CN106871853A - Geological prospecting drilling rod linearity verification agency - Google Patents
Geological prospecting drilling rod linearity verification agency Download PDFInfo
- Publication number
- CN106871853A CN106871853A CN201710064334.9A CN201710064334A CN106871853A CN 106871853 A CN106871853 A CN 106871853A CN 201710064334 A CN201710064334 A CN 201710064334A CN 106871853 A CN106871853 A CN 106871853A
- Authority
- CN
- China
- Prior art keywords
- plate
- frame plate
- bar
- support
- guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B21/00—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
- G01B21/22—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring angles or tapers; for testing the alignment of axes
- G01B21/24—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring angles or tapers; for testing the alignment of axes for testing alignment of axes
Abstract
The present invention relates to a kind of geological prospecting drilling rod linearity verification agency, including frame plate, the upper surface of the frame plate is symmetrically installed with multiple contact induction installations, support meanss and discharging device, and stock guide is fixed with front side of frame plate, material device and storage shelf is moved;The contact induction installation interval is uniformly distributed on frame plate, and support meanss and discharging device are respectively symmetrically and live apart in the upper surface two ends of frame plate length direction, and discharging device is located between two support meanss.Structure of the invention is relatively easy, and Linearity surveying is carried out to drilling rod by multiple spot detection mode, and it has the characteristics of degree of accuracy is high, detection is reliable;Drilling rod is without manually operating;Adjusting rod structure is set, is easy to adjust the height of storage shelf, facilitate forklift operator, smaller labour intensity.
Description
Technical field
The present invention relates to geological prospecting apparatus field, more particularly to a kind of geological prospecting drilling rod linearity verification agency.
Background technology
Drilling rod is the important component in exploratory drilling rig.At present, after drilling rod is machined, by its straight line of artificial easy detection
Degree, its shortcoming is obvious:Accuracy in detection is not high, and later stage drilling rod jitter phenomenon easily occurs when using, and causes drill bit to be easily broken off, and needs
Often to change, it is relatively costly, using also dangerous.
Applicant in having applied for that patent is (entitled on the same day:Drilling rod linearity verification agency) above mentioned problem is solved, but
Also have the drawback that:Its storage shelf is fixed installation structure, it is impossible to use forklift operator, it is therefore desirable to be further improved.
The content of the invention
The applicant is for the shortcoming in above-mentioned existing production technology, there is provided a kind of simple structure, accuracy of detection are high, reliable
Geological prospecting drilling rod linearity verification agency.
The technical solution adopted in the present invention is as follows:
A kind of geological prospecting drilling rod linearity verification agency, including frame plate, the upper surface of the frame plate are symmetrically installed with many
Individual contact induction installation, support meanss and discharging device, are fixed with stock guide, move material device and storage shelf on front side of frame plate;
The contact induction installation interval is uniformly distributed on frame plate, and support meanss and discharging device are respectively symmetrically and live apart in frame plate
The upper surface two ends of length direction, discharging device is located between two support meanss;
The contact induction installation includes being respectively fixedly connected with the hinged seat and support plate in frame plate upper surface, is rotated on hinged seat and installed
There is supporting plate, the end of supporting plate is located at the lower section of support plate, and the lower surface of supporting plate is provided with spring, is passed through in support plate and supporting plate
Logical to be fixed with feeler lever, the lower end of feeler lever is placed in the spring, and the frame plate below feeler lever is provided with contact;
The support meanss include the bearing of relative frame plate width symmetrical mounting, between support is maintained between two bearings
Gap;
The discharging device is included by blowing guide rod carriage on frame plate and positioned at the blowing top of frame plate upper surface
Plate and the blowing base plate below frame plate, the upper surface of blowing top board carry feeding plate, the lower surface of blowing base plate with put
Expect that the piston rod of cylinder is connected, blowing cylinder is connected with frame plate;
The stock guide is connected with the front side of frame plate, its inclination guide portion for carrying front end;
The material device that moves includes the installing plate connected with frame plate front side, and the lower surface of installing plate is connected and moves material cylinder, moves material
The piston rod of cylinder is connected through installing plate with shifting flitch, moves flitch and is moved by many and expects that guide rod is mounted opposite plate slip and sets,
Material roller is moved in the upper surface for moving flitch by material support plate tumbler is moved, and moves material roller and is driven by moving material motor, moves material motor
The side for moving flitch is fixed on by motor fixing plate;
The storage shelf includes support body, and the support body includes the company of the underframe enclosed by many cross bars, vertical poles, cross bar and vertical pole
The place of connecing is fixed with vertical rod, is arranged with reinforcing bar above vertical pole in parallel, and two ends and the vertical rod of reinforcing bar are connected;Vertical rod and cross bar it
Between be fixed with guide bar and securing plate, guide bar and the outer wall of vertical rod are connected with first support bar, the outer wall of guide bar and cross bar
Second support bar is connected with, the 3rd support bar is connected between guide bar and securing plate;The two ends of the cross bar are respectively screw company
Adjusting rod is connected to, the upper end of adjusting rod carries controlfin.
