CN106836181A - A kind of filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill - Google Patents

A kind of filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill Download PDF

Info

Publication number
CN106836181A
CN106836181A CN201710021684.7A CN201710021684A CN106836181A CN 106836181 A CN106836181 A CN 106836181A CN 201710021684 A CN201710021684 A CN 201710021684A CN 106836181 A CN106836181 A CN 106836181A
Authority
CN
China
Prior art keywords
cofferdam
construction
beach
hydraulic reclamation
guard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710021684.7A
Other languages
Chinese (zh)
Other versions
CN106836181B (en
Inventor
李超超
周永福
冯理耀
杨刚
邓峰
刘云峰
曹忠辉
张鸣
张一鸣
丁建阳
刘祖钰
王昭阳
扬程开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
CCCC TDC Binhai Environmental Channel Dredging Co Ltd
CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd
CCCC National Engineering Research Center of Dredging Technology and Equipment Co Ltd
CCCC TDC Environmental Engineering Co Ltd
CCCC TDC Southern Communications Construction Co Ltd
Original Assignee
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
CCCC TDC Binhai Environmental Channel Dredging Co Ltd
CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd
CCCC TDC Environmental Engineering Co Ltd
CCCC TDC Southern Communications Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Dredging Co Ltd, CCCC Tianjin Harbour Engineering Co Ltd, CCCC TDC Binhai Environmental Channel Dredging Co Ltd, CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd, CCCC TDC Environmental Engineering Co Ltd, CCCC TDC Southern Communications Construction Co Ltd filed Critical CCCC Tianjin Dredging Co Ltd
Priority to CN201710021684.7A priority Critical patent/CN106836181B/en
Publication of CN106836181A publication Critical patent/CN106836181A/en
Application granted granted Critical
Publication of CN106836181B publication Critical patent/CN106836181B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Revetment (AREA)

Abstract

The invention discloses it is a kind of for dredge fill fill out go along with sb. to guard him it is synchronous carry out construction method,(1)Operating reserves;(2)Twist and inhale ship hydraulic reclamation;(3)Cofferdam construction;(4)The protection in cofferdam.The present invention is for the soil property that dredging markets are that sandstone etc. is not easily runed off, synchronously carried out using cofferdam construction and strand are inhaled into ship dredge fill, can effectively solve the problems, such as that construction area cofferdam filler is deficient, and effectively improve efficiency of construction and make full use of field resources and reduce engineering cost.

Description

A kind of filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill
Technical field
The invention belongs to technical field of construction, it is related to a kind of filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill.
Background technology
Traditional strand inhales ship dredging and reclamation construction method, is first to specify to need to form the region of land-based area in design, using throwing Stone, sand filling bag, the method such as banket form a cofferdam for closing in its surrounding, then lay hydraulic reclamation pipeline and are inhaled ship and excavated by twisting Dredging markets after moisture is drained, form land-based area using in waterpower hydraulic reclamation to the closing cofferdam by the native stone for leaving.But entering During row offshore off-lying sea man-made island engineering construction, construction area periphery is all without enough or at all with regard to no soil sand building stones for closing Cofferdam is filled, and such engineering is away from inland, if carry out cofferdam construction from inland transport soil sand building stones, not only serious shadow Construction speed is rung, and the construction cost of engineering can be greatly improved.
The content of the invention
Deficiency it is an object of the invention to be directed to existing construction method, there is provided one kind is that sandstone etc. is difficult in face of dredging markets During the soil property of loss, can effectively improve efficiency of construction and make full use of field resources and reduce engineering cost for hydraulic reclamation The filling out of construction is gone along with sb. to guard him and synchronous carries out construction method.
To achieve these goals, present invention employs following technical scheme:
A kind of filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill, it is characterised in that:The method is comprised the following steps:
(1)Operating reserves:
Water-depth measurement is carried out to construction area, it is determined that twist inhaling ship stationary point position;
Scene carries out drill hole sampling to geology, determines soil property situation;
According to soil property situation, it is determined that the slope ratio for inhaling ship hydraulic reclamation into beach is twisted, with reference to hydraulic reclamation height and the bounds of formation land-based area, meter The position that cofferdam should lay is calculated, quantity and the position of line layout is determined therefrom that;
(2)Twist and inhale ship hydraulic reclamation
After completing above-mentioned line layout, strand suction ship is marched into the arena and carries out dredge fill;
Height of beach to be formed exceedes mean high water level (M.H.W.L.) 1m, and beach toe exceedes design cofferdam outward flange 1m, you can opened Open up the construction in cofferdam;
(3)Cofferdam construction
Mechanized construction is carried out using the section construction of Temporary Cofferdam;
The construction in cofferdam will be configured with reference to the axis trend of permanent shore protection to greatest extent, it is to avoid the trouble of Secondary Transport; Simultaneously cofferdam construction progress all the time main points prior to cofferdam into beach progress;
(4)The protection in cofferdam
Should be in one layer of anti-aging geotextiles of cofferdam bedding after the completion of cofferdam, it is to avoid the common geotextiles for cofferdam construction receive illumination Occur aging;Using concrete geotextile tube bag protection lateral surface, it is to avoid washed away by stormy waves by cofferdam.
Further, described step(2)Detection is carried out during suction ship hydraulic reclamation is twisted, the beach formed to hydraulic reclamation The ground gradient is measured, and is then contrasted with former design value, to be corrected in good time in the case where there is gap;
According to design hydraulic reclamation absolute altitude and with reference to actual hydraulic reclamation settling amount, outlet spout beach face elevation control is adjusted, can be effective Ensure the flatness of hydraulic reclamation and control earthwork balance.
Further, described step(3)Middle cofferdam construction progress all the time main points prior to cofferdam into beach progress, it is desirable to Cofferdam length growth is faster than beach and forms 70-130m.The loss of hydraulic reclamation can so be reduced and the efficiency of synchronous construction is improved.
Beneficial effects of the present invention:
The present invention inhales ship dredge fill synchronization for the soil property that dredging markets are that sandstone etc. is not easily runed off using by cofferdam construction and strand Carry out, can effectively solve the problems, such as that construction area cofferdam filler is deficient, and effectively improve efficiency of construction and fully profit Engineering cost is reduced with field resources.
Brief description of the drawings
Fig. 1 is using the site operation figure of construction method of the present invention.
Identified in figure:1- is twisted and is inhaled ship, the cofferdam of 2- constructions, the beach of 3- formation, cofferdam, the 5- mouths of pipe of 4- designs.
Specific embodiment
It is described in further detail to specific embodiment of the invention below.
A kind of filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill, it is characterised in that:The method includes following step Suddenly:
(1)Operating reserves:
Water-depth measurement is carried out to construction area, it is determined that twist inhaling ship stationary point position;
Scene carries out drill hole sampling to geology, determines soil property situation;
According to soil property situation, it is determined that the slope ratio for inhaling ship hydraulic reclamation into beach is twisted, with reference to hydraulic reclamation height and the bounds of formation land-based area, meter The position that cofferdam should lay is calculated, quantity and the position of line layout is determined therefrom that;Hydraulic reclamation shaping is set according to different great soil groups The ratio of slope on beach, such as following table:
Great soil group The ratio of slope
Mud, silt 1:100~1:300
Fine sand 1:50~1:100
Middle sand 1:25~1:50
Coarse sand 1:10~1:25
Gravel 1:5-1:10
(2)Twist and inhale ship hydraulic reclamation
After completing above-mentioned line layout, strand suction ship is marched into the arena and carries out dredge fill;
Height of beach to be formed exceedes mean high water level (M.H.W.L.) 1m, and beach toe exceedes design cofferdam outward flange 1m, you can opened Open up the construction in cofferdam;
(3)Cofferdam construction
Mechanized construction is carried out using the section construction of Temporary Cofferdam;
The construction in cofferdam will be configured with reference to the axis trend of permanent shore protection to greatest extent, it is to avoid the trouble of Secondary Transport; Simultaneously cofferdam construction progress all the time main points prior to cofferdam into beach progress;
(4)The protection in cofferdam
Should be in one layer of anti-aging geotextiles of cofferdam bedding after the completion of cofferdam, it is to avoid the common geotextiles for cofferdam construction receive illumination Occur aging;Using concrete geotextile tube bag protection lateral surface, it is to avoid washed away by stormy waves by cofferdam.
Further, described step(2)Detection is carried out during suction ship hydraulic reclamation is twisted, the beach formed to hydraulic reclamation The ground gradient is measured, and is then contrasted with former design value, to be corrected in good time in the case where there is gap;
According to design hydraulic reclamation absolute altitude and with reference to actual hydraulic reclamation settling amount, outlet spout beach face elevation control is adjusted, can be effective Ensure the flatness of hydraulic reclamation and control earthwork balance.
In the case of conditions permit, docking one sebific duct can be saved in the middle of the section steel pipe of the mouth of pipe first and second, then use excavator Adjustment mouth of pipe direction, hydraulic reclamation beach face area is expanded so as to reach, and further increases the flatness on hydraulic reclamation mouth of pipe periphery.
Further, described step(3)Middle cofferdam construction progress all the time main points prior to cofferdam into beach progress, it is desirable to Cofferdam length growth is faster than beach and forms 70-130m.The loss of hydraulic reclamation can so be reduced and the efficiency of synchronous construction is improved.
Embodiment described above, simply more preferably one of concrete mode of the invention, those skilled in the art are in the present invention The usual variations and alternatives carried out in the range of technical scheme all should be comprising within the scope of the present invention.

Claims (3)

1. a kind of filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill, it is characterised in that:The method is comprised the following steps:
(1)Operating reserves:
Water-depth measurement is carried out to construction area, it is determined that twist inhaling ship stationary point position;
Scene carries out drill hole sampling to geology, determines soil property situation;
According to soil property situation, it is determined that the slope ratio for inhaling ship hydraulic reclamation into beach is twisted, with reference to hydraulic reclamation height and the bounds of formation land-based area, meter The position that cofferdam should lay is calculated, quantity and the position of line layout is determined therefrom that;
(2)Twist and inhale ship hydraulic reclamation
After completing above-mentioned line layout, strand suction ship is marched into the arena and carries out dredge fill;
Height of beach to be formed exceedes mean high water level (M.H.W.L.) 1m, and beach toe exceedes design cofferdam outward flange 1m, you can opened Open up the construction in cofferdam;
(3)Cofferdam construction
Mechanized construction is carried out using the section construction of Temporary Cofferdam;
The construction in cofferdam will be configured with reference to the axis trend of permanent shore protection to greatest extent, it is to avoid the trouble of Secondary Transport; Simultaneously cofferdam construction progress all the time main points prior to cofferdam into beach progress;
(4)The protection in cofferdam
Should be in one layer of anti-aging geotextiles of cofferdam bedding after the completion of cofferdam, it is to avoid the common geotextiles for cofferdam construction receive illumination Occur aging;Using concrete geotextile tube bag protection lateral surface, it is to avoid washed away by stormy waves by cofferdam.
2. filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill according to claim 1, it is characterised in that:It is described The step of(2)Detection is carried out during suction ship hydraulic reclamation is twisted, the beach gradient that hydraulic reclamation is formed is measured, then with original Design value is contrasted, and to be corrected in good time in the case where there is gap;
According to design hydraulic reclamation absolute altitude and with reference to actual hydraulic reclamation settling amount, outlet spout beach face elevation control is adjusted, can be effective Ensure the flatness of hydraulic reclamation and control earthwork balance.
3. filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill according to claim 1, it is characterised in that:It is described The step of(3)Middle cofferdam construction progress all the time main points prior to cofferdam into beach progress, it is desirable to cofferdam length increase be faster than beach shape Into 70-130m.
CN201710021684.7A 2017-01-12 2017-01-12 Filling and enclosing construction method for hydraulic filling construction Active CN106836181B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710021684.7A CN106836181B (en) 2017-01-12 2017-01-12 Filling and enclosing construction method for hydraulic filling construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710021684.7A CN106836181B (en) 2017-01-12 2017-01-12 Filling and enclosing construction method for hydraulic filling construction

Publications (2)

Publication Number Publication Date
CN106836181A true CN106836181A (en) 2017-06-13
CN106836181B CN106836181B (en) 2020-02-18

Family

ID=59124922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710021684.7A Active CN106836181B (en) 2017-01-12 2017-01-12 Filling and enclosing construction method for hydraulic filling construction

Country Status (1)

Country Link
CN (1) CN106836181B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101377077A (en) * 2007-08-29 2009-03-04 林佳栋 Blowing, filling, stacking , loading, precipitating, pre-pressing and strong tamping combined soft soil foundation treating method
CN102493396A (en) * 2011-11-22 2012-06-13 中交一航局第四工程有限公司 Construction method of backfill in layers for sea reclamation
CN103821105A (en) * 2014-03-03 2014-05-28 中交上海航道勘察设计研究院有限公司 Method for building dike by filling geotextile bag with silt
CN106120825A (en) * 2016-08-22 2016-11-16 中交天航港湾建设工程有限公司 Small-sized cutter suction dredger is utilized to set construction system and the method for filling sack cofferdam
CN106223308A (en) * 2016-08-26 2016-12-14 上海建工集团股份有限公司 A kind of vacuum combined water that covers loads pre-pressing system and construction method thereof
CN106320261A (en) * 2016-08-22 2017-01-11 中交天航港湾建设工程有限公司 Ultra-long harbor basin slope excavation construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101377077A (en) * 2007-08-29 2009-03-04 林佳栋 Blowing, filling, stacking , loading, precipitating, pre-pressing and strong tamping combined soft soil foundation treating method
CN102493396A (en) * 2011-11-22 2012-06-13 中交一航局第四工程有限公司 Construction method of backfill in layers for sea reclamation
CN103821105A (en) * 2014-03-03 2014-05-28 中交上海航道勘察设计研究院有限公司 Method for building dike by filling geotextile bag with silt
CN106120825A (en) * 2016-08-22 2016-11-16 中交天航港湾建设工程有限公司 Small-sized cutter suction dredger is utilized to set construction system and the method for filling sack cofferdam
CN106320261A (en) * 2016-08-22 2017-01-11 中交天航港湾建设工程有限公司 Ultra-long harbor basin slope excavation construction method
CN106223308A (en) * 2016-08-26 2016-12-14 上海建工集团股份有限公司 A kind of vacuum combined water that covers loads pre-pressing system and construction method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴子华等: "赣江生米九龙湖段河道疏浚及滩涂填筑工程施工", 《广西水利水电》 *
杨光煦著: "《岩土工程关键技术研究与实践》", 31 August 2016, 中国水利水电出版社 *

Also Published As

Publication number Publication date
CN106836181B (en) 2020-02-18

Similar Documents

Publication Publication Date Title
CN104846787B (en) Construction method for carrying out sand-blowing sea-filling land-making in shallow sea area by using cutter suction dredger
CN205077453U (en) Dam structure that panel rock -fill dam and upstream cofferdam combine
CN106801424A (en) A kind of cofferdam construction method
WO2020248596A1 (en) Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method
CN101422094A (en) Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area
CN109736338A (en) A kind of hydraulic engineering foundation pit pipe well combination light well point Yield rainfall relation method
CN102926376A (en) Treatment method for soft soil foundation in coastal reclamation region
CN101851929B (en) Multi-stage light well point dewatering construction process for Yellow River flood plain bearing platform construction
CN107761670A (en) Stockyard dischargeable capacity method for optimally controlling based on the control of dredged mud original state
CN110130376A (en) A kind of method of tailing back production ground water drainage
CN105951667B (en) Using mud filling tube bag in enclosing tideland for cultivation region pre- profit retention river structure
CN104929141B (en) Town road passes through the construction method of river embankment or irrigation canals and ditches
CN106761914B (en) A kind of routed water water damage prevention and controls of shallow buried coal seam mine raceway groove flood
CN109469066A (en) Earthmoving machinery combines excavation construction method and system with hydraulic tunneling boring solid
CN106836181A (en) A kind of filling out to go along with sb. to guard him and synchronous carry out construction method for dredge fill
CN104358231B (en) A kind of Underwater Slope mold-bagged concrete reinforced construction method
CN110185051A (en) Deep narrow excavation water discharge method
CN110106886A (en) A kind of deep pit digging method of underground high water level
CN102995646B (en) Net cage protection pad type revetment structure and construction method thereof
CN107642065A (en) A kind of dredging and reclamation fills sand pocket construction technology
CN204899930U (en) Secretly dig leading dry out well in subway hole
CN208563278U (en) The rainy season construction structure of major diameter vertical shaft in a kind of soft soil layer
CN206693206U (en) A kind of Tailings Dam bottom storehouse row oozes system
CN107130644A (en) Coffering composite geo-membrane and gravelly clay combination against seepage construction method
CN210068175U (en) A protective structure for preventing tunnel slip casting reinforcement from arousing earth's surface uplift

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211011

Address after: 518000 rooms 2106, 2107, 2108, 2109 and 2110, XinZhuYuan, Nonglin Road, Futian District, Shenzhen, Guangdong Province

Patentee after: CCCC TDC SOUTHERN COMMUNICATIONS CONSTRUCTION Co.,Ltd.

Patentee after: CCCC TIANJIN DREDGING Co.,Ltd.

Patentee after: CCCC-TDC ENVIRONMENTAL ENGINEERING Co.,Ltd.

Patentee after: CCCC-TDC BINHAI ENVIRONMENTAL CHANNEL DREDGING Co.,Ltd.

Patentee after: CCCC TIANJIN DREDGING HARBOUR CONSTRUCTION ENGINEERING Co.,Ltd.

Patentee after: CCCC TIANJIN PORT & WATERWAY PROSPECTION & DESIGN RESEARCH INSTITUTE Co.,Ltd.

Patentee after: NATIONAL ENGINEERING RESEARCH CENTER OF DREDGING TECHNOLOGY AND EQUIPMENT

Address before: 518000 rooms 2106, 2107, 2108, 2109 and 2110, XinZhuYuan, Nonglin Road, Futian District, Shenzhen, Guangdong Province

Patentee before: CCCC TDC SOUTHERN COMMUNICATIONS CONSTRUCTION Co.,Ltd.

Patentee before: CCCC TIANJIN DREDGING Co.,Ltd.

Patentee before: CCCC-TDC ENVIRONMENTAL ENGINEERING Co.,Ltd.

Patentee before: CCCC-TDC BINHAI ENVIRONMENTAL CHANNEL DREDGING Co.,Ltd.

Patentee before: CCCC TIANJIN DREDGING HARBOUR CONSTRUCTION ENGINEERING Co.,Ltd.

Patentee before: CCCC TIANJIN PORT & WATERWAY PROSPECTION & DESIGN RESEARCH INSTITUTE Co.,Ltd.