CN106846835B - Self-adaptive coordination control method for urban area traffic signals - Google Patents

Self-adaptive coordination control method for urban area traffic signals Download PDF

Info

Publication number
CN106846835B
CN106846835B CN201710098242.2A CN201710098242A CN106846835B CN 106846835 B CN106846835 B CN 106846835B CN 201710098242 A CN201710098242 A CN 201710098242A CN 106846835 B CN106846835 B CN 106846835B
Authority
CN
China
Prior art keywords
phase
intersection
period
traffic
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710098242.2A
Other languages
Chinese (zh)
Other versions
CN106846835A (en
Inventor
唐少虎
刘小明
郑国荣
陈智
尚春琳
张良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Technology
Original Assignee
North China University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Technology filed Critical North China University of Technology
Priority to CN201710098242.2A priority Critical patent/CN106846835B/en
Publication of CN106846835A publication Critical patent/CN106846835A/en
Application granted granted Critical
Publication of CN106846835B publication Critical patent/CN106846835B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/07Controlling traffic signals
    • G08G1/08Controlling traffic signals according to detected number or speed of vehicles

Abstract

The invention relates to a self-adaptive coordination control method for urban regional traffic signals, which integrates a plurality of control optimization algorithms with different characteristics, optimizes signal timing parameters of regional intersections according to the actual conditions of traffic flow by establishing a timing module, can reasonably select a control technology according to the conditions of layout positions no matter whether an traffic flow detector on a road section is arranged at any position, and is suitable for self-adaptive coordination control of signals in different traffic states of the regions. On the basis of considering traffic demands of intersections in a plurality of periods, the method aims at improving the overall traffic operation efficiency of the area, comprehensively analyzes the phase demand of a single intersection, makes an area signal adaptive coordination control strategy, and further performs overflow (deadlock) detection and phase difference optimization on road traffic flow, thereby reducing instability and potential safety hazards of a real-time adaptive system to the traffic flow, improving the area traffic operation conditions, relieving traffic jam and improving the traffic capacity of area traffic.

Description

A kind of city area-traffic signal adaptive control method for coordinating
Technical field
The invention discloses a kind of city area-traffic signal adaptive control method for coordinating, belong to intelligent traffic signal control Technical field processed.
Background technique
In recent years, as the swift and violent of vehicle guaranteeding organic quantity increases so that the load of urban road network is increasingly heavier, road network The unbalanced phenomenon of traffic flow is very prominent, and the traffic congestion in regional area and section occurs traffic accident again and again again, pole The earth affects line efficiency and the safety out of citizen.Urban area main traffic artery morning and evening peak period congestion is serious, wagon flow Tidal phenomena it is obvious, and under original signal control system, high intelligent control degree is inadequate, can not adapt to the change of traffic flow Change.Therefore, the lamp control crossing in city is managed collectively, establishes the self-adaptive wavelet base system of regional traffic signal, The work for promoting intelligent signal level control is extremely urgent.
Foreign countries obtain more achievement in terms of regional traffic signal adaptive system research, and application is mature extensively, such as SCOOT system, SCAT system, TRANSYT system, ACTRA system etc., domestic many cities are also introduced sequentially into is handed over lifting region Logical operational efficiency.But after these systems introduce domestic application, since the basic characteristics of China's mixed traffic, traffic base are set The restriction that construction falls behind and lack the composite factors such as the application constraint of relevant speciality operation maintenance personnel and system itself is applied, is generated More practical operation problem, cannot be effectively applicable to local traffic condition.Under above problem background, studies in China personnel The research and development for targetedly having carried out the Area Traffic Control System of suitable China's urban transportation feature, such as Nanjing NUTCS System, Hisense's HiCon system, Shenzhen SMOOTH system etc..But these systems are typically just in the specific region of a few cities The application of less range is carried out, system function and application scenarios are simple and not mature enough, can not successfully manage domestic complexity Changeable traffic noise prediction.
It is compared with prior art, of the invention for the deficiency of domestic and international existing regional traffic signal coordination control system Advantage is:
1. invention is suitable for region different traffic, the timing module of algorithm is referred to comprising multi-model by establishing, such as Shown in Fig. 1, it is integrated with the control optimization algorithm of a variety of different characteristics, and optimize region intersection according to the actual conditions of traffic flow Signal timing dial parameter.
2. being suitable for the different installation site of detector, reasonably according to intersection traffic current sensor installation position situation Control technology is selected, to enable to be applied even more extensively in regional signal control.Two kinds of detectors are illustrated in Fig. 2 The mode of installation, a kind of entrance being mounted on intersection, a kind of exit being mounted on intersection.It is mounted on the inspection of entrance The traffic flow situation for reaching intersection can be detected in real time by surveying device, and the intersection using this detector mounting means is compared It is suitble to using induction control technique of real-time control;It is mounted on exit and obtains detector and can detecte queue length, use is this The intersection of detector mounting means can use fuzzy control.
3. considering that intersection on the basis of transport need, is with lifting region entirety traffic circulation efficiency within multiple periods Target, the phase demand of comprehensive analysis Single Intersection formulate regional signal self-adaptive wavelet base strategy, further hand over section It is through-flow to be overflowed (deadlock) detection and offset optimization, so that it is unstable caused by traffic flow to reduce real-time adaptive system Property and security risk.
Summary of the invention
In order to solve the above technical problems, providing a kind of city area-traffic signal adaptive control method for coordinating, this method Based on the transport need of intersection signal phase in region, the change of out of phase transport need in multiple periods is tested and analyzed Change situation, whether corresponding transport need is met according to each multiphase traffic time allocation in multiple periods, is calculated by timing module current Theoretical timing under transport need, and compared with currently running multiphase traffic time allocation, further analyze the intersection signal side The reasonability of case.Similarly calculate whether all signalized intersections timing schemes in analyzed area meet Current traffic operation demand, And the regional coordinations strategies such as corresponding intersection split, period and phase difference and control parameter are carried out based on the analysis results Adjustment.Wherein, if analysis the result is that regional cycle length it is constant, the intersection for including according to the demand of each phase adjust it is green Ratio is believed, if analysis structure is to be no longer satisfied transport need in the current region period, by calculating each intersection to the period The requirement of length, the cycle time of comprehensive judgement regional coordination, the distribution of followed by each intersection split.It is controlled in intersection After scheme processed determines, split adjustment rationality checking is carried out to it, prevents section overflow phenomena.Technical solution route map is as schemed Shown in 3.Specifically adopt the following technical scheme that
1) initializing signal timing carries out initial configuration to each intersection control signal parameter;
2) traffic flow in each phase is detected by HD video, earth magnetism or induction coil, acquires traffic flow Data;
3) timing module calculates phase green time according to the traffic flow data of acquisition: the phase green time of calculating is greater than When the phase green time of actual motion, "+" is marked to the phase;The phase green time of calculating is less than the phase of actual motion When green time, "-" is marked to the phase;It is right when the phase green time of calculating is equal to the phase green time of actual motion The phase marks " 0 ";
4) determine Single Intersection period modulation strategy: in single intersection, in a cycle each phase all label for When " 0 " or "+" and "-" exist simultaneously, which is labeled as " U ", if the intersection at least continuous N period indicia For " U ", it is constant which is determined as the period;All label is or "-" each phase of a cycle, which is marked For " C ", if the intersection at least continuous N period indicia is " C ", which is determined as period modulation;
5) adjustable strategies regional cycle are determined: if the intersection quantity in adjustment period is needed to be less than whole intersections inside region The half of quantity, it is constant which is determined as the period, enters step 6);If needing the intersection quantity in adjustment period inside region not Less than whole intersection quantity half or crucial intersection need to be adjusted, which is determined as period modulation, enters step 7);
6) period it is constant under split allocation strategy: intersection period each phase mark be " 0 " when, split scheme is not It needs to adjust;
When intersection period each phase mark is that "+" and "-" exist simultaneously, the green letter of optimization is executed after the M+1 period Than scheme, specifically optimize and revise as follows: the phase green time that model calculates is gm, actual motion phase green time is gf, phase Position demand difference is Δ t=gm-gf, whenThen the green time equilibrium assignment of each phase;WhenWhen, then It whole phase difference times labeled as "-" and is evenly distributed in the phase labeled as "+", the green light that each phase assignments arrive Time are as follows:p+For the phase labeled as "+";
7) the split allocation strategy under period modulation: the cycle length of crucial intersection is Ck, maximum cycle length is Lmax, there is Ck≤Lmax, it is g that phase, which increases or decreases green time,a, minimum green time is gmin
If whole phase marks are "+", whenThenIt is crucial at this time The intersection period isWhenHaveThe crucial intersection period is C at this timek_new=Lmax;Remaining intersection period isEach phase green letter time is provided that
If whole phase marks are "-", work as gm< gmin, haveWork as gm≥gmin,The crucial intersection period is at this timeRemaining region intersection period is Ci=Ck_new, 0 < i < n, i ≠ k, each phase green letter time are provided that
Preferably, further include following steps:
8) anti-spilled phase green time detection, the vehicle that upstream intersection arbitrary phase is put into downstream intersection should not Greater than downstream road section residue road link speed, following condition need to be met for arbitrarily flowing into phase,
sikigi(t+1)+Nj(t)≤Nj_max, 0 < i≤p
In formula, si、ki、gi、NjAnd Nj_maxWhen respectively lane saturation volume rate, number of track-lines, phase are effectively green, section it is current Vehicle queue length and maximum queue length;
When the conditions set forth above are not met, then have
9) offset optimization strategy carries out offset optimization after determining regional cycle and split adjustment, according to main line Prevailing state is adaptively adjusted, and when downstream intersection has vehicle queue, condition such as following formula is arranged in phase difference:
In formula, LjFor the length of section j, vjFor the average vehicle speed of section j, λ is the dissipation velocity of wave of queuing vehicle.
The present invention has following beneficial technical effect:
1. invention be suitable for region different traffic, by establishing timing module, as shown in Figure 1, be integrated with it is a variety of not With the control optimization algorithm of feature, and according to the signal timing dial parameter of the actual conditions of traffic flow optimization region intersection.
2. being suitable for the different installation site of detector, reasonably according to intersection traffic current sensor installation position situation Control technology is selected, to enable to be applied even more extensively in regional signal control.Two kinds of detectors are illustrated in Fig. 2 The mode of installation, a kind of entrance being mounted on intersection, a kind of exit being mounted on intersection.It is mounted on the inspection of entrance The traffic flow situation for reaching intersection can be detected in real time by surveying device, and the intersection using this detector mounting means is compared It is suitble to using induction control technique of real-time control;It is mounted on exit and obtains detector and can detecte queue length, use is this The intersection of detector mounting means can use fuzzy control.
3. considering that intersection on the basis of transport need, is with lifting region entirety traffic circulation efficiency within multiple periods Target, the phase demand of comprehensive analysis Single Intersection formulate regional signal self-adaptive wavelet base strategy, further hand over section It is through-flow to be overflowed (deadlock) detection and offset optimization, so that it is unstable caused by traffic flow to reduce real-time adaptive system Property and security risk.
Detailed description of the invention
Fig. 1 is multi-model reference configuration figure.
Fig. 2 is detector different installation schematic diagram.
Fig. 3 is city area-traffic signal adaptive control method for coordinating flow chart.
Fig. 4 is the demand analysis of intersection signal phase and control optimization structure chart.
Specific embodiment
It is described in detail with reference to the accompanying drawing for technical solution used by Summary, key step is such as Under:
Step 1: initializing signal timing, referring to Single Intersection Webster timing method and regional signal coordinated control plan Slightly or the signal timing dial after optimization carries out initial configuration to each intersection control signal parameter.
Step 2: each phase traffic data detection passes through the detectors pair such as HD video detection, earth magnetism or induction coil Traffic flow in each phase carries out demand detection, and whether the phase time supply for providing each traffic flow can satisfy actual traffic stream The basis of demand determines data.
Step 3: phase demand analysis is based on each phase Traffic flow detecting data, meets the friendship by the offer of timing module Reference signal timing data in through-flow situation, and on-site signal controller directly generates control signal function in each of intersection Phase traffic flow, since multi-period fixed timing or induction control mode, multi-period fixation is usually used in signal controller Its control signal of timing is fixed and invariable in a period, cannot reflect the variation demand of consolidation traffic flow in time, and is incuded Control is generally used for the single-point control that main and secondary road traffic flow differs greatly, and since its mechanical periodicity is indefinite, is generally unsuitable for The major function of area coordination control model, multi-model reference is to provide ideal timing information in real time according to Traffic flow detecting data, The module integrates a variety of real time control algorithms, and selects the control algolithm being best suitable for calculate according to crossing different traffic Optimal timing information, as shown in Figure 4.So the timing signal parameter of the two is usually inconsistent.
According to the detection data of traffic flow select model algorithm after, calculate corresponding multiphase traffic time allocation and with actual motion Signal timing dial compares and analyzes, and process is as follows:
1) when the phase green time that timing module calculates is greater than the phase green time of actual motion, then to the phase mark It infuses (+), i.e. the practical green time of the phase is not able to satisfy traffic flow demand, need to increase the green time of the phase to improve this The traffic capacity of phase.
2) when the phase green time that timing module calculates is less than the phase green time of actual motion, then to the phase mark It infuses (-), i.e. the practical green time of the phase has been more than the demand of traffic flow, need to reduce the green time of the phase to avoid can The green light sky that can occur puts phenomenon.
3) when the phase green time that timing module calculates is equal to the phase green time of actual motion, then to the phase mark It infuses (0), i.e. the practical green time of the phase can satisfy the demand of traffic flow, not need adjustment phase place green time.
Step 4: Single Intersection period modulation strategy, there are mainly two types of situations: first is that constant cycle stage, second is that adjustment Cycle stage.
1) condition that need to meet for constant cycle stage is as follows: in a cycle each phase all label for 0), or (+) and (-) exists, then the split of each phase need to be only adjusted under this period, which is labeled as (U), the intersection When at least continuous N period indicia is (U), it is determined that meet such situation.
2) as follows for the condition that need to meet of adjustment cycle stage: each phase of a cycle all label for+) or (-), then this period has been not suitable for the transport need of all phases, needs to increase or reduce cycle time and distributes green letter Than the intersection is labeled as (C), when the intersection at least continuous N period indicia is (C), it is determined that meet such situation.
Step 5: regional coordination analysis of strategies, there are mainly two types of situations: first is that the intersection period belonging to inside region is constant Situation, second is that region internal chiasma mouth period modulation situation.Assuming that it is N that region, which includes intersection quantity, crucial intersection is Ik
1) period constant situation meets following condition: needing the intersection quantity in adjustment period to be less than inside region and all intersects The half of mouth quantity, it may be assumed that
2) period modulation situation meets following condition: needing the intersection quantity in adjustment period not less than all friendships inside region The half of prong quantity need to adjust crucial intersection, it may be assumed that
Step 6: the Split Optimization strategy under the period is constant,
1) for intersection period each phase mark be (0) when, then split scheme is not required to adjust.
2) it when being existed simultaneously for intersection period each phase mark for (+) or (-), is then executed after the M+1 period new Split scheme, specifically optimize and revise as follows: hypothesized model calculate phase green time be gm, actual motion phase green light Time is gf, phase demand difference is Δ t=gm-gf.When all phases demand difference and be zero, i.e.,Then each The green time equilibrium assignment of phase.WhenWhen, then the whole phase difference times and mean allocation for being labeled as (-) It is corresponding to reduce the phase green time for being labeled as (-), the green time that each phase assignments arrive in labeled as the phase of (+) are as follows:p+For the phase labeled as (+).
Step 7: the split allocation strategy under period modulation, it is assumed that the cycle length of crucial intersection is Ck, maximum week Phase length is Lmax, there is Ck≤Lmax, it is g that phase, which increases or decreases green time,a, minimum green time is gmin
1) it is directed to the case where whole phase marks are (+), whenThen haveThe crucial intersection period is at this timeWhenHaveThe crucial intersection period is C at this timek_new=Lmax.Remaining intersection period is Ci =Ck_new, 0 < i < n, i ≠ k, each phase green letter time is provided that
2) it is directed to the case where whole phase marks are (-), works as gm< gm i n, have Work as gm≥gmin,The crucial intersection period is at this timeRemaining region intersection period is Ci=Ck_new, 0 < i < n, i ≠ k, each phase green letter time are provided that
Step 8: anti-spilled phase green time detection, upstream intersection arbitrary phase are put into the vehicle of downstream intersection Downstream road section residue road link speed should be not more than, following condition need to be met for arbitrarily flowing into phase, i.e.,
sikigi(t+1)+Nj(t)≤Nj_max, 0 < i≤p
In formula, si、ki、gi、NjAnd Nj_maxWhen respectively lane saturation volume rate, number of track-lines, phase are effectively green, section it is current Vehicle queue length and maximum queue length.
When the conditions set forth above are not met, then have
Step 9: offset optimization strategy carries out offset optimization after determining regional cycle and split adjustment, according to Main line prevailing state is adaptively adjusted, and is considered when downstream intersection has vehicle queue, under the vehicle that upstream is let pass reaches Swim intersection queuing vehicle time should in downstream queuing vehicle evanescent wave arrival time it is consistent.Accordingly, phase difference is arranged Condition such as following formula:
In formula, LjFor the length of section j, vjFor the average vehicle speed of section j, λ is the dissipation velocity of wave of queuing vehicle.

Claims (2)

1. a kind of city area-traffic signal adaptive control method for coordinating, which is characterized in that
1) initializing signal timing carries out initial configuration to each intersection control signal parameter;
2) traffic flow in each phase is detected by HD video, earth magnetism or induction coil, acquires traffic flow data;
3) timing module calculates phase green time according to the traffic flow data of acquisition: the phase green time of calculating is greater than practical When the phase green time of operation, "+" is marked to the phase;The phase green time of calculating is less than the phase green light of actual motion When the time, "-" is marked to the phase;When the phase green time of calculating is equal to the phase green time of actual motion, to the phase Position mark " 0 ";
4) determine Single Intersection period modulation strategy: in single intersection, all label is 0 " to each phase in a cycle, Or the intersection is labeled as " U ", if the intersection at least continuous N period indicia is when existing simultaneously by "+" and "-" " U ", it is constant which is determined as the period;All label is or "-" each phase of a cycle, which is labeled as " C ", if the intersection at least continuous N period indicia is " C ", which is determined as period modulation;
5) adjustable strategies regional cycle are determined: if the intersection quantity in adjustment period is needed to be less than whole intersections quantity inside region Half, it is constant which is determined as the period, enters step 6);If the intersection quantity in adjustment period is needed to be not less than inside region The half of whole intersection quantity need to adjust crucial intersection, which is determined as period modulation, enters step 7);
6) period it is constant under split allocation strategy: intersection period each phase mark be " 0 " when, split scheme is not required to adjust It is whole;
When intersection period each phase mark is that "+" and "-" exist simultaneously, the split side of optimization is executed after the M+1 period Case is specifically optimized and revised as follows: the phase green time that model calculates is gm, actual motion phase green time is gf, phase need to Seeking difference is Δ t=gm-gf, when all phases demand difference and be zero,It is then that the green time of each phase is equal Weighing apparatus distribution;WhenWhen, then labeled as "-" whole phase difference times and be evenly distributed to the phase labeled as "+" In position, green time that each phase assignments arrive are as follows:p+For the phase labeled as "+";
7) the split allocation strategy under period modulation: the cycle length of crucial intersection is Ck, maximum cycle length is Lmax, have Ck≤Lmax, it is g that phase, which increases or decreases green time,a, minimum green time is gmin
If whole phase marks are "+", whenThenIt is crucial at this time to intersect Mouthful period isWhenHaveThis The intersection the Shi Guanjian period is Ck_new=Lmax;Remaining intersection period is
Ci=Ck_new, 0 < i < n, i ≠ k,
Each phase green letter time is provided that
If whole phase marks are "-", work as gm< gmin, haveWork as gm≥gnim,The crucial intersection period is at this timeRemaining region intersection period is
Ci=Ck_new, 0 < i < n, i ≠ k,
Each phase green letter time is provided that
2. city area-traffic signal adaptive control method for coordinating as described in claim 1, which is characterized in that further include:
8) anti-spilled phase green time detection, the vehicle that upstream intersection arbitrary phase is put into downstream intersection should be not more than Downstream road section residue road link speed need to meet following condition for arbitrarily flowing into phase,
sikigi(t+1)+Nj(t)≤Nj_max, 0 < i≤p
In formula, si、ki、gi、NjAnd Nj_maxWhen respectively lane saturation volume rate, number of track-lines, phase are effectively green, section current vehicle Queue length and maximum queue length;
When the conditions set forth above are not met, then have
9) offset optimization strategy carries out offset optimization after determining regional cycle and split adjustment, current according to main line State is adaptively adjusted, and when downstream intersection has vehicle queue, condition such as following formula is arranged in phase difference:
In formula, LjFor the length of section j, vjFor the average vehicle speed of section j, λ is the dissipation velocity of wave of queuing vehicle.
CN201710098242.2A 2017-02-22 2017-02-22 Self-adaptive coordination control method for urban area traffic signals Expired - Fee Related CN106846835B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710098242.2A CN106846835B (en) 2017-02-22 2017-02-22 Self-adaptive coordination control method for urban area traffic signals

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710098242.2A CN106846835B (en) 2017-02-22 2017-02-22 Self-adaptive coordination control method for urban area traffic signals

Publications (2)

Publication Number Publication Date
CN106846835A CN106846835A (en) 2017-06-13
CN106846835B true CN106846835B (en) 2019-07-05

Family

ID=59134401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710098242.2A Expired - Fee Related CN106846835B (en) 2017-02-22 2017-02-22 Self-adaptive coordination control method for urban area traffic signals

Country Status (1)

Country Link
CN (1) CN106846835B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108765991A (en) * 2018-06-19 2018-11-06 北京建筑大学 Signalized intersections anti-locking control system and method
AU2018282318B2 (en) * 2018-07-25 2021-02-04 Beijing Didi Infinity Technology And Development Co., Ltd. Systems and methods for controlling traffic lights
CN110364002B (en) * 2019-05-22 2020-09-11 江苏科创车联网产业研究院有限公司 Vehicle three-level guidance control method and system in road traffic network
CN111429721B (en) * 2020-03-27 2021-11-09 江苏智通交通科技有限公司 Intersection traffic signal scheme optimization method based on queuing dissipation time
CN111739284B (en) * 2020-05-06 2021-12-14 东华大学 Traffic signal lamp intelligent timing method based on genetic algorithm optimization fuzzy control
CN113936482A (en) * 2020-06-29 2022-01-14 阿里巴巴集团控股有限公司 Timing control method and device, electronic equipment and computer readable storage medium
CN111798677B (en) * 2020-07-15 2021-12-03 安徽达尔智能控制系统股份有限公司 Traffic incident monitoring and commanding system based on road video
CN112037546B (en) * 2020-09-07 2021-09-14 青岛海信网络科技股份有限公司 Traffic signal control method and device
CN113781768B (en) * 2021-08-09 2023-02-10 同济大学 Hot spot district traffic organization control cooperation method based on reserve traffic capacity
CN113393680B (en) * 2021-08-17 2022-01-07 深圳市城市交通规划设计研究中心股份有限公司 Adaptive control method and device for sub-region coordination
CN115063988B (en) * 2022-05-05 2023-06-02 北京联合大学 Cross-traffic subarea signal cooperative control method for emergency vehicle priority
CN115131977B (en) * 2022-06-22 2023-09-05 上海理工大学 Single-point intersection signal timing method for sudden overflow risk
CN115206105A (en) * 2022-07-27 2022-10-18 北京英泰智科技股份有限公司 Regional traffic signal cooperative control system and method
CN115376340A (en) * 2022-08-10 2022-11-22 重庆市城投金卡信息产业(集团)股份有限公司 Cross-platform traffic signal lamp coordination control method based on RFID

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1564222A (en) * 2004-04-02 2005-01-12 张铃 Double-period traffic light optimized configuration method having segmental optimization
CN101763735A (en) * 2010-02-01 2010-06-30 王茜 Method for controlling dynamic signal control system having negative system loss time
TW201142766A (en) * 2010-05-18 2011-12-01 Cct Co Ltd Control method of real-time traffic light at group intersection and prediction method of required green light time for relief car flow at intersection
CN104091451A (en) * 2014-07-08 2014-10-08 公安部交通管理科学研究所 Transitional adjustment method for arterial traffic signal coordination control
CN104485004A (en) * 2014-12-24 2015-04-01 江苏物联网研究发展中心 Signal control method combining main trunk road bidirectional dynamic green wave and secondary trunk road semi-induction
CN105303848A (en) * 2015-09-11 2016-02-03 安徽超远信息技术有限公司 Traffic signal single point self-learning optimization control method
CN105632198A (en) * 2016-01-26 2016-06-01 新誉集团有限公司 City area road traffic coordination control method and city area road traffic coordination system based on fuzzy control
CN105788298A (en) * 2014-12-26 2016-07-20 浙江大华技术股份有限公司 Bidirectional green wave control method and bidirectional green wave control device
CN105844927A (en) * 2016-04-06 2016-08-10 深圳榕亨实业集团有限公司 Novel control system and novel control method for sensing and controlling road intersection group signals
CN106297329A (en) * 2016-08-26 2017-01-04 南京蓝泰交通设施有限责任公司 A kind of signal timing dial adaptive optimization method of networking signals machine

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1564222A (en) * 2004-04-02 2005-01-12 张铃 Double-period traffic light optimized configuration method having segmental optimization
CN101763735A (en) * 2010-02-01 2010-06-30 王茜 Method for controlling dynamic signal control system having negative system loss time
TW201142766A (en) * 2010-05-18 2011-12-01 Cct Co Ltd Control method of real-time traffic light at group intersection and prediction method of required green light time for relief car flow at intersection
CN104091451A (en) * 2014-07-08 2014-10-08 公安部交通管理科学研究所 Transitional adjustment method for arterial traffic signal coordination control
CN104485004A (en) * 2014-12-24 2015-04-01 江苏物联网研究发展中心 Signal control method combining main trunk road bidirectional dynamic green wave and secondary trunk road semi-induction
CN105788298A (en) * 2014-12-26 2016-07-20 浙江大华技术股份有限公司 Bidirectional green wave control method and bidirectional green wave control device
CN105303848A (en) * 2015-09-11 2016-02-03 安徽超远信息技术有限公司 Traffic signal single point self-learning optimization control method
CN105632198A (en) * 2016-01-26 2016-06-01 新誉集团有限公司 City area road traffic coordination control method and city area road traffic coordination system based on fuzzy control
CN105844927A (en) * 2016-04-06 2016-08-10 深圳榕亨实业集团有限公司 Novel control system and novel control method for sensing and controlling road intersection group signals
CN106297329A (en) * 2016-08-26 2017-01-04 南京蓝泰交通设施有限责任公司 A kind of signal timing dial adaptive optimization method of networking signals machine

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Oversaturated traffic signal optimization based on active control;Xiao Meng;《2016 IEEE International Conference on Intelligent Transportation Engineering (ICITE)》;20161006;第91-95页 *
城市主干道交通信号动态协调控制方法研究;徐青政;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20161115(第11期);C034-57页 *

Also Published As

Publication number Publication date
CN106846835A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN106846835B (en) Self-adaptive coordination control method for urban area traffic signals
CN101789183B (en) Self-adaptive control system and method for entrance ramp
CN100495471C (en) Detector layout method for urban traffic signal control system
CN108109398A (en) A kind of overhead expressway Coordinated Ramp Control System and control method
WO2019061933A1 (en) Traffic signal chord panning control method and system
CN106297326A (en) Based on holographic road network tide flow stream Lane use control method
CN201278215Y (en) Adaptive entrance ramp afflux control appliance for road
CN101299298A (en) Road self-adapting entrance ramp afflux control equipment and method
CN102708679B (en) A kind of city signal crossing Short-time Traffic Flow Forecasting Methods
CN104933876B (en) A kind of control method of adaptive smart city intelligent traffic signal
WO2017166474A1 (en) Method and system for intersection group-based traffic control
CN110136455A (en) A kind of traffic lights timing method
CN101308604B (en) Traffic coordinating and controlling method with strategy of big range
CN109410601A (en) Method for controlling traffic signal lights, device, electronic equipment and storage medium
CN108510758A (en) City expressway Entrance ramp signal control method based on video real time information
CN106355905B (en) A kind of overhead signal control method based on bayonet data
CN106548633A (en) A kind of variable guided vehicle road control method of road network tide flow stream
KR101385057B1 (en) Prediction of urban congestion using ITS based data
CN103606284B (en) A kind of intelligent ring road entrance traffic demand combined control system and method
CN106297329A (en) A kind of signal timing dial adaptive optimization method of networking signals machine
CN104900070B (en) A kind of modeling of intersection wagon flow and self-adaptation control method and system
CN108734973A (en) A kind of phase of main line two-way green wave-signal synthesis optimization method
CN1967622A (en) Forecast of urban traffic and traffic information inducement system
CN109147329A (en) Regional traffic operating status index based on the traffic capacity calculates and method for visualizing
CN108573607A (en) A kind of traffic light control system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190705

Termination date: 20210222