CN106874071A - It is a kind of to determine that intelligent substation pressing plate throws the method for moving back operation - Google Patents
It is a kind of to determine that intelligent substation pressing plate throws the method for moving back operation Download PDFInfo
- Publication number
- CN106874071A CN106874071A CN201710207457.3A CN201710207457A CN106874071A CN 106874071 A CN106874071 A CN 106874071A CN 201710207457 A CN201710207457 A CN 201710207457A CN 106874071 A CN106874071 A CN 106874071A
- Authority
- CN
- China
- Prior art keywords
- protection device
- pressing plate
- runnable interface
- interface state
- moving back
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 230000004224 protection Effects 0.000 claims abstract description 76
- 238000004088 simulation Methods 0.000 abstract description 2
- 230000005226 mechanical processes and functions Effects 0.000 abstract 1
- 238000012423 maintenance Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 239000013307 optical fiber Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/455—Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
- G06F9/45533—Hypervisors; Virtual machine monitors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/451—Execution arrangements for user interfaces
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/455—Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
- G06F9/45533—Hypervisors; Virtual machine monitors
- G06F9/45558—Hypervisor-specific management and integration aspects
- G06F2009/45591—Monitoring or debugging support
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- General Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Human Computer Interaction (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Determine that intelligent substation pressing plate throws the method for moving back operation the invention discloses a kind of, first, user operates to the protection device for needing operation in manual synchronization's protection device operation interface, and carries out model, type set to protection device;Then the protection device runnable interface operated by user is matched with default protection device runnable interface state picture model library in terminal device; if matching; then record its operating process; if mismatching; then the protection device is emulated again, is modeled and is included into default protection device runnable interface state picture model library, and record its operating process;Finally the state of moving back is thrown to pressing plate to emulate.The present invention moves back state simulation and can show that operation scheme is moved back in the throwing of actual mechanical process center platen according to pressing plate throwing, it is ensured that the safe and reliable operation of power network.
Description
Technical field
It is more particularly to a kind of to determine intelligent power transformation the present invention relates to a kind of intelligent substation clip plate administrative skill field
Pressing plate of standing throws the method for moving back operation.
Background technology
Compared with conventional substation, substantial amounts of cable secondary circuit is replaced current intelligent substation by optical fiber secondary loop
Generation, the soft pressing plate that intuitively hard pressing plate also develops inside for device outside device.When interruption maintenance is spaced, if pressing plate is thrown
The number and order for moving back are improper, it is impossible to ensure the precision maneuver of intelligent substation protection device so that the peace of whole operation of power networks
Quan Xingshou is on the hazard, it is possible to trigger serious power grid accident.
The content of the invention
Determine that intelligent substation pressing plate throws the method for moving back operation the invention provides a kind of, which overcome prior art really
Determine intelligent substation pressing plate and throw the weak point moved back existing for the method for operation, can effectively ensure that pressing plate is thrown and move back the accurate of state
Property.
The technical solution adopted for the present invention to solve the technical problems is:One kind determines that intelligent substation pressing plate is thrown and moves back operation
Method, the determination method comprises the following steps:
S1:User operates to the protection device for needing operation in manual synchronization's protection device operation interface, and this is artificial
Synchronous protective device operation interface can be various mobile terminal devices, and user can enter to protection device on the mobile terminal device
Row model, type set;
S2:By default protection device fortune in the protection device runnable interface operated by user in step S1 and terminal device
Row interface state graphical model storehouse is matched;
If the protection device is matched with a certain class graphical model in default protection device runnable interface state picture model library,
Then record its operating process;
If if the protection device is all mismatched with graphical model in protection device runnable interface state picture model library, entering
Row the following steps:
S21:It is integrated to the protection device operated by user in step S1, and to integrated protection device runnable interface state
Emulated;
S22:Protection device runnable interface state modeling after to being emulated in step S21, is classified to the default protection
In plant running interface state graphical model storehouse;
S23:The operating process of protection device runnable interface state in recording step S22;
S3:The state of moving back is thrown according to the process recorded in S2 to pressing plate to emulate.
Preferably, the default protection device runnable interface state picture model library sets up process being:
Step 1:All kinds of protection devices provided all kinds of protection devices of transformer station and manufacturer are integrated, and to integrated all kinds of
Protection device runnable interface state is emulated;
Step 2:All kinds of protection device runnable interface states modeling after to being emulated in step 1, builds the default protection
Plant running interface state graphical model storehouse.
Preferably, the integrated model including to protection device of step 1 protection device, type and mode of operation
It is integrated.
Preferably, the step S3 center platens are thrown, order is moved back in throwing of the state of moving back including pressing plate and number is moved back in throwing.
