CN106845680A - A kind of rail line transferring methods of comparison and selection and device - Google Patents
A kind of rail line transferring methods of comparison and selection and device Download PDFInfo
- Publication number
- CN106845680A CN106845680A CN201611186777.7A CN201611186777A CN106845680A CN 106845680 A CN106845680 A CN 106845680A CN 201611186777 A CN201611186777 A CN 201611186777A CN 106845680 A CN106845680 A CN 106845680A
- Authority
- CN
- China
- Prior art keywords
- scheme
- fuzzy
- alpha
- ideal solution
- omega
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 239000011159 matrix material Substances 0.000 claims description 46
- 230000015572 biosynthetic process Effects 0.000 claims description 24
- 238000003786 synthesis reaction Methods 0.000 claims description 24
- 238000004458 analytical method Methods 0.000 claims description 9
- 239000013598 vector Substances 0.000 claims description 7
- 230000008859 change Effects 0.000 claims description 5
- 238000012216 screening Methods 0.000 claims description 4
- 230000009286 beneficial effect Effects 0.000 claims description 2
- 238000012913 prioritisation Methods 0.000 description 16
- 238000010276 construction Methods 0.000 description 11
- 238000010586 diagram Methods 0.000 description 11
- 238000003780 insertion Methods 0.000 description 11
- 230000037431 insertion Effects 0.000 description 11
- 238000012546 transfer Methods 0.000 description 11
- 230000006870 function Effects 0.000 description 10
- 230000011218 segmentation Effects 0.000 description 7
- 241000579895 Chlorostilbon Species 0.000 description 6
- 238000013461 design Methods 0.000 description 6
- 229910052876 emerald Inorganic materials 0.000 description 6
- 239000010976 emerald Substances 0.000 description 6
- 238000011156 evaluation Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 3
- 238000009826 distribution Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 230000009977 dual effect Effects 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 238000013439 planning Methods 0.000 description 2
- 238000011002 quantification Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N7/00—Computing arrangements based on specific mathematical models
- G06N7/02—Computing arrangements based on specific mathematical models using fuzzy logic
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
- G06Q10/047—Optimisation of routes or paths, e.g. travelling salesman problem
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Software Systems (AREA)
- General Health & Medical Sciences (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Health & Medical Sciences (AREA)
- Mathematical Physics (AREA)
- Evolutionary Computation (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Computing Systems (AREA)
- General Engineering & Computer Science (AREA)
- Molecular Biology (AREA)
- Biomedical Technology (AREA)
- Automation & Control Theory (AREA)
- Fuzzy Systems (AREA)
- Educational Administration (AREA)
- Mathematical Analysis (AREA)
- Data Mining & Analysis (AREA)
- Life Sciences & Earth Sciences (AREA)
- Computational Mathematics (AREA)
- Primary Health Care (AREA)
- Artificial Intelligence (AREA)
- Algebra (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of road traffic route transferring methods of comparison and selection and device, it is related to field of traffic, by the every Consideration for determining rail line transferring, and determine original decision information of each policymaker to indices, ideal solution in limited scheme is determined according to original decision information, according to each scheme and the distance of ideal solution, determine required scheme, wherein, original decision information and weight are represented using two type fuzzy numbers, by the method, every Consideration of rail line transferring is considered, the accuracy than selecting result is improve by two type fuzzy numbers, realize carries out rail line transferring than choosing with reference to track traffic actual conditions.
Description
Technical field
The present invention relates to field of traffic, more particularly to a kind of rail line transferring methods of comparison and selection and device.
Background technology
There is the scheme of heterogeneity, different scales in each stage identified project and carry out rail line design
Compare., than the important work that choosing is in track traffic design, not only concern is big, than selecting scope for circuit transferring
Greatly, it is necessary to consider the factor of each side.
Traditional Decision Making of Line Schemes methods of comparison and selection is substantially economically pursued operation of engineering projects expense and is most saved, and combines to each side
The analysis of the qualitative factors such as the technical conditions of case, social and environmental impact factor draws optimal case, and the method is plugged into circuit
The research of scheme comparison is perfect not enough.
For make circuit transferring than select Consideration fully combined with live traffic, how from operation convenience, transport
The aspects such as battalion's flexibility, operation adaptability, construction scale, transfer convenience are carried out to circuit transferring, than choosing, not to be had also at present
There is preferably methods of comparison and selection.
The content of the invention
The present invention provides a kind of rail line transferring methods of comparison and selection and device, is used to realize combining track traffic
Actual conditions carry out rail line transferring than choosing.
According to one aspect of the present invention, there is provided a kind of rail line transferring methods of comparison and selection, including:
It is determined that treating that the rail line of selection is plugged into scheme analysis;
Determine every Consideration of rail line transferring, and determine each policymaker to the original of indices
Decision information and weight;
The ideal solution and each scheme and ideal solution in limited scheme are determined according to the original decision information and weight
Distance, required scheme is determined according to the distance, the original decision information and weight use two type fuzzy numbers
Represent.
Further, it is described that ideal solution in limited scheme and each side are determined according to the original decision information and weight
Case and the distance of ideal solution, required scheme is determined according to the distance, is specifically included:
According to each policymaker to the original decision information and weight of indices, determined respectively for each scheme
The average two types fuzzy number of synthesis of item Consideration, the average two types fuzzy number of synthesis according to every Consideration, it is determined that
The initial decision matrix of standardization;
Initial decision matrix according to the standardization determines ideal solution and each scheme and ideal solution in limited scheme
Distance, required scheme is determined according to the distance.
