CN106844841A - A kind of tunnel cross-section method for drafting for parameterizing Tunneling by mining method - Google Patents

A kind of tunnel cross-section method for drafting for parameterizing Tunneling by mining method Download PDF

Info

Publication number
CN106844841A
CN106844841A CN201611156420.4A CN201611156420A CN106844841A CN 106844841 A CN106844841 A CN 106844841A CN 201611156420 A CN201611156420 A CN 201611156420A CN 106844841 A CN106844841 A CN 106844841A
Authority
CN
China
Prior art keywords
tunnel
section
contour
circular arc
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611156420.4A
Other languages
Chinese (zh)
Other versions
CN106844841B (en
Inventor
农兴中
王建
邹成路
徐文田
翟利华
刘欣
柳宪东
肖峰
杨成
刘加福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201611156420.4A priority Critical patent/CN106844841B/en
Publication of CN106844841A publication Critical patent/CN106844841A/en
Application granted granted Critical
Publication of CN106844841B publication Critical patent/CN106844841B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T11/002D [Two Dimensional] image generation
    • G06T11/20Drawing from basic elements, e.g. lines or circles
    • G06T11/203Drawing of straight lines or curves

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Image Generation (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of tunnel cross-section method for drafting for parameterizing Tunneling by mining method, including:Step A:The regular standard tunnel contour drafted suitable for different tunnel cross-sections is drafted according to default tunnel cross-section, the shape of the standard tunnel contour is by tunnel contour state modulator;Step B:According to given tunnel clearance, the parameter value of the tunnel contour parameter is adjusted, draft new tunnel contour, the new tunnel contour can encase given tunnel clearance.Method of the present invention method efficiently solves the work that designer drafts tunnel contour repeatedly, saves the miscellaneous work calculated tunnel cross-section engineering quantity, improves the operating efficiency of designer.

Description

A kind of tunnel cross-section method for drafting for parameterizing Tunneling by mining method
Technical field
Break the present invention relates to a kind of method for drafting of tunnel cross-section, more particularly to a kind of tunnel for parameterizing Tunneling by mining method Iso-surface patch method.
Background technology
Tunneling by mining method is widely used in engineering field, and drafting for tunnel contour is often relatively complicated, in order to ensure tunnel Each section of circular arc of road profile is mutually tangent, and designer need to repeatedly adjust the radius of each section of circular arc and the position in the center of circle.To improve The operating efficiency of designer, it is necessary to set up a kind of quick method for drafting tunnel contour.
Current tunnel cross-section drafts method:Tunnel is carried out respectively using drawing instrument for different tunnel clearances to break Face is drafted, and when tunnel cross-section size is various, all should be carried out section according to identical drawing step every time and be drafted, and there is the duplication of labour Amount is more, drafts work situation often repeatedly.
The content of the invention
In order to improve deficiency of the prior art, it is an object of the invention to provide a kind of tunnel for parameterizing Tunneling by mining method Road Section chart drawing method, the method efficiently solves the work that designer drafts tunnel contour repeatedly, saves to tunnel The miscellaneous work that section engineering quantity is calculated, improves the operating efficiency of designer.
The present invention is to reach its purpose, and the technical scheme of use is as follows:
A kind of tunnel cross-section method for drafting for parameterizing Tunneling by mining method, including:
Step A:The regular standard tunnel cross-section wheel drafted suitable for different tunnel cross-sections is drafted according to default tunnel cross-section Exterior feature, the shape of the standard tunnel contour is by tunnel contour state modulator;
Step B:According to given tunnel clearance, the parameter value of the tunnel contour parameter is adjusted, draft new tunnel cross-section Profile, the new tunnel contour can encase given tunnel clearance.
Used as a kind of specific embodiment, the tunnel contour parameter includes arc length, radius, radian, the circular arc center of circle.
As a kind of specific embodiment, also include before the step A:Shape, size according to tunnel cross-section, it is determined that Section circular arc quantity.
Used as a kind of specific embodiment, the standard tunnel contour and new tunnel contour are that holocentric is justified or many The heart is justified.
Further, when the tunnel contour is holocentric bowlder, the default tunnel cross-section of the basis drafts regular plan Surely the standard tunnel contour suitable for different tunnel cross-sections is specifically included:According to a certain tunnel clearance, it is determined that adapting to the tunnel The arc radius of the tunnel contour of road gauge, arc length, central angle, and using its center of circle as origin, draw the tunnel cross-section Profile.
Wherein, if the section is stalk formula tunnel cross-section, also need to draw the straight line combined with the drafting circular arc, with Form stalk formula tunnel contour.
Further, when the tunnel contour is oversensitive bowlder, the default tunnel cross-section of the basis drafts regular plan Surely the standard tunnel contour suitable for different tunnel cross-sections is specifically included:
According to a certain tunnel clearance, it is determined that adapting to main arc radius, arc length, the circle of the tunnel contour of the tunnel clearance Heart angle, and using its center of circle as origin, draw the 1st section of circular arc;
According to the tunnel clearance, determine the height of the tunnel contour, the radius and central coordinate of circle of the 2nd section of circular arc, N-th section of radius of circular arc;
Calculate n-th section of central coordinate of circle of circular arc;
Calculate 2n-1 sections of central angle of circular arc, starting point and terminal;
According to the result being calculated, the height of the tunnel contour, the radius and central coordinate of circle of the 2nd section of circular arc and N-th section of radius of circular arc draws 2n sections of circular arc;
Wherein, n >=3.
Used as a kind of specific embodiment, the method also includes:Step C:By being input into preliminary bracing, two thickness of the liner degree are small Conduit or steel tube shed layout angle and spacing, anchor pole spacing draw the tunnel cross-section drawing that can be constructed.
The technical scheme that the present invention is provided has the advantages that:
The tunnel cross-section method for drafting of parametrization Tunneling by mining method of the invention is applied to different tunnels by drafting one first The standard tunnel contour of road section, and it is parameterized;When other different tunnel cross-sections draftings are carried out, only need Adjust corresponding parameter value, you can the change of the shapes and sizes of adjustment tunnel contour is realized, so as to adapt to different tunnels Road gauge, efficiently solves the work that designer drafts tunnel contour repeatedly, improves the operating efficiency of designer.
Further, break due to drawing tunnel using the tunnel cross-section method for drafting of parametrization Tunneling by mining method of the invention Facial contour, it can directly by control tunnel contour shape, the tunnel contour parameter of size, calculating every linear meter(lin.m.) and intending Determine the relevant engineering quantity to be onstructed of tunnel cross-section, save the miscellaneous work calculated tunnel cross-section engineering quantity.
Brief description of the drawings
Fig. 1 is that the |input paramete of the embodiment of the present invention draws first paragraph circular arc figure;
Fig. 2 be the embodiment of the present invention |input paramete draw second and third, four arcses figure;
Fig. 3 is the complete tunnel contour figure of the embodiment of the present invention;
Fig. 4 is the tunnel cross-section and control tunnel cross-section Parameter Map of the output of the embodiment of the present invention.
Specific embodiment
The present invention is described in further detail with reference to instantiation and accompanying drawing 1-4.
A kind of tunnel cross-section method for drafting of parametrization Tunneling by mining method of the embodiment of the present invention, it is comprised the following steps:
Step A:The regular standard tunnel cross-section wheel drafted suitable for different tunnel cross-sections is drafted according to default tunnel cross-section Exterior feature, the shape of the standard tunnel contour is by tunnel contour state modulator.
Wherein, the tunnel contour parameter includes arc length, radius, radian, the circular arc center of circle.The standard tunnel cross-section Profile and new tunnel contour are that holocentric is justified or oversensitive circle.
Before the step A, namely before the standard tunnel contour suitable for different tunnel cross-sections is drafted, also wrap Include following steps:Shape, size according to tunnel cross-section, determine section circular arc quantity, and the circular arc quantity can be holocentric circle, Such as holocentric circle stalk formula tunnel cross-section, circular tunnel section;Can also be oversensitive circle, such as three-core circular tunnel section, five hearts justify tunnel Road section.
It is determined that after section circular arc quantity, being such as defined as circular tunnel section, then the default tunnel cross-section of basis drafts rule Then draft the standard tunnel contour suitable for circular tunnel section.
Specifically, when the tunnel contour is holocentric bowlder, according to a certain holocentric circular tunnel gauge, it is determined that adapting to be somebody's turn to do The arc radius of the tunnel contour of tunnel clearance, arc length, central angle, and using its center of circle as origin, draw the tunnel and break Facial contour.
It is determined that after section circular arc quantity, being such as defined as five heart circular tunnel sections, then the default tunnel cross-section of basis is drafted Rule drafts the standard tunnel contour suitable for five heart circular tunnel sections.
Specifically, when the tunnel contour is oversensitive bowlder, according to a certain oversensitive circular tunnel gauge, it is determined that adapting to be somebody's turn to do The main arc radius of the tunnel contour of tunnel clearance, arc length, central angle, and using its center of circle as origin, draw the 1st section of circle Arc;
According to the tunnel clearance, determine the height of the tunnel contour, the radius and central coordinate of circle of the 2nd section of circular arc, N-th section of radius of circular arc;
Calculate n-th section of central coordinate of circle of circular arc;
Calculate 2n-1 sections of central angle of circular arc, starting point and terminal;
According to the result being calculated, the height of the tunnel contour, the radius and central coordinate of circle of the 2nd section of circular arc and N-th section of radius of circular arc draws 2n sections of circular arc;
Wherein, n >=3.
Step B:According to given tunnel clearance, the parameter value of the tunnel contour parameter is adjusted, draft new tunnel cross-section Profile, the new tunnel contour can encase given tunnel clearance.
For the drafting of holocentric circular tunnel profiled outline, continue by taking above-mentioned circular tunnel section as an example:Drawing circle After the standard tunnel contour of tunnel cross-section, circular tunnel profile parameters are adjusted, make the new tunnel contour after adjustment can To encase given circular tunnel gauge.
For the drafting of oversensitive circular tunnel profiled outline, continue by taking above-mentioned five hearts circular tunnel section as an example:Drawing five After the standard tunnel contour of heart circular tunnel section, five heart circular tunnel profile parameters are adjusted, make the new tunnel cross-section after adjustment Profile can encase five given heart circular tunnel gauges.
Step C:By being input into preliminary bracing, two thickness of the liner degree, ductule or steel tube shed layout angle and spacing, anchor pole spacing The tunnel cross-section drawing that drafting can construct.In other words, after tunnel contour has been drawn, input preliminary bracing, two thickness of the liner degree, The drawn tunnel contour is depicted as constructing by ductule or steel tube shed layout angle and spacing, anchor pole spacing Tunnel cross-section drawing.
The tunnel cross-section method for drafting of parametrization Tunneling by mining method of the invention is applied to different tunnels by drafting one first The standard tunnel contour of road section, and it is parameterized;When other different tunnel cross-sections draftings are carried out, only need Adjust corresponding parameter value, you can the change of the shapes and sizes of adjustment tunnel contour is realized, so as to adapt to different tunnels Road gauge, efficiently solves the work that designer drafts tunnel contour repeatedly, saves to tunnel cross-section engineering quantity meter The miscellaneous work of calculation, improves the operating efficiency of designer.Further, due to using parametrization Mining Method tunnel of the invention The tunnel cross-section method for drafting in road draws tunnel contour, and it can directly by control tunnel contour shape, size Tunnel contour parameter, calculate every linear meter(lin.m.) to be onstructed engineering quantity relevant with tunnel cross-section is drafted, save to tunnel The miscellaneous work that section engineering quantity is calculated
Embodiment 1
As Figure 1-4, it is to draw four with the parametrization Tunneling by mining method tunnel cross-section method for drafting of the embodiment of the present invention The instantiation of heart Arc Axial asymmetric tunnel profile:
Half edge profile is drawn first, and half edge profile and its symmetrical drafting, specifically include following steps in addition:
S100):According to four heart circular tunnel gauges, determine that four hearts justify main arc radius, draw first paragraph circular arc, radius is R1, the corresponding angle of arc length is α1, using its center of circle as origin (0,0).
S200):The height in whole tunnel is determined by tunnel clearance, the radius R2 and its home position of second segment circular arc is determined (0, y2), while determining the 3rd section of the radius R3 and the radius R4 of four arcses of circular arc.
Specifically include following steps:
Using known parameters R1, R2, R3, R4, y2, α1
Obtain the 3rd section of circular arc center of circle:X3=(R3-R1) sin α 1, y3=(R3-R1) cos α 1)
Simultaneous Equations solve the home position (x4, y4) of four arcses:
(X4-x3)2+(y4-y3)2=(R3-R4)2
X4> 0
Seek the corresponding angle of second segment circular arc:α 2=arctan (x4/ (y2-y4)).
Ask second segment circular arc terminal (starting point be (0, (R2-y2)):X22=R2sin (α 2), y22=y2-R2cos (α 2)。
Seek the 3rd section of corresponding angle of circular arc:α 3=arctan ((y31-y3)/(x31-x3))+arctan ((y4-y3)/ (x4-x3))。
Seek the 3rd section of starting point of circular arc (i.e. first paragraph circular arc terminal):X31=R1sin (α 1), y31=R1cos (α 1).
Seek the 3rd section of terminal of circular arc:
X32=R3cos [arctan ((y4-y3)/(x4-x3))]+x3, y32=y3-R3sin [arctan ((y4-y3)/ (x4-x3))]。
The starting point of four arcses is the terminal of second segment circular arc, and the terminal of four arcses is the 3rd section of end of circular arc Point.
Second segment circular arc is drawn using the terminus of the second point circular arc and the center of circle,
The 3rd section of circular arc is drawn using the terminus and the center of circle of thirdly circular arc,
Four arcses are drawn using the terminus of the 4th point circular arc and the center of circle,
Other half edge profile symmetrical with it is drawn using above-mentioned same method.
S300):The control parameter of any adjustment tunnel cross-section changes the shape size of tunnel contour, to adapt to new giving Tunnel clearance.According to the standard tunnel contour of four heart circular tunnels, |input paramete draws first paragraph circular arc S1, described first Section circular arc is as shown in Figure 1.Then distinguish |input paramete and draw second segment circular arc S2, the 3rd section of circular arc S3, four arcses S4, paint Figure after system is as shown in Figure 2.It is last symmetrically to draw second half arc profile, form complete tunnel contour figure, such as Fig. 3 It is shown.
S400):By being input into other tunnel cross-section parameters, thickness of the liner degree as before, two thickness of the liner degree, ductule (steel tube shed) arrangement Angle and spacing, rock-bolt length and spacing draw complete tunnel cross-section construction drawing.As shown in figure 4, for the tunnel of output breaks The Parameter Map of facial contour and control tunnel cross-section.
Embodiment 2
Here is to parameterize Tunneling by mining method tunnel cross-section method for drafting by the embodiment of the present invention to draw stalk formula tunnel The instantiation of profiled outline:
The tunnel clearance of stalk formula tunnel cross-section first, determine arc radius, arc length, central angle and using its center of circle as Origin, draws the arc section of the tunnel contour.
Then the straight line combined with the drafting circular arc is drawn, to form stalk formula tunnel contour.Wherein drawing During the straight line combined with the drafting circular arc, processed the straight line as special circular arc.
It is every that the present invention is not departed to various changes of the invention or modification the invention is not limited in above-mentioned implementation method Spirit and scope, if these are changed and within the scope of modification belongs to claim of the invention and equivalent technologies, then this hair It is bright to also imply that comprising these changes and modification.

Claims (8)

1. it is a kind of parameterize Tunneling by mining method tunnel cross-section method for drafting, it is characterised in that including:
Step A:The regular standard tunnel contour drafted suitable for different tunnel cross-sections, institute are drafted according to default tunnel cross-section The shape of standard tunnel contour is stated by tunnel contour state modulator;
Step B:According to given tunnel clearance, the parameter value of the tunnel contour parameter is adjusted, drafts new tunnel contour, The new tunnel contour can encase given tunnel clearance.
2. method according to claim 1, it is characterised in that:The tunnel contour parameter include circular arc terminus, radius, Radian, the circular arc center of circle.
3. method according to claim 1, it is characterised in that also include before the step A:According to the shape of tunnel cross-section Shape, size, determine section circular arc quantity.
4. method according to claim 1, it is characterised in that the standard tunnel contour and new tunnel contour It is holocentric circular arc or oversensitive circular arc.
5. method according to claim 4, it is characterised in that when the tunnel contour is holocentric bowlder, described The standard tunnel contour that rule drafted suitable for different tunnel cross-sections is drafted according to default tunnel cross-section to specifically include:
According to a certain tunnel clearance, it is determined that the arc radius of the tunnel contour of the tunnel clearance, arc length, central angle are adapted to, And using its center of circle as origin, draw the tunnel contour.
6. method according to claim 5, it is characterised in that the method also includes:Draw and combined with the drafting circular arc Straight line, formed stalk formula tunnel contour.
7. method according to claim 4, it is characterised in that when the tunnel contour is oversensitive bowlder, described The standard tunnel contour that rule drafted suitable for different tunnel cross-sections is drafted according to default tunnel cross-section to specifically include:
According to a certain tunnel clearance, it is determined that adapting to main arc radius, arc length, the center of circle of the tunnel contour of the tunnel clearance Angle, and using its center of circle as origin, draw the 1st section of circular arc;
According to the tunnel clearance, determine the height of the tunnel contour, the radius and central coordinate of circle of the 2nd section of circular arc, n-th section The radius of circular arc;
Calculate n-th section of central coordinate of circle of circular arc;
Calculate 2n-1 sections of central angle of circular arc, starting point and terminal;
According to the result being calculated, the height of the tunnel contour, the radius of the 2nd section of circular arc and central coordinate of circle and n-th The radius of section circular arc draws 2n sections of circular arc;
Wherein, n >=3.
8. method according to claim 1, it is characterised in that the method also includes:
Step C:By being input into preliminary bracing, two thickness of the liner degree, ductule or steel tube shed layout angle and spacing, anchor pole spacing is drawn The tunnel cross-section drawing that can be constructed.
CN201611156420.4A 2016-12-14 2016-12-14 Tunnel section drawing method for parametric mining method tunnel Active CN106844841B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611156420.4A CN106844841B (en) 2016-12-14 2016-12-14 Tunnel section drawing method for parametric mining method tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611156420.4A CN106844841B (en) 2016-12-14 2016-12-14 Tunnel section drawing method for parametric mining method tunnel

Publications (2)

Publication Number Publication Date
CN106844841A true CN106844841A (en) 2017-06-13
CN106844841B CN106844841B (en) 2020-05-05

Family

ID=59139732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611156420.4A Active CN106844841B (en) 2016-12-14 2016-12-14 Tunnel section drawing method for parametric mining method tunnel

Country Status (1)

Country Link
CN (1) CN106844841B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107908848A (en) * 2017-11-08 2018-04-13 安徽省交通控股集团有限公司 The three of a kind of tubular passageway section connect arc design method
CN109211167A (en) * 2018-09-03 2019-01-15 山东大学 A kind of tunnel double-lining thickness accurate detecting method based on function curve fitting
CN109992012A (en) * 2019-04-23 2019-07-09 云南交投集团投资有限公司 A kind of camera cluster attitude control method
CN111914338A (en) * 2020-08-14 2020-11-10 中国十七冶集团有限公司 BIM (building information modeling) model building method for parameterized tunnel open cut tunnel lining structure
CN113137952A (en) * 2021-04-23 2021-07-20 交通运输部公路科学研究所 Positioning method for tunnel section measuring point
CN117436171A (en) * 2023-10-24 2024-01-23 广州地铁设计研究院股份有限公司 BIM-based tunnel load assessment method, device, terminal equipment and medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155230A (en) * 2011-02-15 2011-08-17 龚晓斌 Tunnel curve segment lofting method based on circle coordinates
RO127694A2 (en) * 2011-01-24 2012-07-30 Institutul Naţional De Cercetare-Dezvoltare Aerospaţială "Elie Carafoli" - Incas Technology for optimization of ecological aerodynamic profiles
CN105205240A (en) * 2015-09-14 2015-12-30 北方工业大学 Method for automatic fitting, automatic optimization and interactive design of subway longitudinal section
CN105335576A (en) * 2015-11-25 2016-02-17 广州市盾建地下工程有限公司 Method and system for processing data of cross section of shielded tunnel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RO127694A2 (en) * 2011-01-24 2012-07-30 Institutul Naţional De Cercetare-Dezvoltare Aerospaţială "Elie Carafoli" - Incas Technology for optimization of ecological aerodynamic profiles
CN102155230A (en) * 2011-02-15 2011-08-17 龚晓斌 Tunnel curve segment lofting method based on circle coordinates
CN105205240A (en) * 2015-09-14 2015-12-30 北方工业大学 Method for automatic fitting, automatic optimization and interactive design of subway longitudinal section
CN105335576A (en) * 2015-11-25 2016-02-17 广州市盾建地下工程有限公司 Method and system for processing data of cross section of shielded tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王振湘, 周苏华, 曹琦: "吴庄隧道左线进口横断面优化设计及其电算程序", 《公路工程》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107908848A (en) * 2017-11-08 2018-04-13 安徽省交通控股集团有限公司 The three of a kind of tubular passageway section connect arc design method
CN109211167A (en) * 2018-09-03 2019-01-15 山东大学 A kind of tunnel double-lining thickness accurate detecting method based on function curve fitting
CN109211167B (en) * 2018-09-03 2021-06-01 山东大学 Tunnel secondary lining thickness accurate detection method based on function curve fitting
CN109992012A (en) * 2019-04-23 2019-07-09 云南交投集团投资有限公司 A kind of camera cluster attitude control method
CN111914338A (en) * 2020-08-14 2020-11-10 中国十七冶集团有限公司 BIM (building information modeling) model building method for parameterized tunnel open cut tunnel lining structure
CN111914338B (en) * 2020-08-14 2024-01-19 中国十七冶集团有限公司 Method for establishing BIM model of parameterized tunnel open cut tunnel lining structure
CN113137952A (en) * 2021-04-23 2021-07-20 交通运输部公路科学研究所 Positioning method for tunnel section measuring point
CN113137952B (en) * 2021-04-23 2021-11-12 交通运输部公路科学研究所 Positioning method for tunnel section measuring point
CN117436171A (en) * 2023-10-24 2024-01-23 广州地铁设计研究院股份有限公司 BIM-based tunnel load assessment method, device, terminal equipment and medium
CN117436171B (en) * 2023-10-24 2024-05-07 广州地铁设计研究院股份有限公司 BIM-based tunnel load assessment method, device, terminal equipment and medium

Also Published As

Publication number Publication date
CN106844841B (en) 2020-05-05

Similar Documents

Publication Publication Date Title
CN106844841A (en) A kind of tunnel cross-section method for drafting for parameterizing Tunneling by mining method
CN103616018B (en) Based on the circular arc rapid setting-out method of non-home position
CN102903134A (en) Method for rapidly drawing curves multiple times
CN104216283A (en) Rapid generation method of aircraft conduit processing files
CN106780742B (en) Three-dimensional bar distribution method for volute structure
US7116327B2 (en) Methods for generating control points for cubic bezier curves
CN110990923A (en) Rapid engineering calculation method, system and medium for hyperbolic arch dam of water conservancy and hydropower engineering
CN105527926B (en) Using the method for Digit Control Machine Tool workpieces processing
CN105371925A (en) An anaesthesia machine flow sensor calibration method
CN105320813A (en) Actual intersecting line cross section generation method and apparatus
CN110453602B (en) Catenary arch bridge arch rib construction lofting system
CN107038733B (en) Multi-segment circular arc fitting method of Nurbs curve
CN102393680A (en) Parameter curve interpolation method based on vector interpolation of conical surface cutter
CN102982198B (en) Computer drawing method for centrifugal label calibration tail
CN102897650B (en) Steel wire rope length controlling method for flexible net rack lifting process
CN107808034A (en) A kind of reinforcing bar fast modeling method based on sketchup dynamic assemblies
CN206844309U (en) The ring beam connecting node of round steel tubing string and beams of concrete
CN212959222U (en) Tool for calibrating performance parameters of fan
CN101551917A (en) Three-dimensional path drawing system and method
CN105589990B (en) The method of rail profile Parametric designing
JP2008040775A (en) Management/generation method of linear structure shape data
CN114451615B (en) Design method of sleeve arch line
CN103240618A (en) Clamping and positioning device for machining subway hook
CN203687948U (en) Locating tool for clearance measurement point of room
CN110159269B (en) Underground bent roadway tunneling construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Applicant after: GUANGZHOU METRO DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Applicant before: GUANGZHOU METRO DESIGN & RESEARCH INSTITUTE Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Nong Xingzhong

Inventor after: Liu Jiafu

Inventor after: Huang Zhonghui

Inventor after: Wang Binghua

Inventor after: He Xusheng

Inventor after: Jiang Panping

Inventor after: Wang Jian

Inventor after: Zou Chenglu

Inventor after: Xu Wentian

Inventor after: Zhai Lihua

Inventor after: Liu Xin

Inventor after: Liu Xiandong

Inventor after: Xiao Feng

Inventor after: Yang Cheng

Inventor before: Nong Xingzhong

Inventor before: Liu Jiafu

Inventor before: Wang Jian

Inventor before: Zou Chenglu

Inventor before: Xu Wentian

Inventor before: Zhai Lihua

Inventor before: Liu Xin

Inventor before: Liu Xiandong

Inventor before: Xiao Feng

Inventor before: Yang Cheng