CN106835882B CN201710152494.9A CN201710152494A CN106835882B CN 106835882 B CN106835882 B CN 106835882B CN 201710152494 A CN201710152494 A CN 201710152494A CN 106835882 B CN106835882 B CN 106835882B
Authority
CN
China
Prior art keywords
butadiene
cement
styrene latex
stabilized macadam
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710152494.9A
Other languages
Chinese (zh)
Other versions
CN106835882A (en
Inventor
刘利军
齐连超
袁明傲
赖利贝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd Of Cccc Third Highway Engineering Co ltd
CCCC Third Highway Engineering Co Ltd
Original Assignee
CCCC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Highway Engineering Co Ltd filed Critical CCCC Third Highway Engineering Co Ltd
Priority to CN201710152494.9A priority Critical patent/CN106835882B/en
Publication of CN106835882A publication Critical patent/CN106835882A/en
Application granted granted Critical
Publication of CN106835882B publication Critical patent/CN106835882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of Crack of Cement-Stabilized Macadam Base control methods, it include: Step 1: preparing butadiene-styrene latex ball using butadiene-styrene latex; butadiene-styrene latex ball is the sphere by several line style interconnecting pieces inner hollow interlaced with each other being formed by connecting; the diameter of line style interconnecting piece is 0.6-1mm, and the diameter of butadiene-styrene latex ball is 2-3cm;Step 2: being added butadiene-styrene latex ball into cement stabilized macadam, the mass ratio of butadiene-styrene latex ball and cement stabilized macadam is 0.004-0.006:1, adds water and gathers materials, uniform mixing, so that Cement Stable Macadam Mixture be prepared;Step 3: Cement Stable Macadam Mixture is paved and rolled again, base is formed;Step 4: being conserved to the base that step 3 obtains.The present invention in cement stabilized macadam by adding butadiene-styrene latex ball, and the base being finally made can show good compactness, cohesive force and integral strength, to reduce the generation in crack.

Description

A kind of Crack of Cement-Stabilized Macadam Base control method
Technical field
The present invention relates to a kind of Crack of Cement-Stabilized Macadam Base control methods.
Background technique
Cement stabilized macadam base is high with early strength, globality is strong, anti-ice freezing stability is good, scour resistance is good, The advantages that fatigue-resistance characteristics are good, construction quality is easily controllable can bear bigger Vehicle Load, be adapted to heavy traffic Demand, therefore be widely applied in China Higher grade road base layer.
However most outstanding problem existing for cement stabilized macadam base is that crack resistance is poor, material has centainly crisp Property, it is stronger to temperature, moisture sensitivity, in actual application, it is easy to shrink generation under the alternating variation of temperature and humidity Crack.Under the such environmental effects of vehicular load and mechanical periodicity repeatedly, the crack tip meeting of cement stabilized macadam base It generates biggish stress to concentrate, in turn results in basic crack and reflected upwards along surface layer bottom, form reflection crack.Reflection crack Appearance enters road surface structare layer for surface water and provides channel, since the surface water of entrance cannot be discharged in time and is trapped in face Between layer and base, the flowing pressure generated under the repeated action of vehicular load washes away base, and base material is caused to fall off pine It dissipates;The cohesive force of base and surface layer declines simultaneously, and road surface structare layer bearing capacity reduces, and eventually leads to road surface structare layer globality Damage.
Summary of the invention
In view of the above technical problems, the present invention, which has designed and developed one kind, can be effectively reduced Crack of Cement-Stabilized Macadam Base The Crack of Cement-Stabilized Macadam Base control method of generation.
Technical solution provided by the invention are as follows:
A kind of Crack of Cement-Stabilized Macadam Base control method, comprising:
Step 1: prepare butadiene-styrene latex ball using butadiene-styrene latex, the butadiene-styrene latex ball be by several line style interconnecting pieces that The sphere of inner hollow made of this is cross-linked, the diameter of the line style interconnecting piece are 0.6-1mm, the butadiene-styrene latex ball Diameter is 2-3cm;
Step 2: butadiene-styrene latex ball is added into cement stabilized macadam, the matter of butadiene-styrene latex ball and cement stabilized macadam Amount ratio is 0.004-0.006:1, adds water and gathers materials, uniform mixing, so that Cement Stable Macadam Mixture be prepared;
Step 3: Cement Stable Macadam Mixture is paved and rolled again, base is formed;
Step 4: being conserved to the base that step 3 obtains.
Preferably, in the Crack of Cement-Stabilized Macadam Base control method, in the step 2, butadiene-styrene latex ball Mass ratio with cement stabilized macadam is 0.004:1.
Preferably, in the Crack of Cement-Stabilized Macadam Base control method, in the step 3, in paving process In, paved using paver, rolled using substrate portion of the roller to the completion that paves, spreading speed be at the uniform velocity, And spreading speed is 0.5-0.8m/min, the distance between roller to paver is 0.8-1m, rolling speed and spreading speed Unanimously.
Preferably, in the Crack of Cement-Stabilized Macadam Base control method, in the step 3, spreading speed is 0.8m/min, the distance between roller to paver are 1m.
Preferably, in the Crack of Cement-Stabilized Macadam Base control method, in the step 4, to step 3 When obtained base is conserved, first geotextiles are covered in base, 30min is covered, sprinkles water later, every 1h watering one It is secondary, continue 10 days.
Preferably, in the Crack of Cement-Stabilized Macadam Base control method, the diameter of the butadiene-styrene latex ball is 2-2.5cm。
Crack of Cement-Stabilized Macadam Base control method of the present invention in cement stabilized macadam by adding butylbenzene Latex balloon, the base being finally made can show good compactness, cohesive force and integral strength, to reduce crack It generates.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of butadiene-styrene latex ball of the present invention.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art referring to specification text Word can be implemented accordingly.
As shown in Figure 1, the present invention provides a kind of Crack of Cement-Stabilized Macadam Base control method, comprising:
Step 1: prepare butadiene-styrene latex ball using butadiene-styrene latex, the butadiene-styrene latex ball be by several line style interconnecting pieces 2 that The sphere 1 of inner hollow made of this is cross-linked, the diameter of the line style interconnecting piece are 0.6-1mm, the butadiene-styrene latex ball Diameter be 2-3cm;
Step 2: butadiene-styrene latex ball is added into cement stabilized macadam, the matter of butadiene-styrene latex ball and cement stabilized macadam Amount ratio is 0.004-0.006:1, adds water and gathers materials, uniform mixing, so that Cement Stable Macadam Mixture be prepared;
Step 3: Cement Stable Macadam Mixture is paved and rolled again, base is formed;
Step 4: being conserved to the base that step 3 obtains.
The present invention is prepared for butadiene-styrene latex ball using butadiene-styrene latex, and butadiene-styrene latex ball is really by many line style interconnecting pieces The hollow sphere being cross-linked is added in cement stabilized macadam when by butadiene-styrene latex ball, and cement stabilized macadam can be full of fourth The inner space of Atrolactamide ball, and it is wrapped in the outside of butadiene-styrene latex ball.Butadiene-styrene latex ball can be improved cement stabilized macadam base The cohesive force of layer, inhibits the generation in crack.
Butadiene-styrene latex ball can by by a spherical die formed one with complete surface hollow sphere ball, so Cutting surfaces again afterwards, form it into the hollow sphere of a hollow out.
Preferably, in the Crack of Cement-Stabilized Macadam Base control method, in the step 2, butadiene-styrene latex ball Mass ratio with cement stabilized macadam is 0.004:1.
In order to improve the conjugation of butadiene-styrene latex ball and cement stabilized macadam, the present invention is also to the technique for paving and rolling It is improved.Preferably, it in the Crack of Cement-Stabilized Macadam Base control method, in the step 3, is paving In the process, it is paved using paver, is rolled using substrate portion of the roller to the completion that paves, spreading speed is even Speed, and spreading speed is 0.5-0.8m/min, the distance between roller to paver is 0.8-1m, rolling speed and the speed that paves Degree is consistent.
Gap between roller and paver, when just determining exposure of the same region between paving and rolling Between, the length of the exposure duration ensure that butadiene-styrene latex ball can be adequately bonded with cement stabilized macadam.
Preferably, in the Crack of Cement-Stabilized Macadam Base control method, in the step 3, spreading speed is 0.8m/min, the distance between roller to paver are 1m.
In order to improve the conjugation of butadiene-styrene latex ball and cement stabilized macadam, the present invention also changes the technique of maintenance Into.Preferably, it in the Crack of Cement-Stabilized Macadam Base control method, in the step 4, is obtained to step 3 Base when being conserved, first geotextiles are covered in base, 30min is covered, sprinkles water later, it is primary every 1h watering, hold It is 10 days continuous.
Preferably, in the Crack of Cement-Stabilized Macadam Base control method, the diameter of the butadiene-styrene latex ball is 2-2.5cm。
Embodiment one
A kind of Crack of Cement-Stabilized Macadam Base control method, comprising:
Step 1: prepare butadiene-styrene latex ball using butadiene-styrene latex, the butadiene-styrene latex ball be by several line style interconnecting pieces that The sphere of inner hollow made of this is cross-linked, the diameter of the line style interconnecting piece are 0.6-1mm, the butadiene-styrene latex ball Diameter is 2-2.5cm;
Step 2: butadiene-styrene latex ball is added into cement stabilized macadam, the matter of butadiene-styrene latex ball and cement stabilized macadam Amount ratio is 0.004-:1, adds water and gathers materials, uniform mixing, so that Cement Stable Macadam Mixture be prepared;
Step 3: Cement Stable Macadam Mixture is paved and rolled again, base is formed;In paving process, adopt It is paved with paver, is rolled using substrate portion of the roller to the completion that paves, spreading speed is at the uniform velocity, and to pave Speed is 0.8m/min, and the distance between roller to paver is 1m, and rolling speed is consistent with spreading speed;
Step 4: being conserved to the base that step 3 obtains;When being conserved to the base that step 3 obtains, first will Geotextiles are covered in base, are covered 30min, are sprinkled water later, primary every 1h watering, continue 10 days.
Embodiment two
A kind of Crack of Cement-Stabilized Macadam Base control method, comprising:
Step 1: prepare butadiene-styrene latex ball using butadiene-styrene latex, the butadiene-styrene latex ball be by several line style interconnecting pieces that The sphere of inner hollow made of this is cross-linked, the diameter of the line style interconnecting piece are 0.6-1mm, the butadiene-styrene latex ball Diameter is 2.5-3cm;
Step 2: butadiene-styrene latex ball is added into cement stabilized macadam, the matter of butadiene-styrene latex ball and cement stabilized macadam Amount ratio is 0.006:1, adds water and gathers materials, uniform mixing, so that Cement Stable Macadam Mixture be prepared;
Step 3: Cement Stable Macadam Mixture is paved and rolled again, base is formed;In paving process, adopt It is paved with paver, is rolled using substrate portion of the roller to the completion that paves, spreading speed is at the uniform velocity, and to pave Speed is 0.5m/min, and the distance between roller to paver is 0.8m, and rolling speed is consistent with spreading speed;
Step 4: being conserved to the base that step 3 obtains;When being conserved to the base that step 3 obtains, first will Geotextiles are covered in base, are covered 30min, are sprinkled water later, primary every 1h watering, continue 10 days.
Embodiment three
A kind of Crack of Cement-Stabilized Macadam Base control method, comprising:
Step 1: prepare butadiene-styrene latex ball using butadiene-styrene latex, the butadiene-styrene latex ball be by several line style interconnecting pieces that The sphere of inner hollow made of this is cross-linked, the diameter of the line style interconnecting piece are 0.6-1mm, the butadiene-styrene latex ball Diameter is 2-3cm;
Step 2: butadiene-styrene latex ball is added into cement stabilized macadam, the matter of butadiene-styrene latex ball and cement stabilized macadam Amount ratio is 0.006:1, adds water and gathers materials, uniform mixing, so that Cement Stable Macadam Mixture be prepared;
Step 3: Cement Stable Macadam Mixture is paved and rolled again, base is formed;In paving process, adopt It is paved with paver, is rolled using substrate portion of the roller to the completion that paves, spreading speed is at the uniform velocity, and to pave Speed is 0.8m/min, and the distance between roller to paver is 1m, and rolling speed is consistent with spreading speed;
Step 4: being conserved to the base that step 3 obtains;When being conserved to the base that step 3 obtains, first will Geotextiles are covered in base, are covered 30min, are sprinkled water later, primary every 1h watering, continue 10 days.
The cement stabilized macadam test specimen that embodiment one to embodiment three is prepared is respectively adopted and uses 150mm × 150mm Hydrostatic profile cylinder specimen, test specimen compaction Control are 98%.Test specimen is through 7d, 14d, 28d Standard Curing, last day leaching Water.Successively measure the unconfined compressive strength of test specimen.
Unconfined compressive strength of the embodiment one to embodiment three relative to the test specimen for not adding butadiene-styrene latex ball mentions respectively It is high by 15.2%, 16.0% and 16.2%.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (4)

1. a kind of Crack of Cement-Stabilized Macadam Base control method characterized by comprising
Step 1: preparing butadiene-styrene latex ball using butadiene-styrene latex, the butadiene-styrene latex ball is to be handed over each other by several line style interconnecting pieces The sphere for the inner hollow that mistake is formed by connecting, the diameter of the line style interconnecting piece are 0.6-1mm, the diameter of the butadiene-styrene latex ball For 2-3cm;
Step 2: butadiene-styrene latex ball is added into cement stabilized macadam, the mass ratio of butadiene-styrene latex ball and cement stabilized macadam For 0.004-0.006:1, adds water and gather materials, uniform mixing, so that Cement Stable Macadam Mixture be prepared;
Step 3: Cement Stable Macadam Mixture is paved and rolled again, base is formed;In the step 3, paving In the process, it is paved using paver, is rolled using substrate portion of the roller to the completion that paves, spreading speed is even Speed, and spreading speed is 0.5-0.8m/min, the distance between roller to paver is 0.8-1m, rolling speed and the speed that paves Degree is consistent;In the step 3, spreading speed 0.8m/min, the distance between roller to paver is 1m;
Step 4: being conserved to the base that step 3 obtains.
2. Crack of Cement-Stabilized Macadam Base control method as described in claim 1, which is characterized in that in the step 2, The mass ratio of butadiene-styrene latex ball and cement stabilized macadam is 0.004:1.
3. Crack of Cement-Stabilized Macadam Base control method as described in claim 1, which is characterized in that in the step 4, When being conserved to the base that step 3 obtains, first geotextiles are covered in base, 30min is covered, sprinkles water later, every 1h watering is primary, continues 10 days.
4. Crack of Cement-Stabilized Macadam Base control method as described in claim 1, which is characterized in that the butadiene-styrene latex ball Diameter be 2-2.5cm.
CN201710152494.9A 2017-03-15 2017-03-15 A kind of Crack of Cement-Stabilized Macadam Base control method Active CN106835882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710152494.9A CN106835882B (en) 2017-03-15 2017-03-15 A kind of Crack of Cement-Stabilized Macadam Base control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710152494.9A CN106835882B (en) 2017-03-15 2017-03-15 A kind of Crack of Cement-Stabilized Macadam Base control method

Publications (2)

Publication Number Publication Date
CN106835882A CN106835882A (en) 2017-06-13
CN106835882B true CN106835882B (en) 2019-07-23

Family

ID=59143898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710152494.9A Active CN106835882B (en) 2017-03-15 2017-03-15 A kind of Crack of Cement-Stabilized Macadam Base control method

Country Status (1)

Country Link
CN (1) CN106835882B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2610950A1 (en) * 1976-03-16 1977-10-06 Goldschmidt Ag Th Plastic road surface coating - consists of brittle hollow mouldings set on reaction plastics base
JPH1087846A (en) * 1996-09-18 1998-04-07 Fukae Kogyo Kk Rubber composition, composition utilizing waste golf ball, and its production
CA2385819A1 (en) * 2001-11-16 2003-05-16 Deltalok Inc. Sub-base drainage device
JP2005282128A (en) * 2004-03-30 2005-10-13 Toyo Sports Shisetsu Kk Resin pavement and method for finishing surface of resin pavement
CN102224297A (en) * 2008-11-27 2011-10-19 Sika技术股份公司 Lane seal and method for the manufacture thereof
KR101287145B1 (en) * 2013-01-25 2013-07-17 주식회사 정영씨엠 Elastic packaging construction structure for sports facilities and its construction method
JP5290464B1 (en) * 2012-12-28 2013-09-18 株式会社極東体育施設 Artificial turf filling and artificial turf using the same

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2610950A1 (en) * 1976-03-16 1977-10-06 Goldschmidt Ag Th Plastic road surface coating - consists of brittle hollow mouldings set on reaction plastics base
JPH1087846A (en) * 1996-09-18 1998-04-07 Fukae Kogyo Kk Rubber composition, composition utilizing waste golf ball, and its production
CA2385819A1 (en) * 2001-11-16 2003-05-16 Deltalok Inc. Sub-base drainage device
JP2005282128A (en) * 2004-03-30 2005-10-13 Toyo Sports Shisetsu Kk Resin pavement and method for finishing surface of resin pavement
CN102224297A (en) * 2008-11-27 2011-10-19 Sika技术股份公司 Lane seal and method for the manufacture thereof
JP5290464B1 (en) * 2012-12-28 2013-09-18 株式会社極東体育施設 Artificial turf filling and artificial turf using the same
KR101287145B1 (en) * 2013-01-25 2013-07-17 주식회사 정영씨엠 Elastic packaging construction structure for sports facilities and its construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
SBR乳胶水泥稳定碎石抗裂性能研究;白正英;《公路交通科技(应用技术版)》;20110115(第01期);50-52
丁苯胶乳改性沥青开发与应用研究;祝根全等;《山东建材》;19990630(第03期);6-7

Also Published As

Publication number Publication date
CN106835882A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
Zhang et al. State-of-the-art of porous asphalt pavement: Experience and considerations of mixture design
Joshaghani et al. Optimizing pervious concrete pavement mixture design by using the Taguchi method
Tapkın The effect of polypropylene fibers on asphalt performance
CN205501732U (en) Flexible protection structure of ballastless track structural waterproof damping
Bonicelli et al. Improving pervious concrete pavements for achieving more sustainable urban roads
Espersson Effect in the high modulus asphalt concrete with the temperature
Hu et al. A feasibility study exploring limestone in porous asphalt concrete: Performance evaluation and superpave compaction characteristics
Liu et al. Laboratory evaluation of performance of porous ultra-thin overlay
CN103485256A (en) Grading glass fiber crushed stone seal coat preparation method
Qian et al. Performance evaluation and field application of hard asphalt concrete under heavy traffic conditions
Huang et al. Utilization of waste rubber powder in semi-flexible pavement
CN106835882B (en) A kind of Crack of Cement-Stabilized Macadam Base control method
Soliman et al. Characterizing the performance of cementitious partial-depth repair materials in cold climates
CN108411729A (en) A kind of ultra-thin conductive wearing course paving structure with snow melt ice melting capability
Hasan et al. Performance of ethanol and ethanol-NaHCO3 based foamed WMA mixtures for low emission asphalt technology
CN111794034B (en) Construction method of filling type cement stabilized macadam base with super-large particle size
CN109824301B (en) Water-based polymer stabilized macadam material for roads, preparation and construction method
Saltan et al. Use of scoria waste as subbase stabilization material for highway flexible pavement
Poulikakos et al. Mechanical properties of porous asphalt, recommendations for standardization
CN210151500U (en) Combined base asphalt pavement structure
CN113774749A (en) Pavement structure construction method of dynamic square of automobile test field
Emery et al. Bituminous surfacings for pavement on Australian airports
Jitareekul et al. Early life performance of cement and foamed bitumen stabilised reclaimed asphalt pavement under simulated trafficking
Duan Application of synchronous chip seal course in large bridges
Xu et al. Research on mixture design and mechanical performance of porous asphalt concrete in cold regions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201204

Address after: 100011, Beijing, Dongcheng District anding street, No. 88, No. 801

Patentee after: CCCC THIRD HIGHWAY ENGINEERING Co.,Ltd.

Patentee after: THE THIRD ENGINEERING CO., LTD. OF THE CCCC THIRD HIGHWAY ENGINEERING Co.,Ltd.

Address before: 100011, Beijing, Dongcheng District anding street, No. 88, No. 801

Patentee before: CCCC THIRD HIGHWAY ENGINEERING Co.,Ltd.