CN106836350A - Rigidity bored concrete pile manufacturing equipment - Google Patents
Rigidity bored concrete pile manufacturing equipment Download PDFInfo
- Publication number
- CN106836350A CN106836350A CN201710179615.9A CN201710179615A CN106836350A CN 106836350 A CN106836350 A CN 106836350A CN 201710179615 A CN201710179615 A CN 201710179615A CN 106836350 A CN106836350 A CN 106836350A
- Authority
- CN
- China
- Prior art keywords
- link arm
- bored concrete
- concrete pile
- pivot pin
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/08—Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/08—Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain
- E02F3/086—Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain vertically shiftable relative to the frame
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/06—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging elements mounted on an endless chain
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
A kind of rigidity bored concrete pile manufacturing equipment for being connected multiple bored concrete piles by H steel, the manufacturing process of the gun iron link bored concrete pile is:Needing the axial location of the multiple bored concrete piles of manufacture, multiple H steel are vertically driven into underground certain depth with equipment of squeezing into, at a distance of a spacing for bored concrete pile between the adjacent H steel of each two, a bored concrete pile is manufactured between the adjacent H steel of each two, the termination for making each bored concrete pile left end is clipped between the wing plate of left end H steel two, the termination of right-hand member is clipped between the wing plate of right-hand member H steel two, is consequently formed H steel by the adjacent bored concrete pile gun iron link of each two together.
Description
Technical field
The present invention relates to a kind of bored concrete pile manufacturing equipment, the rigidity perfusion of particularly a kind of bored concrete pile for manufacturing gun iron link
Stake manufacturing equipment.
Background technology
At present, the connection between many cast-in-place concrete piles is connected by the way of the docking of mutual vertical masonry joint, it is impossible to made
Make the bored concrete pile of rigidity joint.
The content of the invention
The invention provides a kind of rigidity bored concrete pile manufacturing equipment for being connected multiple cast-in-place concrete piles by H steel.
The present invention is achieved through the following technical solutions:
A kind of rigidity bored concrete pile manufacturing equipment for being connected multiple bored concrete piles by H steel, including H steel squeezes into equipment and bored concrete pile manufacture
Equipment.
The structure of bored concrete pile manufacturing equipment includes:The drilling rod that top is set;
One piece of connection is fixed in the drilling rod bottom, and the lower end of connection is fixed on the first link arm, and the first link arm bottom sets the 3rd
Link arm;
The left part of first link arm and the 3rd link arm sets the right part of the second link arm, first link arm and the 3rd link arm
4th link arm is set;
The left end of first link arm is fixed with the upper end of the second link arm, and the upper end of the right-hand member of the first link arm and the 4th link arm is consolidated
Fixed, left end and the lower end of the second link arm of the 3rd link arm are fixed, and right-hand member and the lower end of the 4th link arm of the 3rd link arm are fixed.
First link arm, the second link arm, the 3rd link arm and the 4th link arm are fixed into a rectangular frame;
The left upper end of the rectangular frame sets the first pivot pin, and the lower-left end of the rectangular frame sets the second pivot pin, the square
The upper right side of shape framework sets the 4th pivot pin, and the bottom righthand side of the rectangular frame sets the 3rd pivot pin;
The front portion of first pivot pin is provided with the first driving wheel, and the rear portion of the first pivot pin is provided with the 4th driven pulley;
The front portion of second pivot pin is provided with the first driven pulley, and the rear portion of the second pivot pin is provided with the 5th driven pulley;
The front portion of the 3rd pivot pin is provided with the second driven pulley, and the rear portion of the 3rd pivot pin is provided with the 6th driven pulley;
The front portion of the 4th pivot pin is provided with the 3rd driven pulley, and the rear portion of the 4th pivot pin is provided with the second driving wheel;
First driving wheel, the first driven pulley, the second driven pulley and the 3rd driven wheels into round rectangle around surround
First digger chain;
Second driving wheel, the 4th driven pulley, the 5th driven pulley and the 6th driven wheels into round rectangle around surround
Second digger chain;
Multiple first digger blades are installed on first digger chain;
Multiple second digger blades are installed on second digger chain;
First driving wheel is driven by the first motor;Second driving wheel is driven by the second motor.
The invention has the advantages that:
Be rigidly connected for the adjacent bored concrete pile of each two by H steel of the present invention, forms gun iron link bored concrete pile.
Brief description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is the front view of bored concrete pile equipment;
Fig. 2 is the rearview of bored concrete pile equipment;
Fig. 3 is A-A views of Fig. 1;
Fig. 4 is B-B views of Fig. 1;
Fig. 5 is C-C views of Fig. 1;
Fig. 6 is H steel and the rigidly connected sectional view of bored concrete pile.
In figure:1. drilling rod, 2. connects, 3. the first link arm, 4. the second link arm, 5. the 3rd link arm, 6. the 4th link arm, and 7. first
Pivot pin, 8. the second pivot pin, 9. the 3rd pivot pin, 10. the 4th pivot pin, 11. first driving wheels, 12. first driven pulleys, 13. second from
Driving wheel, 14. the 3rd driven pulleys, 15. bucket casees, 16. first digger chains, 17. first digger blades, 18. second digger chains, 19. second
Digger blade, 20. second driving wheels, 21. the 4th driven pulleys, 22. the 5th driven pulleys, 23. the 6th driven pulleys.
Specific embodiment
Accompanying drawing is a kind of specific embodiment of the invention, and the embodiment squeezes into equipment and bored concrete pile manufacturing equipment including H steel.
The structure of bored concrete pile manufacturing equipment includes:The drilling rod 1 that top is set;
One piece of connection 2 is fixed in the drilling rod bottom, and the lower end of connection is fixed on the first link arm 3, and the first link arm bottom sets the
Three link arms 5;
The left part of first link arm and the 3rd link arm sets the right side of the second link arm 4, first link arm and the 3rd link arm
Portion sets the 4th link arm 6;
The left end of first link arm is fixed with the upper end of the second link arm, and the upper end of the right-hand member of the first link arm and the 4th link arm is consolidated
Fixed, left end and the lower end of the second link arm of the 3rd link arm are fixed, and right-hand member and the lower end of the 4th link arm of the 3rd link arm are fixed.
First link arm, the second link arm, the 3rd link arm and the 4th link arm are fixed into a rectangular frame;
The left upper end of the rectangular frame sets the first pivot pin 7, and the lower-left end of the rectangular frame sets the second pivot pin 8, described
The upper right side of rectangular frame sets the 4th pivot pin 10, and the bottom righthand side of the rectangular frame sets the 3rd pivot pin 9;
The front portion of first pivot pin is provided with the first driving wheel 11, and the rear portion of the first pivot pin is provided with the 4th driven pulley 21;
The front portion of second pivot pin is provided with the first driven pulley 12, and the rear portion of the second pivot pin is provided with the 5th driven pulley 22;
The front portion of the 3rd pivot pin is provided with the second driven pulley 13, and the rear portion of the 3rd pivot pin is provided with the 6th driven pulley 23;
The front portion of the 4th pivot pin is provided with the 3rd driven pulley 14, and the rear portion of the 4th pivot pin is provided with the second driving wheel 20;
First driving wheel, the first driven pulley, the second driven pulley and the 3rd driven wheels into round rectangle around surround
First digger chain 16;
Second driving wheel, the 4th driven pulley, the 5th driven pulley and the 6th driven wheels into round rectangle around surround
Second digger chain 18;
Multiple first digger blades 17 are installed on first digger chain;
Multiple second digger blades 19 are installed on second digger chain;
First driving wheel is driven by the first motor;Second driving wheel is driven by the second motor.
When the bored concrete pile equipment works, the first motor drives the first driving wheel, the first digger chain to rotate forward, the second motor belt motor
Dynamic second driving wheel, the reversion of the second digger chain, in rotation process, on the first digger blade and the second digger chain on the first digger chain
The second digger blade excavate the soil body rotate to bucket case top, the soil body in digger blade pour into bucket case in, bucket case fill after, will
Bored concrete pile equipment proposes outside hole that outwell the soil body in bucket case, bored concrete pile equipment is returned in hole, continues to cut the earth, until manufacture
Pore-forming, disposes steel reinforcement cage, concrete perfusion to produce cast-in-place concrete pile in hole.
The manufacturing process of gun iron link bored concrete pile is:Needing the axial location of the multiple bored concrete piles of manufacture, with squeezing into equipment
Multiple H steel are vertically driven into underground certain depth, at a distance of a spacing for bored concrete pile between the adjacent H steel of each two, every
A bored concrete pile is manufactured between two adjacent H steel, the termination for making each bored concrete pile left end is clipped between the wing plate of left end H steel two,
The termination of right-hand member is clipped between the wing plate of right-hand member H steel two, is consequently formed H steel by the adjacent bored concrete pile gun iron link of each two one
Rise.
Claims (4)
1. a kind of rigidity bored concrete pile manufacturing equipment for being connected multiple bored concrete piles by H steel, including H steel squeezes into equipment and bored concrete pile system
Manufacturing apparatus;It is characterized in that:
The structure of the bored concrete pile manufacturing equipment includes:The drilling rod that top is set(1);
One piece of connection is fixed in the drilling rod bottom(2), the lower end of connection is fixed on the first link arm(3)On, the first link arm bottom sets
Put the 3rd link arm(5);
The left part of first link arm and the 3rd link arm sets the second link arm(4), first link arm and the 3rd link arm
Right part sets the 4th link arm(6);
The left end of first link arm is fixed with the upper end of the second link arm, and the upper end of the right-hand member of the first link arm and the 4th link arm is consolidated
Fixed, left end and the lower end of the second link arm of the 3rd link arm are fixed, and right-hand member and the lower end of the 4th link arm of the 3rd link arm are fixed.
2. the first link arm, the second link arm, the 3rd link arm and the 4th link arm are fixed into a rectangular frame described in;
The left upper end of the rectangular frame sets the first pivot pin(7), the lower-left end of the rectangular frame sets the second pivot pin(8),
The upper right side of the rectangular frame sets the 4th pivot pin(10), bottom righthand side the 3rd pivot pin of setting of the rectangular frame(9);
The front portion of first pivot pin is provided with the first driving wheel(11), the rear portion of the first pivot pin is provided with the 4th driven pulley(21);
The front portion of second pivot pin is provided with the first driven pulley(12), the rear portion of the second pivot pin is provided with the 5th driven pulley(22);
The front portion of the 3rd pivot pin is provided with the second driven pulley(13), the rear portion of the 3rd pivot pin is provided with the 6th driven pulley(23);
The front portion of the 4th pivot pin is provided with the 3rd driven pulley(14), the rear portion of the 4th pivot pin is provided with the second driving wheel(20);
First driving wheel, the first driven pulley, the second driven pulley and the 3rd driven wheels into round rectangle around surround
First digger chain(16);
Second driving wheel, the 4th driven pulley, the 5th driven pulley and the 6th driven wheels into round rectangle around surround
Second digger chain(18);
Multiple first digger blades are installed on first digger chain(17);
Multiple second digger blades are installed on second digger chain(19);
When the bored concrete pile equipment works, the first motor drives the first driving wheel, the first digger chain to rotate forward, and the second motor drives the
Two driving wheels, the reversion of the second digger chain, in rotation process, on the first digger blade and the second digger chain on the first digger chain the
The soil body that two digger blades are excavated rotates to the top of bucket case, and the soil body in digger blade is poured into bucket case, after bucket case is filled, will be irrigated
Stake equipment proposes outside hole that outwell the soil body in bucket case, bored concrete pile equipment is returned in hole, continues to cut the earth, until manufacture pore-forming,
Steel reinforcement cage, concrete perfusion is disposed to produce cast-in-place concrete pile in hole;
The manufacturing process of the gun iron link bored concrete pile is:Needing the axial location of the multiple bored concrete piles of manufacture, with squeezing into equipment
Multiple H steel are vertically driven into underground certain depth, at a distance of a spacing for bored concrete pile between the adjacent H steel of each two, every
A bored concrete pile is manufactured between two adjacent H steel, the termination for making each bored concrete pile left end is clipped between the wing plate of left end H steel two,
The termination of right-hand member is clipped between the wing plate of right-hand member H steel two, is consequently formed H steel by the adjacent bored concrete pile gun iron link of each two one
Rise.
3. a kind of rigidity bored concrete pile manufacturing equipment according to claim 1, it is characterised in that:The of the bored concrete pile equipment
One driving wheel is driven by the first motor.
4. a kind of rigidity bored concrete pile manufacturing equipment according to claim 1, it is characterised in that:The of the bored concrete pile equipment
Two driving wheels are driven by the second motor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710179615.9A CN106836350A (en) | 2017-03-23 | 2017-03-23 | Rigidity bored concrete pile manufacturing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710179615.9A CN106836350A (en) | 2017-03-23 | 2017-03-23 | Rigidity bored concrete pile manufacturing equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106836350A true CN106836350A (en) | 2017-06-13 |
Family
ID=59129648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710179615.9A Withdrawn CN106836350A (en) | 2017-03-23 | 2017-03-23 | Rigidity bored concrete pile manufacturing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836350A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106988366A (en) * | 2017-04-19 | 2017-07-28 | 姜西忠 | A kind of mismatch wall manufacture machinery |
CN108130928A (en) * | 2018-01-26 | 2018-06-08 | 宋伟友 | Bored concrete pile equipment |
-
2017
- 2017-03-23 CN CN201710179615.9A patent/CN106836350A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106988366A (en) * | 2017-04-19 | 2017-07-28 | 姜西忠 | A kind of mismatch wall manufacture machinery |
CN108130928A (en) * | 2018-01-26 | 2018-06-08 | 宋伟友 | Bored concrete pile equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106836350A (en) | Rigidity bored concrete pile manufacturing equipment | |
CN105586872A (en) | Rectangular lock-buckling equipment for L piles and rectangular piles | |
CN105603994A (en) | Pi-pile and rectangular-pile V-shaped buckling equipment | |
CN105507272A (en) | Rectangular inserting equipment with L-shaped piles and rectangular piles | |
CN105442547A (en) | V-shaped inserting-connection equipment for L-shaped piles and rectangular piles | |
CN105625377A (en) | V-shaped inserting head pile stirring and drilling machine | |
CN105603972A (en) | Pi-pile and rectangular-pile V-shaped buckling equipment | |
CN105442546A (en) | V-shaped buckling equipment for L-shaped piles and rectangular piles | |
CN105625309A (en) | Rectangular plugging equipment for H piles and rectangular piles | |
CN106930340A (en) | Hole milling equipment | |
CN105649049A (en) | V-shaped connection pile stirring drilling machine | |
CN105442548A (en) | V-shaped inserting-connection equipment for L-shaped piles and rectangular piles | |
CN105625324A (en) | Circular arc inserting-connection equipment for H-shaped piles and rectangular piles | |
CN105568981A (en) | Arc inserting and connecting device for L-shaped piles and rectangular piles | |
CN105625376A (en) | V-shaped splicing pile drilling and stirring machine | |
CN106978831A (en) | A kind of arrangement and method for construction of floor steel pipe fore shaft enclosure wall | |
CN105603993A (en) | Pi-pile and rectangular-pile arc insertion and buckling equipment | |
CN105649040A (en) | Wedge-shaped splicing equipment for n-shaped piles and rectangular piles | |
CN105625343A (en) | V-shaped eye-splicing equipment for L-shaped piles and rectangular piles | |
CN105625372A (en) | Pile forming machine for square and round combined piles | |
CN105507282A (en) | Arc inserting equipment for L-shaped piles and rectangular piles | |
CN105586875A (en) | V-shaped insertion-buckling equipment for L piles and rectangular piles | |
CN105421399A (en) | Rectangular inserting device for cross pile and rectangular pile | |
CN105625334A (en) | Cross pile and rectangular pile rectangular insertion equipment | |
CN105649051A (en) | T-shaped inserting and buckling pile stirring drilling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170613 |
|
WW01 | Invention patent application withdrawn after publication |