CN106869953A - Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on earth pressure balanced shield, EPBS - Google Patents

Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on earth pressure balanced shield, EPBS Download PDF

Info

Publication number
CN106869953A
CN106869953A CN201710177458.8A CN201710177458A CN106869953A CN 106869953 A CN106869953 A CN 106869953A CN 201710177458 A CN201710177458 A CN 201710177458A CN 106869953 A CN106869953 A CN 106869953A
Authority
CN
China
Prior art keywords
shield
construction
pressure
earth
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710177458.8A
Other languages
Chinese (zh)
Inventor
武金城
王江卡
张部令
朱红霞
张天泉
许建飞
李钊
王俊英
徐东升
曲涛
李冬梅
丁峰
孙学鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Engineering Group Co Ltd
Urban Rail Transit Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Original Assignee
China Railway First Engineering Group Co Ltd
Urban Rail Transit Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Engineering Group Co Ltd, Urban Rail Transit Engineering Co Ltd of China Railway First Engineering Group Co Ltd filed Critical China Railway First Engineering Group Co Ltd
Priority to CN201710177458.8A priority Critical patent/CN106869953A/en
Publication of CN106869953A publication Critical patent/CN106869953A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • E21D9/124Helical conveying means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses soft lower hard and tunneling boring hard rock balance driving method of calming the anger on a kind of earth pressure balanced shield, EPBS, including step:First, gas-adding pipe is installed:Install to the gas-adding pipe that air is injected in native storehouse;2nd, shield driving:Shield Construction Method Used is carried out using balancing earth-pressure shielding machine;During Shield Construction Method Used, native storehouse internal pressure stabilization is kept to air is injected in native storehouse by gas-adding pipe, and by the outside casting of screw conveyor machine, the upper surface of dregs in native storehouse is always 20cm~40cm with the spacing at the top of soil outlet;3rd, shield segment assembling construction:In step 2 during Shield Construction Method Used, shield segment assembling construction is carried out according to conventional pipe sheet assembling lining construction technique, obtain the section of jurisdiction ring of assembled shaping.Reasonable in design, easy to operate and using effect of the invention is good, can effectively solve various problems present in soft lower hard and tunneling boring ground consisting of hard rock shield tunneling process, while driving speed is improved, can effectively reduce construction cost.

Description

Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on earth pressure balanced shield, EPBS
Technical field
The invention belongs to subway shield tunnel construction technical field, more particularly, to soft lower hard and complete on a kind of earth pressure balanced shield, EPBS Section hard rock balance driving method of calming the anger.
Background technology
Tunneling boring hard rock driving is the problem that Subway Tunnel shield tunnel construction is often run into, soft lower hard and complete on carrying out When section hard rock earth pressure balanced shield, EPBS is tunneled, often occur that temperature in storehouse is high, tool wear fast, gush, grouting quality difference causes Duct piece float upward the problems such as, cause interval operating expenses to increase, duration and construction quality can not be effectively ensured.With China Large-scale subway construction is carried out, the upper-soft lower-hard ground and complete in each regional subway construction field interval shield construction Section ground consisting of hard rock driving is more and more, how to solve to be dug during soft lower hard and tunneling boring ground consisting of hard rock on earth pressure balanced shield, EPBS Temperature is high in warehouse entry, tool wear is fast, gush, reduce construction cost the problems such as synchronous grouting is of poor quality, it is ensured that the duration and apply Working medium amount turns into the emphasis of domestic each unit in charge of construction's technology control.Current most domestic unit in charge of construction is in upper-soft lower-hard ground Middle driving is constructed using earth pressure balance method, and is applied without pressure driving or low soil pressure driving using hole capital after selling all securities in tunneling boring ground consisting of hard rock Work, often occurs that temperature in storehouse is high, tool wear fast, gushs, the problems such as synchronous grouting is of poor quality in tunneling process.Especially it is being located at When the tunnel segmental length of upper soft lower hard and tunneling boring ground consisting of hard rock is long, construction problem is more prominent.Such as to Guangzhou Underground 13 When one Shield of number line is constructed, upper soft lower hard and tunneling boring ground consisting of hard rock construction length is 2912.35 meters, The 84% of tunnel overall length is accounted for, in order to improve the earth pressure balance driving speed of upper soft lower hard and tunneling boring ground consisting of hard rock, it is ensured that construction While duration, construction cost is reduced, it is necessary to which existing earth pressure balanced shield, EPBS driving method is adjusted.
The content of the invention
The technical problems to be solved by the invention are for above-mentioned deficiency of the prior art, there is provided a kind of earth pressure balance Soft lower hard and tunneling boring hard rock balance driving method of calming the anger in shield, its reasonable in design, easy to operate and using effect is good, energy Various problems present in soft lower hard and tunneling boring ground consisting of hard rock shield tunneling process are effectively solved, driving speed is being improved Meanwhile, can effectively reduce construction cost.
In order to solve the above technical problems, the technical solution adopted by the present invention is:On a kind of earth pressure balanced shield, EPBS it is soft lower hard and Tunneling boring hard rock balance driving method of calming the anger, it is characterised in that the method is comprised the following steps:
Step one, gas-adding pipe are installed:In the shield machine shield body of balancing earth-pressure shielding machine, install and inject air in native storehouse Gas-adding pipe;
Step 2, shield driving:Institute's construction tunnel is entered from the front to the back using balancing earth-pressure shielding machine described in step one Row Shield Construction Method Used, institute's construction tunnel is the subway tunnel for hard rock positioned at upper-soft lower-hard ground or full section of tunnel;
Institute's construction tunnel is carried out during Shield Construction Method Used, by gas-adding pipe to air is injected in native storehouse, keep soil Storehouse internal pressure stabilization;Meanwhile, the dregs in native storehouse is continuously discharged by screw conveyor machine, make the upper of dregs in native storehouse Surface is all the time than soil outlet top d, wherein d=20cm~40cm high;
The soil outlet is the installing port for installing the screw conveyor machine opened up on native storehouse rear wall;
Step 3, shield segment assembling construction:In step 2 during Shield Construction Method Used, served as a contrast according to conventional pipe sheet assembling Building construction technology carries out shield segment assembling construction, obtains the section of jurisdiction ring of assembled shaping.
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on above-mentioned earth pressure balanced shield, EPBS, it is characterized in that:Step D=40cm described in two.
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on above-mentioned earth pressure balanced shield, EPBS, it is characterized in that:Step Gas-adding pipe described in one is the foam solution ascending pipe carried in balancing earth-pressure shielding machine.
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on above-mentioned earth pressure balanced shield, EPBS, it is characterized in that:It is described The quantity of the foam solution ascending pipe carried in balancing earth-pressure shielding machine is many;When gas-adding pipe installation is carried out in step one, by soil The foam solution ascending pipe carried in pressure balance shield machine is used to inject the foam solution, by balancing earth-pressure shielding machine The remaining foam solution ascending pipe for carrying is connected with gas injection equipment and is used as gas-adding pipe.
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on above-mentioned earth pressure balanced shield, EPBS, it is characterized in that:Step Institute's construction tunnel is a tunnel construction sections of subway tunnel to be onstructed in two, and institute's construction tunnel is located at the subway tunnel to be onstructed Middle part or front side;
Before carrying out Shield Construction Method Used to institute's construction tunnel in step 2, native storehouse gas injection displacement filling, process are first carried out It is as follows:By gas-adding pipe to injecting air in native storehouse, and the dregs in native storehouse is gradually discharged by the screw conveyor machine, directly The upper surface of dregs and the spacing at the top of soil outlet are d in native storehouse;
In native storehouse gas injection displacement filling process, monitor in real time is carried out to native storehouse internal pressure, and keep native storehouse internal pressure Stabilization.
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on above-mentioned earth pressure balanced shield, EPBS, it is characterized in that:Tu Cang In gas injection displacement filling process, the balancing earth-pressure shielding machine is in and stops driving state, the knife of the balancing earth-pressure shielding machine Disk and screw conveyor machine are in working condition.
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on above-mentioned earth pressure balanced shield, EPBS, it is characterized in that:Step Before carrying out Shield Construction Method Used to institute's construction tunnel in two, one is installed on the rear wall of Tu Cang is used to judge slag in native storehouse The valve of the upper level of soil, the valve is d with the spacing at the top of soil outlet.
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on above-mentioned earth pressure balanced shield, EPBS, it is characterized in that:Step When carrying out Shield Construction Method Used to institute's construction tunnel from the front to the back using balancing earth-pressure shielding machine in two, process is as follows:
Step 201, preliminary driving:A ring or two rings are tunneled from the front to the back using balancing earth-pressure shielding machine, in tunneling process Synchronize monitoring to the upper level of dregs in native storehouse, and make the upper of dregs in native storehouse by controlling the screw conveyor machine Surface is all the time than soil outlet top d high, while the cutter head torque of balancing earth-pressure shielding machine described in tunneling process is recorded, Now the cutter head torque of the balancing earth-pressure shielding machine is denoted as T;
Step 202, follow-up driving:Continue to carry out shield pick to institute's construction tunnel from the front to the back using balancing earth-pressure shielding machine Enter construction;During Shield Construction Method Used, the cutter head torque of the balancing earth-pressure shielding machine is controlled to be always T.
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on above-mentioned earth pressure balanced shield, EPBS, it is characterized in that:Step When shield segment assembling construction is carried out in three, after Shield Construction Method Used completes a ring in step 2, according to conventional pipe sheet assembling Lining construction technique carries out shield segment assembling construction, obtains a section of jurisdiction ring of assembled shaping.
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on above-mentioned earth pressure balanced shield, EPBS, it is characterized in that:Step When carrying out Shield Construction Method Used to institute's construction tunnel in two, comprise the following steps:
Step 2-1, preceding N rings driving;Carry out preceding N rings tunneling construction from the front to the back using balancing earth-pressure shielding machine;Wherein, N For positive integer andL is the length of the shield machine shield body of balancing earth-pressure shielding machine, and D is the width of section of jurisdiction ring,Represent Round up;
After preceding N rings tunneling construction to be done, in the space between the Tunnel of the shield machine shield body and institute's construction tunnel Filled by air with pressure;
Step 2-2, next ring driving:Carry out next ring tunneling construction from the front to the back using balancing earth-pressure shielding machine;The ring After the completion of tunneling construction, filled by air with pressure in the space between abjection ring and the Tunnel, and use filling system pair The abjection ring synchronizes slip casting behind, by the slurries of synchronous grouting to space between the abjection ring and the Tunnel Interior enters line replacement by air with pressure;
The abjection ring is a section of jurisdiction ring of abjection balancing earth-pressure shielding machine shield tail when the ring tunneling construction is completed.
The present invention has advantages below compared with prior art:
1st, easy construction and method and step is simple, easy to operate, input cost is low, it is convenient to realize.
2nd, reasonable in design, using effect is good and practical value is high, can effectively solve soft lower hard and tunneling boring ground consisting of hard rock Various problems present in shield tunneling process, for the current domestic subway work duration is tight, upper soft lower hard and tunneling boring hard rock Driving is costly and the situation that time-consuming, for solved the upper soft lower hard and tunneling boring hard rock driving time long, inefficiency, tool changing Frequent risk is big, costly, often occurs temperature in storehouse is high, tool wear is fast, gush, synchronous grouting is of poor quality etc. in work progress Problem, the present invention is carried out during Shield Construction Method Used, by gas-adding pipe to air is injected in native storehouse, keeps native storehouse internal pressure Stabilization;Meanwhile, the dregs in native storehouse is continuously discharged by screw conveyor machine, make in native storehouse the upper surface of dregs and be unearthed Spacing at the top of mouthful is always 20cm~40cm, is so dug in upper soft lower hard and tunneling boring ground consisting of hard rock with balancing earth-pressure shielding machine Large quantity of air is added in shield machine soil storehouse when entering, is replaced soil pressure to form pressure with the face soil body and crevice water with air pressure and is put down Weighing apparatus, is analyzed by pressure parameter and the situation of being unearthed judges and ensures that the soil body is located at soil outlet top 20cm~40cm in native storehouse, this Sample can effectively reduce dregs in native storehouse highly, make in native storehouse and shield body is calmed the anger body filling with ground lamellar spacing by balance, it is ensured that The drying of environment and shield body efficiently solve soil in soft lower hard tunneling process with the drying of soil body gap internal pore in native storehouse The soil body same cutterhead high and tool contact area are big in pressure balance bunker, fraction time is long causes temperature in storehouse is high, tool wear is fast etc. Problem, reduces shield high temperature downtime and tool change time, reduces replacing number of cutters;Meanwhile, efficiently solve soft Aqueous more between soil particle in earth pressure balance soil storehouse in hard tunneling process down, shield body front end is easily dead by soil particle plug in addition, shield body Lost with ground lamellar spacing internal pressure power, cause moisture in stratum into shield body with soil body gap, gradually flow into Tu Cang and formation Gush problem;Cause crevice water in stratum a large amount of in addition, efficiently solving tunneling boring hard rock hole capital after selling all securities no pressure and low-pressure driving By face and shield body with ground lamellar spacing into forming the problem of gushing in storehouse;Also, solving shield body gap internal water accumulation causes to take off Go out moisture dilution simultaneous grouting slurry after shield tail, reduce synchronous grouting quality problems;At the same time, shield is improve using the present invention Structure efficiency of construction, it is ensured that shield tunnel quality, there is preferable social benefit and economy.
Meanwhile, the earth pressure balance driving speed of upper soft lower hard and tunneling boring ground consisting of hard rock can be effectively improved using the present invention, While the construction period is ensured, construction cost can be effectively reduced.
In sum, reasonable in design, easy to operate and using effect of the invention is good, can effectively solve soft lower hard and complete disconnected Various problems present in the ground consisting of hard rock shield tunneling process of face, while driving speed is improved, can effectively reduce and be constructed into This.
Below by drawings and Examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is method of the present invention FB(flow block).
Fig. 2 is the Construction State schematic diagram before gas injection displacement filling in soil storehouse of the invention.
Fig. 3 is the Construction State schematic diagram after gas injection displacement filling in soil storehouse of the invention.
Fig. 4 is the schematic view of the mounting position of valve of the present invention.
Fig. 5 is the structural representation after the completion of the synchronous grouting of present invention abjection ring behind.
Description of reference numerals:
1-balancing earth-pressure shielding machine;2-institute construction tunnel;3-Tu Cang;
4-gas-adding pipe;5-soil outlet;6-foam solution ascending pipe;
7-dregs;8-section of jurisdiction ring;9-air with pressure;
10-ball valve;11-synchronous grouting layer.
Specific embodiment
Soft lower hard and tunneling boring hard rock balance driving method of calming the anger, bag on a kind of earth pressure balanced shield, EPBS as shown in Figure 1 Include following steps:
Step one, gas-adding pipe are installed:In the shield machine shield body of balancing earth-pressure shielding machine 1, install empty to being injected in native storehouse 3 The gas-adding pipe 4 of gas, refers to Fig. 2;
Step 2, shield driving:Using balancing earth-pressure shielding machine 1 described in step one from the front to the back to institute's construction tunnel 2 Carry out Shield Construction Method Used, it positioned at upper-soft lower-hard ground or full section of tunnel is the subway tunnel of hard rock that institute's construction tunnel 2 is;
Institute's construction tunnel 2 is carried out during Shield Construction Method Used, by gas-adding pipe 4 to air is injected in native storehouse 3, kept The internal pressure stabilization of native storehouse 3;Meanwhile, the dregs 7 in native storehouse 3 is continuously discharged by screw conveyor machine, make in native storehouse 3 All the time than the top of soil outlet 5 d, wherein d=20cm~40cm high, Fig. 3 is referred in the upper surface of dregs 7;
The soil outlet 5 is the installing port for installing the screw conveyor machine opened up on the rear wall of native storehouse 3;
Step 3, shield segment assembling construction:In step 2 during Shield Construction Method Used, served as a contrast according to conventional pipe sheet assembling Building construction technology carries out shield segment assembling construction, obtains the section of jurisdiction ring 8 of assembled shaping.
The upper-soft lower-hard ground includes bottom rock stratum and the upper soil horizon above the bottom rock stratum, is located at herein The subway tunnel of upper-soft lower-hard ground refers to the top of the tunnel cross-section for soil layer and its underpart are rock stratum, and the rock stratum is Hard formation.
Wherein, the dregs 7 is the mixture of rock slag or rock slag and native slag.
In the present embodiment, the d=40cm described in step 2.
During practice of construction, can according to specific needs, the value size to d is adjusted accordingly.
In the present embodiment, gas-adding pipe 4 described in step one is the foam solution ascending pipe 6 carried in balancing earth-pressure shielding machine 1.
Thus, practical operation is easy, and input cost is relatively low, and saving of work and time.
The quantity of the foam solution ascending pipe 6 carried in the balancing earth-pressure shielding machine 1 is many;Aerating is carried out in step one When pipe is installed, the foam solution ascending pipe 6 carried in balancing earth-pressure shielding machine 1 is used to inject the foam solution, will The remaining foam solution ascending pipe 6 carried in balancing earth-pressure shielding machine 1 is connected with gas injection equipment and is used as gas-adding pipe 4.Its In, gas injection equipment is also referred to as supercharging equipment.
In the present embodiment, the quantity of the foam solution ascending pipe 6 carried in the balancing earth-pressure shielding machine 1 is four, step The three foam solution ascending pipes 6 carried in balancing earth-pressure shielding machine 1 are connected with gas injection equipment and made as gas-adding pipe 4 in one With.
When actually used, the front end of the every foam solution ascending pipe 6 is installed in the rear wall middle part in native storehouse 3.It is described Screw conveyor machine is arranged on the bottom in native storehouse 3.
Thus, the present invention injects the liquid injection system of foam solution using the foaming system carried in balancing earth-pressure shielding machine 1, The foaming system carried in balancing earth-pressure shielding machine 1 includes four road foam solution ascending pipes 6, by adjusting three road foam solution ascending pipes 6, make three road foam solution ascending pipes 6 only to adding air to be added without foam solution and water in native storehouse 3, Shield Construction Method Used with it is described In cutterhead rotation process, the 4th road foam solution ascending pipe 6 is normally added foam solution carries out cutterhead lubrication.
In the present embodiment, institute's construction tunnel 2 is a tunnel construction sections of subway tunnel to be onstructed, institute's construction tunnel in step 2 2 middle parts or front side for being located at the subway tunnel to be onstructed;
As shown in Figures 2 and 3, before carrying out Shield Construction Method Used to institute's construction tunnel 2 in step 2, Tu Cang notes are first carried out Gas displacement filling, process is as follows:By gas-adding pipe 4 to injecting air in native storehouse 3, and by the screw conveyor machine by native storehouse 3 Interior dregs 7 is gradually discharged, until the upper surface of dregs 7 is than the top of soil outlet 5 d high in native storehouse 3;
In native storehouse gas injection displacement filling process, monitor in real time is carried out to the internal pressure of native storehouse 3, and keep the inside of native storehouse 3 pressure Power stabilization.
Wherein, the purpose for keeping native storehouse 3 internal pressure stabilization is air pressure in native storehouse 3 is formed with moisture in stratum and stratum Balance pressure, enables the internal pressure of native storehouse 3 to consolidate the rock mass on the outside of support shield machine shield body.
In native storehouse gas injection displacement filling process, the balancing earth-pressure shielding machine 1 is in and stops driving state, and the soil pressure is put down The cutterhead and screw conveyor machine of weighing apparatus shield machine 1 are in working condition.
When actually carrying out native storehouse gas injection displacement filling, when large quantity of air injects native storehouse 3, start rotating cutter-head, and start The screw conveyor machine is outwards unearthed, and balancing earth-pressure shielding machine 1 is not tunneled forward, and the dregs 7 in native storehouse 3 is replaced using air, And keep storehouse to press stabilization.
In the present embodiment, when carrying out native storehouse gas injection displacement filling, by gas-adding pipe 4 to injecting air in native storehouse 3, and pass through The screw conveyor machine gradually discharges the dregs 7 in native storehouse 3, until the top of soil outlet 5 is down in the upper surface of dregs 7 in native storehouse 3 At the 40cm of top.
As shown in figure 4, before carrying out Shield Construction Method Used to institute's construction tunnel 2 in step 2, on the rear wall in native storehouse 3 One valve for being used to judge the upper level of dregs 7 in native storehouse 3 is installed, the valve is with the spacing at the top of soil outlet 5 d。
In the present embodiment, the valve is ball valve 10.
During actual installation, the valve is arranged on the rear wall outside in native storehouse 3.
In the present embodiment, the ball valve 10 is arranged on the top of soil outlet 5 and is higher by the position of 40cm.Shield is carried out in step 2 During structure tunneling construction, when soil outlet 5 begins with air ejection, dregs in soil storehouse 3 easy, quick can be determined by ball valve 10 Whether 7 upper level is higher by the installation site of ball valve 10, when the upper level of dregs 7 in native storehouse 3 is higher by ball valve 10 During installation site, stop driving;Otherwise, when the upper level of dregs 7 in native storehouse 3 is not higher by the installation site of ball valve 10, Recover driving.
In the present embodiment, shield pick is carried out to institute's construction tunnel 2 using balancing earth-pressure shielding machine 1 from the front to the back in step 2 When entering to construct, process is as follows:
Step 201, preliminary driving:One ring or two rings are tunneled using balancing earth-pressure shielding machine 1 from the front to the back, in tunneling process Upper level to dregs 7 in native storehouse 3 synchronizes monitoring, and makes dregs 7 in native storehouse 3 by controlling the screw conveyor machine Upper surface all the time than the top of soil outlet 5 d high, while entering to the cutter head torque of balancing earth-pressure shielding machine 1 described in tunneling process Row record, now the cutter head torque of the balancing earth-pressure shielding machine 1 is denoted as T;
Step 202, follow-up driving:Continue to carry out shield to institute's construction tunnel 2 from the front to the back using balancing earth-pressure shielding machine 1 Tunneling construction;During Shield Construction Method Used, the cutter head torque of the balancing earth-pressure shielding machine 1 is controlled to be always T.
In the present embodiment, in step 201 in preliminary tunneling process, by the boring parameter for adjusting balancing earth-pressure shielding machine 1 Cutter head torque is referred mainly to, ball valve 10 is iterated through and is determined whether the upper surface of dregs 7 in native storehouse 3 is higher by the installation position of ball valve 10 Put, at the same time, the boring parameter for recording balancing earth-pressure shielding machine 1 refers mainly to cutter head torque;And utilize the earth pressure balanced shield, EPBS The boring parameter of machine 1 refers mainly to cutter head torque and proceeds driving.
In the present embodiment, also need in the cutter head torque in balancing earth-pressure shielding machine 1 not progradation and progradation Cutter head torque T is recorded respectively.
In step 202 in follow-up tunneling process, only the cutter head torque of the balancing earth-pressure shielding machine 1 need to be controlled to be always T, Just the upper surface of dregs 7 and the spacing at the top of soil outlet 5 in native storehouse 3 can be made to be d.
When shield segment assembling construction is carried out in the present embodiment, in step 3, Shield Construction Method Used completes one in step 2 After ring, shield segment assembling construction is carried out according to conventional pipe sheet assembling lining construction technique, obtain an institute of assembled shaping State section of jurisdiction ring 8.
As shown in figure 5, when carrying out Shield Construction Method Used to institute's construction tunnel 2 in step 2, comprising the following steps:
Step 2-1, preceding N rings driving;Carry out preceding N rings tunneling construction from the front to the back using balancing earth-pressure shielding machine 1;Wherein, N For positive integer andL is the length of the shield machine shield body of balancing earth-pressure shielding machine 1, and D is the width of section of jurisdiction ring 8,Table Show and round up;
After preceding N rings tunneling construction to be done, in the space between the Tunnel of the shield machine shield body and institute's construction tunnel 2 Filled by air with pressure 9, play air pressure sealing effect;
Step 2-2, next ring driving:Carry out next ring tunneling construction from the front to the back using balancing earth-pressure shielding machine 1;The ring After the completion of tunneling construction, filled by air with pressure 9 in the space between abjection ring and the Tunnel, and use filling system pair The abjection ring synchronizes slip casting behind, by the slurries of synchronous grouting to space between the abjection ring and the Tunnel Interior enters line replacement by air with pressure 9, simultaneous grouting slurry is diluted without underground water so, it is ensured that simultaneous grouting slurry matter Amount;
The abjection ring is a section of jurisdiction ring of the abjection shield tail of balancing earth-pressure shielding machine 1 when the ring tunneling construction is completed 8。
In the present embodiment, using filling system to it is described abjection ring synchronize slip casting behind after, it is described abjection ring and Synchronous grouting layer 11 is formed between the Tunnel.
The above, is only presently preferred embodiments of the present invention, and not the present invention is imposed any restrictions, every according to the present invention Any simple modification, change and equivalent structure change that technical spirit is made to above example, still fall within skill of the present invention In the protection domain of art scheme.

Claims (10)

1. a kind of soft lower hard and tunneling boring hard rock balance driving method of calming the anger on earth pressure balanced shield, EPBS, it is characterised in that the party Method is comprised the following steps:
Step one, gas-adding pipe are installed:In the shield machine shield body of balancing earth-pressure shielding machine (1), install empty to injection in Tu Cang (3) The gas-adding pipe (4) of gas;
Step 2, shield driving:Using balancing earth-pressure shielding machine described in step one (1) from the front to the back to institute's construction tunnel (2) Carry out Shield Construction Method Used, it positioned at upper-soft lower-hard ground or full section of tunnel is the subway tunnel of hard rock that institute's construction tunnel (2) is;
Institute's construction tunnel (2) is carried out during Shield Construction Method Used, by injection air in gas-adding pipe (4) Xiang Tucang (3), protected Hold Tu Cang (3) internal pressure stabilization;Meanwhile, the dregs (7) in Tu Cang (3) is continuously discharged by screw conveyor machine, make The upper surface of Tu Cang (3) interior dregs (7) is all the time than soil outlet (5) top d, wherein d=20cm~40cm high;
The soil outlet (5) is the installing port for installing the screw conveyor machine opened up on Tu Cang (3) rear wall;
Step 3, shield segment assembling construction:In step 2 during Shield Construction Method Used, applied according to conventional pipe sheet assembling lining cutting Work technique carries out shield segment assembling construction, obtains the section of jurisdiction ring (8) of assembled shaping.
2. according to soft lower hard and tunneling boring hard rock balance driving method of calming the anger on the earth pressure balanced shield, EPBS described in claim 1, It is characterized in that:D=40cm described in step 2.
3. according to soft lower hard and tunneling boring hard rock balance driving side of calming the anger on the earth pressure balanced shield, EPBS described in claim 1 or 2 Method, it is characterised in that:Gas-adding pipe described in step one (4) is the foam solution ascending pipe carried in balancing earth-pressure shielding machine (1) (6)。
4. according to soft lower hard and tunneling boring hard rock balance driving method of calming the anger on the earth pressure balanced shield, EPBS described in claim 3, It is characterized in that:The quantity of the foam solution ascending pipe (6) carried in the balancing earth-pressure shielding machine (1) is many;In step When carrying out gas-adding pipe and installing, the foam solution ascending pipe (6) that will be carried in balancing earth-pressure shielding machine (1) is for injecting State foam solution, the remaining foam solution ascending pipe (6) carried in balancing earth-pressure shielding machine (1) be connected with gas injection equipment simultaneously as Gas-adding pipe (4) is used.
5. according to soft lower hard and tunneling boring hard rock balance driving side of calming the anger on the earth pressure balanced shield, EPBS described in claim 1 or 2 Method, it is characterised in that:Institute's construction tunnel (2) is a tunnel construction sections of subway tunnel to be onstructed, institute's construction tunnel (2) in step 2 Positioned at the middle part or front side of the subway tunnel to be onstructed;
Before carrying out Shield Construction Method Used to institute's construction tunnel (2) in step 2, native storehouse gas injection displacement filling is first carried out, process is such as Under:By injection air in gas-adding pipe (4) Xiang Tucang (3), and by the screw conveyor machine by the dregs (7) in Tu Cang (3) Gradually discharge, until the upper surface of Tu Cang (3) interior dregs (7) is than soil outlet (5) top d high;
In native storehouse gas injection displacement filling process, monitor in real time is carried out to Tu Cang (3) internal pressure, and keep pressure inside Tu Cang (3) Power stabilization.
6. according to soft lower hard and tunneling boring hard rock balance driving method of calming the anger on the earth pressure balanced shield, EPBS described in claim 5, It is characterized in that:In native storehouse gas injection displacement filling process, the balancing earth-pressure shielding machine (1) is described in driving state is stopped The cutterhead and screw conveyor machine of balancing earth-pressure shielding machine (1) are in working condition.
7. according to soft lower hard and tunneling boring hard rock balance driving side of calming the anger on the earth pressure balanced shield, EPBS described in claim 1 or 2 Method, it is characterised in that:Before carrying out Shield Construction Method Used to institute's construction tunnel (2) in step 2, on the rear wall of Tu Cang (3) The valve of one upper level for judging Tu Cang (3) interior dregs (7) is installed, at the top of the valve and soil outlet (5) Spacing is d.
8. according to soft lower hard and tunneling boring hard rock balance driving side of calming the anger on the earth pressure balanced shield, EPBS described in claim 1 or 2 Method, it is characterised in that:Shield pick is carried out to institute's construction tunnel (2) using balancing earth-pressure shielding machine (1) from the front to the back in step 2 When entering to construct, process is as follows:
Step 201, preliminary driving:One ring or two rings are tunneled using balancing earth-pressure shielding machine (1) from the front to the back, it is right in tunneling process The upper level of Tu Cang (3) interior dregs (7) synchronizes monitoring, and is made in Tu Cang (3) by controlling the screw conveyor machine The upper surface of dregs (7) all the time than soil outlet (5) top d high, while to balancing earth-pressure shielding machine described in tunneling process (1) Cutter head torque is recorded, and now the cutter head torque of the balancing earth-pressure shielding machine (1) is denoted as T;
Step 202, follow-up driving:Continue to carry out shield to institute's construction tunnel (2) from the front to the back using balancing earth-pressure shielding machine (1) Tunneling construction;During Shield Construction Method Used, the cutter head torque of the balancing earth-pressure shielding machine (1) is controlled to be always T.
9. according to soft lower hard and tunneling boring hard rock balance driving side of calming the anger on the earth pressure balanced shield, EPBS described in claim 1 or 2 Method, it is characterised in that:When shield segment assembling construction is carried out in step 3, after Shield Construction Method Used completes a ring in step 2, Shield segment assembling construction is carried out according to conventional pipe sheet assembling lining construction technique, a section of jurisdiction of assembled shaping is obtained Ring (8).
10. soft lower hard and tunneling boring hard rock balance driving method of calming the anger on the earth pressure balanced shield, EPBS stated according to claim 9, it is special Levy and be:When carrying out Shield Construction Method Used to institute's construction tunnel (2) in step 2, comprise the following steps:
Step 2-1, preceding N rings driving;Preceding N rings tunneling construction is carried out using balancing earth-pressure shielding machine (1) from the front to the back;Wherein, N is Positive integer andL is the length of the shield machine shield body of balancing earth-pressure shielding machine (1), and D is the width of section of jurisdiction ring (8), Expression rounds up;
After preceding N rings tunneling construction to be done, quilt in the space between the Tunnel of the shield machine shield body and institute's construction tunnel (2) Air with pressure (9) is filled;
Step 2-2, next ring driving:Next ring tunneling construction is carried out using balancing earth-pressure shielding machine (1) from the front to the back;The ring is dug Enter after the completion of construction, by air with pressure (9) filling in the space between abjection ring and the Tunnel, and use filling system pair The abjection ring synchronizes slip casting behind, by the slurries of synchronous grouting to space between the abjection ring and the Tunnel Interior enters line replacement by air with pressure (9);
The abjection ring is the section of jurisdiction ring of abjection balancing earth-pressure shielding machine (1) shield tail when the ring tunneling construction is completed (8)。
CN201710177458.8A 2017-03-23 2017-03-23 Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on earth pressure balanced shield, EPBS Pending CN106869953A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710177458.8A CN106869953A (en) 2017-03-23 2017-03-23 Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on earth pressure balanced shield, EPBS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710177458.8A CN106869953A (en) 2017-03-23 2017-03-23 Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on earth pressure balanced shield, EPBS

Publications (1)

Publication Number Publication Date
CN106869953A true CN106869953A (en) 2017-06-20

Family

ID=59171927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710177458.8A Pending CN106869953A (en) 2017-03-23 2017-03-23 Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on earth pressure balanced shield, EPBS

Country Status (1)

Country Link
CN (1) CN106869953A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108425681A (en) * 2017-10-27 2018-08-21 宏润建设集团股份有限公司 A kind of gas soil joint balance shield machine and its face balance control method
CN108756918A (en) * 2018-07-19 2018-11-06 中国铁建重工集团有限公司 A kind of no pipe sheet assembling device and shield machine
CN112901186A (en) * 2021-02-23 2021-06-04 中铁十九局集团轨道交通工程有限公司 Tunneling equipment and tunneling mode conversion method
CN113202486A (en) * 2021-04-29 2021-08-03 中铁十二局集团有限公司 Auxiliary pressure maintaining propulsion method for water-rich rock stratum SAMSON system
CN114837680A (en) * 2022-05-10 2022-08-02 济南城建集团有限公司 Filling type starting method of earth pressure balance shield machine

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5846027A (en) * 1996-02-22 1998-12-08 Toyo Technos Co., Ltd. Semi-shield method and apparatus for the same
CN101509381A (en) * 2008-12-24 2009-08-19 中铁隧道集团有限公司 Composite shield structure suitable for bad ground construction

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5846027A (en) * 1996-02-22 1998-12-08 Toyo Technos Co., Ltd. Semi-shield method and apparatus for the same
CN101509381A (en) * 2008-12-24 2009-08-19 中铁隧道集团有限公司 Composite shield structure suitable for bad ground construction

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
李洪祺: "复合式TBM在重庆地区复合地层的适应性分析", 《科技信息》 *
竺维彬等: "盾构掘进辅助气压平衡的关键技术研究", 《现代隧道技术》 *
邓彬 等: "上软下硬地层盾构施工技术研究", 《现代隧道技术》 *
郭庆彪: "上软下硬地层盾构掘进模式的研究", 《铁道建筑技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108425681A (en) * 2017-10-27 2018-08-21 宏润建设集团股份有限公司 A kind of gas soil joint balance shield machine and its face balance control method
CN108756918A (en) * 2018-07-19 2018-11-06 中国铁建重工集团有限公司 A kind of no pipe sheet assembling device and shield machine
CN108756918B (en) * 2018-07-19 2024-02-13 中国铁建重工集团股份有限公司 Pipe-free sheet assembling device and shield tunneling machine
CN112901186A (en) * 2021-02-23 2021-06-04 中铁十九局集团轨道交通工程有限公司 Tunneling equipment and tunneling mode conversion method
CN113202486A (en) * 2021-04-29 2021-08-03 中铁十二局集团有限公司 Auxiliary pressure maintaining propulsion method for water-rich rock stratum SAMSON system
CN114837680A (en) * 2022-05-10 2022-08-02 济南城建集团有限公司 Filling type starting method of earth pressure balance shield machine

Similar Documents

Publication Publication Date Title
CN106869953A (en) Soft lower hard and tunneling boring hard rock balance driving method of calming the anger on earth pressure balanced shield, EPBS
CN104088647B (en) Shield tube push bench with super-large rectangular cross section
CN100554645C (en) A kind of composite balancing earth-pressure shielding machine
CN103470267B (en) The one Rapid Construction of Tunnels technique of growing up
CN203905954U (en) Super-large shield pipe push bench with rectangular cross section
CN101967978B (en) Construction method for improving shield soil in composite sand gravel stratum
WO2018176892A1 (en) Network integrated and coordinated control system and method for thin coal seam comprehensive mining and gas control
CN111156010B (en) Construction method for shield of expansion soil layer to penetrate through existing train station house
CN108643922A (en) A kind of highly permeable soil rock compound stratum major diameter slurry shield synthesis driving method
CN109779651B (en) Sand ginger clay stratum short-distance mud-water balance pipe jacking construction method
CN113700527B (en) High-strength coal gangue overlying rock isolation grouting filling green mining method for mining working face
CN104712333A (en) Large-width one-step roadway formation roadway rapid excavation technology
CN110985012A (en) Shield tunneling mode suitable for stratum with uneven hardness and conversion method thereof
CN105240012B (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN203822359U (en) Distribution structure for gas extraction holes of coal face
CN106968671A (en) The filling of underground coal mine coal-face return channel withdraws method
CN206707641U (en) A kind of pile-driving machine
CN111550255A (en) Shield tunneling machine and construction method thereof
CN109372527B (en) System and method for tunneling double-spiral shield tunneling machine in water-rich upper soft stratum and lower hard stratum
CN109578058B (en) Method for improving gas extraction concentration of extraction borehole through auxiliary drilling
CN202745940U (en) Enclosing construction for gob
CN104018844A (en) Shield tunneling machine water-pressure and gas-pressure balance control system and method in water-rich stratum
CN106761448A (en) A kind of pile-driving machine
CN204386597U (en) The coal road comprehensive dig-anchor machine of large width simultaneous drifting
CN204060702U (en) A kind of underground pipe gallery shield-tunneling construction shield machine head

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620