CN106864687A - A kind of jack up offshore recreational is spent a holiday platform - Google Patents
A kind of jack up offshore recreational is spent a holiday platform Download PDFInfo
- Publication number
- CN106864687A CN106864687A CN201710205441.9A CN201710205441A CN106864687A CN 106864687 A CN106864687 A CN 106864687A CN 201710205441 A CN201710205441 A CN 201710205441A CN 106864687 A CN106864687 A CN 106864687A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- platform
- hull
- bar
- holiday
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
Abstract
Spent a holiday platform, including spud leg, hull, sleeve, at least one water balcony, escalator device and superstructure the invention discloses a kind of jack up offshore recreational, the lower end of the spud leg is provided with the supporting part for being placed in seabed;The lower end inner wall of the sleeve is installed on spud leg by elevating mechanism, and the hull is installed on the lower end outer wall of sleeve;Slide bar is provided with the downside of the hull, the connecting portion matched with slide bar is provided with the inside of the water balcony, the connecting portion is connected with sliding bar;The upper end of the escalator device is connected with hull, and the lower end of the escalator device is connected with water balcony, and the hull is provided with entrance, and this entrance is located at the top of escalator device;The superstructure is installed on the upper end of sleeve.The present invention can meet people's vacation tourism on ocean and use, and reduce the pressure on land, it is ensured that the comfortableness of the personnel for using.
Description
Technical field
The present invention relates to Marine Tourism leisure technology, and in particular to a kind of jack up offshore recreational is spent a holiday platform.
Background technology
The land use resource on current land is more and more nervous, the more and more spatial developments to ocean of people.Current people
Mainly carry out the production activity such as offshore drilling, oil recovery using ocean platform on ocean.With the improvement of living standards, it is more next
More people yearn for the tourism of ocean landscape, are spent a holiday with to offshore recreational.And traditional ocean platform is only applicable to industrial production and makes
With, it is impossible to reach the demand of people.For this, urgent need is a kind of can be used for the platform that offshore recreational is spent a holiday, and both meet knot in maritime environment
Economic, safe, the durable requirement of structure thing, meets the demand of the tourism and leisure such as comfortable, attractive in appearance again.
The content of the invention
The invention aims to overcome the shortcomings of that above prior art is present, there is provided a kind of simple and reasonable for structure,
Jack up offshore recreational that is easy to use and meeting modern needs is spent a holiday platform.
The purpose of the present invention is realized by following technical scheme:This jack up offshore recreational is spent a holiday platform, including spud leg,
Hull, sleeve, at least one water balcony, escalator device and superstructure, the lower end of the spud leg is provided with for being placed in seabed
Supporting part;The lower end inner wall of the sleeve is installed on spud leg by elevating mechanism, and the hull is installed on outside the lower end of sleeve
Wall;Slide bar is provided with the downside of the hull, the connecting portion matched with slide bar, the connecting portion are provided with the inside of the water balcony
It is connected with sliding bar;The upper end of the escalator device is connected with hull, and the lower end of the escalator device is connected with water balcony,
The hull is provided with entrance, and this entrance is located at the top of escalator device;The superstructure is installed on the upper end of sleeve.
Preferably, the water balcony includes the first kickboard, and the connecting portion is arranged at the inner side of the first kickboard, the company
One end of socket part is provided with connecting hole, and sliding bearing is provided with this connecting hole, and the sliding bearing is socketed with slide bar.
Preferably, the outer rim of first kickboard is provided with guardrail.
Preferably, the escalator device include the second kickboard, multiple stepped plates and two staircase bars, the staircase bar it is upper
End is articulated with below hull, and the two ends of the stepped plate are individually fixed in two staircase bars, and multiple stepped plates along staircase bar
It is uniformly distributed from bottom to top;Chute is provided with the staircase bar, the both sides of described second kickboard one end are by rolling bearing point
It is not connected with the chute in two staircase bars, the other end of second kickboard is connected with the first kickboard.
Preferably, the superstructure has 3 groups, and this 3 groups of superstructures are uniformly distributed in the top of hull;And spud leg and
The quantity of sleeve is also 3, and every lower end inner wall of sleeve is installed on the upper end of spud leg, every group by corresponding elevating mechanism
Superstructure is set around a corresponding sleeve.
Preferably, the superstructure includes at least one of which cabin mechanism, and this cabin mechanism includes underframe, upper frame and multiple
The cabin of modular, the underframe and upper frame are fixed on the lateral wall of sleeve upper end, and the upper frame is located at the top of underframe;It is described
Multiple screens are formed between underframe and upper frame, the quantity of the screens is equal with the quantity in cabin;Each cabin is connected in accordingly
Screens.
Preferably, the underframe includes the first annular bar that many first radiations and multiple diameters are differed, each article the
One end of one radiation is both secured to sleeve, and the radiation of each bar first is uniformly distributed relative to its circumference;Each first ring
Shape bar is passed through by sleeve, and each first annular bar is fixedly connected with the first radiation;
The upper frame includes the second circular rod that many second radiations and multiple diameters are differed, the radiation of each bar second
One end be both secured to sleeve, and the radiation of each bar second is uniformly distributed relative to its circumference;Each the second circular rod quilt
Sleeve is passed through, and each second circular rod is fixedly connected with radiation;
2 adjacent first radiations and the second radiations formation screens relative with 2 first radiations.
Preferably, the superstructure has two-layer cabin mechanism, has between wind-guiding between the mechanism of two-layer cabin
Every the lower end at this interval is provided with deck.
Preferably, the outer rim of the hull sets profile outer rim in the arc-shaped;Connected between two adjacent groups superstructure
There is transfer bridge.
Preferably, the spud leg uses basalt fiber composite material.
The present invention has the following advantages relative to prior art:
1st, this jack up offshore recreational spend a holiday platform it is main by spud leg, hull, at least one water balcony, escalator device and
Superstructure is constituted, and it is different from traditional ocean platform, is available for people's vacation tourism to use, and meets the demand of the modern life.
2nd, this jack up offshore recreational platform of spending a holiday is provided with water balcony and escalator device, this water balcony and escalator device
Can automatically be risen or fallen with sea level, this is easy to yacht berthing and the people that spends a holiday to climb up hull by water balcony.
3rd, this jack up offshore recreational lower end of spud leg in platform of spending a holiday is provided with supporting part, and when deployed, spud leg declines,
Its supporting part is placed directly within seabed, it is not necessary to which special instrument is fixed;When needing to move, spud leg rises, and hull decline floats on
On sea, so that convenient remove whole platform, it is easy to operate.
4th, this jack up offshore recreational spend a holiday platform superstructure using circular arc profile, and between two-layer cabin
The interval of wind-guiding is designed, the front face area and air resistance coefficient of whole platform can be effectively reduced, so as to reduce suffered by whole platform
Oversea wind influence.
5th, this jack up offshore recreational spends a holiday platform superstructure using frame-type steel construction and modularization entirety cabin, whole
Body cabin structure and it is built-in it is prefabricated by land after the completion of integral hoisting on framework, marine efficiency of construction can be improved, reduction is built
Cause this.
Brief description of the drawings
Fig. 1 is that jack up offshore recreational of the invention is spent a holiday the structural representation of platform.
Fig. 2 is water balcony of the invention and escalator device is installed on structural representation below hull.
Fig. 3 is the enlarged diagram at A in Fig. 2.
Fig. 4 is the structural representation of this bright escalator device.
Fig. 5 is the enlarged diagram at B in Fig. 4.
Fig. 6 is the structural representation of superstructure of the invention.Clear to show, part cabin does not draw.
Fig. 7 is the structural representation of underframe of the invention and upper frame.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples.
Jack up offshore recreational as shown in Figure 1 is spent a holiday platform, including spud leg 1, hull 2, sleeve 20, at least one are hydrophilic
Platform 3, escalator device 4 and superstructure 5, the lower end of the spud leg 1 are provided with the supporting part 6 for being placed in seabed;The sleeve
20 lower end inner wall is installed on the upper end of spud leg 1 by elevating mechanism, and the hull 2 is installed on the lower end outer wall of sleeve 20;Institute
The downside for stating hull 2 is provided with slide bar 7, and the inner side of the water balcony 3 is provided with the connecting portion 8 matched with slide bar 7, the connecting portion
8 are slidably connected with slide bar 7;The upper end of the escalator device 4 is connected with hull 2, the lower end of the escalator device 4 and water balcony
3 connections, the hull 2 is provided with entrance, and this entrance is located at the top of escalator device 4;The superstructure 5 is installed on sleeve 20
Upper end.Wherein, using being made of basalt fiber composite material, basalt fiber material is relative to traditional steel material for spud leg 1
Material, good corrosion resistance lighter with deadweight, and build install, the characteristics of maintenance cost is low.Hull 2 possesses the buoyancy of abundance, whole
When individual platform is moved, spud leg 1 is lifted, then certain length in the upper end insertion sleeve 20 of spud leg 1, so that hull drops to sea level,
So as to drag whole platform, to move to appropriate position.When whole platform moves to deepwater appropriate location, spud leg
1 decentralization, supporting part 6 of the order positioned at the lower end of spud leg 1 is directly fixed on seabed, and general who has surrendered drives hull 2 to rise a segment distance under spud leg,
So as to have enough distances between hull 2 and sea level, now hull forms a platform structure for sufficient intensity;Then it is located at
The superstructure 5 of the top of hull 2 has enough safe distances with sea level, and this also ensures that station spends a holiday in superstructure 5
People has the wide view visual field.And water balcony 3 is slidably connected by connecting portion 8 with slide bar 7, then water balcony 3 can be therewith
The height on sea level rises or falls automatically, to facilitate yacht berthing and personnel to climb up water balcony 3 from yacht or tender, then
To the superstructure 5 of the top of hull 2 from escalator device 4.Elevating mechanism in the present invention can use existing jack up ocean
The elevating mechanism of platform.Wherein, as depicted in figs. 1 and 2, the profile side 16 of hull 1 be provided with escaping exit 29 and with the phase of escaping exit 29
Corresponding escape ship 30, so as to further improve security reliability when whole platform is used.
As shown in Figures 2 and 3, the water balcony 3 includes the first kickboard 9, and the connecting portion 8 is arranged at the first kickboard 9
Inner side, one end of the connecting portion 8 is provided with connecting hole, sliding bearing, the sliding bearing and cunning is provided with this connecting hole
Bar 7 is socketed.Specifically, the first kickboard 9 is in fan-shaped, its buoyancy for passing through itself floats on sea level.To ensure 9 liters of the first kickboard
The stability of drop, the quantity of slide bar 7 has three, and the quantity of connecting portion 8 is three, and three connecting portions 8 are uniformly distributed in the
The inner side of one kickboard 9, and the upper end of three slide bars 7 is both secured to the downside of hull 2;Three connecting portions 8 pass through sliding bearing
It is socketed with corresponding slide bar 7, to ensure that the first kickboard 9 rises or falls along the axis of slide bar 7.Water balcony 3 in this implementation
With two, the structure of this two water balconies is similar, and simply the middle part of the first kickboard 9 of one of water balcony 3 is provided with
Fan-shaped hole, the people that this function of water balcony 3 is to provide vacation tourism carries out various modes of playing such as extra large fishing, yacht, swimming.
The outer rim of first kickboard 9 is provided with guardrail 10.This simple structure, also ensure that people walk in the first kickboard 9
Security when dynamic, it is to avoid people drop marine from water balcony 3.
As shown in Figure 4 and Figure 5, the escalator device 4 includes the second kickboard 11, multiple stepped plates 12 and two staircase bars
13, the upper end of the staircase bar 13 is articulated with below hull 2, and the two ends of the stepped plate 12 are individually fixed in two staircase bars
13, and multiple stepped plates 12 are uniformly distributed from bottom to top along staircase bar 13;Chute 14, described second are provided with the staircase bar 13
The both sides of the one end of kickboard 11 are connected with the chute 14 in two staircase bars 13 respectively by rolling bearing 15, second kickboard
11 other end is connected with the first kickboard 9.Second kickboard 11 is rectangle, and the both sides of the one end of the second kickboard 11 pass through rolling bearing
15 are connected with the chute 14 of staircase bar 13, stability when this ensures that the second kickboard 11 declines with sea level rise, and make second
Kickboard 11 is connected along specific direction rise and fall between the second kickboard 11 and the first kickboard 9, so that both are synchronized with the movement,
Ensure people it is stable go to escalator device 4 from water balcony 3.
The superstructure 5 has 3 groups, and this 3 groups of superstructures 5 are uniformly distributed in the top of hull 1, and in two adjacent groups
Transfer bridge 28 is provided between layer building 5, to facilitate walking about for personnel between each group superstructure 5;And the quantity of spud leg 1 and sleeve 20
Also 3 are, every lower end inner wall of sleeve 20 is installed on spud leg 1 by corresponding elevating mechanism, every group of superstructure 5 around
A corresponding sleeve 20 is set.The quantity of superstructure 5 is equal with the quantity of sleeve, the shape class of hull 2 in the present embodiment
There are three angles like triangle, i.e. hull 2, and the outer rim of hull 2 sets bending, i.e., the outer rim of described hull 2 is arranged to circular arc
The profile side 16 of shape.3 groups of superstructures 5 are located at three angles of hull respectively, and multiple superstructures 5 can meet more people simultaneously
Use.And profile side 16 is set using arc-shaped, this can reduce windage, it is ensured that the stability of whole device.
As shown in Fig. 1, Fig. 6 and Fig. 7, the superstructure 5 includes at least one of which cabin mechanism 17, and this cabin mechanism 17 wraps
The cabin 21 of underframe 18, upper frame 19 and multiple modulars is included, the upper end of spud leg 1, the bottom are fixed in the lower end of the sleeve 20
The upper end of sleeve 20 is fixed at the center of frame 18 and upper frame 19, and the upper frame 19 is located at the top of underframe 18;The He of the underframe 18
Multiple screens 22 are formed between upper frame 19, the quantity of the screens 22 is equal with the quantity in cabin 21;Each cabin 21 is connected in
Corresponding screens 22.There is full seascape deluxe room in cabin, when being lived with the people that ensure to spend a holiday with comfortable experience.And
The modular of cabin 21 is set, this directly can on land manufacture whole cabin 21, be then directly mounted at the entirety of cabin 21
Between underframe and upper frame, this convenient manufacture is installed, and also reduces the construction installation cost of whole platform.
The underframe 18 includes the first annular bar 24 that many first radiations 23 and multiple diameters are differed, each bar first
One end of radiation 23 is both secured to sleeve 20, and the first radiation of each bar 23 is distributed relative to the even circumferential of sleeve 20;Each
First annular bar 24 is passed through by sleeve 20, and each first annular bar 24 is fixedly connected with the first radiation 23;The top
Frame 19 includes the second circular rod 26 that many second radiations 25 and multiple diameters are differed, one end of the second radiation of each bar 25
Sleeve 20 is both secured to, and the second radiation of each bar 25 is distributed relative to the even circumferential of sleeve 20;Each second circular rod 26 is equal
Passed through by sleeve 20, and each second circular rod 26 is fixedly connected with the second radiation 25;2 adjacent first radiations 23
And form screens with 2 relative the second radiations 25 of first radiation 23.This simple structure, it is convenient to install, and good stability.
To ensure uniform force, the spacing between two neighboring first annular bar 24 is equal;Similarly, two neighboring second circular rod 26 it
Between spacing it is equal.And be further to ensure the stability that cabin 21 is installed in screens 22, the underframe 18 is equipped with bottom
Plate 27.
The superstructure 5 has two-layer cabin mechanism 17, has the interval for wind-guiding between two-layer cabin mechanism 17
27, the lower end at this interval 27 is provided with deck, i.e. deck and is installed on the upper frame of cabin mechanism 17 thereunder..This structure has
Air flow in sharp cabin 21, can improve comfortableness during vacation tourism people's accommodation, meanwhile, people can dissipate above deck
Step, while the setting on deck also has open seascape platform feature.
Above-mentioned specific embodiment is the preferred embodiments of the present invention, can not be limited the invention, and others are appointed
Change or other equivalent substitute modes that what is made without departing from technical scheme, are included in protection of the invention
Within the scope of.
Claims (10)
1. a kind of jack up offshore recreational is spent a holiday platform, it is characterised in that:Including spud leg, hull, sleeve, at least one hydrophilic flat
Platform, escalator device and superstructure, the lower end of the spud leg are provided with the supporting part for being placed in seabed;In the lower end of the sleeve
Wall is installed on spud leg by elevating mechanism, and the hull is installed on the lower end outer wall of sleeve;Slide bar is provided with the downside of the hull,
The connecting portion matched with slide bar is provided with the inside of the water balcony, the connecting portion is connected with sliding bar;The staircase dress
The upper end put is connected with hull, and the lower end of the escalator device is connected with water balcony, and the hull is provided with entrance, this entrance position
In the top of escalator device;The superstructure is installed on the upper end of sleeve.
2. jack up offshore recreational according to claim 1 is spent a holiday platform, it is characterised in that:The water balcony includes the
One kickboard, the connecting portion is arranged at the inner side of the first kickboard, and one end of the connecting portion is provided with connecting hole, is set in this connecting hole
Sliding bearing is equipped with, the sliding bearing is socketed with slide bar.
3. jack up offshore recreational according to claim 2 is spent a holiday platform, it is characterised in that:The outer rim of first kickboard
It is provided with guardrail.
4. jack up offshore recreational according to claim 1 is spent a holiday platform, it is characterised in that:The escalator device includes the
Two kickboards, multiple stepped plates and two staircase bars, the upper end of the staircase bar are articulated with below hull, and the two of the stepped plate
End is individually fixed in two staircase bars, and multiple stepped plates are uniformly distributed from bottom to top along staircase bar;It is provided with the staircase bar
Chute, the both sides of described second kickboard one end are connected with the chute in two staircase bars respectively by rolling bearing, and described
The other end of two kickboards is connected with the first kickboard.
5. jack up offshore recreational according to claim 1 is spent a holiday platform, it is characterised in that:The superstructure has 3
Group, this 3 groups of superstructures are uniformly distributed in the top of hull;And the quantity of spud leg and sleeve is also 3, under every sleeve
End inwall is installed on spud leg by corresponding elevating mechanism, and every group of superstructure is set around a corresponding sleeve.
6. jack up offshore recreational according to claim 1 is spent a holiday platform, it is characterised in that:The superstructure is included extremely
Few one layer of cabin mechanism, this cabin mechanism includes the cabin of underframe, upper frame and multiple modulars, and the underframe and upper frame are fixed on
The lateral wall of sleeve upper end, the upper frame is located at the top of underframe;Multiple screens, the card are formed between the underframe and upper frame
The quantity of position is equal with the quantity in cabin;Each cabin is connected in corresponding screens.
7. jack up offshore recreational according to claim 6 is spent a holiday platform, it is characterised in that:The underframe includes many
The first annular bar that one radiation and multiple diameters are differed, one end of the radiation of each bar first is both secured to sleeve, and each bar
First radiation is uniformly distributed relative to its circumference;Each first annular bar is passed through by sleeve, and each first annular bar
It is fixedly connected with the first radiation;
The upper frame includes the second circular rod that many second radiations and multiple diameters are differed, the one of the radiation of each bar second
End is both secured to sleeve, and the radiation of each bar second is uniformly distributed relative to its circumference;Each second circular rod is by sleeve
Pass through, and each second circular rod is fixedly connected with radiation;
2 adjacent first radiations and the second radiations formation screens relative with 2 first radiations.
8. jack up offshore recreational according to claim 1 is spent a holiday platform, it is characterised in that:The superstructure has two
Layer cabin mechanism, has the interval for wind-guiding between the mechanism of two-layer cabin, the lower end at this interval is provided with deck.
9. jack up offshore recreational according to claim 1 is spent a holiday platform, it is characterised in that:The outer rim of the hull is set
Profile outer rim in the arc-shaped;Transfer bridge is connected between two adjacent groups superstructure.
10. jack up offshore recreational according to claim 1 is spent a holiday platform, it is characterised in that:Spud leg is fine using basalt
Dimension composite.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710205441.9A CN106864687B (en) | 2017-03-31 | 2017-03-31 | A kind of jack up offshore recreational is spent a holiday platform |
PCT/CN2017/116128 WO2018176916A1 (en) | 2017-03-31 | 2017-12-14 | Self-elevating off-shore leisure resort platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710205441.9A CN106864687B (en) | 2017-03-31 | 2017-03-31 | A kind of jack up offshore recreational is spent a holiday platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106864687A true CN106864687A (en) | 2017-06-20 |
CN106864687B CN106864687B (en) | 2019-04-09 |
Family
ID=59161023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710205441.9A Active CN106864687B (en) | 2017-03-31 | 2017-03-31 | A kind of jack up offshore recreational is spent a holiday platform |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106864687B (en) |
WO (1) | WO2018176916A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018176916A1 (en) * | 2017-03-31 | 2018-10-04 | 华南理工大学 | Self-elevating off-shore leisure resort platform |
CN113622396A (en) * | 2020-05-06 | 2021-11-09 | 中国海洋大学 | Lifting type multifunctional leisure platform on sea |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2342378A1 (en) * | 2001-03-28 | 2002-09-28 | Florencio Neto Palma | Waser |
WO2012036574A3 (en) * | 2010-09-17 | 2012-05-10 | Deep Ocean Technology Spółka Z Ograniczoną Odpowiedzialnością | An underwater-above water accomodation, especially for residential purposes |
CN102673741A (en) * | 2012-05-29 | 2012-09-19 | 中国海洋石油总公司 | Skid-proof platform gangway ladder |
CN103770914A (en) * | 2014-02-13 | 2014-05-07 | 中国船舶重工集团公司第七○二研究所 | Movable type marine tourism resort hotel |
CN104743078A (en) * | 2013-12-29 | 2015-07-01 | 王世华 | Floating type water surface entertainment platform |
CN105201237A (en) * | 2015-10-19 | 2015-12-30 | 宏华海洋油气装备(江苏)有限公司 | Self-elevating off-island hotel |
CN105253261A (en) * | 2015-10-06 | 2016-01-20 | 东北石油大学 | Lifting type water floating split green building structure system and construction method |
CN205168829U (en) * | 2015-10-30 | 2016-04-20 | 中石化石油工程技术服务有限公司 | Can extend deck jack -up platform |
CN206691340U (en) * | 2017-03-31 | 2017-12-01 | 华南理工大学 | A kind of jack up offshore recreational is spent a holiday platform |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004019975A1 (en) * | 2004-04-23 | 2005-11-10 | Siemens Ag | Device with at least one aufbockbaren via water carrier surface |
CN201494598U (en) * | 2009-07-15 | 2010-06-02 | 江阴市船舶设备制造有限公司 | Buoyancy tank type raft boarding ladder |
CN201593181U (en) * | 2009-10-16 | 2010-09-29 | 抚州市临川白勇海洋工程有限公司 | Self-lifting offshore wind power set mounting platform |
WO2011116254A2 (en) * | 2010-03-19 | 2011-09-22 | National Oilwell Varco, L.P. | Jack-up rig with leg-supported ballast loads |
CN106218827B (en) * | 2016-07-28 | 2018-03-16 | 太重(天津)滨海重型机械有限公司 | Offshore wind farm O&M supports platform |
CN106284270B (en) * | 2016-08-30 | 2019-05-17 | 武汉船用机械有限责任公司 | A kind of modularization jack-up unit |
CN106544996A (en) * | 2016-10-27 | 2017-03-29 | 湖北海洋工程装备研究院有限公司 | A kind of ocean service platform |
CN106864687B (en) * | 2017-03-31 | 2019-04-09 | 华南理工大学 | A kind of jack up offshore recreational is spent a holiday platform |
-
2017
- 2017-03-31 CN CN201710205441.9A patent/CN106864687B/en active Active
- 2017-12-14 WO PCT/CN2017/116128 patent/WO2018176916A1/en active Application Filing
