CN106844802A - A kind of wind farm group inside wind direction confirmation method - Google Patents

A kind of wind farm group inside wind direction confirmation method Download PDF

Info

Publication number
CN106844802A
CN106844802A CN201510876277.5A CN201510876277A CN106844802A CN 106844802 A CN106844802 A CN 106844802A CN 201510876277 A CN201510876277 A CN 201510876277A CN 106844802 A CN106844802 A CN 106844802A
Authority
CN
China
Prior art keywords
wind
power plant
wind power
wind direction
farm group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510876277.5A
Other languages
Chinese (zh)
Inventor
马明
汪宁渤
曹银利
沈润杰
何斌
马彦宏
张健美
周强
赵龙
王明松
吕清泉
王定美
陈钊
张艳丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Wind Power Technology Center of Gansu Electric Power Co Ltd
Original Assignee
Tongji University
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Wind Power Technology Center of Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University, State Grid Corp of China SGCC, State Grid Gansu Electric Power Co Ltd, Wind Power Technology Center of Gansu Electric Power Co Ltd filed Critical Tongji University
Priority to CN201510876277.5A priority Critical patent/CN106844802A/en
Publication of CN106844802A publication Critical patent/CN106844802A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of wind farm group inside wind direction confirmation method, comprise the following steps:Wind power plant latitude and longitude coordinates in wind farm group are converted into simple two-dimensional coordinate by conversion wind farm group coordinate;Confirm wind power plant relation, judge order of the wind by each wind power plant, recursion analysis are carried out further according to the order successively downward wind direction;Confirm wind farm group inside wind direction relation.The present invention provides a method for more accurately analyzing wind farm group inside wind direction for the builder of wind power plant, the method can be solved effectively because the factor such as landform, blower fan causes the wind speed analytical error produced during the wind direction generation large change of wind farm group inside, provided safeguard to assess whole wind farm group generating capacity, its analytical error can be effectively reduced.

Description

A kind of wind farm group inside wind direction confirmation method
Technical field
The present invention relates to technical field of power systems, more particularly to a kind of wind farm group inside wind direction confirmation method.
Background technology
With the development of the mankind, energy problem turns into the major issue of influence human survival quality.A main method for solving energy problem is to greatly develop clean energy resource, Optimization of Energy Structure.And in new energy, wind energy is a very important part.Compared with other new energy, wind energy resources is abundant and worldwide distributed more widely, and with very big potentiality to be exploited and increasingly mature with wind turbine manufacture and wind-electricity integration technology, wind-power electricity generation also turns into focus of concern gradually.The strength that the kinetic energy that the mankind can be kept watch using windmill is converted into rotation is pushed to generator and produces electric energy, and method is, by power transmission shaft, the rotary power of rotor to be sent into generator.The wind energy in the whole world is about 2.74 × 109MW, wherein available wind energy is 2 × 107MW, the water energy total amount than that can be developed on the earth is also big 10 times, so wind energy is in occupation of highly important effect in new energy research.
With the fast development of wind power generation industry, the quantity of wind power plant is more and more, also exposes many problems in power plant construction and operation engineering, although now more and more to this research, but many problems are also difficult to be analyzed because impacted factor is more.In addition when these problems are solved, many measures are often before implementation all it cannot be guaranteed that feasibility, can only be verified by actual experiment, and the high cost cycle is long, it is relative blindly.
When the wind direction situation of wind power station is analyzed, single wind direction analysis typically all is carried out for wind farm group one by one, seldom analyze the wind direction of whole wind power station.Do not have influential or influence negligible between many wind farm groups because the distance between wind farm group is larger in practice, thus specifically confirm wind direction inside wind power station it is not necessary that.
Sometimes it is not very big wind farm group that two distances can be also there are in wind power station, also have in addition to the influence of scheduling requirement the influence similar to wake effect between these wind farm groups, the influence for causing that generated electricity to some wind power plants of these factors can not be ignored.During this time, confirm that wind farm group inside wind direction can provide certain data basis to analyze the size of these influences.
The whole wind power plant masses have many wind power plants, compared to the environment inside single wind power plant for, it is more complicated situations such as wind direction, the environment of whole wind power station.So when the wind direction inside wind farm group is confirmed, it is necessary to can be more for the more single wind power plant of factor for considering.
The position of wind farm group is not similar to neat permutation like that in wind power plant in wind power station, and area inside wind farm group is big, and geographical environment therein may be extremely complex.Factor above will increase some difficulties to the confirmation of wind farm group inside wind direction, and analysis meeting is relatively difficult when wind direction occurs to change in a big way, be susceptible to the mistake analyzed, and cause precision to be unable to reach certain requirement.
The content of the invention
In view of the drawbacks described above of prior art, the technical problems to be solved by the invention are to provide a kind of wind farm group inside wind direction confirmation method, the wind direction gone out inside whole wind farm group by the Algorithm Analysis based on wind direction at each wind power plant, the mutual wind direction relation of each wind power plant in wind farm group is obtained, may be influenced each other through being commonly present wind power plant in the actual wind farm group of correct reply treatment.
To achieve the above object, the invention provides a kind of wind farm group inside wind direction confirmation method, it is characterised in that comprise the following steps:
Step 1, converts wind farm group coordinate, the wind power plant latitude and longitude coordinates in wind farm group is converted into simple two-dimensional coordinate, and make the two-dimensional coordinate in the first quartile of the coordinate system set up;
Step 2, judges wind power plant wind direction, confirms single wind power plant inside wind direction, after the wind direction inside described each wind power plant is confirmed, draws the position of the outlet and inlet of each wind power plant, and the confirmation of wind direction is carried out to wind farm group;
Step 3, confirms wind power plant relation, and the data according to anemometer tower judge the overall substantially wind direction of wind farm group, so as to judge order of the wind by each wind power plant, the analysis of recursion are carried out further according to the order successively downward wind direction, untill satisfaction is required;
Step 4, confirms wind farm group inside wind direction relation.
It is preferred that wind power plant is defaulted as during the confirmation of wind farm group wind direction described in the step 2 unified air intake angle and an air outlet angle, mean wind direction and to go out mean wind direction confirmation method as follows:
Assuming that have m Fans on the air intake border of wind power plant, and wind direction is respectively α 1, α 2... α m at blower fan, the weight of wind direction is respectively i1, i2...im, then can obtain wind power plant enters mean wind direction
Assuming that there are a n Fans on the air-out border of wind power plant, and wind direction at blower fan is respectively β 1, β 2...... β n, and the weight of wind direction is respectively j1, j2......jn, then can obtain the wind power plant goes out mean wind direction
It is preferred that wind power plant relation confirmation method described in the step 3 is as follows:
Assuming that the wind power plant of lower wind direction is followed successively by wind power plant 1, wind power plant 2, wind power plant 3...... in wind farm group, then need for the wind power plant 1 to go out mean wind speedThe mean wind speed that enters with lower wind direction each wind power plant judged successively, until there is wind power plant to meet to require or without wind power plant untill;
The center of each wind power plant is taken as its analysis position, coordinate is respectively (xz1, yz1), (xz2, yz2) ..., it is θ to set the difference critical angle of field wind direction, and field coordinate critical angle is λ, and analysis method is illustrated by taking the wind power plant 1 and the wind power plant 2 as an example;
When the wind power plant 1 and the wind power plant 2 meet following two relational expression, represent two most of parts of wind power plant on the same distinguished and admirable field wire of wind farm group,
When the data of the wind power plant 1 and the wind power plant 2 meet described two relational expressions simultaneously, by both relation records wind direction relation table on the scene;If described two relational expressions can not be met simultaneously, then the data of the wind power plant 1 and the wind power plant 3 are analyzed, the like, untill meeting and requiring.
Preferably, the inside of wind farm group described in the step 4 wind direction relation is a more complete table for representing wind farm group inside wind direction relation, the wind direction relation table can show the substantially flow direction of wind farm group inside wind, that is, confirm wind farm group inside wind direction.
A kind of wind farm group inside wind direction confirmation method of the invention, using all work blower fan data wind farm group inside wind direction is determined, the wind direction data of anemometer tower is no longer relied solely on, the accuracy to the distinguished and admirable field analysis in wind farm group inside can be greatly improved;Mobility status to the wind inside wind farm group have carried out more analysis in detail, and it is more accurate compared with the method that acquiescence wind farm group wind direction is single direction to the impact analysis between wind power plant to make;The relation table that wind flow field in wind farm group flows through wind power plant is constructed, the relation between wind power plant under different wind farm groups entirety wind speed can be quickly understood, meanwhile, good analysis foundation can be provided for the influence between wind power plant.
The present invention provides a method for more accurately analyzing wind farm group inside wind direction for the builder of wind power plant, the method can be solved effectively because the factor such as landform, blower fan causes the wind speed analytical error produced during the wind direction generation large change of wind farm group inside, provided safeguard to assess whole wind farm group generating capacity, its analytical error can be effectively reduced.
The technique effect of design of the invention, concrete structure and generation is described further below with reference to accompanying drawing, to be fully understood from the purpose of the present invention, feature and effect.
Brief description of the drawings
Fig. 1 is a kind of wind farm group inside wind direction confirmation method schematic flow sheet of a preferred embodiment of the present invention.
Fig. 2 is the wind farm group inside distribution schematic diagram of a preferred embodiment of the present invention.
Specific embodiment
As shown in Figure 1, a kind of wind farm group inside wind direction confirmation method, the wind direction gone out inside whole wind farm group by a kind of Algorithm Analysis based on wind direction at each wind power plant, to obtain the mutual wind direction relation of each wind power plant in wind farm group, and a table is built based on this relation record these influence relations, comprise the following steps that described.
Step 1, changes wind farm group coordinate, the wind power plant latitude and longitude coordinates in wind farm group is converted into simple two-dimensional coordinate and makes the two-dimensional coordinate in the first quartile of the coordinate system set up.
Assume that the wind power plant situation in wind farm group is as shown in Figure 2 in the present embodiment.
Step 2, judges wind power plant wind direction, confirms single wind power plant inside wind direction, after the wind direction inside each wind power plant is confirmed, draws the position of the outlet and inlet of each wind power plant, wind direction is carried out to wind farm group and is confirmed.
Wherein, single wind power plant inside wind direction confirmation method is as follows:
(1) blower fan coordinate is set, the latitude and longitude coordinates of blower fan is converted into simple two-dimensional coordinate and is made these two-dimensional coordinates in the first quartile of the coordinate system set up.
Wind direction is the positive direction of x-axis to two-dimensional coordinate from West to East, it is the positive direction of y-axis from south orientation north, angle a be with the angle of x-axis positive direction (0-360 °), the wind electric field blower is an array, and the row and file of the wind electric field blower array be parallel with x-axis with y-axis respectively.
(2) judge air intake position, judge blower fan at wind power plant air intake position.
Setting one angle parameter a0, the a0 are the important parameters for setting critical wind direction of the wind power plant in different air intake situations;Simultaneously, the wind direction for taking the blower fan at the minimum place of x, y-coordinate is a1, takes that x coordinate is maximum, the minimum place of y-coordinate blower fan wind direction is a2, takes x, the wind direction of the blower fan of y-coordinate maximum is a3, take x coordinate minimum, the wind direction of the blower fan of y-coordinate maximum is a4, specifically judges that step is as follows:
The parameter that gets parms a0, the parameter a0 can be analyzed acquisition to the history wind direction of wind power plant, air speed data, it is also possible to which artificial is configured in parameter setting part;
The wind direction of wind power plant four wind direction datas a1, a2 in corner, a3 and a4 and anemometer tower is analyzed, the accuracy of this blower fan everywhere is detected, needs to be substituted from the data of neighbouring border blower fan if inaccurate;
Decision method is as follows to be judged to the air intake position of wind power plant according to different wind directions:
If the blower fan at S (x, y) expression selection (x, y) coordinates is used as blower fan at the inlet air point of wind power plant,
When 0<a1<During a0, then S (xmin ...) (choosing all blower fans at x minimums);
Work as a0<=a1<During=90-a0, then S (x min ...) and S (..., ymin);
Work as 90-a0<a1<When=90, then S (..., ymin);
When 90<a2<During 90+a0, then S (x min ...);
Work as 90+a0<=a2<During=180-a0, then S (x max ...) and S (..., ymin);
Work as 180-a0<a2<When=180, then S (x max ...);
When 180<a3<During 180+a0, then S (x max ...);
Work as 180+a0<=a3<During=270-a0, then S (x max ...) and S (..., ymax);
Work as 270-a0<a3<When=270, then S (..., ymax);
When 270<a4<During 270+a0, then S (..., ymax);
Work as 270+a0<=a4<During=360-a0, then S (x min ...) and S (..., ymax);
Work as 360-a0<a4<When=360, then S (x min ...).
If some borderline blower fans are not because failure and other reasons work, then closest to its non-border blower fan, first Fans of lower wind direction i.e. in wind power plant totality wind direction, if influenceed by wake effect, need to be judged according to the angle of its neighbouring wind power plant border blower fan.
(3) internal wind direction is determined:Each blower fan inside wind power plant is analyzed, a relation table on each wind turbine wind direction in wind power plant inside is obtained, based on the relation table, wind direction inside whole wind power plant is drawn out.
With when 0<a<As a example by 90:
If wind direction difference critical value be β, coordinate critical value be γ, it is considered to now under blower fan wind direction three possible blower fans,
Now understand that wind necessarily first passes through blower fan 0 according to wind direction, if wind direction is ε (0 at the blower fan 0 for now measuring<ε<90),
Work as ε<During=a0, then the wind direction that can analyze blowing machine 1 is necessarily influenceed by blower fan 0, i.e., they are on a distinguished and admirable field wire, and the wind direction of remaining blower fan is little with the wind direction relation of blower fan 0, and the relation can be added in wind direction relation table;
Work as ε>During=90-a0, then the wind direction that can analyze blowing machine 2 is necessarily influenceed by blower fan 0, i.e., they are on a distinguished and admirable field wire, and the wind direction of remaining blower fan is little with the wind direction relation of blower fan 0, and the relation can be added in wind direction relation table;
Work as a0<ε<During 90-a0, whether blower fan 0 is accomplished by being further analyzed with blower fan 5 on a distinguished and admirable field wire.It is that β and coordinate critical value are γ hereinbefore to introduce wind direction difference critical value, wind direction difference critical angle β is used to judge both sides relation by the wind direction differential seat angle of blower fan at two, and coordinate critical angle gamma is then for judging both sides relation with the relation of blower fan 0 by the differential seat angle of blower fan at two;
If the coordinate of blower fan 5 is (x5, y5), the coordinate of blower fan 0 is (x0, y0), wind direction at blower fan 5 is ε 5, then when data between the two meet following formula 1 and formula 2, just it is considered as blower fan 5 and blower fan 0 on a distinguished and admirable field wire, both corresponding numberings in wind power plant is recorded in wind direction relation table;
|ε5-ε|≤β (2)
If during condition when blower fan 5 can not simultaneously meet formula (1) and formula (2), needing to be analyzed the data at blower fan 6 and blower fan 7 the two blower fans;
WhenWhen, it is necessary to be analyzed according to the formula 1 and formula 2 to the data of blower fan 6, if setting up by the relation record of blower fan 0 and blower fan 6 in wind direction relation table;
WhenWhen, it is necessary to be analyzed according to above-mentioned two formula to the data of blower fan 7, if setting up by the relation record of blower fan 0 and blower fan 7 in wind direction relation table;
The like, both the blower fan being in blower fan 0 on a wind direction, the record numberings of blower fan in wind field can be found;
Progressively each blower fan of wind power plant is analyzed according to the above-mentioned analysis mode to blower fan 0 in wind power plant, just a relation table on each wind turbine wind direction in wind power plant inside can be obtained, the wind direction inside whole wind power plant can be just drawn out based on the relation table.
The wind direction inside wind farm group can be analyzed after wind direction inside each wind power plant is confirmed with this.Although practical experience shows that the wind direction inside wind power plant can change, it is identical that the angle of its outlet and inlet can all remain substantially, does not have too big difference.
By analysis, it can be deduced that the position of the outlet and inlet of each wind power plant, the angle of each air intake position does not have too big difference, and the angle of same each air-out position there will not be too big difference.Wind power plant can be so defaulted as unified air intake angle and air outlet angle, and the confirmation of wind direction just can be carried out to wind farm group.
The unified air intake angle of wind power plant and air outlet angle analysis method are as follows:Assuming that have m Fans on the air intake border of wind power plant, and wind direction is respectively α 1, α 2... α m at blower fan, the weight of wind direction is respectively i1, i2...im, then can obtain wind power plant enters mean wind directionAs shown in Equation 3:
Assuming that there are a n Fans on the air-out border of wind power plant, and wind direction at blower fan is respectively β 1, β 2...... β n, and the weight of wind direction is respectively j1, j2......jn, then can obtain the wind power plant goes out mean wind directionAs shown in Equation 4:
Step 3, confirms wind power plant relation, and the data according to anemometer tower judge the overall substantially wind direction of wind farm group, so as to judge order of the wind by each wind power plant, recursion analysis are carried out further according to the order successively downward wind direction, untill satisfaction is required.
Assuming that the wind power plant of lower wind direction is followed successively by wind power plant 1, wind power plant 2, wind power plant 3...... in wind farm group, then need for the wind power plant 1 to go out mean wind speedThe mean wind speed that enters with lower wind direction each wind power plant judged successively, until there is wind power plant to meet to require or without wind power plant untill;
The center of each wind power plant is taken as its analysis position, coordinate is respectively (xz1, yz1), (xz2, yz2) ..., it is θ to set the difference critical angle of field wind direction, and field coordinate critical angle is λ, and analysis method is illustrated by taking the wind power plant 1 and the wind power plant 2 as an example;
When the wind power plant 1 and the wind power plant 2 meet following two relational expression 5 and formula 6, represent two most of parts of wind power plant on the same distinguished and admirable field wire of wind farm group.
When the data of wind power plant 1 and wind power plant 2 meet two formulas (5) above and (6) simultaneously, by both relation records wind direction relation table on the scene;If can not simultaneously meet above-mentioned formula (5) and (6), then the data of wind power plant 1 and wind power plant 3 are analyzed, the like, untill meeting and requiring.
Step 4, confirms wind farm group inside wind direction relation.
Analysis by wind power plant is carried out to the wind power plant in wind farm group by the method in above-mentioned above-mentioned steps 3, a more complete table for representing wind farm group inside wind direction relation can be obtained.This table can show the substantially flow direction of wind farm group inside wind, that is, confirm wind farm group inside wind direction.
Preferred embodiment of the invention described in detail above.It should be appreciated that the ordinary skill of this area just can make many modifications and variations without creative work with design of the invention.Therefore, all technical staff in the art, all should be in the protection domain being defined in the patent claims under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (4)

1. a kind of wind farm group inside wind direction confirmation method, it is characterised in that comprise the following steps:
Step 1, converts wind farm group coordinate, the wind power plant latitude and longitude coordinates in wind farm group is converted into simple two-dimensional coordinate, and make the two-dimensional coordinate in the first quartile of the coordinate system set up;
Step 2, judges wind power plant wind direction, confirms single wind power plant inside wind direction, after the wind direction inside described each wind power plant is confirmed, draws the position of the outlet and inlet of each wind power plant, and the confirmation of wind direction is carried out to wind farm group;
Step 3, confirms wind power plant relation, and the data according to anemometer tower judge the overall substantially wind direction of wind farm group, so as to judge order of the wind by each wind power plant, the analysis of recursion are carried out further according to the order successively downward wind direction, untill satisfaction is required;
Step 4, confirms wind farm group inside wind direction relation.
2. wind farm group as claimed in claim 1 inside wind direction confirmation method, it is characterized in that, wind farm group wind direction described in the step 2 is defaulted as wind power plant when confirming unified air intake angle and air outlet angle, enters mean wind direction and to go out mean wind direction confirmation method as follows:
Assuming that have m Fans on the air intake border of wind power plant, and wind direction is respectively α 1, α 2... α m at blower fan, the weight of wind direction is respectively i1, i2...im, then can obtain wind power plant enters mean wind direction
Assuming that there are a n Fans on the air-out border of wind power plant, and wind direction at blower fan is respectively β 1, β 2...... β n, and the weight of wind direction is respectively j1, j2......jn, then can obtain the wind power plant goes out mean wind direction
3. wind farm group as claimed in claim 2 inside wind direction confirmation method, it is characterised in that wind power plant relation confirmation method described in the step 3 is as follows:
Assuming that the wind power plant of lower wind direction is followed successively by wind power plant 1, wind power plant 2, wind power plant 3...... in wind farm group, then need for the wind power plant 1 to go out mean wind speedThe mean wind speed that enters with lower wind direction each wind power plant judged successively, until there is wind power plant to meet to require or without wind power plant untill;
The center of each wind power plant is taken as its analysis position, coordinate is respectively (xz1, yz1), (xz2, yz2) ..., it is θ to set the difference critical angle of field wind direction, and field coordinate critical angle is λ, and analysis method is illustrated by taking the wind power plant 1 and the wind power plant 2 as an example;
When the wind power plant 1 and the wind power plant 2 meet following two relational expression, represent two most of parts of wind power plant on the same distinguished and admirable field wire of wind farm group,
When the data of the wind power plant 1 and the wind power plant 2 meet described two relational expressions simultaneously, by both relation records wind direction relation table on the scene;If described two relational expressions can not be met simultaneously, then the data of the wind power plant 1 and the wind power plant 3 are analyzed, the like, untill meeting and requiring.
4. wind farm group as claimed in claim 3 inside wind direction confirmation method, it is characterized in that, the inside of wind farm group described in the step 4 wind direction relation is a more complete table for representing wind farm group inside wind direction relation, the wind direction relation table can show the substantially flow direction of wind farm group inside wind, that is, confirm wind farm group inside wind direction.
CN201510876277.5A 2015-12-03 2015-12-03 A kind of wind farm group inside wind direction confirmation method Pending CN106844802A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510876277.5A CN106844802A (en) 2015-12-03 2015-12-03 A kind of wind farm group inside wind direction confirmation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510876277.5A CN106844802A (en) 2015-12-03 2015-12-03 A kind of wind farm group inside wind direction confirmation method

Publications (1)

Publication Number Publication Date
CN106844802A true CN106844802A (en) 2017-06-13

Family

ID=59149921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510876277.5A Pending CN106844802A (en) 2015-12-03 2015-12-03 A kind of wind farm group inside wind direction confirmation method

Country Status (1)

Country Link
CN (1) CN106844802A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103401236A (en) * 2013-07-30 2013-11-20 华北电力大学 Wind power farm generator unit grouping method based on flow correlation of wind power farm
CN103500370A (en) * 2013-10-21 2014-01-08 华北电力大学 Establishment method of wind direction coordinate precomputation system of dynamic wind power plant
CN103605912A (en) * 2013-12-10 2014-02-26 武汉大学 Wind power plant power external characteristic modeling method
CN104200097A (en) * 2014-08-29 2014-12-10 重庆大学 Wind power plant wind generation set layout site selection method
CN105119320A (en) * 2015-09-15 2015-12-02 东北大学 Distributed wind power plant fan optimized arrangement system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103401236A (en) * 2013-07-30 2013-11-20 华北电力大学 Wind power farm generator unit grouping method based on flow correlation of wind power farm
CN103500370A (en) * 2013-10-21 2014-01-08 华北电力大学 Establishment method of wind direction coordinate precomputation system of dynamic wind power plant
CN103605912A (en) * 2013-12-10 2014-02-26 武汉大学 Wind power plant power external characteristic modeling method
CN104200097A (en) * 2014-08-29 2014-12-10 重庆大学 Wind power plant wind generation set layout site selection method
CN105119320A (en) * 2015-09-15 2015-12-02 东北大学 Distributed wind power plant fan optimized arrangement system and method

Similar Documents

Publication Publication Date Title
CN102444553A (en) Systems and methods for identifying wind turbine performance inefficiency
CN103886179B (en) A kind of wind electric field blower polymerization based on wake effect point group
Rahimi et al. An engineering model for wind turbines under yawed conditions derived from high fidelity models
CN103219725A (en) Wind power plant equivalent modeling method based on real-time operation data
CN112199908B (en) Wind turbine generator yaw control wake model correction method based on hydrodynamics
Zheng et al. Effect of blade number on performance of drag type vertical axis wind turbine
Andersen et al. Global trends in the performance of large wind farms based on high-fidelity simulations
Bhargava et al. A case study of wind turbine loads and performance using steady-state analysis of BEM
Karadag et al. Wind turbine integration to tall buildings
CN106844802A (en) A kind of wind farm group inside wind direction confirmation method
Sun et al. Numerical simulation of the unsteady flow and power of horizontal axis wind turbine using sliding mesh
CN102945326A (en) Wind turbine micro-siting device and method based on binary coded genetic algorithm
CN106845737A (en) A kind of wind farm group entirety generating capacity appraisal procedure
CN106844795A (en) A kind of wind power plant inside wind direction confirmation method
Zheng et al. Power efficiency of 5-blade drag-type Vertical Axis Wind Turbine
Wang et al. Preliminary Performance Tests and Simulation of a V-Shape Roof Guide Vane Mounted on an Eco-Roof System
Ajedegba Effects of blade configuration on flow distribution and power output of a zephyr vertical axis wind turbine.
CN106846162A (en) A kind of wind power plant entirety generating capacity appraisal procedure
Nilsson Numerical computations of wind turbine wakes and wake interaction: Optimization and control
Su A new hybrid free-wake model for wind turbine aerodynamics with application to wake steering
Zhang Analysis and optimisation of a novel wind turbine
Zhang et al. Influence of Wind Turbine Structural Parameters on Wind Shear and Tower Shadow Effect
Sun et al. Airfoil optimization of vertical-axis turbine based on CFD Method
Pan et al. A wake interaction model for the coordinated control of wind farms
Ahsan et al. CFD analysis of wind concentrator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170613