CN106825051A - A kind of piercing mill of seamless steel tube push rod - Google Patents

A kind of piercing mill of seamless steel tube push rod Download PDF

Info

Publication number
CN106825051A
CN106825051A CN201710184032.5A CN201710184032A CN106825051A CN 106825051 A CN106825051 A CN 106825051A CN 201710184032 A CN201710184032 A CN 201710184032A CN 106825051 A CN106825051 A CN 106825051A
Authority
CN
China
Prior art keywords
linkage section
push rod
section
sleeve
annular groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710184032.5A
Other languages
Chinese (zh)
Other versions
CN106825051B (en
Inventor
程飞生
张辉
姚俊丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Rong Yi Industrial Technology Co Ltd
Original Assignee
Shanxi Rong Yi Industrial Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Rong Yi Industrial Technology Co Ltd filed Critical Shanxi Rong Yi Industrial Technology Co Ltd
Priority to CN201710184032.5A priority Critical patent/CN106825051B/en
Publication of CN106825051A publication Critical patent/CN106825051A/en
Application granted granted Critical
Publication of CN106825051B publication Critical patent/CN106825051B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B19/00Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work
    • B21B19/02Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work the axes of the rollers being arranged essentially diagonally to the axis of the work, e.g. "cross" tube-rolling ; Diescher mills, Stiefel disc piercers or Stiefel rotary piercers
    • B21B19/04Rolling basic material of solid, i.e. non-hollow, structure; Piercing, e.g. rotary piercing mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B25/00Mandrels for metal tube rolling mills, e.g. mandrels of the types used in the methods covered by group B21B17/00; Accessories or auxiliary means therefor ; Construction of, or alloys for, mandrels or plugs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Rolls And Other Rotary Bodies (AREA)

Abstract

The present invention relates to seamless steel pipe puncturing technique field, specifically a kind of piercing mill of seamless steel tube push rod.Linkage section, the three-roller guiding devices on the outside of linkage section, cooling water pipe that the columned connecting rod and connecting rod that there is cylindrical hollow the inside that the top of the taper including inner hollow and top are bolted are bolted, linkage section are made up of the combination of the first linkage section, the second linkage section, N number of 3rd linkage section and the second linkage section that are linked in sequence, foot piece section.The linkage section of traditional push rod is divided into multistage by the present invention, and bearing is loaded onto on the second linkage section, so can increase the second linkage section and the 3rd linkage section according to the length of drilling, effectively solves to be contacted with the dynamic instability between guide roller when push rod is rolled.

Description

A kind of piercing mill of seamless steel tube push rod
Technical field
The present invention relates to seamless steel pipe puncturing technique field, specifically a kind of piercing mill of seamless steel tube push rod.
Background technology
Traditional push rod of present seamless steel tube production application, is made up of top, connecting rod, linkage section and cooling water pipe.It is interior Portion's water flowing cooling(Fig. 1);Linkage section quickly rotates during billet production with pipe, and by three retractable roller guides of number set The guide roller limitation push rod of device does not bend when high thrust is born.Such push rod due to during drilling/rolling due to quick Rotation and the folding of guide roller so that push rod is constantly beated, cause top centralized positioning unstable, so as to influence 1, product wall thickness Precision;2nd, three-roller guiding devices part life reduction.
When these problems are solved, typically all improving the centralized positioning precision of single set three-roller guiding devices and increasing push rod Rigidity.
Such as:" application of punching machine three-roller centered positions control method " metallurgical power --- Li Enxue
" the positioning adjustment and control of three-roller centring device " steel rolling --- Hou Shuai, etc.
But the bad measure in pass center that three guide rollers of three-roller guiding devices are formed, and led with three rollers in the presence of traditional push rod To the dynamic instability contact problems of the guide roller of device, because push rod is oversize, even if increasing rigidity can not effectively strengthen top Bar stability.
The content of the invention
The technical problems to be solved by the invention are:How to solve push rod push rod in perforation procedure constantly to beat, cause The unstable problem of top centralized positioning.
The technical solution adopted in the present invention is:The top and top of the taper including inner hollow are bolted The inside columned connecting rod and connecting rod that have cylindrical hollow be bolted linkage section, installed in linkage section The three-roller guiding devices in outside, cooling water pipe, linkage section is by the first linkage section, the second linkage section, N number of 3rd company that are linked in sequence Connect combination, the foot piece section composition of section and the second linkage section;First linkage section one end and connecting rod be connected through a screw thread the other end with Second linkage section is connected through a screw thread, the first linkage section into it is cylindric have inside it accommodate the hollow of cooling water pipe;Second connection Duan Yiduan is connected through a screw thread the other end and passes through with the 3rd linkage section or foot piece section with the first linkage section or the 3rd linkage section Threaded connection, have inside the second linkage section accommodate cooling water pipe it is hollow, have inside the 3rd linkage section receiving cooling water pipe in Sky, there is an annular groove on the side wall of the second linkage section, bearing is provided with annular groove, and there are sleeve, three roller guides in bearing outside Device is arranged on sleeve outside, and N is nonnegative integer.
As a kind of preferred embodiment:There are two bearings to be separately mounted to the both sides of annular groove in the annular groove, sleeve with Annular groove edge junction is connected with sleeve by rubber seal, two bearings by interference fit.
The beneficial effects of the invention are as follows:The linkage section of traditional push rod is divided into multistage by the present invention, on the second linkage section Bearing is loaded onto, so the second linkage section and the 3rd linkage section can be increased according to the length of drilling, when effectively solving push rod rolling Dynamic instability between guide roller is contacted, and relative rotation is occurred in Bearing inner, rolling in the absence of vibration folding State, so that push rod is always ensured that top alignment rolling center, further improves product wall thickness accuracy.And effectively extend The part life of guider.
Brief description of the drawings
Fig. 1 is the structural representation of existing traditional push rod;
Fig. 2 is schematic structural view of the invention;
Fig. 3 is the first linkage segment structure schematic diagram;
Fig. 4 is the second linkage segment structure schematic diagram;
Fig. 5 is the 3rd linkage segment structure schematic diagram;
Fig. 6 is foot piece segment structure schematic diagram;
Wherein, 1, top, 2, connecting rod, 3, the guide roller in three-roller guiding devices, 4, linkage section, 5, cooling water pipe, 6, first Linkage section, the 7, second linkage section, the 8, the 3rd linkage section, 9, foot piece section, 10, rubber seal, 11, bearing, 12, positioning sleeve, 13, Linkage interior bar, 14, sleeve.
Specific embodiment
As shown in figure 1, traditional push rod of present seamless steel tube production application, by top, connecting rod, linkage section and cooling water Pipe is constituted.Internal water flowing cooling;Linkage section quickly rotates during billet production with pipe, and by three retractable rollers of number set The guide roller limitation push rod of guider does not bend when high thrust is born.Such push rod due to during drilling/rolling due to Quick rotation and the folding of guide roller so that push rod is constantly beated, cause top centralized positioning unstable, so as to influence 1, product Wall thickness accuracy;2nd, three-roller guiding devices part life reduction.
As shown in Fig. 2 in order to solve problems of the prior art, invention is improved traditional push rod, The linkage section order of traditional push rod is divided into:First linkage section, the second linkage section, N number of 3rd linkage section and the second linkage section Combination, foot piece section, it is front and rear between be connected through a screw thread, wherein, have an annular groove on the side wall of the second linkage section, in annular groove There are two bearings to be separately mounted to the both sides of annular groove, installation sleeve on the outside of bearing so that in linkage interior bar rotation process, sleeve Do not rotate, so that the guide roller clamp sleeve in three-roller guiding devices so that push rod is not beated.
As shown in figure 3, the left end of the first linkage section is threadedly attached in connecting rod, the left end of the first linkage section is interior Screw thread, after a ladder is split into connecting rod, then opens the outer spiral shell coordinated with the left end of the first linkage section on the end of minor diameter Line so that the first linkage section can hold out against connecting rod in rotation process, connecting rod produces very big thrust.First linkage section Right-hand member inside open one it is round table-like it is hollow after open a cylindrical hollow again, internal thread is provided with cylindrical hollow, second connects The left end for connecing section is provided with annular groove, and external screw thread is provided with annular groove so that the connection that the first linkage section is connected with second is steady Determine reliable, and the second linkage section can hold out against the first linkage section and provide thrust to the first linkage section.
As shown in figure 4, the second linkage section is emphasis of the invention, a circle is opened on the central side wall of the second linkage section Annular groove, a bearing is respectively installed at the two ends of groove, uses a centre internally hollow boss, the positioning of two concave ends Set clamping;Two bearings, place bearing and are slided to center, and a sleeve is installed in bearing outside, and linkage interior bar passes through axle with overcoat Support is held so that linkage interior bar and sleeve are constituted and rotate connection, in order to prevent debris from falling into bearing, in sleeve and annular trough rim Edge junction is installed by rubber seal.The right-hand member of the second linkage section is provided with a ladder being similar to connecting rod right-hand member and same opens There is external screw thread, with the connection for completing to coordinate with the left end of the 3rd linkage section or foot piece section.
As shown in figure 5, right-hand member structure of the left and right two ends of the 3rd linkage section all with the first linkage section is similar, it is therefore an objective to can The combination of N number of 3rd linkage section and the second linkage section is formed, so that the present invention reaches the length of needs, by reducing or expanding The combination of the 3rd linkage section and the second linkage section, that is, adjust the size of N, can reach random length, and N is 0 or natural number.
As shown in fig. 6, foot piece section is clutch end, the left end of foot piece section is threadedly coupled the second linkage section right-hand member, foot piece The right-hand member connection PTO of section.
The course of work is as follows:
The depth for drilling as needed selects the size of N(I.e. selection the 3rd linkage section and the second linkage section combination number, can It is individual to be 0 or random natural number), three-roller guiding devices are compressed the sleeve of the second linkage section, before starting drilling, three rollers are led It is identical to the quantity for being installed on sleeve, as top pierces steel pipe, same number is coordinated according to the exposed sleeve quantity outside steel pipe The three-roller guiding devices of amount, clutch end drives foot piece section to rotate, then is connected by the second linkage section, the 3rd linkage section, first Connecing section etc. drives top to rotate to steel tube drilling, and sleeve is not rotated in boring procedure, and only the linkage interior bar of sleeve inner is rotated. Three-roller guiding devices hold static overcoat tightly during work roll, and overcoat is with three-roller guiding devices without relative rotation, and linkage interior bar is managed Base transmission top thrust and with pipe synchronous axial system, be easy to pierced billet, be provided simultaneously with the function of positioning and be oriented to, seal is prevented Dust and cooling water enter internal.Push rod section 2 typically arranges that 2-5 covers according to push rod length.
Dynamic instability contact problems when push rod is rolled and between guide roller are efficiently solved, and relative rotation occurs In Bearing inner, rolling in the absence of vibration folding condition, so that push rod is always ensured that top alignment rolling center, enters one Step improves product wall thickness accuracy.And effectively extend the part life of guider.

Claims (2)

1. in the top and top of a kind of taper of piercing mill of seamless steel tube push rod, including inner hollow are bolted Linkage section that the columned connecting rod and connecting rod that there is cylindrical hollow in portion are bolted, installed in linkage section outside Three-roller guiding devices, cooling water pipe, it is characterised in that:Linkage section is by the first linkage section, the second linkage section, the N that are linked in sequence The combination of individual 3rd linkage section and the second linkage section, foot piece section composition;First linkage section one end is connected through a screw thread with connecting rod The other end is connected through a screw thread with the second linkage section, the first linkage section into it is cylindric have inside it accommodate the hollow of cooling water pipe; Second linkage section one end is connected through a screw thread the other end and the 3rd linkage section or tail with the first linkage section or the 3rd linkage section Bar segment is connected through a screw thread, and has inside the second linkage section and accommodates the hollow of cooling water pipe, has receiving to cool down inside the 3rd linkage section Water pipe it is hollow, have an annular groove on the side wall of the second linkage section, bearing is installed in annular groove, there is sleeve in bearing outside, Three-roller guiding devices are arranged on sleeve outside, and N is nonnegative integer.
2. a kind of piercing mill of seamless steel tube push rod according to claim 1, it is characterised in that:There are two in the annular groove Bearing is separately mounted to the both sides of annular groove, there is positioning sleeve between bearing, and sleeve passes through rubber blanket with annular groove edge junction Sealing, two bearings are connected with sleeve by interference fit.
CN201710184032.5A 2017-03-24 2017-03-24 A kind of piercing mill of seamless steel tube mandril Expired - Fee Related CN106825051B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710184032.5A CN106825051B (en) 2017-03-24 2017-03-24 A kind of piercing mill of seamless steel tube mandril

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710184032.5A CN106825051B (en) 2017-03-24 2017-03-24 A kind of piercing mill of seamless steel tube mandril

Publications (2)

Publication Number Publication Date
CN106825051A true CN106825051A (en) 2017-06-13
CN106825051B CN106825051B (en) 2018-11-02

Family

ID=59130522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710184032.5A Expired - Fee Related CN106825051B (en) 2017-03-24 2017-03-24 A kind of piercing mill of seamless steel tube mandril

Country Status (1)

Country Link
CN (1) CN106825051B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112246873A (en) * 2020-09-03 2021-01-22 鑫鹏源(聊城)智能科技有限公司 Connecting ejector rod for hot rolling and processing method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5933010A (en) * 1982-08-19 1984-02-22 Kawasaki Steel Corp Piercer for production of seamless steel pipe
EP0787542A2 (en) * 1996-02-02 1997-08-06 MANNESMANN Aktiengesellschaft Mandrel and mandrel bar for skew-rolling mills
CN101224469A (en) * 2008-02-01 2008-07-23 山西创奇实业有限公司 Mobile mandril cooling and lubricating device
CN201969725U (en) * 2010-12-27 2011-09-14 河南汇丰管业有限公司 Core rod positioning device in perforating machine trolley
CN102247990A (en) * 2011-05-27 2011-11-23 江苏武进不锈钢管厂集团有限公司 Molybdenum-based tappet
CN204583852U (en) * 2015-05-11 2015-08-26 聊城鑫鹏源金属制造有限公司 The tube rolling device of pipe mill
DE102014105815A1 (en) * 2014-04-24 2015-10-29 Hans Joachim Pehle Internal contiguous cooling water guide in piercer

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5933010A (en) * 1982-08-19 1984-02-22 Kawasaki Steel Corp Piercer for production of seamless steel pipe
EP0787542A2 (en) * 1996-02-02 1997-08-06 MANNESMANN Aktiengesellschaft Mandrel and mandrel bar for skew-rolling mills
CN101224469A (en) * 2008-02-01 2008-07-23 山西创奇实业有限公司 Mobile mandril cooling and lubricating device
CN201969725U (en) * 2010-12-27 2011-09-14 河南汇丰管业有限公司 Core rod positioning device in perforating machine trolley
CN102247990A (en) * 2011-05-27 2011-11-23 江苏武进不锈钢管厂集团有限公司 Molybdenum-based tappet
DE102014105815A1 (en) * 2014-04-24 2015-10-29 Hans Joachim Pehle Internal contiguous cooling water guide in piercer
CN204583852U (en) * 2015-05-11 2015-08-26 聊城鑫鹏源金属制造有限公司 The tube rolling device of pipe mill

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112246873A (en) * 2020-09-03 2021-01-22 鑫鹏源(聊城)智能科技有限公司 Connecting ejector rod for hot rolling and processing method

Also Published As

Publication number Publication date
CN106825051B (en) 2018-11-02

Similar Documents

Publication Publication Date Title
CN103143604A (en) Rolling and forming device for ring-shaped groove on inner wall of pipe product
CN106825051A (en) A kind of piercing mill of seamless steel tube push rod
CN201172157Y (en) Vehicle rear wheel spindle bearing pressing tool
CN104759652B (en) Bundy tube roll cylindrical groove processing special tooling and processing technique
US20120174642A1 (en) Multi-roll mandrel mill and method of producing seamless tubes
CN204961487U (en) Novel flexible pipe assembly
CN101209458A (en) Method for rolling tube by hot-rolled seamless tube restraint core rod continuous rolling mill
CN103291766A (en) Shaft end supporting device with convenient disassembly and assembly, and rubber roller rice huller having same
CN106670283B (en) A kind of pipe end rolling technology and equipment
CN107246856A (en) A kind of expansible support inner chamber formula tubular elements positioner and localization method
CN206373398U (en) Device for processing stepped hole of tapered pipe die
CN105798068B (en) Roll mechanism for axial adjusting
CN101318200B (en) Precision rolling process for heavy-caliber skew rolling reeling weldless steel tube
CN206241105U (en) A kind of contracting hose machine high-precision rotary roller mechanism
CN204603353U (en) Bundy tube roll cylindrical groove processing special tooling
CN203976138U (en) A kind of oil cylinder or cylinder as coupler
CN108145024B (en) Positionable internal expansion type rolling tool
US2458110A (en) Apparatus for producing seamless tubes
CN215467044U (en) Mandrel tail guide cone for seamless steel tube cold rolling mill
CN205969954U (en) School circle device of PVC steel band winding pipe
CN104815846A (en) Adjustable pull rod of core bar support frame
CN109483159A (en) Ultra-large type roller and processing method
CN203875369U (en) Central spindle machining tool of seamless tube machine
CN108067502B (en) Antioxidant conveying device in hot rolling seamless pipe rolling process and use method thereof
CN201823804U (en) Rolling capstan of spiral tube former

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102