As the further improvement of above-mentioned technical proposal:
The upper surface of the frame plate is symmetrically installed with stopping means, and the stopping means includes relative frame plate width cloth
Band limited location gap between the limited block put, two limited blocks;
The end of the supporting plate carries thinning area, and thinning area is located at the lower section of the support plate, the lower surface device institute of thinning area
State spring;
The upper surface of the supporting plate is also equipped with contact block;
The inclined blowing inclined-plane in the oriented frame plate front side of upper surface band of the feeding plate;
The guide bar carries arcuate structure, and its convex side is towards the securing plate;
The upper and lower ends of the guide bar are respectively provided with guide breach;
The central axis of the first support bar, second support bar and the 3rd support bar intersects at same point;
The 4th support bar is connected between the cross bar, the 4th support bar is parallel with vertical pole.
Beneficial effects of the present invention are as follows:
Structure of the invention is relatively easy, and Linearity surveying is carried out to drilling rod by multiple spot detection mode, its have the degree of accuracy it is high,
The characteristics of detection is reliable;Drilling rod is without manually operating;Adjusting rod structure is set, is easy to adjust the height of storage shelf, facilitate fork truck
Operation, smaller labour intensity.
Brief description of the drawings
Fig. 1 is three-dimensional structure diagram of the invention;
Fig. 2 is sectional perspective structure chart of the invention;
Fig. 3 is sectional perspective structure chart of the invention;
Fig. 4 is the three-dimensional structure diagram for moving material device of the invention;
Fig. 5 is the three-dimensional structure diagram of storage shelf of the invention;
Wherein:1st, frame plate;2nd, contact induction installation;21st, hinged seat;22nd, supporting plate;221st, thinning area;23rd, contact block;24、
Feeler lever;25th, support plate;26th, spring;3rd, material device is moved;31st, material cylinder is moved;32nd, flitch is moved;33rd, installing plate;34th, material support plate is moved;
35th, material roller is moved;36th, motor fixing plate;37th, material motor is moved;38th, material guide rod is moved;4th, stock guide;41st, guide portion;5th, blowing dress
Put;51st, feeding plate;511st, blowing inclined-plane;52nd, blowing guide rod;53rd, blowing top board;54th, blowing base plate;55th, blowing cylinder;6、
Limited block;7th, bearing;8th, storage shelf;81st, cross bar;82nd, vertical rod;83rd, vertical pole;84th, guide bar;841st, guide breach;85th, reinforce
Plate;86th, first support bar;87th, the 3rd support bar;88th, second support bar;89th, reinforcing bar;810th, adjusting rod;811st, controlfin;
812nd, the 4th support bar;9th, drilling rod.
Specific embodiment
Below in conjunction with the accompanying drawings, specific embodiment of the invention is illustrated:
As shown in Figure 1, Figure 2, Figure 3 shows, the geological prospecting drilling rod linearity verification agency of the present embodiment, including frame plate 1, frame plate
1 upper surface is symmetrically installed with multiple contact induction installations 2, support meanss and discharging device 5, and the front side of frame plate 1 is fixed with
Stock guide 4 and shifting material device 3;Contact induction installation 2 at least includes three groups, and three groups of intervals are uniformly distributed on frame plate 1, support
Device and discharging device 5 include two groups respectively, are respectively symmetrically and live apart in the upper surface two ends of the length direction of frame plate 1, blowing dress
5 are put to be located between two support meanss;
Contact induction installation 2 includes being respectively fixedly connected with the hinged seat 21 and support plate 25 in the upper surface of frame plate 1, is rotated on hinged seat 21
Supporting plate 22 is installed, the upper surface of supporting plate 22 is provided with contact block 23, and the end of supporting plate 22 carries thinning area 221, subtracts
Thin area 221 is located at the lower section of support plate 25, and the lower surface device spring 26 of thinning area 221, support plate 25 is consolidated with insertion in supporting plate 22
Feeler lever 24 is connected with, the lower end of feeler lever 24 is placed in spring 26, the frame plate 1 of the lower section of feeler lever 24 is provided with contact;Feeler lever 24 with touch
Activation signal is produced after point contact, controller (not shown) is transmitted a signal to, controller controls other device actions.
Support meanss include the bearing 7 of the relative width symmetrical mounting of frame plate 1, and support is maintained between two bearings 7
Gap;
Discharging device 5 is included by the carriage of blowing guide rod 52 on frame plate 1 and positioned at the blowing top of the upper surface of frame plate 1
Plate 53 and the blowing base plate 54 positioned at the lower section of frame plate 1, the upper surface of blowing top board 53 carry feeding plate 51, feeding plate 51 it is upper
The inclined blowing inclined-plane 511 in the oriented front side of frame plate 1 of surface band, the lower surface of blowing base plate 54 and the piston rod of blowing cylinder 55
It is connected, blowing cylinder 55 is connected with frame plate 1;
Stock guide 4 is connected with the front side of frame plate 1, its inclination guide portion 41 for carrying front end;
As shown in figure 4, moving material device 3 includes the installing plate 33 connected with the front side of frame plate 1, the lower surface of installing plate 33 is connected and moves
Material cylinder 31, moves and expects that the piston rod of cylinder 31 is connected through installing plate 33 with flitch 32 is moved, and shifting flitch 32 moves material and leads by many
Bar 38 is mounted opposite plate 33 and slides setting, and material roller 35, shifting are moved in the upper surface for moving flitch 32 by material support plate 34 tumbler is moved
Material roller 35 is driven by moving material motor 37, moves material motor 37 and the side for moving flitch 32 is fixed on by motor fixing plate 36.
The upper surface of frame plate 1 is symmetrically installed with stopping means, and stopping means includes the relative width of frame plate 1 arrangement
Limited block 6, band limited location gap between two limited blocks 6.
As shown in figure 5, storage shelf 8 includes support body, support body includes the underframe enclosed by many cross bars 81, vertical pole 83, horizontal
Bar 81 is fixed with vertical rod 82 with the junction of vertical pole 83, and the top of vertical pole 83 is arranged with reinforcing bar 89, the two of reinforcing bar 89 in parallel
End is connected with vertical rod 82;Guide bar 84 and securing plate 85, guide bar 84 and vertical rod 82 are fixed between vertical rod 82 and cross bar 81
Outer wall is connected with first support bar 86, and guide bar 84 and the outer wall of cross bar 81 are connected with second support bar 88, guide bar 84 with plus
Gu the 3rd support bar 87 is connected between plate 85;The two ends of cross bar 81 are respectively screw and are connected with adjusting rod 810, adjusting rod 810
Upper end to carry and be connected with the 4th support bar 812 between controlfin 811, two cross bars 81,;Adjusting rod is adjusted by rotating controlfin 811
810 height, storage shelf 8 is supported the height for making its liftoff holding certain, facilitates the carrying to storage shelf such as fork truck, the 4th
Strut 812 is used to coordinate with the inserted link of fork truck, is easy to forklift operator.
Guide bar 84 carries arcuate structure, and towards securing plate 85, arcuate structure is used to slow down the rolling of drilling rod to its convex side
Decrease speed, prevents excessive percussion.
The upper and lower ends of guide bar 84 are respectively provided with guide breach 841, and guide breach 841 is easy to the smooth rolling of drilling rod extremely
In storage shelf 8.
First support bar 86, the central axis of the support bar 87 of second support bar 88 and the 3rd intersect at same point, and three bars are total to
Friendship formula sets the support improved to guide bar 84, prevents it from deforming, and improves guide stability.
During present invention work, as shown in figure 1, drilling rod 9 is placed in support meanss and positioned at contact induction installation 2, blowing dress
5 top is put, because inertia is rotated between bearing 7 when drilling rod 9 is positioned on bearing 7, if three groups of contact sensings in rotation process
What device 2 can sense drilling rod 9 presses signal, then it represents that drilling rod 9 is qualified, if the contact of one of them is reactionless, then it represents that
Segment of drillpipe herein is undesirable;After drilling rod 9 has been detected, blowing cylinder 55 ejects feeding plate 51, and drilling rod 9 is along putting
Material inclined-plane 511 is rolled out from stock guide 4, is rolled into storage shelf 8 along guide bar 84;If drilling rod 9 detects unqualified, material is moved
Cylinder 31 will move the jack-up supports drill rods 9 of material roller 35, start shifting material motor 37, move material motor 37 and drive shifting material roller 35, will bore
Bar 9 is removed along the length direction of frame plate 1.
Structure of the invention is relatively easy, and Linearity surveying is carried out to drilling rod by multiple spot detection mode, and it has accurately
The characteristics of degree is high, detection is reliable;Drilling rod is without manually operating;Adjusting rod structure is set, is easy to adjust the height of storage shelf, it is convenient
Forklift operator, smaller labour intensity.
Above description is explanation of the invention, is not the restriction to inventing, and limited range of the present invention is referring to right
It is required that, within protection scope of the present invention, any type of modification can be made.
Claims (5)
1. a kind of geological prospecting drilling rod linearity verification agency, including frame plate (1), it is characterised in that:The frame plate (1)
Upper surface is symmetrically installed with multiple contact induction installations (2), support meanss and discharging device (5), and the front side of frame plate (1) is connected
There is stock guide (4), move material device (3) and storage shelf (8);Contact induction installation (2) interval is uniformly distributed in frame plate (1)
On, support meanss and discharging device (5) are respectively symmetrically and live apart in the upper surface two ends of frame plate (1) length direction, discharging device
(5) between two support meanss;
The contact induction installation (2) is cut with scissors including being respectively fixedly connected with hinged seat (21) and support plate (25) in frame plate (1) upper surface
Supporting plate (22) is rotatablely equipped with joint chair (21), the end of supporting plate (22) is located at the lower section of support plate (25), supporting plate (22)
Lower surface spring (26) is installed, support plate (25) is fixed with feeler lever (24) with insertion in supporting plate (22), under feeler lever (24)
End is placed in the spring (26), and the frame plate (1) below feeler lever (24) is provided with contact;
The support meanss include the bearing (7) of relative frame plate (1) width symmetrical mounting, are kept between two bearings (7)
There is supporting gap;
The discharging device (5) including by blowing guide rod (52) carriage on frame plate (1) and on frame plate (1)
The blowing top board (53) on surface and the blowing base plate (54) below frame plate (1), the upper surface of blowing top board (53) carries
Feeding plate (51), the lower surface of blowing base plate (54) and the piston rod of blowing cylinder (55) are connected, blowing cylinder (55) and frame
Plate (1) is connected;
The stock guide (4) is connected with the front side of frame plate (1), its inclination guide portion (41) for carrying front end;
Material device (3) that moves includes the installing plate (33) connected with frame plate (1) front side, and the lower surface of installing plate (33) is connected
Material cylinder (31) is moved, the piston rod for moving material cylinder (31) is connected through installing plate (33) with flitch (32) is moved, move flitch (32) and borrow
Help many shiftings material guide rod (38) to be mounted opposite plate (33) and slide setting, the upper surface for moving flitch (32) turns by shifting material support plate (34)
Dynamic device moves material roller (35), moves material roller (35) and is driven by moving material motor (37), moves material motor (37) and is fixed by motor
Plate (36) is fixed on the side for moving flitch (32);
The storage shelf (8) includes support body, and the support body includes the underframe enclosed by many cross bars (81), vertical pole (83), horizontal
Bar (81) is fixed with vertical rod (82) with the junction of vertical pole (83), is arranged with reinforcing bar (89) above vertical pole (83) in parallel, plus
Gu the two ends of bar (89) are connected with vertical rod (82);Guide bar (84) and securing plate are fixed between vertical rod (82) and cross bar (81)
(85), guide bar (84) is connected with first support bar (86) with the outer wall of vertical rod (82), and guide bar (84) is outer with cross bar (81)
Wall is connected with second support bar (88), and the 3rd support bar (87) is connected between guide bar (84) and securing plate (85);The horizontal stroke
The two ends of bar (81) are respectively screw and are connected with adjusting rod (810), and the upper end of adjusting rod (810) carries controlfin (811);
The upper surface of the frame plate (1) is symmetrically installed with stopping means, and the stopping means includes relative frame plate (1) width
Band limited location gap between the limited block (6) of direction arrangement, two limited blocks (6);
The end of the supporting plate (22) carries thinning area (221), and thinning area (221) subtract positioned at the lower section of the support plate (25)
Spring (26) described in the lower surface device of thin area (221);
The upper surface of the supporting plate (22) is also equipped with contact block (23);
The inclined blowing inclined-plane (511) in the oriented frame plate of upper surface band (1) front side of the feeding plate (51).
2. geological prospecting drilling rod linearity verification agency as claimed in claim 1, it is characterised in that:Guide bar (84) band
There is arcuate structure, its convex side is towards the securing plate (85).
3. geological prospecting drilling rod linearity verification agency as claimed in claim 1, it is characterised in that:The guide bar (84)
Upper and lower ends are respectively provided with guide breach (841).
4. geological prospecting drilling rod linearity verification agency as claimed in claim 1, it is characterised in that:The first support bar
(86), the central axis of second support bar (88) and the 3rd support bar (87) intersects at same point.
5. geological prospecting drilling rod linearity verification agency as claimed in claim 1, it is characterised in that:Between the cross bar (81)
The 4th support bar (812) is connected with, the 4th support bar (812) is parallel with vertical pole (83).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710064334.9A CN106871853B (en) | 2014-10-31 | 2014-10-31 | Geological prospecting drilling rod straightness verification agency |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710064334.9A CN106871853B (en) | 2014-10-31 | 2014-10-31 | Geological prospecting drilling rod straightness verification agency |
CN201410606917.6A CN104280005B (en) | 2014-10-31 | 2014-10-31 | Drilling rod linearity verification agency |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410606917.6A Division CN104280005B (en) | 2014-10-31 | 2014-10-31 | Drilling rod linearity verification agency |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106871853A true CN106871853A (en) | 2017-06-20 |
CN106871853B CN106871853B (en) | 2019-07-16 |
Family
ID=52255133
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710064334.9A Active CN106871853B (en) | 2014-10-31 | 2014-10-31 | Geological prospecting drilling rod straightness verification agency |
CN201410606917.6A Active CN104280005B (en) | 2014-10-31 | 2014-10-31 | Drilling rod linearity verification agency |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410606917.6A Active CN104280005B (en) | 2014-10-31 | 2014-10-31 | Drilling rod linearity verification agency |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN106871853B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114877829B (en) * | 2022-07-08 | 2022-09-09 | 兰州城市学院 | Straightness detection device of geological exploration drilling rod |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10236555A1 (en) * | 2002-08-08 | 2004-02-19 | Prüftechnik Dieter Busch AG | Shaft or axle, angular and lateral displacement measurement method, wherein measurement accuracy is optimized by execution of a balancing calculation on at least four measurement values |
CN101241003A (en) * | 2008-03-06 | 2008-08-13 | 上海交通大学 | Bore rod straightness automatic detection straightening status monitoring and failure diagnosis system |
CN201322615Y (en) * | 2008-12-10 | 2009-10-07 | 宝山钢铁股份有限公司 | Device for detecting the straightness of drill stem |
CN201407985Y (en) * | 2009-04-30 | 2010-02-17 | 上海标五高强度紧固件有限公司 | Simple straightness measuring instrument of long stem piece |
CN103245280A (en) * | 2013-05-20 | 2013-08-14 | 无锡市钻通工程机械有限公司 | Drill stem straightness detection device |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101458058B (en) * | 2007-12-12 | 2010-09-29 | 鸿富锦精密工业(深圳)有限公司 | Measuring device |
CN102335682B (en) * | 2010-07-28 | 2013-06-19 | 宝山钢铁股份有限公司 | Online detecting and straightening equipment and method of straightness of pipe end of drill pipe |
CN202994125U (en) * | 2012-12-18 | 2013-06-12 | 吴江市新申铝业科技发展有限公司 | Linearity detection tool |
CN203148419U (en) * | 2013-01-29 | 2013-08-21 | 天津塞维拉电梯轨道系统有限公司 | Automatic detection system for elevator guide rail straightness |
CN203704907U (en) * | 2014-02-10 | 2014-07-09 | 高英辉 | Automatic box body hole coaxiality measuring device |
CN204142227U (en) * | 2014-10-31 | 2015-02-04 | 无锡中地地质装备有限公司 | Drilling rod linearity verification agency |
-
2014
- 2014-10-31 CN CN201710064334.9A patent/CN106871853B/en active Active
- 2014-10-31 CN CN201410606917.6A patent/CN104280005B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10236555A1 (en) * | 2002-08-08 | 2004-02-19 | Prüftechnik Dieter Busch AG | Shaft or axle, angular and lateral displacement measurement method, wherein measurement accuracy is optimized by execution of a balancing calculation on at least four measurement values |
CN101241003A (en) * | 2008-03-06 | 2008-08-13 | 上海交通大学 | Bore rod straightness automatic detection straightening status monitoring and failure diagnosis system |
CN201322615Y (en) * | 2008-12-10 | 2009-10-07 | 宝山钢铁股份有限公司 | Device for detecting the straightness of drill stem |
CN201407985Y (en) * | 2009-04-30 | 2010-02-17 | 上海标五高强度紧固件有限公司 | Simple straightness measuring instrument of long stem piece |
CN103245280A (en) * | 2013-05-20 | 2013-08-14 | 无锡市钻通工程机械有限公司 | Drill stem straightness detection device |
Non-Patent Citations (1)
Title |
---|
高瑞等: "多轴钻机钻杆变形分析及校直工艺研究", 《工程机械》 * |
Also Published As
Publication number | Publication date |
---|---|
CN104280005A (en) | 2015-01-14 |
CN106871853B (en) | 2019-07-16 |
CN104280005B (en) | 2017-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102733163B (en) | Efficient and practical clothes folding machine | |
CN103306609B (en) | Boring adjustable supporter vertically upward | |
CN207260964U (en) | A kind of fixed support device used for geological prospecting | |
CN205742196U (en) | It is provided with the boring casing guider of correcting mechanism | |
CN104452258A (en) | Cloth feed frame | |
CN114135231A (en) | Reamer for geological exploration | |
CN106871853A (en) | Geological prospecting drilling rod linearity verification agency | |
CN204142232U (en) | The linearity testing apparatus of drilling rod | |
CN203271739U (en) | Support for electric coal drill | |
CN205673405U (en) | The apparatus for shaping of drilling rod | |
CN204142229U (en) | The straightness detection mechanism of drilling rod | |
CN204142227U (en) | Drilling rod linearity verification agency | |
CN104280006B (en) | The straightness detection mechanism of drilling rod | |
CN205996641U (en) | For the boiler hanger rods bracket system on screw-rolling machine | |
CN204142225U (en) | From the straightness detection mechanism of modus ponens drilling rod | |
CN106555553B (en) | Oil platform deep hole bores | |
CN205996232U (en) | Double card disk stable type suspension rod lathe mechanism | |
CN104280008B (en) | Straightness detection mechanism from modus ponens drilling rod | |
CN104354018B (en) | Fixture for drilling steel rails | |
CN103182745A (en) | Slide block side hanging type cutting machine rack for portable electric cutting machine | |
CN207656197U (en) | A kind of roll-changing equipment of strip machining production line | |
CN207668813U (en) | A kind of changing rig for strip machining production line | |
CN202963554U (en) | Perforating mold for dust removal blow pipe of dust collector | |
CN105082382B (en) | Diamond wire actuating device is used in a kind of silicon heavy stone used as an anchor cutting | |
CN219015249U (en) | Mechanism for rapidly detecting flatness of product |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190624 Address after: No. 1088 Lane 17, Qishan Road, Pudong, Pudong New Area, Shanghai, 200120 Applicant after: Shanghai middle coal Geophysical Survey Co., Ltd. Address before: 266000 No. 68 Changjiang West Road, Qingdao Development Zone, Shandong Applicant before: Zhang Bo |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |