CN106892052B - A kind of removable short buoyancy tank connection structure of lower water workboat - Google Patents
A kind of removable short buoyancy tank connection structure of lower water workboat Download PDFInfo
- Publication number
- CN106892052B CN106892052B CN201710160950.4A CN201710160950A CN106892052B CN 106892052 B CN106892052 B CN 106892052B CN 201710160950 A CN201710160950 A CN 201710160950A CN 106892052 B CN106892052 B CN 106892052B
- Authority
- CN
- China
- Prior art keywords
- buoyancy tank
- main body
- short
- topside
- upper recess
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B3/00—Hulls characterised by their structure or component parts
- B63B3/02—Hulls assembled from prefabricated sub-units
- B63B3/08—Hulls assembled from prefabricated sub-units with detachably-connected sub-units
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B43/00—Improving safety of vessels, e.g. damage control, not otherwise provided for
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The present invention relates to a kind of removable short buoyancy tank connection structures of lower water workboat, including main body buoyancy tank, pontoon deck based on the upper surface of the main body buoyancy tank, the quadrangle of the main body pontoon deck is installed with high building, several independent closed formula short buoyancy tanks are installed on the main body pontoon deck, the short buoyancy tank bottom sets short buoyancy tank bottom plate, between the short buoyancy tank bottom plate and main body pontoon deck have topside at and non-topside at two class tie points.The bottom box angle of the short buoyancy tank all has upper recess at topside and at non-topside, there is lower concave part, main body pontoon deck to be connect by fixing bolt in the space that upper recess is formed with lower concave part with short buoyancy tank bottom plate in the place that the main body pontoon deck corresponds to upper recess.The present invention can realize Fast Installation or the short buoyancy tank of dismounting, it is possible to prevente effectively from the shortcomings of the cutting repeatedly of direct welding structure form, destruction main body buoyancy tank Local Members, while also avoiding the potential danger that setting small base is brought.
Description
Technical field
The present invention relates to the removable short buoyancy tank connection structures of lower water workboat, belong to technical field.
Background technology
Lower water workboat is a kind of ship type between semi-submerged ship and barge, dedicated for ship and extra large work construction
Deng level land build after under the vertical, horizontal of lower water workboat water.In conjunction with shown in Fig. 1, lower water workboat is by main body buoyancy tank 1 and cloth
2 two parts of buoyancy high building composition on its quadrangle is set, be mainly used for being moved water under object implementation translates on the bank and is moved to from waterborne
Operation on the bank.
When by shifting object by being arranged in lower water workboat and after longitudinal and transverse track on the bank moves to this ship, in the effect of towboat
Under, this ship is dragged away from together with by shifting object at harbour to heavy hole (having the depth of water required enough by the drinking water of shifting object).Meeting
After operating condition, by main body buoyancy tank ballast tank water filling, this ship is sunk in water completely together with slowly sinking down into main body buoyancy tank by shifting object,
At this time only there are four corners high building on the water surface to provide ship enough buoyancy.After being in completely from floating state by shifting object,
Lower water workboat can be dragged away from, and then completed by water process under shifting object.
During above-mentioned lower water, only there are four corners high buildings on the water surface in main body buoyancy tank just sinks water completely
When, it just contacts the water surface due to being in by shifting object and does not generate any buoyancy also, the maximum load of hull bear is all by four at this time
The buoyancy that high building provides at angle undertakes, while being also the more difficult calculating operating mode for meeting code requirement of this ship Calculation of Stability.Based on this,
Arrange that a number of short buoyancy tank is the design effectively means for improving above-mentioned calculating operating mode stability on main body pontoon deck, it can be effective
Increase the operating mode splash line area, is conducive to improve vessel stability.
Currently, the connection type of the short buoyancy tank of ship type and main body pontoon deck mainly uses direct welding form, this knot
Configuration formula is easy for construction, weight is relatively light, but its have the shortcomings that it is more apparent.This ship is moved to by shifting object to meet, in master
A number of vertical, horizontal track is arranged on body pontoon deck.In addition, to meet the requirement of this ship positionning, in main body buoyancy tank first
A number of outfititem is also arranged on plate, fixed short buoyancy tank hardly results in reasonable Arrangement position.The arrangement of short buoyancy tank
So that main body pontoon deck arrangement is become too fat to move, while being also possible to generate interference with longitudinal and transverse track, influences to be moved water under object.
When carrying out other operations without short buoyancy tank miscellaneous function, the cutting repeatedly of short buoyancy tank, welding be user bring it is many not
Just, working efficiency is influenced, and is easily destroyed main body buoyancy tank local strength at this, increases unnecessary operation costs.
Short buoyancy tank is made into independent closed structure, short buoyancy tank four corners arrange small base and by bolt by short buoyancy tank and master
The structure type that body buoyancy tank is connected is relatively preferable, avoid user cut repeatedly, the workload of welding, improve work effect
Rate, but there are still other problems for this kind of structure type.First, the highly desirable bolt installation requirement that meets of four corners small base (leads to
The screw rod height of bolt need to be often more than, generally need 150~200mm), and the height of pedestal is necessarily by short buoyancy tank and main body buoyancy tank point
It leaves (at least height of small base).And the reason of adding short buoyancy tank it is above-mentioned be expressly recited, the two is separated to be bound to
It can not solve root problem.Secondly, after removing short floating box structure, the presence of each small base not only influences the cloth of main body buoyancy tank
It sets, while also can be that staff's work brings potential danger on ship.
Invention content
Technical problem to be solved by the present invention lies in providing a kind of removable short buoyancy tank connection structure of lower water workboat,
The dismounting of short buoyancy tank can be facilitated not destroy local strength of the main body buoyancy tank at this.
To solve the above-mentioned problems, the technical solution adopted by the present invention is as follows:
A kind of removable short buoyancy tank connection structure of lower water workboat, including main body buoyancy tank, the upper end of the main body buoyancy tank
The quadrangle of pontoon deck based on face, the main body pontoon deck is installed with high building, if being equipped on the main body pontoon deck
The short buoyancy tank of dry independent closed formula, the short buoyancy tank bottom are installed with short buoyancy tank bottom plate, the short buoyancy tank bottom plate and main body buoyancy tank first
Between plate have topside at and non-topside at two class tie points,
The bottom box angle of the short buoyancy tank, which is located at topside, has the first upper recess, and the main body pontoon deck corresponds to first
The place of upper recess has the first lower concave part, the main body pontoon deck recessed in the first upper recess and first with short buoyancy tank bottom plate
It connects to form tie point at topside by fixing bolt in the space that portion is formed,
There is the second upper recess, the main body pontoon deck to correspond to second at non-topside at the bottom box angle of the short buoyancy tank
The place of upper recess has the second lower concave part, the main body pontoon deck recessed in the second upper recess and second with short buoyancy tank bottom plate
It connects to form tie point at non-topside by fixing bolt in the space that portion is formed, the main body pontoon deck is in the second lower concave part
Offer hole.
Further, the shape of first upper recess, the first lower concave part and the second upper recess is rounding arc and plane combination
Structure, second lower concave part be groove structure.
Preferably, first upper recess and the height of the first lower concave part are 400mm, width 200mm, rounding arc
Radius is 300mm.
Preferably, the height of second upper recess is 600mm, the radius of width 400mm, rounding arc are 500mm.
Preferably, the structure of second lower concave part is cube groove.
The height and length of the cube groove are 400mm.
Further, the short buoyancy tank bottom plate and thickness of the main body pontoon deck at the place of being bolted are 25mm.So both
It can ensure short buoyancy tank and main body buoyancy tank junction local strength, and be conducive to be bolted and ensure its intensity requirement.
Further, first upper recess, the first lower concave part and the second upper recess, the second lower concave part the equal 20mm of thickness.
Preferably, the bolt at the topside at tie point and non-topside at tie point is two groups or three groups, topside
The bolt for locating tie point is longitudinally arranged, and the bolt of tie point is arranged along the horizontal at non-topside.
The operation principle of the present invention is that short buoyancy tank realizes short buoyancy tank in the installation or removal of main body buoyancy tank by bolt group
Connecting or separating between bottom plate and main body pontoon deck.There is topside and non-topside with main body pontoon deck on short buoyancy tank bottom plate
Two class tie points, short buoyancy tank is respectively provided with upper recess and lower concave part with main body buoyancy tank at two class tie points, total in two recess portions
Setting small base is not required to main body pontoon deck to connect by fixing bolt, both disappeared with short buoyancy tank bottom plate at the space formed
In addition to the potential danger that setting small base is brought, and short floating box structure and main body buoyancy tank can be made closely coupled.
To sum up, compared with prior art, the beneficial effects of the present invention are:
1, the visual operating condition Fast Installation of the present invention or the short buoyancy tank of dismounting, not only it is possible to prevente effectively from direct welding structure
The shortcomings of cutting repeatedly of form, destruction main body buoyancy tank Local Members, while also avoiding the potential danger that setting small base is brought
Danger.
2, the present invention can greatly improve working efficiency, shorten duty cycle, reduce operation cost.
Description of the drawings
Fig. 1 is the structural schematic diagram of lower water workboat.
Fig. 2 is the structural schematic diagram of local main body pontoon deck in the present invention.
Fig. 3 is the structural schematic diagram of short buoyancy tank bottom plate in the present invention.
Fig. 4 is structure enlargement diagram of the main body pontoon deck at short buoyancy tank case angle in the present invention.
Fig. 5 is the sectional view at DET-1 in Fig. 4.
Fig. 6 is the sectional view at DET-2 in Fig. 4.
Fig. 7 is the sectional view at DET-3 in Fig. 4.
Fig. 8 is the sectional view at DET-4 in Fig. 4.
Fig. 9 is structure enlargement diagram of the short buoyancy tank bottom plate at case angle in the present invention.
In figure:1, main body buoyancy tank;1-1, main body pontoon deck;1a, the first lower concave part;1b, the second lower concave part;2, high building;
3, short buoyancy tank bottom plate;4, short buoyancy tank;4a, the first upper recess;4b, the second upper recess;5, fixing bolt;6, bolt mounting holes.
Specific implementation mode
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.According to following explanation, originally
The purpose, technical scheme and advantage of invention will be apparent from.It should be noted that described embodiment is the preferred of the present invention
Embodiment, instead of all the embodiments.
In conjunction with shown in Fig. 1 to Fig. 4, a kind of removable short buoyancy tank connection structure of lower water workboat, including main body buoyancy tank 1,
The quadrangle of pontoon deck 1-1 based on the upper surface of the main body buoyancy tank, the main body pontoon deck are installed with high building 2, described
Several independent closed formulas short buoyancy tank 4 is installed, the short buoyancy tank bottom is installed with short buoyancy tank bottom plate 3, institute on main body pontoon deck
State between short buoyancy tank bottom plate and main body pontoon deck have topside at and non-topside at two class tie points.
Referring to figs 5 and 6, the bottom box angle of the short buoyancy tank, which is located at topside, has the first upper recess 4a, the master
The place that body pontoon deck corresponds to the first upper recess 4a has the first lower concave part 1a, the main body pontoon deck and short buoyancy tank bottom plate
Tie point at topside is formed by the connection of fixing bolt 5 in the space that the first upper recess and the first lower concave part are formed.As excellent
Select scheme, first upper recess, the structure that the shape of the first lower concave part is rounding arc and plane combination, first upper recess
Height with the first lower concave part is 400mm, and the radius of width 200mm, rounding arc are 300mm.
In conjunction with shown in Fig. 7 and Fig. 8, the bottom box angle of the short buoyancy tank has the second upper recess 4b at non-topside, described
The place that main body pontoon deck corresponds to the second upper recess 4b has the second lower concave part 1b, the main body pontoon deck and short buoyancy tank bottom
Plate forms tie point at non-topside, institute in the space that the second upper recess and the second lower concave part are formed by the connection of fixing bolt 5
It states main body pontoon deck and offers bolt mounting holes 6 in the second lower concave part.Preferably, the shape of second upper recess is to fall
The height of the structure of circular arc and plane combination, second upper recess is 600mm, and the radius of width 400mm, rounding arc are
500mm.Second lower concave part is groove structure, and the structure of second lower concave part is preferably cube groove, described cube
The height and length of body groove are 400mm.Certainly, the structure of groove can also be other shapes, as long as meeting the peace of bolt
Fill space requirement.The size of bolt mounting holes 6 is as small as possible, and only need to meet operative employee's hand can put in, and construct in time
Installation bolt.Clear trepanning size dimension, visual on-site actual situations processing are not provided in this programme.
In conjunction with shown in Fig. 5 and Fig. 7, in order to ensure short buoyancy tank and main body buoyancy tank junction local strength, and be conducive to bolt
Connection ensures its intensity requirement, it is preferred that thickness of the short buoyancy tank bottom plate with main body pontoon deck at the place of being bolted is
25mm。
The equal 20mm of thickness of first upper recess, the first lower concave part and the second upper recess, the second lower concave part is formed above-mentioned
The siding of recess portion ensures that watertight, each commissure use the welding manner of complete penetraction and fusion in welding.
Bolt at the topside at tie point and non-topside at tie point can be two groups or three groups, tie point at topside
Bolt it is longitudinally arranged, the bolt of tie point is arranged along the horizontal at non-topside, and the quantity of bolt according to circumstances determines, for compared with
Long short floating box structure can increase bolt group, structure type in the appropriate location (such as at length direction center) of short buoyancy tank
Close bolt group can be referred to.
The operation principle of the present invention is that short buoyancy tank realizes short buoyancy tank in the installation or removal of main body buoyancy tank by bolt group
Connecting or separating between bottom plate and main body pontoon deck.There is topside and non-topside with main body pontoon deck on short buoyancy tank bottom plate
Two class tie points, short buoyancy tank is respectively provided with upper recess and lower concave part with main body buoyancy tank at two class tie points, total in two recess portions
Setting small base is not required to main body pontoon deck to connect by fixing bolt, both disappeared with short buoyancy tank bottom plate at the space formed
In addition to the potential danger that setting small base is brought, and short floating box structure and main body buoyancy tank can be made closely coupled.
The above is only the description explanation of the preferred embodiment of the present invention, and not limiting the scope of the present invention, shows
So, any technical person familiar with the field is based on above-described embodiment, can readily occur in replacement or variation to obtain other implementations
Example, these are covered by the protection scope of the present invention.
Claims (9)
1. a kind of removable short buoyancy tank connection structure of lower water workboat, including main body buoyancy tank (1), the upper end of the main body buoyancy tank
The quadrangle of pontoon deck (1-1) based on face, the main body pontoon deck are installed with high building (2), it is characterised in that:
Several short buoyancy tanks of independent closed formula (4) are installed, the short buoyancy tank bottom is installed with short floating on the main body pontoon deck
Bottom plate (3), between the short buoyancy tank bottom plate and main body pontoon deck have topside at and non-topside at two class tie points,
The bottom box angle of the short buoyancy tank, which is located at topside, has the first upper recess (4a), and the main body pontoon deck corresponds to first
The place of upper recess has the first lower concave part (1a), and the main body pontoon deck is with short buoyancy tank bottom plate in the first upper recess and first
Tie point at topside is formed by fixing bolt (5) connection in the space that lower concave part is formed,
There is the second upper recess (4b), the main body pontoon deck to correspond to second at non-topside at the bottom box angle of the short buoyancy tank
The place of upper recess has the second lower concave part (1b), and the main body pontoon deck is with short buoyancy tank bottom plate in the second upper recess and second
It is connected by fixing bolt (5) in the space that lower concave part is formed and forms tie point at non-topside, the main body pontoon deck is the
Two lower concave parts offer hole (6).
2. the removable short buoyancy tank connection structure of lower water workboat according to claim 1, it is characterised in that:
The shape of first upper recess, the first lower concave part and the second upper recess is the structure of rounding arc and plane combination, described
Second lower concave part is groove structure.
3. the removable short buoyancy tank connection structure of lower water workboat according to claim 2, it is characterised in that:
First upper recess and the height of the first lower concave part are 400mm, and the radius of width 200mm, rounding arc are 300mm.
4. the removable short buoyancy tank connection structure of lower water workboat according to claim 2, it is characterised in that:
The height of second upper recess is 600mm, and the radius of width 400mm, rounding arc are 500mm.
5. the removable short buoyancy tank connection structure of lower water workboat according to claim 2, it is characterised in that:
The structure of second lower concave part is cube groove.
6. the removable short buoyancy tank connection structure of lower water workboat according to claim 5, it is characterised in that:
The height and length of the cube groove are 400mm.
7. the removable short buoyancy tank connection structure of lower water workboat according to claim 1, it is characterised in that:
The short buoyancy tank bottom plate and thickness of the main body pontoon deck at the place of being bolted are 25mm.
8. the removable short buoyancy tank connection structure of lower water workboat according to claim 1, it is characterised in that:
The equal 20mm of thickness of first upper recess, the first lower concave part and the second upper recess, the second lower concave part.
9. the removable short buoyancy tank connection structure of lower water workboat according to claim 1, it is characterised in that:
Bolt at the topside at tie point and non-topside at tie point is two groups or three groups, the bolt of tie point at topside
Longitudinally arranged, the bolt of tie point is arranged along the horizontal at non-topside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710160950.4A CN106892052B (en) | 2017-03-17 | 2017-03-17 | A kind of removable short buoyancy tank connection structure of lower water workboat |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710160950.4A CN106892052B (en) | 2017-03-17 | 2017-03-17 | A kind of removable short buoyancy tank connection structure of lower water workboat |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106892052A CN106892052A (en) | 2017-06-27 |
CN106892052B true CN106892052B (en) | 2018-07-20 |
Family
ID=59192802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710160950.4A Active CN106892052B (en) | 2017-03-17 | 2017-03-17 | A kind of removable short buoyancy tank connection structure of lower water workboat |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106892052B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113602437B (en) * | 2021-08-23 | 2023-12-19 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | Split type large-scale offshore operation platform structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101397050A (en) * | 2008-10-22 | 2009-04-01 | 江苏科技大学 | Detachable multifunctional pontoon dock |
JP2010111278A (en) * | 2008-11-06 | 2010-05-20 | Sasebo Heavy Industries Co Ltd | Ship storage apparatus |
CN202400258U (en) * | 2011-12-24 | 2012-08-29 | 广东中远船务工程有限公司 | Device for improving stability of semi-submersible barge |
CN103910044A (en) * | 2014-04-14 | 2014-07-09 | 大连理工大学 | Large-scale floating type ocean-structure semi-submersible lifting platform and application method thereof |
CN204452882U (en) * | 2015-01-30 | 2015-07-08 | 江苏韩通船舶重工有限公司 | A kind of high-efficiency conveying device based on large ocean module |
CN105083486A (en) * | 2015-08-03 | 2015-11-25 | 上海海洋大学 | Temporary fixing device and construction method thereof |
-
2017
- 2017-03-17 CN CN201710160950.4A patent/CN106892052B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101397050A (en) * | 2008-10-22 | 2009-04-01 | 江苏科技大学 | Detachable multifunctional pontoon dock |
JP2010111278A (en) * | 2008-11-06 | 2010-05-20 | Sasebo Heavy Industries Co Ltd | Ship storage apparatus |
CN202400258U (en) * | 2011-12-24 | 2012-08-29 | 广东中远船务工程有限公司 | Device for improving stability of semi-submersible barge |
CN103910044A (en) * | 2014-04-14 | 2014-07-09 | 大连理工大学 | Large-scale floating type ocean-structure semi-submersible lifting platform and application method thereof |
CN204452882U (en) * | 2015-01-30 | 2015-07-08 | 江苏韩通船舶重工有限公司 | A kind of high-efficiency conveying device based on large ocean module |
CN105083486A (en) * | 2015-08-03 | 2015-11-25 | 上海海洋大学 | Temporary fixing device and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106892052A (en) | 2017-06-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104627332B (en) | A kind of floating self-elevating drilling platform | |
CN207987900U (en) | A kind of removable deep water offshore operation platform of bottom-sitting type | |
CN104210627B (en) | Build the device and method of lower water for jack-up unit level land | |
CN202298591U (en) | Shallow water tremie frame platform | |
CN102787587A (en) | Non-enclosed pervious member for river regulation | |
KR20180027108A (en) | Floating marine structure | |
CN106892052B (en) | A kind of removable short buoyancy tank connection structure of lower water workboat | |
CN104805857A (en) | Detachable cyclic utilization bottomless steel jacket box and construction method thereof | |
CN204608812U (en) | One detachably recycles bottomless steel jacket box | |
CN101929149A (en) | Shallow sea pile foundation concrete oil drilling and producing platform | |
US20020090270A1 (en) | Column-stabilized offshore vessel | |
CN105129597B (en) | A kind of floating container breakwater special hanger | |
CN201990995U (en) | Jacket support structure for expanding offshore platform | |
CN202416334U (en) | Thin-walled steel box | |
CN204527546U (en) | A kind of pond, ocean mining ship ore deposit | |
CN108179728A (en) | Floating-island type cruise travelling dock | |
CN203623907U (en) | Lifting cup support for offshore platform | |
CN207879332U (en) | Marine mining ship | |
CN207773385U (en) | A kind of steel buoyant means of the built hydraulic structure overall stability of protection | |
CN208219547U (en) | A kind of suspension mounting structure of harbour lower section shore protection block | |
CN206939015U (en) | A kind of new floating dock | |
CN204489132U (en) | A kind of floating jack-up drilling unit | |
CN206679219U (en) | A kind of floating for operation at sea moves construction platform | |
CN206367562U (en) | A kind of steel and concrete structure produced for marine petroleum development adopts storage platform | |
CN205804378U (en) | Can be from floating both arms steel cofferdam device during for removing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |