CN106845766A CN201611159715.7A CN201611159715A CN106845766A CN 106845766 A CN106845766 A CN 106845766A CN 201611159715 A CN201611159715 A CN 201611159715A CN 106845766 A CN106845766 A CN 106845766A
Authority
CN
China
Prior art keywords
attribute information
collected
equipment
information list
shaft tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611159715.7A
Other languages
Chinese (zh)
Inventor
王森
王滨
何莹
李新颜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611159715.7A priority Critical patent/CN106845766A/en
Publication of CN106845766A publication Critical patent/CN106845766A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C3/00Registering or indicating the condition or the working of machines or other apparatus, other than vehicles

Abstract

The invention discloses a kind of information collecting method.Wherein, the method includes:Triggering command of the acquisition for mobile terminal to specified control in current display interface;Under the triggering of the triggering command, the corresponding attribute information list to be collected of corresponding with triggering command device type in electrical power transmission system is obtained, wherein, the corresponding attribute information list to be collected of the device type pre-sets;The device attribute information of designated equipment is obtained according to the attribute information list to be collected.The attribute information of grid equipment is obtained using mobile terminals such as mobile phones, information is gathered according to default attribute information list to be collected, avoid the situation for forgetting to gather certain class data, so as to greatly improve the accuracy rate of the attribute information of collection grid equipment, and then solve due to the artificial attribute information waste of resource for collecting and recording grid equipment in correlation technique, it is impossible to ensure the technical problem of accuracy rate.

Description

Information collecting method
Technical field
The present invention relates to power domain, in particular to a kind of information collecting method.
Background technology
With the increase year by year of power consumption, power department is in order to meet power consumption demand, it is necessary to continuous newly-built numerous classes Type equipment, such as shaft tower, batch meter etc., but, need manually to go to scene to take down notes the various of the newly-built equipment of record in correlation technique Master data, for example, number, material etc..
Technical scheme in above-mentioned correlation technique, can not only waste a large amount of artificial, the resource such as material, and count what is returned Data message unavoidably has omission, there is forgetting, and accuracy rate has much room for improvement.
In for correlation technique, the attribute information waste of resource of grid equipment is manually collected and recorded, it is impossible to ensure asking for accuracy rate Topic, there is presently no effective solution.
The content of the invention
A kind of information collecting method is the embodiment of the invention provides, at least to solve due to manually collecting and recording electricity in correlation technique The attribute information waste of resource of net equipment, it is impossible to ensure the technical problem of accuracy rate.
According to one embodiment of present invention, there is provided a kind of information collecting method, including:Acquisition for mobile terminal is to current The triggering command of control is specified on display interface;Under the triggering of the triggering command, obtain electrical power transmission system in it is described The corresponding attribute information list to be collected of the corresponding device type of triggering command, wherein, the device type is corresponding to be collected Attribute information list pre-sets;The device attribute for obtaining designated equipment according to the attribute information list to be collected is believed Breath.
Alternatively, obtain to before the triggering command that control is specified in current display interface, methods described also includes:Receive The sequence number of the described specified control of user input;In the case where the sequence number meets predetermined sequence number, it is allowed to the use Family operates the specified control, wherein, the predetermined sequence number by No. IMei of the mobile terminal after carrying out md5 encryption Obtain.
Alternatively, it is described after according to the device attribute information of the attribute information list acquisition designated equipment to be collected Method also includes:The mobile terminal stores the device attribute information of the designated equipment;Refer in the derivation triggering for receiving user After order, by the device attribute information transfer of the designated equipment to the first equipment.
Alternatively, the device type in the electrical power transmission system includes at least one of:Low pressure shaft tower, batch meter, Metering cabinet, electric energy meter, terminal device.
Alternatively, the terminal device includes:Concentrator.
Alternatively, the corresponding attribute information list to be collected of the device type includes at least one of:Set described When standby type is low pressure shaft tower, the attribute information in the attribute information list to be collected includes at least one of:It is described low Whether the title of depression bar tower, the low pressure shaft tower is branch line, and whether the low pressure shaft tower is to joint use, the low pressure shaft tower Material, the electric company belonging to the low pressure shaft tower;It is described to be collected when the device type is batch meter or metering cabinet Attribute information in attribute information list includes at least one of:The installation addresses of the batch meter or metering cabinet, it is described The locking equipment type of the barcode number of batch meter or metering cabinet, the batch meter or metering cabinet, the batch meter or The electricity box type of the locking equipment title of metering cabinet, the batch meter or metering cabinet;When the device type is electric energy meter, Attribute information in the attribute information list to be collected includes at least one of:The installation addresses of the electric energy meter, it is described The batch meter barcode number of the batch meter of electric energy meter ownership, the barcode number of the electric energy meter;It is terminal in the device type During equipment, the attribute information in the attribute information list to be collected includes at least one of:The business of the terminal device System identifier, the asset number of the terminal device, the address of the terminal device, the terminal type of the terminal device is described The electric company of terminal device ownership.
Alternatively, the device attribute information of designated equipment is obtained according to the attribute information list to be collected, including:Obtain The geographical location information of the designated equipment.
Alternatively, the geographical location information of the designated equipment is obtained one of in the following manner:It is fixed by mobile data The mode of position, by way of satellite fix.
Alternatively, the geographical location information that the designated equipment is obtained by way of satellite fix is included:The movement Terminal obtains the geographical position of the designated equipment according to the position offset information of the first place after positioning and user input Information, wherein, the position offset information is the range information that the designated equipment offsets first place.
Alternatively, the device attribute information of designated equipment is obtained according to the attribute information list to be collected, including:It is described The photo of designated equipment described in acquisition for mobile terminal, and store the corresponding relation of the photo and the designated equipment.
In embodiments of the present invention, triggering command of the acquisition for mobile terminal to specified control in current display interface;At this Under the triggering of triggering command, the corresponding attribute to be collected of corresponding with triggering command device type in electrical power transmission system is obtained Information list, wherein, the corresponding attribute information list to be collected of the device type pre-sets;According to the attribute to be collected Information list obtains the device attribute information of designated equipment.The attribute letter of grid equipment is obtained using mobile terminals such as mobile phones Breath, according to default attribute information list to be collected gathers information, it is to avoid forget to gather the situation of certain class data, so that greatly Width improves the accuracy rate of the attribute information of collection grid equipment, and then solves and collected and recorded power network and set due to artificial in correlation technique Standby attribute information waste of resource, it is impossible to ensure the technical problem of accuracy rate.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 be according to embodiments of the present invention in a kind of information collecting method flow chart;
Fig. 2 is initial picture of the battalion with insertion according to the preferred embodiment of the invention;
Fig. 3 is the signal of the first to be entered software sequence number that logs in of the battalion according to the preferred embodiment of the invention with insertion Figure;
Fig. 4 is system home page schematic diagram of the battalion with insertion according to the preferred embodiment of the invention;
Fig. 5 is the interface schematic diagram of data acquisition according to the preferred embodiment of the invention;
Fig. 6 is the interface schematic diagram of newly-built collection file according to the preferred embodiment of the invention;
Fig. 7 is the major interfaces schematic diagram of system acquisition function according to the preferred embodiment of the invention;
Fig. 8 is the schematic diagram that master data according to the preferred embodiment of the invention is set;
Fig. 9 is the interface schematic diagram of selection grab type according to the preferred embodiment of the invention;
Figure 10 is newly-built low pressure shaft tower interface schematic diagram according to the preferred embodiment of the invention;
Figure 11 is the interface schematic diagram of newly-built batch meter (cabinet) according to the preferred embodiment of the invention;
Figure 12 is the interface schematic diagram of collection electric energy meter attribute information according to the preferred embodiment of the invention;
Figure 13 is the interface schematic diagram of newly-built terminal device according to the preferred embodiment of the invention;
Figure 14 is the interface schematic diagram for checking collection file according to the preferred embodiment of the invention;
Figure 15 is that the interface of the data for specifically checking certain file being collected according to the preferred embodiment of the invention is illustrated Figure;
Figure 16 be the collection in distinct device type according to the preferred embodiment of the invention data list between switch Schematic diagram;
Figure 17 is the interface schematic diagram for checking electric energy meter data according to the preferred embodiment of the invention;
Figure 18 is the interface schematic diagram that system according to the preferred embodiment of the invention is set.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection Enclose.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or other intrinsic steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of information collecting method embodiment, it is necessary to explanation, in the stream of accompanying drawing The step of journey is illustrated can perform in the such as one group computer system of computer executable instructions, and, although in stream Logical order is shown in journey figure, but in some cases, can be with shown or described different from order execution herein The step of.
It should be noted that the technical scheme in present specification can be used for supporting that insertion software is matched somebody with somebody by the battalion of national grid It is operated, but, it is not limited to above-mentioned software.
Fig. 1 be according to embodiments of the present invention in a kind of information collecting method flow chart, as shown in figure 1, including following step Suddenly:
Step S102, triggering command of the acquisition for mobile terminal to specified control in current display interface;
Step S104, it is corresponding with the triggering command in acquisition electrical power transmission system to set under the triggering of the triggering command The corresponding attribute information list to be collected of standby type, wherein, the corresponding attribute information list to be collected of the device type is advance Set;
Step S106, the device attribute information of designated equipment is obtained according to the attribute information list to be collected.
Alternatively, obtain to before the triggering command that control is specified in current display interface, this of reception user input refers to Determine the sequence number of control;In the case where the sequence number meets predetermined sequence number, it is allowed to which the user operates the specified control, its In, the predetermined sequence number is by by the International Mobile Equipment Identity of mobile terminal code (International Mobile Equipment Identity, referred to as IMei) number carry out Message Digest Algorithm 5 (Message Digest Algorithm MD5, referred to as MD5) encryption after obtain.
Alternatively, after according to the device attribute information of attribute information list acquisition designated equipment to be collected, the movement The device attribute information of the terminal storage designated equipment;After the derivation triggering command for receiving user, by setting for the designated equipment Standby attribute information is transmitted to the first equipment.
Alternatively, the device type in the electrical power transmission system includes at least one of:Low pressure shaft tower, batch meter, meter Amount cabinet, electric energy meter, terminal device.
Alternatively, the terminal device includes:Concentrator.
Alternatively, the corresponding attribute information list to be collected of the device type includes at least one of:
When the device type is low pressure shaft tower, attribute information in the attribute information list to be collected include it is following at least One of:Whether the title of the low pressure shaft tower, the low pressure shaft tower is branch line, and whether the low pressure shaft tower is to joint use, the low pressure stem The material of tower, the electric company belonging to the low pressure shaft tower;
When the device type is batch meter or metering cabinet, the attribute information in the attribute information list to be collected includes At least one of:The barcode number of the installation addresses of the batch meter or metering cabinet, the batch meter or metering cabinet, the metering The locking equipment title of the locking equipment type of case or metering cabinet, the batch meter or metering cabinet, the batch meter or metering The electricity box type of cabinet;
When the device type is electric energy meter, attribute information in the attribute information list to be collected include it is following at least it One:The installation addresses of the electric energy meter, the batch meter barcode number of the batch meter of electric energy meter ownership, the bar code of the electric energy meter is compiled Number;
When the device type is terminal device, attribute information in the attribute information list to be collected include it is following at least One of:The operation system ID of the terminal device, the asset number of the terminal device, the address of the terminal device, the terminal device Terminal type, the terminal device ownership electric company.
Alternatively, the device attribute information of designated equipment is obtained according to the attribute information list to be collected, including:Obtaining should The geographical location information of designated equipment.
Alternatively, the geographical location information of the designated equipment is obtained one of in the following manner:Positioned by mobile data Mode, by way of satellite fix.
Alternatively, the geographical location information that the designated equipment is obtained by way of satellite fix is included:
The mobile terminal obtains this and specifies and set according to the position offset information of the first place after positioning and user input Standby geographical location information, wherein, the position offset information is the range information that the designated equipment offsets first place.
Alternatively, the device attribute information of designated equipment is obtained according to the attribute information list to be collected, including:
The photo of the acquisition for mobile terminal designated equipment, and store the corresponding relation of the photo and the designated equipment.
Preferred embodiment below in conjunction with present specification is described in detail.
The battalion of China national grid company is recorded in this preferred embodiment with insertion software, the software major function is with number Based on collection, the grid equipment attribute information such as low pressure shaft tower, transformer, batch meter, electric energy meter, terminal device can be gathered. The data of collection can be exported to xls files by software support data exporting function, support data network upload function, Facilitate internal or office work Commitment, Accounting and Management of Unit Supply.Software support Workload Account and map function.
In terms of battalion is with insertion software development, Java language is employed, system applies SQLite Lightweight Databases, it is convenient Data carried out with additions and deletions change the operation such as looking into, meanwhile, derived from software application md5 encryptions, coordinate correction algorithm and xls files Third party library so that software is positioned more precisely using safer, and derived data also more facilitate indoor service.Software Middle many places have been applied to self-defined View so that interface is more attractive in appearance, reasonable, convenient operation.
Technical scheme of the battalion with insertion introduced below, while being also specific to one of the technical scheme in present specification Description.
Battalion is with pass-through systems introduction
The system is mainly used in supporting national grid battalion with insertion work that major function is supported red based on data acquisition The function such as outer scanning, bar code scan, coordinate setting and correction, map denotation.Software is in line with " all are with on-site actual situations, solution The problem run into certainly collecting and recording is starting point " principle, software interface is succinct, simple to operate, very easy left-hand seat, facilitates outer The work of diligent personnel.Meanwhile, software support derives xls formatted files, reduces the workload of back office force.
The system equipment supports GPS module, infrared module and bar code scan module;
The system is constituted
Four parts are broadly divided into, table 1 is that corresponding work(is distinguished in four parts of the system according to the preferred embodiment of the invention Can, as shown in table 1, four parts gather including low pressure shaft tower, batch meter, electric energy meter collection, terminal device collection, SQLite data Storehouse.
Table 1
System login
The system is logged in for the first time needs Input Software sequence number, and Serial No. carries out md5 encryption by No. IMei of equipment, takes The 3rd to the 13rd of numerical portion.If user input mistake, then point out;Input is correctly then directly entered main interface.This is When system is logged on, list entries interface is directly skipped.Fig. 2 is that battalion according to the preferred embodiment of the invention is initial with insertion Picture, Fig. 3 is the schematic diagram of the first to be entered software sequence number that logs in of the battalion according to the preferred embodiment of the invention with insertion. You need to add is that, mass-tone system of the battalion with insertion software is green.
System home page
Fig. 4 is system home page schematic diagram of the battalion with insertion according to the preferred embodiment of the invention, as shown in figure 4, system is first Page is illustrated:Data acquisition, data are imported, data are derived, system sets (4 columns)
Data acquisition:User can newly-built collection information herein;
Data are imported:User can be by external data import system;
Data are derived:The data of collection can be exported to xls forms by user;
System is set:Whether whether user can herein set and open GPS location, open sound and match somebody with somebody on battalion and pass through It is logical.
The corresponding function of data acquisition in above-mentioned 4 columns introduced below
Newly-built collection file
Fig. 5 is the interface schematic diagram of data acquisition according to the preferred embodiment of the invention.User uses the software for the first time, Click on " data acquisition ", click on " newly-built collection file " afterwards, logging data.Wherein, file name is self-defined, it is impossible to be sky, And can not comprising * ,/,:、<、>, etc. spcial character.Fig. 6 is newly-built collection file according to the preferred embodiment of the invention Interface schematic diagram.
The data of collection
Fig. 7 is the major interfaces schematic diagram of system acquisition function according to the preferred embodiment of the invention, as shown in fig. 7, setting Result after standby collection can be illustrated in interface in the form of a list.At present, support collection device type include low pressure shaft tower, Batch meter (cabinet), electric energy meter and terminal device.
Fig. 8 is the schematic diagram that master data according to the preferred embodiment of the invention is set, when user gathers for the first time, can be with " data setting " button is first clicked on, the general-purpose data base of all types of equipment of collection is set.Each file can correspond to a base Notebook data is set, and user can fill in relevant information correctly, operation during easy actual acquisition before acquisition.After being provided with Save button is clicked on, when there is " preserving successfully " prompting frame, illustrates that master data information is preserved successfully.
Selection grab type
After the corresponding master data of the device type in tentatively setting up Fig. 8, display interface jumps to Fig. 9, and Fig. 9 is The interface schematic diagram of selection grab type according to the preferred embodiment of the invention, as shown in figure 9, user can be schemed by clicking on Mark, selection needs the device type of collection.Current device type includes:Low pressure shaft tower, batch meter (cabinet), electric energy meter, terminal set Standby, wherein the collection of electric energy meter is after the collection of batch meter (cabinet).
Introducing several device types individually below needs the data of collection:
Low pressure shaft tower
Figure 10 is newly-built low pressure shaft tower interface schematic diagram according to the preferred embodiment of the invention, as shown in Figure 10, shaft tower name Can not be called empty.User can slide downward interface, fill in shaft tower information.
It is emphasized that in the information of acquisition, there is following points for attention:
1. in shaft tower title can not comprising * ,/,:、<、>, etc. spcial character.
2. shaft tower title has automatic function, and system can search for similar character string according to the character of input in database, If in the presence of, (input number of characters is minimum for two can just point out) is pointed out in lower section, selected for user.Such as:Before Preserved data " apple orchard road ", after user input " apple ", system can lower section by whole Name hints out.
3. when shaft tower is branch line or when joint using, choice box is chosen, information is inserted in the new edited frame of ejection;Otherwise Please choose.
4. when obtaining positional information, hiding " satellite number " information can be ejected, satellite number is more, positioned more accurate.Every Before secondary positioning, measuring apparatus signal flow diagram benefit (best without veils such as high buildings around) nearby is selected as far as possible, and can be with multiple spot Button several times is hit, to ensure location accuracy.
When measuring apparatus place is unable to reach, first select a signal good locations as collection at, by normal method Obtain coordinate.After acquisition, then " position skew " choice box is chosen, the side-play amount input according to East, West, South, North at collection, point Submission is hit, system can be calculated automatically, show the substantially coordinate of device location.
5. whether the information that must first fill in complete shaft tower (especially " shaft tower title " and is filled in after choosing " being branch line " " branch line title "), then taken pictures, otherwise photo storing path can malfunction.
Batch meter (cabinet)
Figure 11 is the interface schematic diagram of newly-built batch meter (cabinet) according to the preferred embodiment of the invention, as shown in figure 11, peace Dress address, batch meter barcode number, row, column can not be empty, locking equipment title.User can slide downward interface, fill in metering Case information.
Note:The text auto-complete function of installation addresses and locking equipment title, positioning function and camera function operation side Method is identical with the collection positioning of low pressure shaft tower, photographic method.
Electric energy meter
After user has gathered batch meter (cabinet), electric energy meter acquisition interface can be automatic jumped to, click on the electricity for wanting collection Energy table, so that it may be acquired to ammeter.
Figure 12 is the interface schematic diagram of collection electric energy meter attribute information according to the preferred embodiment of the invention, as shown in 12, User can carry out newly-built and modification to electric energy meter information at the interface.Wherein, installation addresses, batch meter barcode number, row, column are The data of Auto-writing.Electric energy meter barcode number can not be sky.User can slide downward interface, fill in electric energy meter information.Note:Clap It is identical with the photographic method of collection low pressure shaft tower according to feature operation method.
Terminal device
Figure 13 is the interface schematic diagram of newly-built terminal device according to the preferred embodiment of the invention, as shown at 13, business system System ID, asset number, address can not be sky, and address can not include spcial character.User can slide downward interface, fill in terminal Facility information.
Note:The text auto-complete function of address, positioning function and camera function operating method and collection low pressure shaft tower Positioning, photographic method are identical, refer to 4.1.3.4.
Check collection file
User can click on " checking collection file " button at " data acquisition " interface and enter " checking collection file " interface, figure 14 is the interface schematic diagram for checking collection file according to the preferred embodiment of the invention, as shown at 14, checks gathered in this place Data.It is long to press certain list items in " checking collection file " interface, low pressure shaft tower, the meter gathered in file can be checked Measuring tank (cabinet), electric energy meter, terminal device quantity, it is also possible to modified to this document filename and deletion file operation.
Figure 15 is that the interface of the data for specifically checking certain file being collected according to the preferred embodiment of the invention is illustrated Figure, as shown in figure 15, user clicks on the corresponding list items of certain filename, and system jumps to " data of collection " interface, user The data that can be checked in this document.
Figure 16 be the collection in distinct device type according to the preferred embodiment of the invention data list between switch Schematic diagram, as shown in figure 16, user can horizontally slip on screen, check different device type collection information.Click on row List item, can check operation into execution;Collection information can be modified in checking, " preservation " be clicked on after the completion of modification and is pressed Button.It is long to press certain list items, the gathered data of the equipment can be deleted.
Figure 17 is the interface schematic diagram for checking electric energy meter data according to the preferred embodiment of the invention, as shown in figure 17, when Batch meter interface is checked, it is necessary to be introduced into when user wants to check electric energy meter data, " ammeter is adopted for click in interface upper right corner position Collection " button.
Data are imported
User can click on " data importing button ", and data file is chosen in a device, import into equipment.
Data are derived
After user clicks on " data derivation ", system automatic jumps to " derived file is wanted in selection " interface.User can be Click on herein and want derived file, and select to want the collection of export.
System is set
Figure 18 is the interface schematic diagram that system according to the preferred embodiment of the invention is set, and as shown in figure 18, system is set Function is redirected by main interface, and concrete function includes:
1. whether GPS is opened.
2. whether sound is opened.
3. insertion is matched somebody with somebody on battalion.
System is exited
System is exited to be needed to be input into password, and current system exits password for " 95598 ".
Above is technical scheme of the battalion with insertion software being related in present specification.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents in present specification, Can realize by another way.Wherein, device embodiment described above be only it is schematical, such as described unit Divide, can be a kind of division of logic function, there can be other dividing mode when actually realizing, for example multiple units or component Can combine or be desirably integrated into another system, or some features can be ignored, or do not perform.It is another, it is shown or The coupling each other for discussing or direct-coupling or communication connection can be the indirect couplings of unit or module by some interfaces Close or communicate to connect, can be electrical or other forms.
The unit that is illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On unit.Some or all of unit therein can be according to the actual needs selected to realize the purpose of this embodiment scheme.
In addition, during each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is to realize in the form of SFU software functional unit and as independent production marketing or use When, can store in a computer read/write memory medium.Based on such understanding, technical scheme is substantially The part for being contributed to prior art in other words or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are used to so that a computer Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the invention whole or Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. a kind of information collecting method, it is characterised in that including:
Triggering command of the acquisition for mobile terminal to specified control in current display interface;
Under the triggering of the triggering command, device type corresponding with the triggering command is corresponding in obtaining electrical power transmission system Attribute information list to be collected, wherein, the corresponding attribute information list to be collected of the device type pre-sets;
The device attribute information of designated equipment is obtained according to the attribute information list to be collected.
2. method according to claim 1, it is characterised in that obtain and refer to the triggering that control is specified in current display interface Before order, methods described also includes:
Receive the sequence number of the described specified control of user input;
In the case where the sequence number meets predetermined sequence number, it is allowed to which the user operates the specified control, wherein, it is described Predetermined sequence number is obtained after the International Mobile Equipment Identity code IMei of the mobile terminal is carried out into md5 encryption.
3. method according to claim 1, it is characterised in that obtain to specify according to the attribute information list to be collected and set After standby device attribute information, methods described also includes:
The mobile terminal stores the device attribute information of the designated equipment;
After the derivation triggering command for receiving user, by the device attribute information transfer of the designated equipment to the first equipment.
4. method according to claim 1, it is characterised in that the device type in the electrical power transmission system includes following At least one:
Low pressure shaft tower, batch meter, metering cabinet, electric energy meter, terminal device.
5. method according to claim 4, it is characterised in that the terminal device includes:Concentrator.
6. method according to claim 1, it is characterised in that the corresponding attribute information list to be collected of the device type Including at least one of:
When the device type is low pressure shaft tower, attribute information in the attribute information list to be collected include it is following at least One of:Whether the title of the low pressure shaft tower, the low pressure shaft tower is branch line, and whether the low pressure shaft tower is to joint use, institute State the material of low pressure shaft tower, the electric company belonging to the low pressure shaft tower;
When the device type is batch meter or metering cabinet, the attribute information in the attribute information list to be collected includes At least one of:The barcode number of the installation addresses of the batch meter or metering cabinet, the batch meter or metering cabinet, institute State the locking equipment title of the locking equipment type of batch meter or metering cabinet, the batch meter or metering cabinet, the metering The electricity box type of case or metering cabinet;
When the device type is electric energy meter, attribute information in the attribute information list to be collected include it is following at least it One:The installation addresses of the electric energy meter, the batch meter barcode number of the batch meter of the electric energy meter ownership, the bar of the electric energy meter Code numbering;
When the device type is terminal device, attribute information in the attribute information list to be collected include it is following at least One of:The operation system ID of the terminal device, the asset number of the terminal device, the address of the terminal device is described The terminal type of terminal device, the electric company of the terminal device ownership.
7. method according to claim 1, it is characterised in that obtain to specify according to the attribute information list to be collected and set Standby device attribute information, including:
Obtain the geographical location information of the designated equipment.
8. method according to claim 7, it is characterised in that obtain the ground of the designated equipment one of in the following manner Reason positional information:
By way of mobile data is positioned, by way of satellite fix.
9. method according to claim 8, it is characterised in that the designated equipment is obtained by way of satellite fix Geographical location information includes:
The mobile terminal obtains described specifying and sets according to the position offset information of the first place after positioning and user input Standby geographical location information, wherein, the position offset information is the distance letter that the designated equipment offsets first place Breath.
10. method according to claim 1, it is characterised in that obtained according to the attribute information list to be collected and specified The device attribute information of equipment, including:
The photo of designated equipment described in the acquisition for mobile terminal, and store photo pass corresponding with the designated equipment System.
CN201611159715.7A 2016-12-14 2016-12-14 Information collecting method Pending CN106845766A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611159715.7A CN106845766A (en) 2016-12-14 2016-12-14 Information collecting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611159715.7A CN106845766A (en) 2016-12-14 2016-12-14 Information collecting method

Publications (1)

Publication Number Publication Date
CN106845766A true CN106845766A (en) 2017-06-13

Family

ID=59140279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611159715.7A Pending CN106845766A (en) 2016-12-14 2016-12-14 Information collecting method

Country Status (1)

Country Link
CN (1) CN106845766A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107403339A (en) * 2017-07-10 2017-11-28 国网辽宁省电力有限公司 A kind of marketing electricity box collecting method based on mobile terminal
CN107967551A (en) * 2017-10-30 2018-04-27 国网江苏省电力公司信息通信分公司 A kind of method and device of electric power wireless private network communication terminal access work exploration examination
CN108171399A (en) * 2017-12-06 2018-06-15 国家电网公司 Method and terminal device are collected and recorded in battalion's auxiliary tone
CN108537692A (en) * 2018-02-07 2018-09-14 链家网(北京)科技有限公司 Cell building collecting method and device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104504529A (en) * 2014-12-31 2015-04-08 北京太格时代自动化系统设备有限公司 Overhead line routing inspection electronic tag system based on wireless radio frequency technology
CN105161106A (en) * 2015-08-20 2015-12-16 深圳Tcl数字技术有限公司 Voice control method of intelligent terminal, voice control device and television system
CN105608640A (en) * 2016-01-29 2016-05-25 厦门亿力吉奥信息科技有限公司 Power grid equipment data acquisition method and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104504529A (en) * 2014-12-31 2015-04-08 北京太格时代自动化系统设备有限公司 Overhead line routing inspection electronic tag system based on wireless radio frequency technology
CN105161106A (en) * 2015-08-20 2015-12-16 深圳Tcl数字技术有限公司 Voice control method of intelligent terminal, voice control device and television system
CN105608640A (en) * 2016-01-29 2016-05-25 厦门亿力吉奥信息科技有限公司 Power grid equipment data acquisition method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵琳等: "《卫星导航原理及应用》", 30 June 2011 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107403339A (en) * 2017-07-10 2017-11-28 国网辽宁省电力有限公司 A kind of marketing electricity box collecting method based on mobile terminal
CN107967551A (en) * 2017-10-30 2018-04-27 国网江苏省电力公司信息通信分公司 A kind of method and device of electric power wireless private network communication terminal access work exploration examination
CN108171399A (en) * 2017-12-06 2018-06-15 国家电网公司 Method and terminal device are collected and recorded in battalion's auxiliary tone
CN108537692A (en) * 2018-02-07 2018-09-14 链家网(北京)科技有限公司 Cell building collecting method and device

Similar Documents

Publication Publication Date Title
CN108197114B (en) Method and device for detecting table data, storage medium and electronic device
CN109408746A (en) Portrait information query method, device, computer equipment and storage medium
CN106845766A (en) Information collecting method
CN102810105B (en) Edit method for pages accessed by mobile terminals and webpage editor
CN109819284A (en) A kind of short video recommendation method, device, computer equipment and storage medium
CN102368261A (en) Expandable running maintenance report generation method
CN107888978A (en) KEY codes method for burn-recording, device and computer-readable recording medium
CN105205757A (en) Android-based elective system
CN105184489A (en) Mobile card punching system and method and cloud system thereof
CN107562372B (en) Electronic equipment, data management method thereof and computer readable storage medium
CN101661735A (en) Displaying adapter, mobile terminal and displaying method of service content
CN104753979B (en) A kind of method, server, terminal and system showing site information
CN103617221B (en) Software recommendation method and software recommendation system
CN113301171B (en) Digital mirror image construction method and system fusing multiple Internet of things data
CN102945628A (en) Accident consequence information acquiring method, device and training system
CN105159997B (en) Report processing method and report processing system
CN105072090A (en) Method, system and computer-readable medium for synchronizing spot information
CN108737487B (en) Data synchronization method and device, storage medium and electronic device
CN113536023A (en) Drawing file management method and system based on BIM and Internet of things
CN109446164A (en) The large data sets of space planning are at method, system and device
CN104184824A (en) Mobile phone newspaper customizing and pushing device and method
CN107977419A (en) A kind of nuclear power station DCS O&Ms support file identification method and system
CN110110153A (en) A kind of method and apparatus of node searching
CN101976255B (en) Method and device for large-quantity export of webpage information to generate WORD document
CN105577462A (en) Mobile device flow statistical method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170613

RJ01 Rejection of invention patent application after publication