CN106842918B - A kind of calculation method of the real-time coal amount of drag conveyor - Google Patents

A kind of calculation method of the real-time coal amount of drag conveyor Download PDF

Info

Publication number
CN106842918B
CN106842918B CN201611271965.XA CN201611271965A CN106842918B CN 106842918 B CN106842918 B CN 106842918B CN 201611271965 A CN201611271965 A CN 201611271965A CN 106842918 B CN106842918 B CN 106842918B
Authority
CN
China
Prior art keywords
coal amount
drag conveyor
real
time
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611271965.XA
Other languages
Chinese (zh)
Other versions
CN106842918A (en
Inventor
范宝冬
陈伟
王会枝
宋冰清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Zhangjiakou Coal Mining Machinery Co Ltd
Original Assignee
China Coal Zhangjiakou Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Zhangjiakou Coal Mining Machinery Co Ltd filed Critical China Coal Zhangjiakou Coal Mining Machinery Co Ltd
Priority to CN201611271965.XA priority Critical patent/CN106842918B/en
Publication of CN106842918A publication Critical patent/CN106842918A/en
Application granted granted Critical
Publication of CN106842918B publication Critical patent/CN106842918B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/042Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Mechanical Engineering (AREA)
  • Artificial Intelligence (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Control Of Conveyors (AREA)

Abstract

The present invention relates to coal mining technology field, the calculation method of specifically a kind of real-time coal amount of drag conveyor.Existing method is the coal amount detected on elevating conveyor by the coal amount scanning sensor being mounted on elevating conveyor, the current coal amount being inferred on drag conveyor by this data.Although the method precision is higher, there are certain hysteresis qualitys.The present invention passes through to mining height of coal mining machine, the speed of travel, section deep, electric current, the acquisition of the data such as drag conveyor electric current, voltage, the speed of service, realize the calculating of the real-time coal amount of drag conveyor, amendment is made to calculation method in conjunction with the coal amount scanner on elevating conveyor, guarantees the accurate of real-time coal weighing method.The invention has the advantages that the calculation method of design is scientific and reasonable, the coal amount data of reaction are accurate in real time, realize the calculating to the real-time coal amount of drag conveyor, the coal amount data for grasping drag conveyor in real time, provide data basis to adjust the speed automatically in drag conveyor operational process according to coal amount.

Description

A kind of calculation method of the real-time coal amount of drag conveyor
Technical field
The present invention relates to drag conveyor intelligent speed-regulating technical fields during underground coal mine Mining Transport, specifically A kind of calculation method of the real-time coal amount of drag conveyor.
Background technique
When underground coal mine Seams are exploited, raw coal is transported work by scraper plate chain movement by drag conveyor Face, as converter technique is widely applied on drag conveyor, so that being become according to the current coal amount intelligent speed-regulating of drag conveyor May, just more stringent requirements are proposed for the acquisition to the real-time coal amount data of drag conveyor and calculating for this.Existing method is to pass through The coal amount being mounted on the coal amount scanning sensor detection elevating conveyor on elevating conveyor, is inferred to drag conveyor by this coal amount On coal amount.Although the method precision is higher, there are certain hysteresis qualitys, i.e., can only count after coal unloads and falls on elevating conveyor Coal output is calculated, the real-time coal amount of the drag conveyor reflected has certain hysteresis quality.In order to grasp drag conveyor in real time Coal amount and load state reach drag conveyor convenient for being adjusted the speed according to drag conveyor real time load to it and applied Green, energy saving purpose are realized in journey, have invented a kind of calculation method of real-time coal amount of drag conveyor.
Summary of the invention
The purpose of the present invention is inventing a kind of calculation method of real-time coal amount of drag conveyor, drag conveyor is accurately perceived Current coal amount in operational process, convenient for being applied in drag conveyor real-time speed regulating.
The technical solution adopted by the present invention is that: a kind of calculation method of the real-time coal amount of drag conveyor is adopted using coalcutter Mining height, section depth, the speed of travel, position, electric current, direction, drag conveyor motor speed, input current, hydraulic branch during coal Frame elapses step pitch, and the coal amount data etc. of coal amount scanner detection, in summary data calculate the real-time coal amount of drag conveyor.One The calculation method of the kind real-time coal amount of drag conveyor, comprising the following steps:
1. coal amount data computing system 1 passes through coal mining machine control system 2, bracket electricity hydraulic control system 3, drag conveyor frequency conversion Controller 4, coal amount scanner 5 etc. acquire mining height during coalcutter 6 is mined, cut depth, the speed of travel, position, electric current, direction, 7 speed of service of drag conveyor, input current, hydraulic support 9 elapse step pitch, 5 coal of coal amount scanner being mounted on elevating conveyor 8 The data such as data are measured, provide data basis for the calculating of coal amount data.
2. by mining height of coal mining machine, cutting the data such as depth, the speed of travel, position, electric current, direction and hydraulic support passage step pitch Construct the mathematical model of the real-time coal weighing of drag conveyor:
K is that coalcutter is coaling coefficient in formula, Q1For the coal amount that coalcutter calculates, t0For benchmark time, t1For the time of coalingging Point, t2For real-time time, v1The coalcutter speed of service, v2The drag conveyor speed of service, H mining height of coal mining machine, D coalcutter are cut deeply, Lt0For t0Moment coal winning machine position.
3. calculating the coal amount on drag conveyor by drag conveyor electric current and the existing relationship of load;Scraper plate conveying Machine load variation factor only have coal amount variation, there are also drag conveyor curvature, working face condition change etc. other because Element, so only accounting for real-time coal amount a part according to the coal amount that curent change calculates;
Drag conveyor it is straight, without being run under conditions of objective factor when in the case that theoretically speed is certain Electric current and real-time coal amount are linear, it may be assumed that
I2Drag conveyor electric current
Q2The real-time coal amount of drag conveyor calculated according to electric current
M coefficient
I0Drag conveyor no-load current
According to the curvature of drag conveyor in the process of running, the ratio that electric current calculates real-time coal amount is adjusted, obtains meter Calculate the real-time coal amount of drag conveyor;
4. calculating the real-time coal amount of drag conveyor according to working face condition and each equipment operation condition:
Q=pQ1+(1-p)Q2
Q is to calculate the gained real-time coal amount of drag conveyor, Q in formula1The real-time coal amount of drag conveyor calculated by coalcutter, Q2Drag conveyor coal amount is calculated by drag conveyor real-time current, p is the ratio that coalcutter calculates that coal amount accounts for real-time coal weighing Weight.
5. the scraper plate that calculated drag conveyor coal amount and the coal amount scanner being mounted on elevating conveyor detect conveys The coal amount of synchronization is compared on machine, and each parameter in calculation method is adjusted when there is larger difference for a long time, being guaranteed The accuracy of calculated result.
Coal amount data computing system 1 acquires the real-time of coalcutter 6 from coal mining machine control system 2 by real-time data communication Data, the information such as the speed of travel, two rocker arm height, coalcutter current location and coalcutter cutting electric current including coalcutter, meter It calculates mining height of coal mining machine, cut the information such as deep.
Coal amount data computing system 1 and hydraulic support electricity hydraulic control system 3 acquire the passage step pitch of hydraulic support 9, according to pushing away Walk is away from the cutting electric current and the speed of travel for cutting deeply, and passing through coalcutter for calculating coalcutter with coalcutter current location information It is cut as auxiliary parameter verifying deep.
Coal amount data computing system 1 is defeated by the acquirement each variable-frequency motor of drag conveyor 7 of drag conveyor frequency-variable controller 4 Enter electric current, motor speed etc., the current operation speed of drag conveyor is calculated with information such as variable-frequency motor revolving speed, retarder no-load voltage ratios Degree, the input current of variable-frequency motor is the intuitive reaction of drag conveyor load state, due to removing the outside the pale of civilization influence scraper plate of coal quantitative change The factor of conveyer input current variation is more, so input current is only used as the auxiliary ginseng of the reaction real-time coal amount of drag conveyor Number.
Coal amount data computing system 1 acquires the 5 coal amount data of coal amount scanner being mounted on elevating conveyor 8, as coal amount number According to the verifying of computing system calculated result, when verification result is larger there are deviation, other acquisition data, system in integrated system Automatic corrected parameter setting, to guarantee the accurate of calculated result.
The present invention has rational design, and it is convenient to realize, acquires each data using the existing equipment of fully-mechanized mining working, passes through computer Technology realizes the calculating to the real-time coal amount of drag conveyor, can grasp the coal amount data of drag conveyor in real time, is that scraper plate is defeated It send to be adjusted the speed automatically in machine operational process according to coal amount and data basis is provided.
Detailed description of the invention
Fig. 1 is system diagram of the invention.
Fig. 2 is the flow chart of the real-time coal weighing of drag conveyor.
Fig. 3 is the curve graph that the real-time coal amount of drag conveyor is calculated by coalcutter.
In figure: 1 coal amount data computing system, 2 coal mining machine control systems, 3 bracket electricity hydraulic control systems, 4 drag conveyors become Frequency controller, 5 coal amount scanners, 6 coalcutters, 7 drag conveyors, 8 elevating conveyors, 9 hydraulic supports.
Specific embodiment
Invention is further described in detail with specific embodiment with reference to the accompanying drawing:
As shown in Figure 1, the calculation method of the real-time coal amount of a kind of drag conveyor, related equipment include coal amount data meter Calculation system 1, coal mining machine control system 2, bracket electricity hydraulic control system 3, drag conveyor frequency-variable controller 4, coal amount scanner 5 are adopted Coal machine 6, drag conveyor 7, elevating conveyor 8, hydraulic support 9.Coal amount data computing system 1 operates on a flame proof computer, It is mounted at crossheading equipment train, is become by communication acquisition coal mining machine control system 2, bracket electricity hydraulic control system 3, drag conveyor The data of frequency controller 4, coal amount scanner 5, communications protocol and interface are depending on each associate device.Coal mining machine control system 2 It acquires mining height in real time from coalcutter 6, cut the data such as depth, the speed of travel, position, electric current, direction.Bracket electricity hydraulic control system 3 is adopted Collect the data such as passage step pitch, the supporting height of each hydraulic support 9.Drag conveyor frequency-variable controller 4 acquires each variable-frequency motor Input current, motor speed etc..Coal amount scanner 5 is mounted on elevating conveyor 8, detects the coal amount unloaded on drag conveyor, inspection It surveys result to be compared with last stage coal amount on drag conveyor, verifies the accuracy of calculated result.
1, coalcutter cuts deep determination
The passage step pitch of hydraulic support is theoretically that coalcutter cuts deep intuitive reflection, under actual condition, due to branch Occasionally there are large errors deeply for the passage method and sensor error reason of frame, passage step pitch and coalcutter section.Coalcutter cuts deep There are linear relationships with cutting current relationship:
I=aD+b
I coalcutter cutting electric current
A slope
B coalcutter zero load cutting electric current
D coalcutter cuts deep
It can determine a, b in formula according to actual condition.Formula can be according to coal mining machine roller cutting electric current to hydraulic after determining The passage step pitch (i.e. coalcutter cuts deep) of bracket compensates.When cutting electric current is mismatched with section deeply for a long time, then according to electric current Adjustment calculates the coalcutter used when coal amount and cuts deep numerical value.
2, according to coalcutter operating condition to the real-time coal weighing of drag conveyor
Coal amount data computing system 1 carries out real-time coal on calculating drag conveyor according to the coalcutter operation data detected Amount.According to coalcutter operating condition, coal amount under 1 cumulative calculation coalcutter cutting of coal amount data computing system is by coalingging Number, which calculates, adds up coal amount on drag conveyor, remove the reality that the coal amount that drag conveyor is laid down is drag conveyor on this basis When coal amount.It calculates as follows:
1., coalcutter runs in the middle part of drag conveyor
When coalcutter is run to tail direction,
When coalcutter is run to heading,
K coalcutter is coaling coefficient
Q1The coal amount calculated for coalcutter
t0For the benchmark time
t1For time point of coalingging
t2For real-time time
v1The coalcutter speed of service
v2The drag conveyor speed of service
H mining height of coal mining machine
D coalcutter cuts deep
Lt0 t0Moment coal winning machine position
2., coalcutter run to tail after inverted running
After drag conveyor is run to tail, reversely run to head,
K coalcutter is coaling coefficient
Q1The coal amount calculated for coalcutter
t0For the benchmark time
t1For time point of coalingging
t2For real-time time
v1The coalcutter speed of service
v2The drag conveyor speed of service
H mining height of coal mining machine
D coalcutter cuts deep
Lt0 t0Moment coal winning machine position
L face length
3., coalcutter run to head after inverted running
After drag conveyor is run to head, reversely run to tail,
K coalcutter is coaling coefficient
Q1The coal amount calculated for coalcutter
t0For the benchmark time
t1For time point of coalingging
t2For real-time time
v1The coalcutter speed of service
v2The drag conveyor speed of service
H mining height of coal mining machine
D coalcutter cuts deep
Lt0 t0Moment coal winning machine position
Coal amount data computing system 1 chooses the above calculation formula based on above method, through coalcutter real time position. T in formula0The selection at moment can be changed by the coalcutter cycle of operation, but t0It is necessarily less than t1
3, the real-time coal weighing of drag conveyor
Drag conveyor it is straight, without being run under conditions of objective factor when in the case that theoretically speed is certain Electric current and real-time coal amount are linear, it may be assumed that
I2Drag conveyor electric current
Q2The real-time coal amount of drag conveyor calculated according to electric current
M coefficient
I0Drag conveyor no-load current
According to the curvature of drag conveyor in the process of running, the ratio that electric current calculates real-time coal amount is adjusted, obtains meter The real-time coal amount for calculating drag conveyor is as follows:
Q=pQ1+(1-p)Q2
Q calculates the gained real-time coal amount of drag conveyor
Q1The real-time coal amount of drag conveyor calculated by coalcutter
Q2Drag conveyor coal amount is calculated by drag conveyor real-time current
P coalcutter calculates the specific gravity that coal amount accounts for real-time coal weighing
After raw coal is discharged to elevating conveyor by drag conveyor, system is to t1When the coal amount that calculates detected with coal amount scanner 5 Coal amount be compared, when calculating coal magnitude and detected value for a long time there are when larger difference, calculated result is carried out in proportion Amendment.

Claims (3)

1. a kind of calculation method of the real-time coal amount of drag conveyor, it is characterised in that: the following steps are included:
1. coal amount data computing system (1) is become by coal mining machine control system (2), bracket electricity hydraulic control system (3), drag conveyor Frequency controller (4), coal amount scanner (5) etc. acquire mining height during coalcutter (6) mine, cut depth, the speed of travel, position, electricity Stream, direction, drag conveyor (7) speed of service, input current, hydraulic support (9) elapse step pitch, are mounted on elevating conveyor (8) The data such as coal amount scanner (5) coal amount data, provide data basis for the calculating of coal amount data;
2. by mining height of coal mining machine, cutting the data buildings such as depth, the speed of travel, position, electric current, direction and hydraulic support passage step pitch The mathematical model of the real-time coal weighing of drag conveyor:
K is that coalcutter is coaling coefficient in formula, Q1For the coal amount that coalcutter calculates, t0For benchmark time, t1For time point of coalingging, t2For Real-time time, v1The coalcutter speed of service, v2The drag conveyor speed of service, H mining height of coal mining machine, D coalcutter cut deep, Lt0For t0 Moment coal winning machine position;
3. calculating the coal amount on drag conveyor by drag conveyor electric current and the existing relationship of load;Drag conveyor is negative The factor for carrying variation does not only have the variation of coal amount, and there are also the other factors such as drag conveyor curvature, the variation of working face condition, institutes Real-time coal amount a part is only accounted for the coal amount calculated according to curent change;
Drag conveyor it is straight, without being run under conditions of objective factor when electric current in the case that theoretically speed is certain It is linear with real-time coal amount, it may be assumed that
I2Drag conveyor electric current
Q2The real-time coal amount of drag conveyor calculated according to electric current
M coefficient
I0Drag conveyor no-load current
According to the curvature of drag conveyor in the process of running, the ratio that electric current calculates real-time coal amount is adjusted, show that calculating is scraped The real-time coal amount of plate conveyer;
4. calculating the real-time coal amount of drag conveyor according to working face condition and each equipment operation condition:
Q=pQ1+(1-p)Q2
Q is to calculate the gained real-time coal amount of drag conveyor, Q in formula1The real-time coal amount of drag conveyor calculated by coalcutter, Q2By Drag conveyor real-time current calculates drag conveyor coal amount, and p is the specific gravity that coalcutter calculates that coal amount accounts for real-time coal weighing;
5. on the drag conveyor that calculated drag conveyor coal amount and the coal amount scanner being mounted on elevating conveyor detect The coal amount of synchronization is compared, and each parameter in calculation method is adjusted when there is larger difference for a long time, guarantees to calculate As a result accuracy.
2. a kind of calculation method of the real-time coal amount of drag conveyor according to claim 1, characterized in that according to working face The real-time coal amount Q of drag conveyor that condition and the adjustment of each equipment operation condition are calculated according to coalcutter operation1Account for real-time coal amount Q's Specific gravity.
3. the calculation method of the real-time coal amount of a kind of drag conveyor according to claim 1, characterized in that scanned by coal amount Instrument verifies the real-time coal weighing method of drag conveyor.
CN201611271965.XA 2016-12-23 2016-12-23 A kind of calculation method of the real-time coal amount of drag conveyor Active CN106842918B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611271965.XA CN106842918B (en) 2016-12-23 2016-12-23 A kind of calculation method of the real-time coal amount of drag conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611271965.XA CN106842918B (en) 2016-12-23 2016-12-23 A kind of calculation method of the real-time coal amount of drag conveyor

Publications (2)

Publication Number Publication Date
CN106842918A CN106842918A (en) 2017-06-13
CN106842918B true CN106842918B (en) 2019-07-16

Family

ID=59118271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611271965.XA Active CN106842918B (en) 2016-12-23 2016-12-23 A kind of calculation method of the real-time coal amount of drag conveyor

Country Status (1)

Country Link
CN (1) CN106842918B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107697598A (en) * 2017-10-12 2018-02-16 中煤张家口煤矿机械有限责任公司 A kind of frequency conversion drag conveyor Intelligent speed-adjustable control system
CN108491360B (en) * 2018-02-26 2022-04-01 北京天玛智控科技股份有限公司 Coal mining amount calculation method
CN108910405B (en) * 2018-04-13 2020-03-17 宁夏天地奔牛实业集团有限公司 Coal seam height control device on underground mining scraper conveyor and working method thereof
CN110033128B (en) * 2019-03-18 2023-01-31 西安科技大学 Self-adaptive prediction method for scraper conveyor load based on limited Boltzmann machine
CN110040472A (en) * 2019-04-25 2019-07-23 连云港天明装备有限公司 A kind of fully-mechanized mining working frequency conversion scratch board conveyor automatic speed governing device and its method
CN111897376A (en) * 2020-06-10 2020-11-06 常州联力自动化科技有限公司 Automatic speed regulation method for conveyor and coal mining machine without coal flow sensor
CN111689170B (en) * 2020-06-17 2021-11-30 青岛中加特电气股份有限公司 Scraper conveyor and self-adaptive speed regulation method thereof
CN112340387A (en) * 2020-09-30 2021-02-09 中煤科工集团上海有限公司 Belt conveyor intelligent control system and control method based on machine vision
CN114988024A (en) * 2022-06-09 2022-09-02 北京天地华泰矿业管理股份有限公司 Fully mechanized coal mining face scraper conveying speed regulation control system and method
CN116916193B (en) * 2023-09-12 2023-12-12 苏州爱雄斯通信技术有限公司 Coal mining data transmission method for multi-platform collaborative operation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358587A (en) * 2014-09-30 2015-02-18 宁夏天地奔牛实业集团有限公司 Adverse feedback conveying system for working face of underground coal mine
CN104444211A (en) * 2014-09-30 2015-03-25 宁夏天地奔牛实业集团有限公司 Method for intelligently adjusting speed of working face scraper conveyer under coal mine
CN104555343A (en) * 2014-09-30 2015-04-29 宁夏天地奔牛实业集团有限公司 Adaptive intelligent scraper conveyer used for coal mine underground mining face
CN104860030A (en) * 2015-05-14 2015-08-26 中煤张家口煤矿机械有限责任公司 Fully mechanized coal face coal flow monitoring and control system
CN204702158U (en) * 2015-05-14 2015-10-14 中煤张家口煤矿机械有限责任公司 Fully-mechanized mining working coal stream Monitoring and control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358587A (en) * 2014-09-30 2015-02-18 宁夏天地奔牛实业集团有限公司 Adverse feedback conveying system for working face of underground coal mine
CN104444211A (en) * 2014-09-30 2015-03-25 宁夏天地奔牛实业集团有限公司 Method for intelligently adjusting speed of working face scraper conveyer under coal mine
CN104555343A (en) * 2014-09-30 2015-04-29 宁夏天地奔牛实业集团有限公司 Adaptive intelligent scraper conveyer used for coal mine underground mining face
CN104860030A (en) * 2015-05-14 2015-08-26 中煤张家口煤矿机械有限责任公司 Fully mechanized coal face coal flow monitoring and control system
CN204702158U (en) * 2015-05-14 2015-10-14 中煤张家口煤矿机械有限责任公司 Fully-mechanized mining working coal stream Monitoring and control system

Also Published As

Publication number Publication date
CN106842918A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN106842918B (en) A kind of calculation method of the real-time coal amount of drag conveyor
Zeng et al. Measurement of bulk material flow based on laser scanning technology for the energy efficiency improvement of belt conveyors
CN106743339A (en) A kind of method and apparatus for automatically adjusting adhesive tape conveyor speed
CN102183280B (en) Statistical principle and PLC technology-based method for measuring and calculating discharge amount of tobacco shred storage cabinet
CN107544565A (en) A kind of reclaimer feeding flow control methods and feeding flow control system
CN104318396B (en) Coal consumption dispatching method and system
CN104569360A (en) Concrete slump controlling method and system of mixing station
CN105784066B (en) A kind of mine ultra-deep drop shaft material position On-line Measuring Method with Redundancy Design
CN1761860A (en) Device for effecting continuous gravimetric dosing
CN203751864U (en) Discharge device of bearing machine tool
CN102213610A (en) Automatic weighing method and device for various materials
CN203682515U (en) Even feeding device
CN102756904B (en) Bulk material method and system
CN104811106B (en) The method and system of direct current generator closed-loop control
CN108100609A (en) A kind of efficient bulking value concentrates Measurement & automation system
CN103612889A (en) Automatic speed regulating and controlling method of coal mine tape machine conveying system
CN106452429A (en) Method and system for calculating stock volume of storage cabinet based on virtual pulses
CN205620823U (en) Burden level examining device and paver
CN202974268U (en) Working surface topography detection sensor and system
CN203545091U (en) Timber testing and measuring device
KR20100037716A (en) Conveyer belt of moter current comparison to weight measurement equipment
CN103894925A (en) Discharge detecting device of bearing double-end-face processing machine tool
CN105062569B (en) The control method and system of double-fluidized-bed coal gasifying process load
CN104030005A (en) Material location tracking method
CN205771703U (en) Bucket wheel machine feeding revolution border judges control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant