CN106849056A - The load transfer policy searching method of cutting load under a kind of reduction forecast failure - Google Patents

The load transfer policy searching method of cutting load under a kind of reduction forecast failure Download PDF

Info

Publication number
CN106849056A
CN106849056A CN201611018306.5A CN201611018306A CN106849056A CN 106849056 A CN106849056 A CN 106849056A CN 201611018306 A CN201611018306 A CN 201611018306A CN 106849056 A CN106849056 A CN 106849056A
Authority
CN
China
Prior art keywords
load
load transfer
cutting load
forecast failure
overload
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611018306.5A
Other languages
Chinese (zh)
Other versions
CN106849056B (en
Inventor
刘福锁
王珂
刘婷
李碧君
张红丽
周磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NARI Group Corp
Guangzhou Power Supply Bureau Co Ltd
Nari Technology Co Ltd
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Nari Technology Co Ltd
Nanjing NARI Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd, Nari Technology Co Ltd, Nanjing NARI Group Corp filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201611018306.5A priority Critical patent/CN106849056B/en
Publication of CN106849056A publication Critical patent/CN106849056A/en
Application granted granted Critical
Publication of CN106849056B publication Critical patent/CN106849056B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0073Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source when the main path fails, e.g. transformers, busbars

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of load transfer policy searching method of cutting load under reduction forecast failure, belong to Power System and its Automation technical field.The present invention calculates multiple failure incision spatial load forecasting amounts for the overload or the out-of-limit problem of node voltage of equipment under forecast failure.According to different load turning solution to reducing the integrated performance index of cutting load decrement under multiple failures, it is negative load transfer scheme to exclude integrated performance index, integrated performance index highest load transfer scheme is selected successively, can check solve the problems, such as to need cutting load under forecast failure, until being finished without cutting load or load transfer measure.The present invention, so as to reduce cutting load risk, can reduce electric power safety accident responsibility risk, the operation and management level of raising power network for forecast failure issues generating apparatus overload and the state of emergency such as voltage out-of-limit provides optimization load transfer strategy in power network.

Description

The load transfer policy searching method of cutting load under a kind of reduction forecast failure
Technical field
The invention belongs to Power System and its Automation technical field, more precisely, reduced the present invention relates to one kind pre- Think the load transfer policy searching method of cutting load under failure.
Background technology
Urgent cutting load is an important measures in China's electricity net safety stable defense technique system, by tight in power network Implementing cutting load under anxious state can solve the stable problems such as generator rotor angle, voltage, frequency and overload.The command of State Council the 599th《Electric power Security incident response is disposed and regulations of investigating》(Hereinafter referred to as《Regulations》), specify that stabilized control system cutting load is equal to event Barrier loss load, can equally trigger when steady control cutting load causes partial electric grid to lose when load reaches certain proportion《Regulations》.Cause This, on the premise of power network safety operation is ensured, on the one hand should strengthen stabilized control system management and distribute rationally, recognize configuration The risk that stabilized control system brings, on the other hand to the less demanding state of emergency of some control times, actively seek bodyfixed frame, Load loss is reduced on the premise of power grid security is ensured.
For realizing the power network that layering and zoning is run already, the load transfer of by stages move be undoubtedly power network be in warning/ One of the quick of system security and stability, effective means are improved under the state of emergency.The reliability of power supply can to the full extent be ensured Property, reduce load loss.The method that generally uses of the country is at present, 220kV by stages be provided with one or more solution circling points and Standby service channel, when there is accident in some subregion, being unlikely to influence can phase between other subregions, and different subregions Mutually support, while also just for the load transfer between subregion provides condition.
The content of the invention
The present invention seeks to:In order to reduce cutting load amount after grid collapses, reduce or eliminate solving by cutting load Overload and the electric power safety accident responsibility brought when the problems such as voltage out-of-limit, are given and a kind of reduce bearing for cutting load under forecast failure Lotus turns to supply policy searching method.
Specifically, the present invention is realized using following technical scheme, is comprised the following steps:
1)Based on the load transfer scheme that online mode data validation can perform, the sum of the executable load transfer scheme of note is M, such as M=0, then turn to step 10), otherwise turn to step 2);
2)Simulation analysis are carried out for forecast failure table, and judge overload or voltage out-of-limit problem whether occur under institute is faulty, If not occurring, step 10 is turned to)If occurring, step 3 is turned to);
3)Note causes the sum that the forecast failure of overload or voltage out-of-limit problem occurs in power network to be K, and for these forecast failures, It is calculated as solving the problems, such as each resulting in power network successively and the state of emergency institute existed under the forecast failure of overload or voltage out-of-limit occurs The cutting load measure amount for needing, meter wherein thekCutting load amount needed for individual forecast failure is
4)For M executable load transfer scheme, calculate successively after performing each load transfer scheme, solve to each result in There is the cutting load measure amount needed for the state of emergency that exists under the forecast accident of overload or voltage out-of-limit problem in power network, and meter is wherein ThekIndividual forecast failure is takingmRequired cutting load amount is under individual load transfer scheme
5)By formula(1)Each load transfer scheme is calculated successively to reducing the performance indications of cutting load:
(1)
Wherein,It ismPerformance indications of the individual load transfer scheme to reduction cutting load;
6)M load transfer scheme is sorted from big to small according to the performance indications for reducing cutting load, the 1st load is designated as successively Turning solution, the 2nd load transfer scheme ..., M load transfer schemes;If the initial value of cyclic variable H is 1, by online mode number According to being designated as the method for operation 0;
7)On the basis of method of operation H-1, adjusted according to H load transfer schemes ways of carrying out, form the new method of operation, and Method of operation H is designated as, and based on which, the forecast failure scene for causing power network overload or voltage out-of-limit problem occur to K Carry out simulation analysis;
8)Judge to whether there is overload or voltage under all K forecast failures for causing power network overload or voltage out-of-limit problem occur More restricted problem, if not occurring, turns to step 10)If occurring, H=H+1 is made, turn to step 9);
9)Judge that whether whether H load transfers scheme reduces the performance indications of cutting load more than zero and while meeting H<M+1, if Both meet simultaneously, then turn to step 7);Otherwise, step 10 is turned to);
10)Terminate this method.
Beneficial effects of the present invention are as follows:The command of State Council the 599th specify that stabilized control system cutting load is equal to failure damage Lose load, region cutting load ratio is too high or load distribution it is unreasonable can cause even more serious incident classification grade and Call to account afterwards.And the present invention reduces the performance indications of cutting load according to load transfer scheme, forecast failure incision load is reduced. So as to reduce failure incision load, electric power safety accident responsibility risk is reduced, improve the operation and management level of power network.
Brief description of the drawings
Fig. 1 is the flow chart of the inventive method.
Specific embodiment
The present invention is described in further detail in conjunction with the embodiments with reference to the accompanying drawings.
Step 1 is described in Fig. 1, and based on the load transfer scheme that online mode data validation can perform, note is executable Load transfer scheme sum be M, if load transfer scheme is zero, turn to step 10, terminate calculate.Otherwise turn to step 2。
Step 2 is described in Fig. 1, according to the forecast failure table for pre-setting, carries out simulation calculation, and according to simulation analysis As a result, judgement system causes system overload or voltage out-of-limit problem occur with the presence or absence of forecast failure.If nothing, step 10 is turned to, Terminate to calculate;If so, showing there is the demand for carrying out load transfer, step 3 is turned to.
Step 3 is described in Fig. 1, overload or voltage out-of-limit problem occurs for power network is causedKIndividual forecast failure, according to It is secondary to be calculated as solving the problems, such as each resulting in needed for the state of emergency existed under the forecast failure of overload or voltage out-of-limit occurs in power network Cutting load measure amount, meter wherein thekCutting load amount needed for individual forecast failure is
Step 4 is described in Fig. 1, for M executable load transfer scheme, calculates perform each load turn successively After supplier's case, solve the problems, such as to each result in needed for the state of emergency existed under the forecast accident of overload or voltage out-of-limit occurs in power network Cutting load measure amount, meter wherein thekIndividual forecast failure is takingmRequired cutting load amount is under individual load transfer scheme
Step 5 is described in Fig. 1, by formula(1)Each load transfer scheme is calculated successively to reducing the property of cutting load Can index:
(1)
Wherein,It ismPerformance indications of the individual load transfer scheme to reduction cutting load.
Step 6 is described in Fig. 1, by M load transfer scheme according to reduce cutting load performance indications from greatly to Small sequence, be designated as successively the 1st load transfer scheme, the 2nd load transfer scheme ..., M load transfer schemes;If cyclic variable H Initial value be 1, online mode data are designated as the method for operation 0.
Step 7 is described in Fig. 1, on the basis of method of operation H-1, is adjusted according to H load transfer schemes ways of carrying out It is whole, the new method of operation is formed, and method of operation H is designated as, and based on which, cause power network overload or voltage occur to K The forecast failure scene of out-of-limit problem carries out simulation analysis.
Step 8 is described in Fig. 1, judges all K anticipation events for causing power network overload or voltage out-of-limit problem occur Barrier is lower with the presence or absence of overload or voltage out-of-limit problem, such as no, turns to step 10, terminates search.In this way, H=H+1 is made, step is turned to Rapid 9.
Step 9 is described in Fig. 1, judges that whether H load transfers scheme reduces the performance indications of cutting load more than zero And whether meet H simultaneously<M+1, if both meet simultaneously, shows also reduce the turning solution of cutting load in the presence of other, turns to Step 7;Otherwise, step 10 is turned to.
Step 10 is described in Fig. 1, when system under forecast failure without cutting load or by load transfer measure Without cutting load or play reduce cutting load effect load transfer scheme be finished after, terminate search.
From the description above as can be seen that the present embodiment can overload and voltage to issue generating apparatus in forecast failure in power network The out-of-limit state of emergency provides the load transfer strategy for reducing cutting load, so as to reduce cutting load measure amount, reduces electric power safety thing Therefore liability exposure, improve the operation and management level of power network.
Although the present invention is disclosed as above with preferred embodiment, embodiment is not of the invention for limiting.Not Depart from the spirit and scope of the present invention, any equivalence changes done or retouching also belong to the protection domain of the present invention.Cause The content that this protection scope of the present invention should be defined with claims hereof is as standard.

Claims (1)

1. it is a kind of reduce forecast failure under cutting load load transfer policy searching method, it is characterised in that comprise the following steps:
1)Based on the load transfer scheme that online mode data validation can perform, the sum of the executable load transfer scheme of note is M, such as M=0, then turn to step 10), otherwise turn to step 2);
2)Simulation analysis are carried out for forecast failure table, and judge overload or voltage out-of-limit problem whether occur under institute is faulty, If not occurring, step 10 is turned to)If occurring, step 3 is turned to);
3)Note causes the sum that the forecast failure of overload or voltage out-of-limit problem occurs in power network to be K, and for these forecast failures, It is calculated as solving the problems, such as each resulting in power network successively and the state of emergency institute existed under the forecast failure of overload or voltage out-of-limit occurs The cutting load measure amount for needing, meter wherein thekCutting load amount needed for individual forecast failure is
4)For M executable load transfer scheme, calculate successively after performing each load transfer scheme, solve to each result in There is the cutting load measure amount needed for the state of emergency that exists under the forecast accident of overload or voltage out-of-limit problem in power network, and meter is wherein ThekIndividual forecast failure is takingmRequired cutting load amount is under individual load transfer scheme
5)By formula(1)Each load transfer scheme is calculated successively to reducing the performance indications of cutting load:
(1)
Wherein,It ismPerformance indications of the individual load transfer scheme to reduction cutting load;
6)M load transfer scheme is sorted from big to small according to the performance indications for reducing cutting load, the 1st load is designated as successively Turning solution, the 2nd load transfer scheme ..., M load transfer schemes;If the initial value of cyclic variable H is 1, by online mode number According to being designated as the method for operation 0;
7)On the basis of method of operation H-1, adjusted according to H load transfer schemes ways of carrying out, form the new method of operation, and Method of operation H is designated as, and based on which, the forecast failure scene for causing power network overload or voltage out-of-limit problem occur to K Carry out simulation analysis;
8)Judge to whether there is overload or voltage under all K forecast failures for causing power network overload or voltage out-of-limit problem occur More restricted problem, if not occurring, turns to step 10)If occurring, H=H+1 is made, turn to step 9);
9)Judge that whether whether H load transfers scheme reduces the performance indications of cutting load more than zero and while meeting H<M+1, if Both meet simultaneously, then turn to step 7);Otherwise, step 10 is turned to);
10)Terminate this method.
CN201611018306.5A 2016-11-20 2016-11-20 The load transfer policy searching method of cutting load under a kind of reduction forecast failure Active CN106849056B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611018306.5A CN106849056B (en) 2016-11-20 2016-11-20 The load transfer policy searching method of cutting load under a kind of reduction forecast failure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611018306.5A CN106849056B (en) 2016-11-20 2016-11-20 The load transfer policy searching method of cutting load under a kind of reduction forecast failure

Publications (2)

Publication Number Publication Date
CN106849056A true CN106849056A (en) 2017-06-13
CN106849056B CN106849056B (en) 2019-08-09

Family

ID=59145396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611018306.5A Active CN106849056B (en) 2016-11-20 2016-11-20 The load transfer policy searching method of cutting load under a kind of reduction forecast failure

Country Status (1)

Country Link
CN (1) CN106849056B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107910879A (en) * 2017-11-10 2018-04-13 大连理工大学 A kind of active frequency response events control strategy
CN109768544A (en) * 2018-12-21 2019-05-17 中国电力科学研究院有限公司 Area power grid load transfer method
CN109787224A (en) * 2019-01-23 2019-05-21 中国电力科学研究院有限公司 Method for generating regional power grid load transfer strategy for preventing cascading overload
CN112952844A (en) * 2021-05-14 2021-06-11 国网浙江省电力有限公司金华供电公司 Load adjusting method under power grid out-of-limit working condition
CN116961012A (en) * 2023-09-21 2023-10-27 国网吉林省电力有限公司松原供电公司 Controllable load switch identification method and system based on shortest path search out-of-limit equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103427445A (en) * 2013-05-28 2013-12-04 华东电网有限公司 Thermal power load shedding peak shaving method based on load reconstruction strategy
CN104835077A (en) * 2015-04-14 2015-08-12 国网上海市电力公司 Static safety analysis system with dispatcher accident prediction supporting function
US20150229128A1 (en) * 2012-09-12 2015-08-13 Nec Corporation Method of managing electric power, power management device, and program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150229128A1 (en) * 2012-09-12 2015-08-13 Nec Corporation Method of managing electric power, power management device, and program
CN103427445A (en) * 2013-05-28 2013-12-04 华东电网有限公司 Thermal power load shedding peak shaving method based on load reconstruction strategy
CN104835077A (en) * 2015-04-14 2015-08-12 国网上海市电力公司 Static safety analysis system with dispatcher accident prediction supporting function

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107910879A (en) * 2017-11-10 2018-04-13 大连理工大学 A kind of active frequency response events control strategy
CN107910879B (en) * 2017-11-10 2019-11-26 大连理工大学 A kind of active frequency response events control strategy
CN109768544A (en) * 2018-12-21 2019-05-17 中国电力科学研究院有限公司 Area power grid load transfer method
CN109768544B (en) * 2018-12-21 2021-11-16 中国电力科学研究院有限公司 Regional power grid load transfer method
CN109787224A (en) * 2019-01-23 2019-05-21 中国电力科学研究院有限公司 Method for generating regional power grid load transfer strategy for preventing cascading overload
CN109787224B (en) * 2019-01-23 2022-05-13 中国电力科学研究院有限公司 Method for generating regional power grid load transfer strategy for preventing cascading overload
CN112952844A (en) * 2021-05-14 2021-06-11 国网浙江省电力有限公司金华供电公司 Load adjusting method under power grid out-of-limit working condition
CN116961012A (en) * 2023-09-21 2023-10-27 国网吉林省电力有限公司松原供电公司 Controllable load switch identification method and system based on shortest path search out-of-limit equipment
CN116961012B (en) * 2023-09-21 2024-01-16 国网吉林省电力有限公司松原供电公司 Controllable load switch identification method and system based on shortest path search out-of-limit equipment

Also Published As

Publication number Publication date
CN106849056B (en) 2019-08-09

Similar Documents

Publication Publication Date Title
CN106849056A (en) The load transfer policy searching method of cutting load under a kind of reduction forecast failure
CN107093895B (en) online transient state safety and stability assessment method based on automatic screening of expected fault set
CN105391050B (en) Cut the check method and system of machine allocation plan high week
CN103762590B (en) Power system UFLS takes turns off-load amount on-line tuning method substantially
CN103840476B (en) A kind of height week based on unit Equivalent Model cuts machine setting method
CN102403720A (en) Hyper-real-time setting method for superposed time sequences based on transient voltage safety margin
CN102170131A (en) Limit power calculating method of associated electricity transmission cross-section based on parallel calculating model
Liu et al. Sensitivity and robustness issues of operating envelopes in unbalanced distribution networks
Li et al. A neural power system stabilizer of DFIGs for power system stability support
CN105703375B (en) A kind of three lines of defence collocation method of adaptive islanding power grid scale
CN106026083A (en) Power grid transient stabilization analysis method based on MATLAB
CN106099918B (en) A kind of method of simulation calculation multi-infeed DC mains frequency emergency control policy
Zhang et al. Impact of dynamic load models on transient stability-constrained optimal power flow
CN110071499B (en) Method and system for rapidly judging safety loop closing of power distribution network
CN113572191B (en) Distributed camera setting configuration method and system for large-scale new energy direct current delivery system
Li et al. A simultaneous phase sequence exchange control method based on transient energy function
CN109698524A (en) Area containing small power station based on design value isolates net stable calculation analysis method
CN102315646A (en) Maximum power capability based power distribution network communication validity and communication simplifying method
Chen et al. Pareto optimal allocation of fault current limiter based on immune algorithm considering cost and mitigation effect
CN106447525B (en) A kind of power grid dynamic partition policy optimization searching method
CN112165097B (en) Method and system for determining equivalent proportion of short-circuit current contributed by induction motor
CN104410071A (en) 35KV high voltage distribution network loop-closing and loop-opening current estimation method
CN105514983B (en) Load model construction method based on statistical synthesis method and fault fitting method
CN107818414B (en) Method for generating N-2 expected accident set of large-scale alternating current-direct current hybrid power grid
Yu et al. MMC‐HVDC system oscillation suppression control strategy based on state feedback decoupling control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510620 No.2, Tianhe south 2nd Road, Guangzhou, Guangdong

Patentee after: GUANGZHOU POWER SUPPLY Co.,Ltd.

Patentee after: NARI TECHNOLOGY Co.,Ltd.

Patentee after: NARI Group Corp.

Address before: 510620 No.2, Tianhe south 2nd Road, Guangzhou, Guangdong

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.

Patentee before: NARI TECHNOLOGY Co.,Ltd.

Patentee before: NANJING NARI Group Corp.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20231020

Address after: 510620, No. two, No. 2, Tianhe South Road, Guangzhou, Guangdong, Tianhe District

Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Patentee after: NARI TECHNOLOGY Co.,Ltd.

Patentee after: NARI Group Corp.

Address before: 510620 No.2, Tianhe south 2nd Road, Guangzhou, Guangdong

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.

Patentee before: NARI TECHNOLOGY Co.,Ltd.

Patentee before: NARI Group Corp.

TR01 Transfer of patent right