Compared to prior art, the invention has the advantages that:The present invention can first exist before interruption maintenance is spaced
The runnable interface state of simulation protection device in analogue system in terminal device, so determine pressing plate throw move back operation order and
The number that throwing is moved back, after determining that the interval can keep apart with interval completely, O&M maintainer can just be obtained by analogue system
Operation scheme is moved back in the pressing plate throwing for going out carries out practical operation, to prevent the generation of accident, it is ensured that the safe and reliable operation of power network, evades
Possible power grid accident risk, improves intelligent substation safe and stable operation level.
The present invention is described in further detail below in conjunction with drawings and Examples;But a kind of determination intelligence of the invention becomes
The method that operation is moved back in power station pressing plate throwing is not limited to embodiment.
Brief description of the drawings
Fig. 1 is FB(flow block) of the invention.
Specific embodiment
Embodiment, refers to Fig. 1, and a kind of determination intelligent substation pressing plate of the invention throws the method for moving back operation, the determination
Method is comprised the following steps:
S1:User operates to the protection device for needing operation in manual synchronization's protection device operation interface, and this is artificial
Synchronous protective device operation interface is specially set mobile phone A PP on mobile terminal device, and carries out type to protection device in APP
Number, type set;
S2:By default protection device fortune in the protection device runnable interface operated by user in step S1 and terminal device
Row interface state graphical model storehouse is matched;
If the protection device is matched with a certain class graphical model in default protection device runnable interface state picture model library,
Then record its operating process;
If if the protection device is all mismatched with graphical model in protection device runnable interface state picture model library, entering
Row the following steps:
S21:It is integrated to the protection device operated by user in step S1, and to integrated protection device runnable interface state
Emulated;
S22:Protection device runnable interface state modeling after to being emulated in step S21, is classified to the default protection
In plant running interface state graphical model storehouse;
S23:The operating process of protection device runnable interface state in recording step S22;
S3:The state of moving back is thrown according to the process recorded in S2 to pressing plate to emulate.
In the present embodiment, the default protection device runnable interface state picture model library sets up process and is:
Step 1:All kinds of protection devices provided all kinds of protection devices of transformer station and manufacturer are integrated, and to integrated all kinds of
Protection device runnable interface state is emulated;
Step 2:All kinds of protection device runnable interface states modeling after to being emulated in step 1, builds the default protection
Plant running interface state graphical model storehouse.
In the present embodiment, the integrated model including to protection device of step 1 protection device, type and operation side
Formula it is integrated;The step S3 center platens throw state of moving back includes that order is moved back in the throwing of pressing plate and number is moved back in throwing.
Before interruption maintenance is spaced, first simulates pressing plate throwing in analogue system according to above-mentioned steps and move back operation, it is determined that between being somebody's turn to do
After it can keep apart with interval completely, the pressing plate that O&M maintainer can just be drawn by analogue system is thrown and moves back operation scheme
Carry out practical operation.
Above-described embodiment is only used for further illustrating the side that operation is moved back in a kind of determination intelligent substation pressing plate throwing of the invention
Method, but the invention is not limited in embodiment, every any letter made to above example according to technical spirit of the invention
Single modification, equivalent variations and modification, each fall within the protection domain of technical solution of the present invention.
Claims (4)
1. it is a kind of to determine that intelligent substation pressing plate throws the method for moving back operation, it is characterised in that the determination method is comprised the following steps:
S1:User is operated to the protection device for needing operation in manual synchronization's protection device operation interface, and protection is filled
Putting carries out model, type set;
S2:By default protection device operation circle in the protection device runnable interface operated by user in step S1 and terminal device
Surface state graphical model storehouse is matched;
If the protection device is matched with a certain class graphical model in default protection device runnable interface state picture model library, remember
Record its operating process;
If if the protection device is all mismatched with graphical model in protection device runnable interface state picture model library, carrying out down
Row step:
S21:It is integrated to the protection device operated by user in step S1, and integrated protection device runnable interface state is carried out
Emulation;
S22:Protection device runnable interface state modeling after to being emulated in step S21, is classified to the default protection device
In runnable interface state picture model library;
S23:The operating process of protection device runnable interface state in recording step S22;
S3:The state of moving back is thrown according to the process recorded in S2 to pressing plate to emulate.
2. a kind of determination intelligent substation pressing plate according to claim 1 throws the method for moving back operation, it is characterised in that:It is described
Default protection device runnable interface state picture model library sets up process and is:
Step 1:All kinds of protection devices provided all kinds of protection devices of transformer station and manufacturer are integrated, and to integrated all kinds of protections
Plant running interface state is emulated;
Step 2:All kinds of protection device runnable interface states modeling after to being emulated in step 1, builds the default protection device
Runnable interface state picture model library.
3. a kind of determination intelligent substation pressing plate according to claim 2 throws the method for moving back operation, it is characterised in that:It is described
The integrated model including to protection device of step 1 protection device, type and mode of operation it is integrated.
4. a kind of determination intelligent substation pressing plate according to claim 1 throws the method for moving back operation, it is characterised in that:It is described
Step S3 center platens throw state of moving back includes that order is moved back in the throwing of pressing plate and number is moved back in throwing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710207457.3A CN106874071A (en) | 2017-03-31 | 2017-03-31 | It is a kind of to determine that intelligent substation pressing plate throws the method for moving back operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710207457.3A CN106874071A (en) | 2017-03-31 | 2017-03-31 | It is a kind of to determine that intelligent substation pressing plate throws the method for moving back operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106874071A true CN106874071A (en) | 2017-06-20 |
Family
ID=59159731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710207457.3A Pending CN106874071A (en) | 2017-03-31 | 2017-03-31 | It is a kind of to determine that intelligent substation pressing plate throws the method for moving back operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106874071A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103578134A (en) * | 2013-11-11 | 2014-02-12 | 国网山东省电力公司 | Pressing plate fallback status simulation method based on virtual reality technology |
CN105092996A (en) * | 2014-05-04 | 2015-11-25 | 华北电力大学 | EMTP (Electro-Magnetic Transient Program)-based relay protection tester compound fault real-time simulation system |
CN105679136A (en) * | 2016-03-11 | 2016-06-15 | 国家电网公司 | Power distribution network fault rush-repairing process simulation system and implementation method thereof |
CN106021694A (en) * | 2016-05-16 | 2016-10-12 | 国网北京市电力公司 | Model simulation method and apparatus used for power supply system |
-
2017
- 2017-03-31 CN CN201710207457.3A patent/CN106874071A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103578134A (en) * | 2013-11-11 | 2014-02-12 | 国网山东省电力公司 | Pressing plate fallback status simulation method based on virtual reality technology |
CN105092996A (en) * | 2014-05-04 | 2015-11-25 | 华北电力大学 | EMTP (Electro-Magnetic Transient Program)-based relay protection tester compound fault real-time simulation system |
CN105679136A (en) * | 2016-03-11 | 2016-06-15 | 国家电网公司 | Power distribution network fault rush-repairing process simulation system and implementation method thereof |
CN106021694A (en) * | 2016-05-16 | 2016-10-12 | 国网北京市电力公司 | Model simulation method and apparatus used for power supply system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102236841B (en) | Method for handling accidents of electric power system | |
CN105302121A (en) | Sequential control operation order automatic anti-error check method based on simulation IED device | |
CN107546854B (en) | Transformer substation pressure plate anti-misoperation method and device | |
CN102033798A (en) | Method for simulating intelligent electronic device IEC61850/MMS (Microsoft media server) server | |
CN105429027A (en) | Secondary safety measure support system in operation and maintenance of intelligent substation and construction method | |
CN104535861A (en) | General template for automated relay protection tester and instantiation method of general template | |
CN105093017B (en) | Intelligent substation GOOSE integrated testabilities device and its method of testing | |
CN204291050U (en) | A kind of dispatching and monitoring information check system | |
CN104702466A (en) | IEC62351 (International Electrotechnical Commission 62351)-based process layer safety test system and method | |
CN105958644A (en) | Pressing plate information management system for intelligent transformer station | |
CN103984795A (en) | IEC 61850-based partial discharge on-line monitoring equipment communication simulation method | |
CN104460607A (en) | Production system graphic ticketing method based on simulated rehearsal | |
CN106843990A (en) | Application program control method and device | |
CN103995916A (en) | IEC 61850-based SF6Communication simulation method for gas online monitoring equipment | |
CN103324744A (en) | Topology search method based on distribution looped network automatic mapping | |
CN103955561A (en) | IEC 61850-based lightning arrester on-line monitoring equipment communication simulation method | |
CN103713523A (en) | Influencing analysis method of whole intelligent substation model | |
CN103716207A (en) | Detection method and device for IEC61850 protocol | |
CN106874071A (en) | It is a kind of to determine that intelligent substation pressing plate throws the method for moving back operation | |
CN104601372B (en) | A kind of intelligent substation void circuit visualization comparison method based on three layer patterns | |
CN106549494A (en) | A kind of method for realizing that based on IEC61850 terminal is automatically configured | |
CN104182818B (en) | A kind of method and system of substation information intelligence automatic data collection | |
CN106533755B (en) | A kind of IEC61850 device network interface method of automatic configuration | |
CN109587161A (en) | The monitoring method of smart grid remote control command transmission overall process information | |
CN101609984A (en) | The fast aided modeling method that is used for data acquisition and supervisor control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170620 |