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2342378A1 (en) * | 2001-03-28 | 2002-09-28 | Florencio Neto Palma | Waser |
WO2012036574A3 (en) * | 2010-09-17 | 2012-05-10 | Deep Ocean Technology Spółka Z Ograniczoną Odpowiedzialnością | An underwater-above water accomodation, especially for residential purposes |
CN102673741A (en) * | 2012-05-29 | 2012-09-19 | 中国海洋石油总公司 | Skid-proof platform gangway ladder |
CN104743078A (en) * | 2013-12-29 | 2015-07-01 | 王世华 | Floating type water surface entertainment platform |
CN103770914A (en) * | 2014-02-13 | 2014-05-07 | 中国船舶重工集团公司第七○二研究所 | Movable type marine tourism resort hotel |
CN105253261A (en) * | 2015-10-06 | 2016-01-20 | 东北石油大学 | Lifting type water floating split green building structure system and construction method |
CN105201237A (en) * | 2015-10-19 | 2015-12-30 | 宏华海洋油气装备(江苏)有限公司 | Self-elevating off-island hotel |
CN205168829U (en) * | 2015-10-30 | 2016-04-20 | 中石化石油工程技术服务有限公司 | Can extend deck jack -up platform |
CN206691340U (en) * | 2017-03-31 | 2017-12-01 | 华南理工大学 | A kind of jack up offshore recreational is spent a holiday platform |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018176916A1 (en) * | 2017-03-31 | 2018-10-04 | 华南理工大学 | Self-elevating off-shore leisure resort platform |
CN113622396A (en) * | 2020-05-06 | 2021-11-09 | 中国海洋大学 | Lifting type multifunctional leisure platform on sea |
Also Published As
Publication number | Publication date |
---|---|
CN106864687B (en) | 2019-04-09 |
WO2018176916A1 (en) | 2018-10-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101837237B1 (en) | Offshore platform with outset columns | |
US8007204B2 (en) | Floating structure for support of mixed use facilities | |
CN201580542U (en) | Single-pole platform of triangular truss | |
CN203544335U (en) | Semisubmersible living platform | |
CN102616344A (en) | Heavy draught truss type floating platform | |
CN204452864U (en) | Prevent that the semisubmersible high stability ecological, environmental protective wind-proof and wave-proof of swinging plate floats platform with damping | |
CN105408550A (en) | Submersible structure for actively supporting towers of generators and sub-stations or similar elements in maritime facilities | |
CN107697238A (en) | A kind of dry tree semi-submerged platform of deep water floating type multifunctional and its offshore installation method | |
CN100999247A (en) | Truss semi-submersible offshore floating structure | |
CN203358825U (en) | Special boarding ladder for FPSO (Floating Production Storage and Offloading) | |
CN206691340U (en) | A kind of jack up offshore recreational is spent a holiday platform | |
CN106864687A (en) | A kind of jack up offshore recreational is spent a holiday platform | |
CN203902802U (en) | Deep sea glass steel survey platform device | |
CN101927812B (en) | Mating of buoyant hull structure with truss structure | |
CN101351379B (en) | Lashing of a tender assist drilling unit to a floating production facility | |
CN105083485A (en) | Inclined upright truss type semi-submersible oil production platform | |
US9731796B2 (en) | Well intervention semisubmersible vessel | |
CN210912785U (en) | Self-elevating offshore platform climbing ladder | |
CN202847984U (en) | Heavy draught truss type floating platform | |
US4632600A (en) | Movable fixed-type semi-submerged construction | |
EP2566751A2 (en) | Boom mooring system | |
CN106232468B (en) | Outer capstan head with steering framing wheel | |
CN102071819A (en) | Deep water suspension safety swimming pool | |
CN205524857U (en) | Take how much truss -like stand platforms in oil storage tank | |
CN106697208B (en) | A kind of underwater integrated form production conveying riser systems and its installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |