CN106845758A - Information processing method and device - Google Patents

Information processing method and device Download PDF

Info

Publication number
CN106845758A
CN106845758A CN201611127409.5A CN201611127409A CN106845758A CN 106845758 A CN106845758 A CN 106845758A CN 201611127409 A CN201611127409 A CN 201611127409A CN 106845758 A CN106845758 A CN 106845758A
Authority
CN
China
Prior art keywords
task
information
terminal
waiting task
waiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611127409.5A
Other languages
Chinese (zh)
Inventor
汪竞之
王瀚秋
李军
王韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611127409.5A priority Critical patent/CN106845758A/en
Publication of CN106845758A publication Critical patent/CN106845758A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of information processing method and device.Wherein, the method includes:The first information of typing is received, wherein, the first information is used to record waiting task;Determine the task category of the waiting task;Based on the task category, the waiting task is sent to terminal, wherein, the user of the terminal matches with the task category of the waiting task.The present invention solves the low technical problem of distribution task efficiency.

Description

Information processing method and device
Technical field
The present invention relates to field of information processing, in particular to a kind of information processing method and device.
Background technology
In the prior art, for the task in the information of typing, it is impossible to effectively distributed, for example, in Utilities Electric Co.'s electricity Can the specialty such as metering carry out every routine work process (such as high pressure new clothes, change class, increase-volume, cancellation, metering on-line monitoring, become Power station new clothes, Switching Station, platform area new clothes etc.) in, it is necessary to service link time limit, unit in charge of construction's evaluation, on-scene communication signal etc. Index carries out on-line monitoring.But the present link time limit relies only on artificial urgency, it is impossible to realize the monitor in real time of system, also not Timely system fault link can send prompting message.Can so cause what unit in charge of construction was evaluated can only rely on organoleptic impression, Objective appraisal can not be realized, while the efficiency in terms of Workload Account and Schedule monitoring can be very low, is caused in distribution task When efficiency it is very low, the task of distribution is likely to that the problem that can not accurately distribute occurs.
For the above-mentioned distribution low problem of task efficiency, effective solution is not yet proposed at present.
The content of the invention
A kind of information processing method and device are the embodiment of the invention provides, the skill low at least to solve distribution task efficiency Art problem.
A kind of one side according to embodiments of the present invention, there is provided information processing method, including:Receive the first of typing Information, wherein, the first information is used to record waiting task;Determine the task category of the waiting task;Based on institute Task category is stated, the waiting task is sent to terminal, wherein, the user of the terminal and the waiting task Task category matches.
Further, sent to terminal by the waiting task, methods described also includes:Receive the terminal The second information for sending, wherein, second information is used to indicate to perform to complete the waiting task.
Further, after the completion information that the terminal sends is received, methods described also includes:Statistics receives institute Between moment to the moment for receiving second information for stating the first information, the operation duration of each running node.
Further, after the operation duration for counting each running node, methods described also includes:If each node Operation duration be less than corresponding scheduled duration, it is determined that the handling process of the waiting task is normal;If multiple operation section The operation duration of any one running node is less than corresponding scheduled duration in point, it is determined that the processing stream of the waiting task Cheng Yichang.
Further, after the second information that the terminal sends is received, methods described also includes:Based on the terminal The quantity of the second information for sending, counts the workload of the terminal.
Another aspect according to embodiments of the present invention, additionally provides a kind of information processor, including:Receiving unit, uses In the first information for receiving typing, wherein, the first information is used to record waiting task;Determining unit, for determining State the task category of waiting task;Transmitting element, for based on the task category, the waiting task being sent to end End, wherein, the user of the terminal matches with the task category of the waiting task.
Further, described device also includes:Receiver module, for by the waiting task send to terminal it Afterwards, the second information that the terminal sends is received, wherein, second information is used to indicate to perform to complete described pending Business.
Further, described device also includes:First statistical module, for receiving the completion information that the terminal sends Afterwards, between moment to the moment for receiving second information that statistics receives the first information, each running node Operation duration.
Further, described device also includes:First determining module, for when the operation of each running node is counted After length, if the operation duration of each node is less than corresponding scheduled duration, it is determined that the handling process of the waiting task Normally;Second determining module, for after the operation duration for counting each running node, if any in multiple running nodes One operation duration of running node is less than corresponding scheduled duration, it is determined that the handling process exception of the waiting task.
Further, described device also includes:Second statistical module, for receiving the second information that the terminal sends Afterwards, the quantity of the second information for being sent based on the terminal, counts the workload of the terminal.
In embodiments of the present invention, the first information of typing can be received, wherein, the first information have recorded pending appointing Business, after the first information is received, analyzes the waiting task of typing, and determines the task category of waiting task, finally According to the task category determined, each pending task is sent in corresponding terminal, wherein, the user of terminal with The task category of waiting task matches.According to embodiments of the present invention, can be entered into task in system by user, without use Task is distributed at family oneself, and can be sent to each task in corresponding terminal by server, solves the low skill of distribution task efficiency Art problem, has reached the effect of the efficiency for improving distribution task.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of information processing method according to embodiments of the present invention;
Fig. 2 is a kind of schematic diagram of optional information processing method of the invention;
Fig. 3 is a kind of structure chart of optional information processor of the invention.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection Enclose.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or other intrinsic steps of equipment or unit.
According to embodiments of the present invention, there is provided a kind of embodiment of the method for information processing, it is necessary to explanation, in accompanying drawing The step of flow is illustrated can perform in the such as one group computer system of computer executable instructions, and, although Logical order is shown in flow chart, but in some cases, can be performing shown different from order herein or retouch The step of stating.
Fig. 1 is the flow chart of information processing method according to embodiments of the present invention, as shown in figure 1, the method is including as follows Step:
Step S102, receives the first information of typing, wherein, the first information is used to record waiting task;
Step S104, determines the task category of waiting task;
Step S106, task based access control classification, waiting task is sent to terminal, wherein, the user of terminal with wait to locate The task category of reason task matches.
By above-described embodiment, server can receive the first information of typing, wherein, the first information have recorded pending Task, after the first information is received, analyze the waiting task of typing, and determine the task category of waiting task, Finally according to the task category determined, each pending task is sent in corresponding terminal, wherein, the use of terminal Person matches with the task category of waiting task.According to embodiments of the present invention, can be entered into task in server by user, Task is distributed without user oneself, can be sent to each task in corresponding terminal by server, solve distribution task efficiency Low technical problem, has reached the effect of the efficiency for improving distribution task.
Optionally, during above-described embodiment can apply to server, the server can receive the information of user's typing, and Each task that will be determined is sent in corresponding terminal.
Another optional implementation method, above-described embodiment can apply in Utilities Electric Co.'s electric energy metrical business, in step In the technical scheme that rapid S102 is provided, the first information of typing is received, multiple tasks can be included in the first information.Wherein, appoint Business such as high pressure new clothes, batch new clothes, can change class, increase-volume, cancellation, metering on-line monitoring, transformer station's new clothes, platform for various Area's new clothes etc..
In the technical scheme that step S104 is provided, the task category of waiting task is determined.Task category can be with record Entering for task is corresponding, for example, task category is divided into task category A and task category B, after the first information is received, Task can be divided into corresponding task category.
In the technical scheme that step S106 is provided, task based access control classification sends to terminal waiting task, wherein, The user of terminal matches with the task category of waiting task.Each terminal can distribute one or more tasks, often The task type of individual terminal distribution can be consistent.
Optionally, after the completion information that receiving terminal sends, can count and receive moment of the first information to connecing Receive between the moment of the second information, the operation duration of each running node.Wherein, the second information can include multiple tasks, Or be the state of each task, or complete the result of each task.It is each task for completing in the second information When as a result, the time period between the first information and the second information can be recorded, the time of each task is completed so as to analyze With the state of each task.Wherein, running node can be when being divided into the different stages of each task, the behaviour in each stage Make, each running node has corresponded to a scheduled duration, and the scheduled duration can pre-set.
Optionally, running node can be with the simple information of logger task, for example, mission number, task names, process task Name, the task operating state of user etc..
Another optional implementation method, after the operation duration for counting each running node, can also include:If The operation duration of each node is less than corresponding scheduled duration, it is determined that the handling process of waiting task is normal;If multiple behaviour The operation duration for making any one running node in node is less than corresponding scheduled duration, it is determined that the processing stream of waiting task Cheng Yichang.
Optionally, whether the operation duration of any one running node in multiple running nodes are judged is less than corresponding During scheduled duration, if judging, the operation duration of any one running node in multiple running nodes is less than corresponding pre- timing It is long, it is determined that the handling process of waiting task is normal;If judging any one running node in multiple running nodes Operation duration is more than or equal to corresponding scheduled duration, it is determined that the handling process exception of waiting task.
By above-described embodiment, it is possible to achieve to the monitor in real time of the state of task, by the operation section to each task Point monitoring, can in real time recognize the completion status of each task, if judge the operation duration of some node beyond Scheduled duration, then can send prompt message to the corresponding terminal of the task, and the prompt message can be warning message.
Optionally, after receiving terminal sends the second information, the quantity of the second information of terminal transmission is also based on, Count the workload of terminal.In this embodiment, the second information can be task completion status.By counting what terminal was completed Task quantity can obtain the workload of terminal.
Here is specific implementation of the invention.
Fig. 2 is a kind of schematic diagram of optional information processing method of the invention, as shown in Fig. 2 the method application In measurement service, wherein, the professional internal or office work 21 of metering can distribute that task is long by 22 to each every class, and each class includes field force 23 With back office force 24.
Optionally, since work link is sent, by task typing measurement service system, system can for the professional internal or office work 21 of metering It is long by 22 to each every class with the task of distributing.
Optionally, each task can be sent to each every class long 22 field force 23 and back office force 24 of each class In, field force 23 and back office force 24 can print work order from system, arrange work on the spot, process task.
Optionally, after the completion of task, task status to the professional internal or office work 21 of metering can be fed back by the back office force 24 of each class, Field personnel typing relevant information in systems, and complete flow push.
Wherein, the timing node of each link is by system programming count.When each link occurs special circumstances, can By special circumstances input system, and feed back to relevant staff.
By above-described embodiment, measurement service flow, shared service information can be online tracked, and realize that automatic monitoring is each The individual link time limit, so as to improve appraisement system.Solving the links time limit in the prior art can only be by artificial urgency, it is impossible to The problem of the real-time reminding of system is realized, can be to unit in charge of construction's objective evaluation.
Fig. 3 is the structure chart of the optional information processor of another kind according to embodiments of the present invention, including:Receiving unit 31, the first information for receiving typing, wherein, the first information is used to record waiting task;Determining unit 33, for determining The task category of waiting task;Transmitting element 35, for task based access control classification, waiting task is sent to terminal, wherein, The user of terminal matches with the task category of waiting task.
By above-described embodiment, the first information of typing can be received by receiving unit 31, wherein, first information record Pending task, analyzes the waiting task of typing, and determines the task class of waiting task by determining unit 33 Not, each pending task can be sent to corresponding terminal by transmitting element 35 according to the task category determined In, wherein, the user of terminal matches with the task category of waiting task.According to embodiments of the present invention, user can be by Task is entered into server, and task is distributed without user oneself, and each task can be sent to corresponding terminal by server In, solve the low technical problem of distribution task efficiency.
Optionally, device also includes:Receiver module, for being sent to terminal by waiting task, receiving terminal The second information for sending, wherein, the second information is used to indicate to perform to complete waiting task.
Another optional implementation method, device also includes:First statistical module, for the completion sent in receiving terminal After information, between moment to the moment for receiving the second information that statistics receives the first information, the behaviour of each running node Make duration.
Optionally, device also includes:First determining module, for count each running node operation duration it Afterwards, if the operation duration of each node is less than corresponding scheduled duration, it is determined that the handling process of waiting task is normal;Second Determining module, for after the operation duration for counting each running node, if any one operation in multiple running nodes The operation duration of node is less than corresponding scheduled duration, it is determined that the handling process exception of waiting task.
Further, device also includes:Second statistical module, for after the second information for being sent in receiving terminal, base The quantity of the second information sent in terminal, counts the workload of terminal.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, can be by other Mode is realized.Wherein, device embodiment described above is only schematical, such as division of described unit, Ke Yiwei A kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can combine or Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual Between coupling or direct-coupling or communication connection can be the INDIRECT COUPLING or communication link of unit or module by some interfaces Connect, can be electrical or other forms.
The unit that is illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On unit.Some or all of unit therein can be according to the actual needs selected to realize the purpose of this embodiment scheme.
In addition, during each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is to realize in the form of SFU software functional unit and as independent production marketing or use When, can store in a computer read/write memory medium.Based on such understanding, technical scheme is substantially The part for being contributed to prior art in other words or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are used to so that a computer Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the invention whole or Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. a kind of information processing method, it is characterised in that including:
The first information of typing is received, wherein, the first information is used to record waiting task;
Determine the task category of the waiting task;
Based on the task category, the waiting task is sent to terminal, wherein, the user of the terminal treats with described The task category of process task matches.
2. method according to claim 1, it is characterised in that sent to terminal by the waiting task, institute Stating method also includes:
The second information that the terminal sends is received, wherein, second information is used to indicate to perform to complete described pending Business.
3. method according to claim 2, it is characterised in that after the completion information that the terminal sends is received, institute Stating method also includes:
Between moment to the moment for receiving second information that statistics receives the first information, each running node Operation duration.
4. method according to claim 3, it is characterised in that after the operation duration for counting each running node, Methods described also includes:
If the operation duration of each node is less than corresponding scheduled duration, it is determined that the handling process of the waiting task is just Often;
If the operation duration of any one running node is less than corresponding scheduled duration in multiple running nodes, it is determined that described to treat The handling process exception of process task.
5. method according to claim 2, it is characterised in that after the second information that the terminal sends is received, institute Stating method also includes:
The quantity of the second information sent based on the terminal, counts the workload of the terminal.
6. a kind of information processor, it is characterised in that including:
Receiving unit, the first information for receiving typing, wherein, the first information is used to record waiting task;
Determining unit, the task category for determining the waiting task;
Transmitting element, for based on the task category, the waiting task being sent to terminal, wherein, the terminal User matches with the task category of the waiting task.
7. device according to claim 6, it is characterised in that described device also includes:
Receiver module, for being sent to terminal by the waiting task, receives the second information that the terminal sends, Wherein, second information is used to indicate to perform to complete the waiting task.
8. device according to claim 7, it is characterised in that described device also includes:
First statistical module, for after the completion information that the terminal sends is received, statistics to receive the first information Moment to the moment for receiving second information between, the operation duration of each running node.
9. device according to claim 8, it is characterised in that described device also includes:
First determining module, for after the operation duration for counting each running node, if the operation duration of each node Less than corresponding scheduled duration, it is determined that the handling process of the waiting task is normal;
Second determining module, for after the operation duration for counting each running node, if any in multiple running nodes One operation duration of running node is less than corresponding scheduled duration, it is determined that the handling process exception of the waiting task.
10. device according to claim 7, it is characterised in that described device also includes:
Second statistical module, for after the second information that the terminal sends is received, second sent based on the terminal The quantity of information, counts the workload of the terminal.
CN201611127409.5A 2016-12-08 2016-12-08 Information processing method and device Pending CN106845758A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611127409.5A CN106845758A (en) 2016-12-08 2016-12-08 Information processing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611127409.5A CN106845758A (en) 2016-12-08 2016-12-08 Information processing method and device

Publications (1)

Publication Number Publication Date
CN106845758A true CN106845758A (en) 2017-06-13

Family

ID=59139046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611127409.5A Pending CN106845758A (en) 2016-12-08 2016-12-08 Information processing method and device

Country Status (1)

Country Link
CN (1) CN106845758A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108921502A (en) * 2018-06-12 2018-11-30 广东电网有限责任公司 A kind of Project Process tracking and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101510280A (en) * 2009-02-25 2009-08-19 中国网络通信集团公司 Platform for optimizing and scheduling task
CN102799771A (en) * 2012-06-29 2012-11-28 厦门易用软件技术有限公司 Execution quality analysis system
KR20140021094A (en) * 2012-08-07 2014-02-20 제프리 김 A method acquiring information with efficiency by issuing missions and collecting mission results through on-line and system there of
CN105809323A (en) * 2016-02-23 2016-07-27 平安科技(深圳)有限公司 Task allocation method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101510280A (en) * 2009-02-25 2009-08-19 中国网络通信集团公司 Platform for optimizing and scheduling task
CN102799771A (en) * 2012-06-29 2012-11-28 厦门易用软件技术有限公司 Execution quality analysis system
KR20140021094A (en) * 2012-08-07 2014-02-20 제프리 김 A method acquiring information with efficiency by issuing missions and collecting mission results through on-line and system there of
CN105809323A (en) * 2016-02-23 2016-07-27 平安科技(深圳)有限公司 Task allocation method and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108921502A (en) * 2018-06-12 2018-11-30 广东电网有限责任公司 A kind of Project Process tracking and device

Similar Documents

Publication Publication Date Title
CN108667747A (en) The method, apparatus and computer readable storage medium of network flow application type identification
CN102929961A (en) Data processing method and device thereof based on building quick data staging channel
CN107995377A (en) Customer service management method, electronic device and computer-readable recording medium
CN108737240A (en) The method that the method, apparatus and group that chat group automatically creates create
CN110365536A (en) A kind of the fault cues method and relevant apparatus of internet of things equipment
CN110390584A (en) A kind of recognition methods of abnormal user, identification device and readable storage medium storing program for executing
CN108429754A (en) A kind of high in the clouds Distributed Detection method, system and relevant apparatus
CN106101264A (en) Content distributing network daily record method for pushing, device and system
CN107944677A (en) Achievement method for tracing, application server and computer-readable recording medium
CN109993417A (en) A kind of service condition mark adding method, device and storage medium
CN107249182A (en) A kind of note transmission method and its device, terminal device
CN106429130A (en) Garbage information processing method, device and system
CN104063772B (en) A kind of logistics information certificate authenticity method and device
CN107741949A (en) Integration method, device, storage medium and processor
CN108063685A (en) Log analysis method and device
CN110968479A (en) Business-level full-link monitoring method for application program and server
CN106845758A (en) Information processing method and device
CN106682813A (en) User working state determining method and terminal
CN107330608B (en) Production scheduling method based on neuron network technology
CN108777603A (en) A kind of data transmission method, device, storage medium and electronic equipment
CN108389314A (en) A kind of medicine selling machine and its drug stock management method, storage medium
CN108319595A (en) A kind of application data analysis method and device
CN106953811B (en) Large-scale network service system behavior reconstruction method
CN110009273A (en) Information processing method and device, storage medium, electronic device
CN109165145A (en) A kind of the service condition statistical method and device of application program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170613