Further, the initial decision matrix according to the standardization determines the ideal solution in limited scheme and each side
Case and the distance of ideal solution, required scheme is determined according to the distance, is specifically included:
Initial decision matrix according to standardization determines the ideal solution in limited scheme;
For each scheme, it is determined that under multiple Truncated set levels corresponding all schemes fuzzy relative similarity, go forward side by side
Row de-fuzzy, obtains de-fuzzy value;
For each scheme, according to the de-fuzzy value, the distance of the program and ideal solution is determined;
According to the attribute of ideal solution, it is determined that closest with positive ideal solution or with minus ideal result be apart from farthest scheme
Required scheme.
Further, it is described according to each policymaker to the original decision information and weight of indices, for every
Individual scheme determines the average two types fuzzy number of the synthesis of every Consideration, the synthesis average two according to every Consideration
Type fuzzy number, it is determined that the initial decision matrix of standardization, specifically includes:
According to each policymaker to the original decision information of indices, the decision-making of Fuzzy Multiple Attribute Decision Making problem is determined
Scheme collection isProperty set is C={ c1,c2,...,cm};
For option Aj(j=1,2 ..., m), according to attribute ciEstimated, obtained Aj(j=1,2 ..., m) on ci
(i=1,2 ..., property value n) is Triangular Fuzzy NumberConstitute fuzzy decision matrix
W=[ω1,ω2,...,ωn]T
Wherein, W is the weight vectors of attribute, and meets ωi>=0 He
If Triangular Fuzzy NumberAnd specified decision matrixIt is right
In income type variable,For cost type variable,
Wherein,
Further, it is described for each scheme, it is determined that under multiple Truncated set levels corresponding all schemes fuzzy phase
To similarity, and de-fuzzy is carried out, obtain de-fuzzy value, specifically included:
The multiple cut set value α of setting, and determine under each cut set value α, alternative AiWith ideal solution A*Relative similarity
Higher limit and lower limit:
Wherein,WithIt is respectively xijAnd ωjCollection in cut set value α
Close;
Determine that de-fuzzy value is:
The embodiment of the present invention correspondingly provides a kind of rail line transferring than screening device, including:
Scheme determination unit, the rail line for determining to treat selection is plugged into scheme analysis;
Decision information determining unit, the every Consideration for determining rail line transferring, and determine each
Original decision information and weight of the policymaker to indices;
Than menu unit, for determining the ideal solution in limited scheme and each according to the original decision information and weight
Scheme and the distance of ideal solution, required scheme is determined according to the distance, and the original decision information and weight make
Represented with two type fuzzy numbers.
Further, it is described than menu unit specifically for:
According to each policymaker to the original decision information and weight of indices, determined respectively for each scheme
The average two types fuzzy number of synthesis of item Consideration, the average two types fuzzy number of synthesis according to every Consideration, it is determined that
The initial decision matrix of standardization;
Initial decision matrix according to the standardization determines ideal solution and each scheme and ideal solution in limited scheme
Distance, required scheme is determined according to the distance.
Further, the ideal determined according to the initial decision matrix of the standardization than menu unit in limited scheme
Solution, according to each scheme and the distance of ideal solution, determines required scheme, specifically includes:
Initial decision matrix according to standardization determines the ideal solution in limited scheme;
For each scheme, it is determined that under multiple Truncated set levels corresponding all schemes fuzzy relative similarity, go forward side by side
Row de-fuzzy, obtains de-fuzzy value;
For each scheme, according to the de-fuzzy value, the distance of the program and ideal solution is determined;
According to the attribute of ideal solution, it is determined that closest with positive ideal solution or with minus ideal result be apart from farthest scheme
Required scheme.
Further, it is described than menu unit according to each policymaker to the original decision information and power of indices
Weight, determines the average two types fuzzy number of the synthesis of every Consideration, according to every Consideration for each scheme
Comprehensive average two types fuzzy number, it is determined that the initial decision matrix of standardization, specifically includes:
According to each policymaker to the original decision information of indices, the decision-making of Fuzzy Multiple Attribute Decision Making problem is determined
Scheme collection isProperty set is C={ c1,c2,...,cm};
For option Aj(j=1,2 ..., m), according to attribute ciEstimated, obtained Aj(j=1,2 ..., m) on ci
(i=1,2 ..., property value n) is Triangular Fuzzy NumberConstitute fuzzy decision matrix
W=[ω1,ω2,...,ωn]T
Wherein, W is the weight vectors of attribute, and meets ωi>=0 He
If Triangular Fuzzy NumberAnd specified decision matrixIt is right
In income type variable,For cost type variable,
Wherein,
Further, it is described more first than menu for each scheme, it is determined that corresponding all schemes under multiple Truncated set levels
Fuzzy relative similarity, and carry out de-fuzzy, obtain de-fuzzy value, specifically include:
The multiple cut set value α of setting, and determine under each cut set value α, alternative AiWith ideal solution A*Relative similarity
Higher limit and lower limit:
Wherein,WithIt is respectively xijAnd ωjCollection in cut set value α
Close;
Determine that de-fuzzy value is:
The present invention has the beneficial effect that:Rail line transferring methods of comparison and selection provided in an embodiment of the present invention and dress
Put, by determining every Consideration of rail line transferring, and determine each policymaker to the original of indices
Decision information, the ideal solution in limited scheme is determined according to original decision information, according to each scheme and the distance of ideal solution, it is determined that
Go out required scheme, wherein, original decision information and weight are represented using two type fuzzy numbers, with it, comprehensive examine
Consider every Consideration of rail line transferring, the accuracy than selecting result improve by two type fuzzy numbers,
Realize carries out rail line transferring than choosing with reference to track traffic actual conditions.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only
Some embodiments of the present invention, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also
Other accompanying drawings are obtained with according to these accompanying drawings.
Fig. 1 is rail line transferring methods of comparison and selection flow chart provided in an embodiment of the present invention;
Fig. 2 is rail line schematic diagram provided in an embodiment of the present invention;
Fig. 3 is the schematic diagram of rail line transferring one provided in an embodiment of the present invention;
Fig. 4 is the schematic diagram of rail line transferring two provided in an embodiment of the present invention;
Fig. 5 is the schematic diagram of rail line transferring three provided in an embodiment of the present invention;
Fig. 6 selects Consideration schematic diagram for rail line transferring ratio provided in an embodiment of the present invention;
Fig. 7 is the fuzzy relative similarity schematic diagram of operation convenience provided in an embodiment of the present invention;
Fig. 8 is the fuzzy relative similarity schematic diagram of operation flexibility provided in an embodiment of the present invention;
Fig. 9 is the fuzzy relative similarity schematic diagram of operation adaptability provided in an embodiment of the present invention;
Figure 10 is the fuzzy relative similarity schematic diagram of construction scale provided in an embodiment of the present invention;
Figure 11 is the fuzzy relative similarity schematic diagram of transfer convenience provided in an embodiment of the present invention;
Figure 12 is the fuzzy relative similarity schematic diagram of each circuit transferring provided in an embodiment of the present invention;
Figure 13 is rail line transferring provided in an embodiment of the present invention than screening device structural representation.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
As shown in figure 1, rail line transferring methods of comparison and selection provided in an embodiment of the present invention, including:
Step S101, determination treat that the rail line of selection is plugged into scheme analysis;
Step S102, determine every Consideration of rail line transferring, and determine each policymaker to items
The original decision information of index;
Step S103, the ideal solution and each scheme determined according to the original decision information and weight in limited scheme
With the distance of ideal solution, required scheme is determined according to the distance, original decision information and weight use two patterns
Paste number is represented.
The rail line transferring methods of comparison and selection, by determining that the every of rail line transferring considers
Factor, and determine original decision information of each policymaker to indices, in determining limited scheme according to original decision information
Ideal solution, according to each scheme and the distance of ideal solution, determines required scheme, wherein, original decision information and weight are equal
Represented using two type fuzzy numbers, with it, having considered every Consideration of rail line transferring, led to
Cross two type fuzzy numbers and improve accuracy than selecting result, realize carries out rail line with reference to track traffic actual conditions
Transferring is than choosing.
Circuit according to the objective selection of track traffic design experiences plug into need Consideration can quantification, reflect exactly each
The real-time status of item Consideration, every Consideration weight and value can be objectively expressed not with interval two types fuzzy number
Certainty, carries out, than choosing, improve the objectivity and accuracy than selecting by the method to rail line transferring.
Specifically, general rail line transferring is than selecting the factor that need to be considered:Rail line transferring
Evaluation object than selecting is circuit transferring, suitable from operation convenience, operation flexibility, operation respectively according to evaluation object
From the aspect of Ying Xing, construction scale and transfer convenience etc..What the value of every Consideration should be designed by policymaker's combined circuit
Real data data and the experience of oneself comprehensively show that computing formula is as follows:
Wherein, i represents policymaker's number.
Interval two type fuzzy numbers have the following two kinds to define:
Define 1. 1 interval type-2 fuzzy sets being defined on domain XIt is represented by:
Wherein, x is primary variables, Jx∈ [0,1] is the membership function of primary variables x, and μ is secondary variable, andIt is the secondary membership function of primary variables x.
Define 2. 1 interval type-2 fuzzy sets being defined on domain XIt is represented by:
Wherein, x is primary variables, Jx∈ [0,1] is the membership function of primary variables x, and μ is secondary variable, andIt is the secondary membership function of primary variables x.
The collection that all elements in type-2 fuzzy sets are subordinate to angle value composition with its all master is collectively referred to as probabilistic track
(Footprint of Uncertainty, FOU) is defined as follows.
Wherein, FOU is a region, by upper limit member function (Upper membership function, UMF)
With lower limit member function (Lower membership function, LMF)Zone line composition, and UMF and LMF are equal
It is a type fuzzy set.
Interval type-2 fuzzy sets are the special cases of type-2 fuzzy sets, and relative to a type fuzzy set, it can preferably describe not true
Qualitative, and compared with general type-2 fuzzy sets, its secondary membership value is all 1, it is to avoid the selection of secondary membership function, collection is total
Greatly simplify, so interval type-2 fuzzy sets are normally used for solving uncertain information decision problem.
The every factor weight and value that circuit transferring need to consider than choosing in the embodiment of the present invention use interval two pattern
Paste number, a scope is set to by the weight and value of every factor.
TOPSIS methods (Technique for Order Preference by Similarity to an Ideal
Solution, according to the method that limited evaluation object is ranked up with the degree of closeness of idealization target) it is that one kind approaches reason
Think the sort method of solution, its basic ideas is:Initial decision matrix first according to standardization finds out the correct principle in limited scheme
Think solution and minus ideal result, then calculate each evaluation object and positive ideal solution and the distance of minus ideal result, it is each than choosing so as to obtain
Scheme and the relative proximity of optimal case, are finally ranked up, and in this, as the foundation of scheme superior and inferior evaluating.
It is assumed that the decision scheme collection of Fuzzy Multiple Attribute Decision Making problem isProperty set is C={ c1,
c2,...,cm}.For option Aj(j=1,2 ..., m), according to attribute ciEstimated, obtained Aj(j=1,2 ..., m) on
ci(i=1,2 ..., property value n) is Triangular Fuzzy NumberSo as to constitute fuzzy decision matrix
W=[ω1,ω2,...,ωn]T
Wherein, W is the weight vectors of attribute, and meets ωi>=0 He
If Triangular Fuzzy NumberNow by TOPSIS method solution procedures enumerate as
Under:
(1) decision matrix is standardizedIts computing formula is:
Wherein:
Formula (5) is suitable for income type variable;Formula (6) is applied to cost type variable.
(2) determination of positive ideal solution and minus ideal result:
Fuzzy decision matrixPositive ideal solution and minus ideal result may be defined as
(3) cut set α is set, its corresponding decision matrix is calculated
(4) according to Nonlinear programming Model, the fuzzy relative phase of corresponding all scheme analysis under Truncated set level α is calculated
Like degree.
Alternative AiWith positive ideal solution A*Relative similarity may be defined as
Because RCiIt is an interval value, its upper and lower bound tries to achieve method difference corresponding segments plan model
Wherein,WithIt is respectively evaluation of estimate xijAnd weights omegajIn cut set
Set during for alpha levels.
(5) the average blur relative similarities under all cut set α are solved, the de-fuzzy method of the average blur set is such as
Shown in formula.
(6) according to the result of calculation of formula, all alternatives are ranked up,It is worth bigger, alternative AjMore lean on
Nearly ideal scheme, effect is better.
It can be seen that, to improve the accuracy than selecting result, in step S103, determine have according to original decision information and weight
Ideal solution and each scheme and the distance of ideal solution in limit scheme, required scheme is determined according to distance, is specifically included:
According to each policymaker to the original decision information and weight of indices, determine that items are examined for each scheme
The average two types fuzzy number of synthesis of worry factor, the average two types fuzzy number of synthesis according to every Consideration, it is determined that standardization
Initial decision matrix;
Initial decision matrix according to standardization determine ideal solution and each scheme in limited scheme and ideal solution away from
From the scheme according to needed for distance is determined.
Wherein, the initial decision matrix according to standardization determines the ideal solution and each scheme and ideal solution in limited scheme
Distance, required scheme is determined according to distance, specifically include:
Initial decision matrix according to standardization determines the ideal solution in limited scheme;
For each scheme, it is determined that under multiple Truncated set levels corresponding all schemes fuzzy relative similarity, go forward side by side
Row de-fuzzy, obtains de-fuzzy value;
For each scheme, according to de-fuzzy value, the distance of the program and ideal solution is determined;
According to the attribute of ideal solution, it is determined that closest with positive ideal solution or with minus ideal result be apart from farthest scheme
Required scheme.
Specifically, being determined for each scheme to the original decision information and weight of indices according to each policymaker
Go out the average two types fuzzy number of synthesis of every Consideration, the average two types fuzzy number of synthesis according to every Consideration, it is determined that
The initial decision matrix of standardization, specifically includes:
According to each policymaker to the original decision information of indices, the decision scheme of Fuzzy Multiple Attribute Decision Making problem is determined
Collect and beProperty set is C={ c1,c2,...,cm};
For option Aj(j=1,2 ..., m), according to attribute ciEstimated, obtained Aj(j=1,2 ..., m) on ci
(i=1,2 ..., property value n) is Triangular Fuzzy NumberConstitute fuzzy decision matrix
W=[ω1,ω2,...,ωn]T
Wherein, W is the weight vectors of attribute, and meets ωi>=0 He
If Triangular Fuzzy NumberAnd specified decision matrixIt is right
In income type variable,For cost type variable,
Wherein,
Specifically, for each scheme, it is determined that under multiple Truncated set levels corresponding all schemes it is fuzzy relatively similar
Degree, and de-fuzzy is carried out, de-fuzzy value is obtained, specifically include:
The multiple cut set value α of setting, and determine under each cut set value α, alternative AiWith ideal solution A*Relative similarity
Higher limit and lower limit:
Wherein,WithIt is respectively xijAnd ωjCollection in cut set value α
Close;
Determine that de-fuzzy value is:
Below by a specific embodiment to rail line transferring provided in an embodiment of the present invention than selecting
Method is illustrated:
By taking No. 3 lines of Hefei City's urban track traffic as an example, 3A lines and No. 3 Xian Fangxing main roads station transfer, No. 3 lines with
The former construction plan scheme that 3A lines are plugged into is as follows.
No. 3 line Emerald Lake parking lots of planning are arranged on Fang Xing main roads southern side, and are connect with No. 3 line main tracks at Fang Xing main roads station
Rail, 3A lines carry out factory's un-wheeling repair using No. 3 Xian Modian rolling stock sections.In the second wheel construction plan, after Fang Xing main roads station employs station
Turn back line is connected with the section line that comes in and goes out, and No. 3 line distant view years extend to the scheme of Feixi and 3A lines insertion operation, as shown in Figure 2.
The program exist problem be:
3A lines at a specified future date can only be with No. 3 line insertion operations, and flexibility, adaptability are poor.According to line network planning, distant view year 3A lines
Commuter rush hour section be 1.69 ten thousand person-times/hour, less than No. 3 amounts of person-time/hour of line peak section 3.21 ten thousand, by the volume of the flow of passengers
3A lines are only needed to open 4 marshalings for level, and 3A lines need to be used and No. 3 line identical vehicles and row if runing in insertion
Car is organized into groups, and being thus likely to result in cannot match in intown some the section capacities in peak period Hefei with passenger flow, it is difficult to meet
Operation demand, and capacity can be caused excessive in the range of Feixi, serious problem is wasted, to operation, taeniae telarum is certain not
Just, the risk of operation is increased;
No. 3 big cross-channels of line are turned back and are only capable of being turned back using the field wire that come in and gone out behind station, and flexibility is not good enough.
For the not good enough problem of former construction plan Fang Xing main roads station distribution design flexibility, the station distribution pattern is carried out
Three ratio choosings of scheme.
(1) prioritization scheme one
In view of 3A lines as distant view circuit, certain possibility is respectively provided with using with No. 3 line insertion operations and segmentation operation
Property, the transfer of passenger flow for convenience, it is proposed that the distribution design of interchange on the same platform, as shown in Figure 3.
This programme, Fang Xing main roads station station is provided with double crossover after setting out in advance to make arrangements, the field wire that comes in and goes out is drawn from main track outside, is reserved
Extend the condition with 3A lines insertion operation.3A lines at a specified future date and No. 3 line segmentation operations, No. 3 alignment cars utilize Fang Xing main roads Zi Yun roads
The double crossover in direction is turned back operation before being stood, and 3A alignments car is turned back before carrying out 3A lines station using the double crossover in Feixi direction
Operation, can meet the turning-back capacity demand of respective circuit.Two lines carry out out admission operation using Emerald Lake parking lot discrepancy line.Should
Scheme can solve insertion operation tissue difficulty, and capacity and passenger flow are difficult to the problem for matching;Two lines realize interchange on the same platform, facilitate two
Passenger flow between line is exchanged;No. 3 lines of 3A lines at a specified future date also possess engineering specifications according to insertion operation.
Scheme advantage:
Distant view year can organization scheme segmentation operation, also organize insertion operation, flexibility is strong;
Segmentation operation is capable of achieving the interchange on the same platform of line-to-line, and transfer more facilitates.
Scheme shortcoming:
Initial stage station scale is larger;
Long term, then going out admission operation can the certain influence of match line operation generation according to insertion Management plan.
(2) prioritization scheme two
Such as determine No. 3 line distant views year and 3A line insertion operations, the wiring scheme to former construction plan carries out following optimization tune
It is whole, as shown in Figure 4.
Increase list branch-cut bridge before station, realize function of turning back before Fang Xing main roads station station;
For 3A lines increase a discrepancy line to Emerald Lake parking lot.
Scheme advantage:
Increase single branch-cut bridge before the station at Fang Xing main roads station, realize before Fang Xing main roads station station with station after the dual work(of turning back turned back
Can, operation organizational flexibility is more preferable;
For 3A lines have reserved the condition for accessing Emerald Lake parking lot, the flexibility of operation is enhanced.
Scheme shortcoming:
Distant view year can only organize insertion operation, it is impossible to realize segmentation operation, dumb;
Station scale is larger.
(3) prioritization scheme three
Such as determine 3A lines at a specified future date and No. 3 line segmentation operations, the wiring scheme to former construction plan is optimized and revised as follows,
As shown in Figure 5.
This programme 3A lines and No. 3 Xian Fangxing main roads station form passage transfer, and No. 3 Xian Fangxing main roads station model is implemented in the recent period
Enclose, and the reserved transferring passage with 3A lines, distant view year, 3A line scopes were built again.Set behind No. 3 Xian Fangxing main roads station station double crossover,
Turn back line, the field wire that comes in and goes out is connected with turn back line, and single branch-cut bridge is set before standing.3A Xian Fangxing main roads set double crossover behind the station of station, are set before standing
Come in and go out field wire.3A lines and No. 3 interconnections of line are located at Emerald Lake parking lot.
Scheme advantage:
Increase single branch-cut bridge before the station at Fang Xing main roads station, realize before Fang Xing main roads station station with station after the dual work(of turning back turned back
Can, increased operation organizational flexibility;
The resource 3A lines in Emerald Lake parking lot can be shared, and be conducive to the intensive utilization of resource;
Two lines can realize time phasing, not interfere with each other.
Scheme shortcoming:
Distant view year, two lines can only tissue segmentation operation, dumb, bad adaptability;
Transfer need to be changed to and slightly show inconvenience by passage between two lines;
After distant view year 3A lines build up, Fang Xing main roads station overall size is larger.
By to three analyses of prioritization scheme, from operation convenience, operation flexibility, operation adaptability, construction scale
Prioritization scheme is carried out than choosing with the aspect such as transfer convenience, it is more as shown in Figure 6 than selecting structure chart.
Circuit is plugged into the real data number that the value of prioritization scheme Consideration more every than choosing is designed by policymaker's combined circuit
Comprehensively drawn according to the experience with oneself, three bit decisions persons are to operation convenience, operation flexibility, operation adaptability, construction scale
Judged that table 2 gives policymaker the original decision information to indices, and can with five desired values such as transfer convenience
Calculate the average two types fuzzy number of synthesis of each index.
The rail line of table 2 plug into prioritization scheme indices interval two pattern paste evaluation information
Run the fuzzy relatively similar of convenience, operation flexibility, operation adaptability, construction scale and transfer convenience
Degree, as shown in Fig. 7-Figure 11, Fig. 7-Figure 11 chain lines are that prioritization scheme one, dotted line is that prioritization scheme two, solid line is optimization side
Case three.
Interval type-2 fuzzy sets according to propositions such as Mendel are closed, and the weight of every Consideration will be using interval two pattern
Paste language weight set, as shown in table 3.
The interval two types fuzzy language weight set of table 3
Table 4 gives policymaker the original decision information to every Consideration weight, and can calculate the flat of each index
Interval two types fuzzy number.
The rail line of table 4 is plugged into the interval two types fuzzy number of prioritization scheme indices weight
Because desired value is closer to positive ideal solution, it is meant that scheme is better, so positive ideal solution is A+=1,1,1,0,
1 }, minus ideal result is A-={ 0,0,0,1,0 }.
In order to be precisely calculated fuzzy relative similarity, 11 different Truncated set levels are set, α=0,0.1,0.2,
0.3,0.4,0.5,0.6,0.7,0.8,0.9,1.0.Each circuit plug into prioritization scheme fuzzy relative similarity result of calculation such as
Shown in table 5 and Figure 12, Figure 12 chain lines are that prioritization scheme one, dotted line is that prioritization scheme two, solid line is prioritization scheme three.As a result
Show, the de-fuzzy value highest of prioritization scheme one, RC*=0.6967, RC*Value represents the program closer to ideal side closer to 1
Case, also superior to other two schemes, than selecting result more to meet engineering practice.
Each circuit is plugged into the fuzzy relative similarity of prioritization scheme under the different Truncated set level α of table 5
The embodiment of the present invention correspondingly provides a kind of rail line transferring than screening device, as shown in figure 13, bag
Include:
Scheme determination unit 1301, the rail line for determining to treat selection is plugged into scheme analysis;
Decision information determining unit 1302, the every Consideration for determining rail line transferring, and really
Original decision information and weight of the fixed each policymaker to indices;
Than menu unit 1303, for determining the ideal solution in limited scheme and each according to original decision information and weight
Scheme and the distance of ideal solution, required scheme is determined according to distance, and original decision information and weight use two patterns
Paste number is represented.
Wherein, than menu unit 1303 specifically for:
According to each policymaker to the original decision information and weight of indices, determine that items are examined for each scheme
The average two types fuzzy number of synthesis of worry factor, the average two types fuzzy number of synthesis according to every Consideration, it is determined that standardization
Initial decision matrix;
Initial decision matrix according to standardization determine ideal solution and each scheme in limited scheme and ideal solution away from
From the scheme according to needed for distance is determined.
Further, the ideal solution in limited scheme, root are determined according to the initial decision matrix of standardization than menu unit 1303
According to each scheme and the distance of ideal solution, required scheme is determined, specifically included:
Initial decision matrix according to standardization determines the ideal solution in limited scheme;
For each scheme, it is determined that under multiple Truncated set levels corresponding all schemes fuzzy relative similarity, go forward side by side
Row de-fuzzy, obtains de-fuzzy value;
For each scheme, according to de-fuzzy value, the distance of the program and ideal solution is determined;
According to the attribute of ideal solution, it is determined that closest with positive ideal solution or with minus ideal result be apart from farthest scheme
Required scheme.
Further, than menu unit 1303 according to each policymaker to the original decision information and weight of indices, pin
The average two types fuzzy number of the synthesis of every Consideration is determined to each scheme, the synthesis average two according to every Consideration
Type fuzzy number, it is determined that the initial decision matrix of standardization, specifically includes:
According to each policymaker to the original decision information of indices, the decision scheme of Fuzzy Multiple Attribute Decision Making problem is determined
Collect and beProperty set is C={ c1,c2,...,cm};
For option Aj(j=1,2 ..., m), according to attribute ciEstimated, obtained Aj(j=1,2 ..., m) on ci
(i=1,2 ..., property value n) is Triangular Fuzzy NumberConstitute fuzzy decision matrix
W=[ω1,ω2,...,ωn]T
Wherein, W is the weight vectors of attribute, and meets ωi>=0 He
If Triangular Fuzzy NumberAnd specified decision matrix
For income type variable,For cost type variable,
Wherein,
Further, than menu unit 1303 for each scheme, it is determined that corresponding all schemes under multiple Truncated set levels
Fuzzy relative similarity, and carry out de-fuzzy, obtain de-fuzzy value, specifically include:
The multiple cut set value α of setting, and determine under each cut set value α, alternative AiWith ideal solution A*Relative similarity
Higher limit and lower limit:
Wherein,WithIt is respectively xijAnd ωjCollection in cut set value α
Close;
Determine that de-fuzzy value is:
The rail line transferring methods of comparison and selection and device, by determining each of rail line transferring
Item Consideration, and determine original decision information of each policymaker to indices, limited side is determined according to original decision information
Ideal solution in case, according to the distance of each scheme and ideal solution, determines required scheme, wherein, original decision information and
Weight is represented using two type fuzzy numbers, with it, having considered every consideration of rail line transferring
Factor, the accuracy than selecting result is improve by two type fuzzy numbers, and realize carries out track with reference to track traffic actual conditions
Traffic route transferring is than choosing.
Circuit according to the objective selection of track traffic design experiences plug into need Consideration can quantification, reflect exactly each
The real-time status of item Consideration, every Consideration weight and value can be objectively expressed not with interval two types fuzzy number
Certainty, carries out, than choosing, improve the objectivity and accuracy than selecting by the method to rail line transferring.
Each embodiment in this specification is described by the way of progressive, identical similar portion between each embodiment
Divide mutually referring to what each embodiment was stressed is its difference with other embodiment.Particularly with device
For embodiment, due to its substantially similar and embodiment of the method, so, description it is fairly simple, related part is referring to method reality
Apply the part explanation of example.
Although describing the application by embodiment, it will be apparent to one skilled in the art that the application has many deformations and change
Change without departing from the spirit and scope of the present invention.So, if these modifications of the invention and modification belong to right of the present invention and want
Ask and its equivalent technologies within the scope of, then the present invention be also intended to comprising these change and modification.
Claims (10)
1. a kind of rail line transferring methods of comparison and selection, it is characterised in that including:
It is determined that treating that the rail line of selection is plugged into scheme analysis;
Determine every Consideration of rail line transferring, and determine original decision-making of each policymaker to indices
Information and weight;
According to the original decision information and weight determine ideal solution and each scheme in limited scheme and ideal solution away from
From, required scheme is determined according to the distance, the original decision information and weight are represented using two type fuzzy numbers.
2. the method for claim 1, it is characterised in that described to determine have according to the original decision information and weight
Ideal solution and each scheme and the distance of ideal solution in limit scheme, required scheme, specific bag are determined according to the distance
Include:
According to each policymaker to the original decision information and weight of indices, determine that items are examined for each scheme
The average two types fuzzy number of synthesis of worry factor, the average two types fuzzy number of synthesis according to every Consideration, determines specification
The initial decision matrix of change;
Initial decision matrix according to the standardization determine ideal solution and each scheme in limited scheme and ideal solution away from
From the scheme according to needed for the distance is determined.
3. method as claimed in claim 2, it is characterised in that described to determine have according to the initial decision matrix of the standardization
Ideal solution and each scheme and the distance of ideal solution in limit scheme, required scheme, specific bag are determined according to the distance
Include:
Initial decision matrix according to standardization determines the ideal solution in limited scheme;
For each scheme, it is determined that under multiple Truncated set levels corresponding all schemes fuzzy relative similarity, and gone
Obfuscation, obtains de-fuzzy value;
For each scheme, according to the de-fuzzy value, the distance of the program and ideal solution is determined;
According to the attribute of ideal solution, it is determined that it is closest with positive ideal solution or with minus ideal result apart from farthest scheme for needed for
Scheme.
4. method as claimed in claim 3, it is characterised in that it is described according to each policymaker to indices it is original certainly
Plan information and weight, the average two types fuzzy number of the synthesis of every Consideration is determined for each scheme, according to described each
The average two types fuzzy number of synthesis of item Consideration, it is determined that the initial decision matrix of standardization, specifically includes:
According to each policymaker to the original decision information of indices, the decision scheme of Fuzzy Multiple Attribute Decision Making problem is determined
Collect and beProperty set is C={ c1,c2,...,cm};
For option Aj(j=1,2 ..., m), according to attribute ciEstimated, obtained Aj(j=1,2 ..., m) on ci(i=
1,2 ..., property value n) is Triangular Fuzzy NumberConstitute fuzzy decision matrix
W=[ω1,ω2,...,ωn]T
Wherein, W is the weight vectors of attribute, and meets ωi>=0 He
If Triangular Fuzzy NumberAnd specified decision matrixFor receiving
Beneficial type variable,For cost type variable,
Wherein,
5. method as claimed in claim 4, it is characterised in that described for each scheme, it is determined that under multiple Truncated set levels
The fuzzy relative similarity of corresponding all schemes, and de-fuzzy is carried out, de-fuzzy value is obtained, specifically include:
The multiple cut set value α of setting, and determine under each cut set value α, alternative AiWith ideal solution A*Relative similarity it is upper
Limit value and lower limit:
Wherein,WithIt is respectively xijAnd ωjSet in cut set value α;
Determine that de-fuzzy value is:
6. a kind of rail line transferring compares screening device, it is characterised in that including:
Scheme determination unit, the rail line for determining to treat selection is plugged into scheme analysis;
Decision information determining unit, for determining every Consideration of rail line transferring, and determines each decision-making
Original decision information and weight of the person to indices;
Than menu unit, for determining ideal solution and each scheme in limited scheme according to the original decision information and weight
With the distance of ideal solution, required scheme is determined according to the distance, the original decision information and weight use two
Type fuzzy number is represented.
7. device as claimed in claim 6, it is characterised in that it is described than menu unit specifically for:
According to each policymaker to the original decision information and weight of indices, determine that items are examined for each scheme
The average two types fuzzy number of synthesis of worry factor, the average two types fuzzy number of synthesis according to every Consideration, determines specification
The initial decision matrix of change;
Initial decision matrix according to the standardization determine ideal solution and each scheme in limited scheme and ideal solution away from
From the scheme according to needed for the distance is determined.
8. device as claimed in claim 7, it is characterised in that it is described than menu unit according to the initial decision square of the standardization
Battle array determines the ideal solution in limited scheme, according to each scheme and the distance of ideal solution, determines required scheme, specifically includes:
Initial decision matrix according to standardization determines the ideal solution in limited scheme;
For each scheme, it is determined that under multiple Truncated set levels corresponding all schemes fuzzy relative similarity, and gone
Obfuscation, obtains de-fuzzy value;
For each scheme, according to the de-fuzzy value, the distance of the program and ideal solution is determined;
According to the attribute of ideal solution, it is determined that it is closest with positive ideal solution or with minus ideal result apart from farthest scheme for needed for
Scheme.
9. device as claimed in claim 8, it is characterised in that it is described than menu unit according to each policymaker to indices
Original decision information and weight, determine the average two types fuzzy number of the synthesis of every Consideration, root for each scheme
According to the average two types fuzzy number of the synthesis of every Consideration, it is determined that the initial decision matrix of standardization, specifically includes:
According to each policymaker to the original decision information of indices, the decision scheme of Fuzzy Multiple Attribute Decision Making problem is determined
Collect and beProperty set is C={ c1,c2,...,cm};
For option Aj(j=1,2 ..., m), according to attribute ciEstimated, obtained Aj(j=1,2 ..., m) on ci(i=
1,2 ..., property value n) is Triangular Fuzzy NumberConstitute fuzzy decision matrix
W=[ω1,ω2,...,ωn]T
Wherein, W is the weight vectors of attribute, and meets ωi>=0 He
If Triangular Fuzzy NumberAnd specified decision matrixFor income
Type variable,For cost type variable,
Wherein,
10. device as claimed in claim 9, it is characterised in that it is described than menu unit for each scheme, it is determined that being cut in multiple
The fuzzy relative similarity of corresponding all schemes under collection level, and de-fuzzy is carried out, de-fuzzy value is obtained, specific bag
Include:
The multiple cut set value α of setting, and determine under each cut set value α, alternative AiWith ideal solution A*Relative similarity it is upper
Limit value and lower limit:
Wherein,WithIt is respectively xijAnd ωjSet in cut set value α;
Determine that de-fuzzy value is:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611186777.7A CN106845680A (en) | 2016-12-20 | 2016-12-20 | A kind of rail line transferring methods of comparison and selection and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611186777.7A CN106845680A (en) | 2016-12-20 | 2016-12-20 | A kind of rail line transferring methods of comparison and selection and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106845680A true CN106845680A (en) | 2017-06-13 |
Family
ID=59140907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611186777.7A Pending CN106845680A (en) | 2016-12-20 | 2016-12-20 | A kind of rail line transferring methods of comparison and selection and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106845680A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108032861A (en) * | 2017-12-29 | 2018-05-15 | 中铁第四勘察设计院集团有限公司 | A kind of arrangement of track traffic section field discrepancy line transition station work platform |
CN109190790A (en) * | 2018-07-25 | 2019-01-11 | 广东工业大学 | Evacuation optimizing paths model building method based on two patterns paste |
CN110539753A (en) * | 2019-09-30 | 2019-12-06 | 广州地铁设计研究院股份有限公司 | Subway line disassembling arrangement structure and construction method |
CN112664013A (en) * | 2020-12-11 | 2021-04-16 | 交控科技股份有限公司 | Rail transit vehicle parking lot system |
-
2016
- 2016-12-20 CN CN201611186777.7A patent/CN106845680A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108032861A (en) * | 2017-12-29 | 2018-05-15 | 中铁第四勘察设计院集团有限公司 | A kind of arrangement of track traffic section field discrepancy line transition station work platform |
CN108032861B (en) * | 2017-12-29 | 2023-11-10 | 中铁第四勘察设计院集团有限公司 | Arrangement structure of working platform of line-in and line-out rail-connecting station of rail transit section field |
CN109190790A (en) * | 2018-07-25 | 2019-01-11 | 广东工业大学 | Evacuation optimizing paths model building method based on two patterns paste |
CN110539753A (en) * | 2019-09-30 | 2019-12-06 | 广州地铁设计研究院股份有限公司 | Subway line disassembling arrangement structure and construction method |
CN112664013A (en) * | 2020-12-11 | 2021-04-16 | 交控科技股份有限公司 | Rail transit vehicle parking lot system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106845680A (en) | A kind of rail line transferring methods of comparison and selection and device | |
Sohn et al. | Factors generating boardings at Metro stations in the Seoul metropolitan area | |
Lee | A multi-criteria approach for prioritizing advanced public transport modes (APTM) considering urban types in Korea | |
CN111652520B (en) | Pavement maintenance intelligent decision system and method based on big data | |
CN109543882B (en) | Bus network density calculation method based on optimal bus average station spacing | |
CN104809112A (en) | Method for comprehensively evaluating urban public transportation development level based on multiple data | |
CN107871184A (en) | A kind of site selecting method of the electric automobile charging station of facing area electrically-charging equipment | |
CN107180274A (en) | A kind of charging electric vehicle facilities planning typical scene is chosen and optimization method | |
CN108665140A (en) | A kind of inter-city passenger rail Passenger Transport Hub traffic connection System Assessment Method | |
CN102081754B (en) | Multi-expert dynamic coordination judging method and intellectualized aid decision support system | |
CN105243837A (en) | Bus passenger flow corridor discriminating method | |
He et al. | Analysis of socio-economic spatial structure of urban agglomeration in China based on spatial gradient and clustering | |
Hsu et al. | Planning and assessment system for light rail transit construction in Taiwan | |
Petrović et al. | Location planning approach for intermodal terminals in urban and suburban rail transport | |
CN110188938B (en) | Method for screening ground bus lines to be adjusted in early stage of rail transit networking | |
Sunkanapalli et al. | Dynamic analysis of traveler attitudes and perceptions using panel data | |
CN116720750B (en) | Comprehensive energy station equipment capacity planning method, device, terminal and storage medium | |
Jajac et al. | Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities | |
CN112488500A (en) | TOD site connection design evaluation method based on AHP-cloud model | |
Sun et al. | An AHP-Fuzzy comprehensive evaluation model for parking lots in urban CBD area | |
Kosijer et al. | Fuzzy multicriteria decision-making in railway infrastructure planning and design | |
CN115456372A (en) | Construction method of rural inefficient construction land identification standard system | |
CN113902341A (en) | Method, device and system for site selection of parking spaces in parking lot | |
CN113762613A (en) | Road network maintenance planning method based on maintenance priority ranking | |
Yang | Spatial planning in Asia |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |