement advanced water stop post-cast strip structure and construction method thereof
CN207987983U (en) A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN104264594B (en) A kind of self-balancing tied arch system for improving PSC continuous box girder bridge bearing ability and the method using it to reinforce
CN108589737A (en) Underground speedy way hands over the construction method that section is built jointly with rail under a kind of major urban arterial highway
CN102296546A (en) Treatment scheme of hollow slab bridge hinge joint defects and construction process thereof
CN108797249A (en) The construction method of soft soil roadbed high roadbed steep slope road section Foam lightweight soil
CN109653491A (en) More gradient Sloping roof concrete construction methods
CN101691742B (en) Construction method for back cable-balancing single-side cantilever concreted beam bodies of slant-legged rigid frame bridges
WO2023155469A1 (en) Road structure transformed from oversized detached underground garage and construction method thereof
CN106894347A (en) A kind of splicing bridge and bridge reorganization and expansion method based on cast-in-place united layer supertronic
CN105781570B (en) A kind of construction method of subway without inner support section of track well
CN107090908A (en) A kind of new vertical prefabricated components joint connecting method
CN106894325A (en) A kind of deck transverse slope adjusts structure and laying method
CN107700299B (en) Overpass lower-layer ground road structure and construction method thereof
CN204875556U (en) PC roof beam cable -stay bridge tower roof beam concreties structure temporarily
CN207032022U (en) Bridge central partition
CN106948502A (en) A kind of water-proof top cover and its construction method
CN110042865A (en) Box top board structure for large span city tunnel
CN103306439A (en) Pouring technology for implanting high anti-leakage and anti-crack protective layer into roof structure layer
CN106894333B (en) Bridge central partition
CN106894348A (en) The reparation remodeling method of bridge central partition
CN207905825U (en) A kind of circular cross section tunnel lining construction device three times
CN207919848U (en) Top plate of underground parking garage is combined the unit with plastics diaphragm capsule

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190405

Termination date: 20200407

CF01 Termination of patent right due to non-payment of annual fee