CN106816878A - A kind of demand response regulation device and method for being applied to drainage and irrigation hyelectric power facility - Google Patents

A kind of demand response regulation device and method for being applied to drainage and irrigation hyelectric power facility Download PDF

Info

Publication number
CN106816878A
CN106816878A CN201710137896.1A CN201710137896A CN106816878A CN 106816878 A CN106816878 A CN 106816878A CN 201710137896 A CN201710137896 A CN 201710137896A CN 106816878 A CN106816878 A CN 106816878A
Authority
CN
China
Prior art keywords
demand response
drainage
power facility
module
irrigation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710137896.1A
Other languages
Chinese (zh)
Other versions
CN106816878B (en
Inventor
孙鼎浩
陈宋宋
徐阿元
李德智
何胜
孙畅
闫华光
钟鸣
郭炳庆
张兴华
蒋利民
韩永军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Gansu Electric Power Co Ltd
Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Gansu Electric Power Co Ltd
Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Gansu Electric Power Co Ltd, Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710137896.1A priority Critical patent/CN106816878B/en
Publication of CN106816878A publication Critical patent/CN106816878A/en
Application granted granted Critical
Publication of CN106816878B publication Critical patent/CN106816878B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/16Control of watering
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention provides a kind of demand response regulation device and method for being applied to drainage and irrigation hyelectric power facility, and device includes microprocessor module, communication module, security module, interface module, data acquisition module, data memory module, real-time clock module, watchdog module and power management module;Solve existing drainage and irrigation hyelectric power utility automation level high not enough, demand response cannot be participated in, the demand response signal that demand response server is sent is automatically analyzed, equipment period operation reserve can not be generated and directly according to the problem of policy control equipment start-stop, for supporting drainage and irrigation hyelectric power facility to participate in demand response business, not only on the basis of electricity price and incentive policy, for user's power cost saving, subsidized, load can also be opened when needing load to dissolve, so as to obtain low price electric energy or obtain subsidy.

Description

A kind of demand response regulation device and method for being applied to drainage and irrigation hyelectric power facility
Technical field
Participate in the present invention relates to irrigation and drainage facility electricity automation and its automatically demand response, and in particular to one kind is applied to electricity The demand response regulation device and method of power irrigation and drainage facility.
Background technology
Irrigate and drain flooded fields for defeating drought, damage caused by waterlogging to do harm to, promote the development tool of agriculture, woods, animal husbandry to be of great significance.With The reinforcement of farmland capital construction and the raising of productivity level, many places are all irrigated and draining using electric power, this Behave causes the obvious seasonal characteristics of farming power, i.e., in the spring and summer that drought resisting flood control problem is more prominent, power consumption With power load apparently higher than other seasons.Also, because conventional irrigation and drainage utility automation degree is relatively low, still must people except a lot To control outside its start and stop, even if the automation irrigation and drainage facility of realization hitherto also can not intelligently participate in demand response, cause Except seasonal substantially outer, load is also due to the work and rest custom of people on the same day for irrigation and drainage electricity consumptions, daytime and evening in the presence of compared with Big peak-valley difference.And while peak of power consumption moment power shortage, the low power consumption moment also abandons wind, abandons light and show in the presence of serious As causing substantial amounts of waste of energy.These features, not only exacerbate power network summer power shortage, reliability and face serious prestige The situation of the side of body;Due to transformer capacity limitation, the irrigation and drainage activity of user is severely limited;And also create substantial amounts of electricity Can waste.
China power supply and demand anxiety situation still happens occasionally, and abandons wind and abandons optical phenomenon and is also constantly aggravating, the correlation such as Committee of Development and Reform Department pays much attention to the development of demand response work.At present, although automatic irrigation and drainage control system can accomplish oneself of farmland discharging-irrigating Dynamicization, but cannot meet the demand such as user's maximization of economic benefit and power network peak load shifting, regenerative resource of dissolving, have Body surface is now in terms of following two:On the one hand, power network is there is supply and demand stressful situation, and such as supply falls short of demand the Peak power use moment, or Power network has regenerative resource cannot effectively dissolve, and when supply exceed demand, can formulate the electricity prices such as flexible tou power price, Spot Price Policy, but the operation that existing automatic irrigation and drainage control system cannot be according to above-mentioned flexible electricity price practical policies at times now;On the other hand, Organize and implement peakload and cut down or regenerative resource in demand response service provider, Load aggregation Shang Deng demand responses enforcement body During plan target of dissolving, existing automatic irrigation and drainage control system cannot automatically participate in above-mentioned plan target, so as to cannot also obtain right The excitation answered.
The patent of invention of Application No. 201320283908.9 provides a kind of based on the automatic irrigation and drainage control in farmland being wirelessly transferred System processed, specifically provides the automatic irrigation emitter unit of irrigation that a kind of law of needing the water according to crop carries out timely and appropriate discovery, according to water Position information makes draining or the decision-making poured water, but the patent of invention cannot support irrigation and drainage facility to join automatically in design of hardware and software With demand response.
The content of the invention
It is high not enough for existing drainage and irrigation hyelectric power utility automation level, it is impossible to participate in demand response, automatically analyze demand The demand response signal that response server is sent, it is impossible to generate equipment period operation reserve and directly opened according to policy control equipment The problem stopped, the present invention provides a kind of demand response regulation device and method for being applied to drainage and irrigation hyelectric power facility, for supporting electricity Power irrigation and drainage facility participates in demand response business, not only on the basis of electricity price and incentive policy, is user's power cost saving, is mended Patch, can also open load when needing load to dissolve, so as to obtain low price electric energy or obtain subsidy.
In order to realize foregoing invention purpose, the present invention is adopted the following technical scheme that:
A kind of demand response regulation device for being applied to drainage and irrigation hyelectric power facility of present invention offer, including microprocessor module, Communication module, security module, interface module, data acquisition module, data memory module, real-time clock module, watchdog module And power management module;
The communication module, security module, interface module, data acquisition module, data memory module, real-time clock mould Block, watchdog module are bi-directionally connected with microprocessor module, the power management module and microprocessor module and interface mould Block unidirectional connection simultaneously.
Microprocessor module is based on the demand response strategy in demand response policy library, and matches operation regulating strategy storehouse Operation regulating strategy, and then generating run regulation and control instruction.
Communication module is communicated by communication network with demand response server and customer mobile terminal, and it arranges electric power The power information for filling facility is sent to demand response server and customer mobile terminal, and receives what demand response server was issued Electricity price information and excitation information, while receiving the user's control instruction that customer mobile terminal is issued.
Data acquisition module is used to gather the running state parameter of drainage and irrigation hyelectric power facility, and the running state parameter to gathering It is monitored, while being additionally operable to measure the electrical parameter and ambient parameter of drainage and irrigation hyelectric power facility;
Electrical parameter includes the electrical parameter of each main frame and the electrical parameter of relevant components part;
Ambient parameter includes soil moisture, water level and temperature.
The built-in demand response policy library of data memory module and operation regulating strategy storehouse, it is used to store drainage and irrigation hyelectric power facility Essential information, running state parameter, electrical parameter, ambient parameter and historical data;
Essential information includes numbering, address, subscriber phone and the power supply priority of drainage and irrigation hyelectric power facility.
Demand response server passes through to call and match the essential information of drainage and irrigation hyelectric power facility, distinguishes and search drainage and irrigation hyelectric power Facility.
Security module be used to verifying the running state parameter of drainage and irrigation hyelectric power facility of data collecting module collected, electrical parameter and The legitimacy of ambient parameter, and feedback signal is encrypted, while being maintained secrecy to user basic information, it is ensured that user is basic Information security does not outflow, and plays a part of to protect privacy of user.
Micro treatment module completes issuing for operation regulation and control instruction by interface module, and the interface module connects including numeral Mouth, analog interface, RJ45, RS232 and RS485;
Analog interface gathers analog signal, and the module by signal of collection is processed, and produces and export simulation control afterwards Signal processed;
Digital interface gathers data signal, and for judging the running status of each water pump assembly in drainage and irrigation hyelectric power facility, it Digital controlled signal is produced and exported afterwards.
Real-time clock module provides Perfect Time for described device, prevents core dumped during drainage and irrigation hyelectric power facility operation Situation, it is ensured that operation regulating strategy is normally performed;
Watchdog module is used to monitor whether described device is normally run;
Power management module is responsible for the management and distribution of described device electric energy.
Customer mobile terminal includes smart mobile phone and panel computer, and user is by customer mobile terminal real-time remote monitoring electricity The running status of power irrigation and drainage facility, and when user's refusal is according to operation regulating strategy regulation and control drainage and irrigation hyelectric power facility, by under user Hair manual control instruction, when the operation regulation and control instruction that the manual control instruction that user issues is issued with microprocessor module conflicts When, the manual control instruction operation that drainage and irrigation hyelectric power facility is issued according to user.
The present invention also provides a kind of demand response regulation and control method for being applied to drainage and irrigation hyelectric power facility, including:
Demand response event information is received, and judges demand response classification;
According to different demand response categorical match corresponding demand response policies;
Response policy performs operation regulating strategy according to demand.
Demand response event information is received, and judges that demand response classification is specifically included:
Receive the demand response event information that demand response server is issued;
Response events information judges demand response classification according to demand, and the demand response classification is rung including stimulable type demand Should be with electricity price type demand response.
Specifically included according to different demand response categorical match corresponding demand response policies:
If demand response classification is stimulable type demand response, first receives and parses through load eliminating tolerancing signal or regenerative resource disappears Receive signal, corresponding demand response policy is then matched according to stimulable type demand response;
If demand response classification is electricity price type demand response, electricity price signal is first received, then according to electricity price type demand response Matching corresponding demand response policy.
According to including after different demand response categorical match corresponding demand response policies:
If demand response classification is stimulable type demand response, electrical parameter, ambient parameter and the fortune of drainage and irrigation hyelectric power facility are gathered Row state parameter, then determines response grade and response capacity, and uploads feedback signal, finally judges whether to meet demand response Event requirements, confirmation signal is issued if meeting and receiving demand response server, load is continued to and parsed if being unsatisfactory for and is disappeared Cut signal or regenerative resource are dissolved and signal and perform subsequent operation;
If demand response classification is electricity price type demand response, electrical parameter, ambient parameter and the fortune of drainage and irrigation hyelectric power facility are gathered Row state parameter, then determines response grade and response capacity, and uploads feedback signal, and demand response server is according to feedback letter Number issue confirmation signal.
Judge whether that meeting demand response event requirements specifically includes:
Load reduction plan or the regenerative resource plan of dissolving are uploaded to demand response server, the demand response clothes Business device signals according under summarized results, is divided into situations below:
If 1) summarized results meets demand response event requirements, the demand response server issues confirmation signal;
If 2) summarized results is unsatisfactory for demand response event requirements, the demand response server issues the demand of reformulating Response policy signal, continues to and parses load eliminating tolerancing signal or regenerative resource is dissolved signal, and demand response is matched again Strategy simultaneously feeds back, and until remittance result meets demand response event requirements, now demand response server issues confirmation signal.
Response policy performs operation regulating strategy and specifically includes according to demand:
Receive the confirmation signal that demand response server is issued;
Response policy and confirmation signal perform operation regulating strategy according to demand.
Response policy includes after performing operation regulating strategy according to demand:
According to response grade, judge whether demand response belongs to emergency demand response;If being not belonging to emergency demand sound Should, user's selection is in a manual manner or automated manner carries out spatial load forecasting;If belonging to emergency demand response, user must be with certainly Flowing mode carries out spatial load forecasting;
Demand response strategy is performed, and based on the operation regulating strategy in operation regulating strategy storehouse, generating run regulation and control refer to Order;
Electrical parameter, the environment of drainage and irrigation hyelectric power facility during record demand response time started, end time, demand response After parameter and running state parameter, and the above- mentioned information encryption that will be recorded, send to demand response server.
User's selection is in a manual manner or automated manner carries out spatial load forecasting and specifically includes:
If user's selection automated manner carries out spatial load forecasting, each water pump assembly is automatically controlled according to operation regulating strategy Start and stop;
If user's selection manual mode carries out spatial load forecasting, by user, voluntarily response policy and operation regulate and control as desired Policy execution result regulates and controls to drainage and irrigation hyelectric power facility.
Demand response strategy includes that response participates in object information, response object running state information and response time arrangement letter Breath.
For price type demand response and stimulable type demand response, corresponding demand response policy all should be with can not be to irrigated area It is principle that interior crop produces influence, is specifically divided into situations below:
For the drainage and irrigation hyelectric power facility only containing separate unit water pump assembly, first confirm that water pump assembly in the demand response period Working condition, the demand response period is divided according to the necessary and urgency level that water pump assembly runs, it is necessary to load is cut down Flow is closed down or reduced to Shi Youxian in the inessential operation period;
For the drainage and irrigation hyelectric power facility being polymerized by least two water pump assemblies, on the premise of demand response requirement is met, Each demand response period, water pump assembly was needed the unit of response, concrete operations according to the necessary and urgency level selection of operation The inessential operation water pump assembly of prioritizing selection is, it is necessary to prioritizing selection urgent water pump machine when load is dissolved during to need load to cut down Group, it is final to determine response load.
Operation regulating strategy adjusts whole water pump assembly of flow and start and stop of water pump assembly using converter plant.
Compared with immediate prior art, the technical scheme that the present invention is provided has the advantages that:
The present invention provide be applied to drainage and irrigation hyelectric power facility the built-in demand response policy library of demand response regulation device and Operation regulating strategy storehouse, the order while response regenerative resource is dissolved that not photoresponse load cuts down order, and support real-time update;
Running state parameter and the environment ginseng of the demand response strategy combination drainage and irrigation hyelectric power facility in demand response policy library Number, determines the necessity and emergency of the operation of unit day part, and formulates the preferential operation order of response unit, farthest Reduce influence of the unit load change to production and living;
The fortune of the demand response regulation device built-in power irrigation and drainage facility for being applied to drainage and irrigation hyelectric power facility that the present invention is provided Row regulating strategy storehouse, the operation regulation and control instruction for drainage and irrigation hyelectric power facility is converted into by demand response strategy;
The demand response regulation device for being applied to drainage and irrigation hyelectric power facility of present invention offer is deployed in drainage and irrigation hyelectric power facility side, Power consumption parameter and ambient parameter of drainage and irrigation hyelectric power facility side etc. can be gathered, and its running status can be regulated and controled with responsive electricity grid side Or Load aggregation business's demand response semaphore request, be user it is cost-effective or produce economic benefit, the operation that improve power network can By property;
In terms of automatic demand response business is participated in, what the present invention was provided is applied to the demand response tune of drainage and irrigation hyelectric power facility Control device can replace artificial, be automatically obtained the spatial load forecasting of drainage and irrigation hyelectric power facility, it is to avoid it is artificial participate in bringing it is uncertain because Element;
The targeted demand response task of the demand response regulation device for being applied to drainage and irrigation hyelectric power facility for providing of the invention Except load cuts down class demand response, regenerative resource of dissolving is can be also used for, load is opened at the moment that supply exceed demand, by one Sub-load is transferred to the renewable energy power generation period that supply exceed demand;
The present invention provide be applied to drainage and irrigation hyelectric power facility demand response regulation device can both make irrigation and drainage system according to Strategy execution, while receive manual intervention again, and the priority of user's manual intervention order is higher, sends instructions when under user Afterwards, demand response strategy execution is stopped, drainage and irrigation hyelectric power facility directly runs according to user instruction;
For the water pump assembly that demand response is participated in by Load aggregation business, due to sub-load, polymerization business must is fulfilled for one Fixed response task, thus after Load aggregation business is collected feedback information, it is impossible to when meeting reduction task, Load aggregation Business will re-issue response instruction, and the demand response regulation device for being applied to drainage and irrigation hyelectric power facility of present invention offer has to be received Again the function of operation reserve is matched after to such instruction;
For different demand response grades, what the present invention was provided is applied to the demand response regulation and control dress of drainage and irrigation hyelectric power facility Putting can make different operation regulating strategies, and be applied to the demand response regulation device of drainage and irrigation hyelectric power facility it is built-in to by The many operation regulating strategies of the drainage and irrigation hyelectric power system of water pump assembly composition, the operation regulating strategy can be according to from grid side The demand response event information of demand response server, operational factor, ambient parameter with reference to itself, to by many water pump assemblies The drainage and irrigation hyelectric power system of composition, considers the necessity and emergency of each water pump assembly operation, and reasonable arrangement participates in needing automatically The order of the unit of response is sought, while the execution efficiency of automatic demand response business is improve, be effectively prevent because of unit The unreasonable economic loss for causing of operation.
Brief description of the drawings
Fig. 1 is the demand response regulation device structural representation that drainage and irrigation hyelectric power facility is applied in the embodiment of the present invention;
Fig. 2 is that the demand response regulation device data exchange that drainage and irrigation hyelectric power facility is applied in the embodiment of the present invention is illustrated Figure;
Fig. 3 is the demand response regulation and control method flow diagram that drainage and irrigation hyelectric power facility is applied in the embodiment of the present invention.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
The present invention proposes to carry out drainage and irrigation hyelectric power facility automatic demand response regulation and control, both reduces peak of power consumption, alleviates Power network pressure, improves operation of power networks reliability;The workload of user's manual manipulation irrigation and drainage facility is reduced again, is provided the user Facility;Also abandoning light, abandoning under the serious background of landscape condition, for renewable energy power generation of effectively dissolving provides technology branch Hold.
A kind of demand response regulation device for being applied to drainage and irrigation hyelectric power facility of present invention offer, such as Fig. 1 and Fig. 2, including it is micro- Processor module, communication module, security module, interface module, data acquisition module, data memory module, real-time clock module, Watchdog module and power management module;
Communication module, security module, interface module, data acquisition module, data memory module, real-time clock module, see Door dog module is bi-directionally connected with microprocessor module, and power management module is simultaneously unidirectional with microprocessor module and interface module Connection.
Microprocessor module is based on the demand response strategy in demand response policy library, and matches operation regulating strategy storehouse Operation regulating strategy, and then generating run regulation and control instruction.
Communication module is communicated by communication network with demand response server and customer mobile terminal, and it arranges electric power The power information for filling facility is sent to demand response server and customer mobile terminal, and receives what demand response server was issued Electricity price information and excitation information, while receiving the user's control instruction that customer mobile terminal is issued.
Data acquisition module is used to gather the running state parameter of drainage and irrigation hyelectric power facility, and the running state parameter to gathering It is monitored, while being additionally operable to measure the electrical parameter and ambient parameter of drainage and irrigation hyelectric power facility;
Electrical parameter includes the electrical parameter of each main frame and the electrical parameter of relevant components part;
Ambient parameter includes soil moisture, water level and temperature.
The built-in demand response policy library of data memory module and operation regulating strategy storehouse, it is used to store drainage and irrigation hyelectric power facility Essential information, running state parameter, electrical parameter, ambient parameter and historical data;
Essential information includes numbering, address, subscriber phone and the power supply priority of drainage and irrigation hyelectric power facility.
Demand response server passes through to call and match the essential information of drainage and irrigation hyelectric power facility, distinguishes and search drainage and irrigation hyelectric power Facility.
On the one hand security module is used for running state parameter, the electricity of the drainage and irrigation hyelectric power facility for verifying data collecting module collected The legitimacy of parameter and ambient parameter, on the other hand, in order to prevent the information for sending out to be tampered, security module is to feedback signal It is encrypted, while being maintained secrecy to user basic information, it is ensured that user basic information does not outflow safely, plays protection user hidden Private effect.
Micro treatment module completes issuing for operation regulation and control instruction by interface module, and interface module includes digital interface, mould Intend interface, RJ45, RS232 and RS485;
Analog interface gathers analog signal, and the module by signal of collection is processed, and produces and export simulation control afterwards Signal processed;
Digital interface gathers data signal, and for judging the running status of each water pump assembly in drainage and irrigation hyelectric power facility, it Digital controlled signal is produced and exported afterwards.
Real-time clock module provides Perfect Time for device, prevents the feelings of core dumped during drainage and irrigation hyelectric power facility operation Condition, it is ensured that operation regulating strategy is normally performed;
Whether watchdog module normally runs for supervising device;
Power management module is responsible for the management and distribution of device electric energy.
Customer mobile terminal includes smart mobile phone and panel computer, and user is by customer mobile terminal real-time remote monitoring electricity The running status of power irrigation and drainage facility, and when user's refusal is according to operation regulating strategy regulation and control drainage and irrigation hyelectric power facility, by under user Hair manual control instruction, when the operation regulation and control instruction that the manual control instruction that user issues is issued with microprocessor module conflicts When, the manual control instruction operation that drainage and irrigation hyelectric power facility is issued according to user.
The demand response regulation device that the present invention is provided is installed on drainage and irrigation hyelectric power facilities and equipment side, by communication network on Communicated with demand response server and customer mobile terminal;To lower according to actual conditions, selection distrbuted bus or Other LANs communicate with each water pump assembly of drainage and irrigation hyelectric power facility.
The present invention also provides a kind of demand response regulation and control method for being applied to drainage and irrigation hyelectric power facility, as shown in figure 3, specific bag Include:
S101:Demand response event information is received, and judges demand response classification;
S102:According to different demand response categorical match corresponding demand response policies;
S103:Response policy performs operation regulating strategy according to demand.
S101 detailed processes are as follows:
Receive the demand response event information that demand response server is issued;
Response events information judges that demand response classification is stimulable type demand response or electricity price type demand response according to demand.
S102 detailed processes are divided into situations below:
Situation 1:If demand response classification is stimulable type demand response, load eliminating tolerancing signal or renewable is first received and parsed through Energy consumption signal, then matches corresponding demand response policy according to stimulable type demand response;
Situation 2:If demand response classification is electricity price type demand response, electricity price signal is first received, then according to electricity price type need Seek response matching corresponding demand response policy.
After S102 in two kinds of situation:
Situation 1:If demand response classification is stimulable type demand response, electrical parameter, the environment ginseng of drainage and irrigation hyelectric power facility are gathered Number and running state parameter, then determine response grade and response capacity, and upload feedback signal, finally judge whether to meet need Response events requirement is asked, confirmation signal is issued if meeting and receiving demand response server, continued to if being unsatisfactory for and parsed Load eliminating tolerancing signal or regenerative resource are dissolved and signal and perform subsequent operation;
Judge whether to meet demand response event requirements detailed process as follows:
Load reduction plan or the regenerative resource plan of dissolving are uploaded to demand response server, demand response server Signaled according under summarized results, be divided into situations below:
If 1) summarized results meets demand response event requirements, demand response server issues confirmation signal;
If 2) summarized results is unsatisfactory for demand response event requirements, demand response server is issued reformulates demand response Policy signal, continues to and parses load eliminating tolerancing signal or regenerative resource is dissolved signal, and demand response strategy is matched again And feed back, until remittance result meets demand response event requirements, now demand response server issues confirmation signal.
Situation 2:If demand response classification is electricity price type demand response, electrical parameter, the environment ginseng of drainage and irrigation hyelectric power facility are gathered Number and running state parameter, then determine response grade and response capacity, and upload feedback signal, demand response server according to Feedback signal issues confirmation signal.
S103 is specifically included:
Receive the confirmation signal that demand response server is issued;
Response policy and confirmation signal perform operation regulating strategy according to demand.
Following operation is also performed after S103:
1) according to response grade, judge whether demand response belongs to emergency demand response:
If 1-1) being not belonging to emergency demand response, user's selection is in a manual manner or automated manner carries out spatial load forecasting; It is specifically divided into situations below:
If user's selection automated manner carries out spatial load forecasting, each water pump assembly is automatically controlled according to operation regulating strategy Start and stop;
If user's selection manual mode carries out spatial load forecasting, by user, voluntarily response policy and operation regulate and control as desired Policy execution result regulates and controls to drainage and irrigation hyelectric power facility.
If 1-2) belonging to emergency demand response, user must in an automatic fashion carry out spatial load forecasting;
2) demand response strategy is performed, and based on the operation regulating strategy in operation regulating strategy storehouse, generating run regulation and control Instruction;(for separate unit water pump assembly, when its actual power loss receives flow effect, therefore demand response strategy to be related to the start and stop of water pump The flow of day part when section and opening;For being made up of many water pump assembly parallel connections, and can individually adjust each water pump Irrigation and drainage system, the formulation of response policy needs to consider the start and stop period of many water pumps and the flow of day part, makes whole system The response condition of system is optimal)
3) record demand response time started, end time, during demand response drainage and irrigation hyelectric power facility electrical parameter, ring After border parameter and running state parameter, and the above- mentioned information encryption that will be recorded, send to demand response server.
Demand response strategy includes that response participates in object information, response object running state information and response time arrangement letter Breath.
For price type demand response and stimulable type demand response, corresponding demand response policy all should be with can not be to irrigated area It is principle that interior crop produces influence, is specifically divided into situations below:
For the drainage and irrigation hyelectric power facility only containing separate unit water pump assembly, first confirm that water pump assembly in the demand response period Working condition, the demand response period is divided according to the necessary and urgency level that water pump assembly runs, it is necessary to load is cut down Flow is closed down or reduced to Shi Youxian in the inessential operation period;
For the drainage and irrigation hyelectric power facility being polymerized by least two water pump assemblies, on the premise of demand response requirement is met, Each demand response period, water pump assembly was needed the unit of response, concrete operations according to the necessary and urgency level selection of operation The inessential operation water pump assembly of prioritizing selection is, it is necessary to prioritizing selection urgent water pump machine when load is dissolved during to need load to cut down Group, it is final to determine response load.For example, after load reduction order is received, if must be protected in a certain unit of certain moment Normal operation is held, then when moment strategy is formulated, load reduction task is distributed into other units, it is normal to ensure the unit Operation.
Operation regulating strategy adjusts whole water pump assembly of flow and start and stop of water pump assembly using converter plant:
(1) flow of water pump assembly is adjusted using converter plant:
For the water pump dragging motor equipped with converter plant, the operation power of motor is influenceed by pump capacity, therefore can be with By the operation power for controlling Flow-rate adjustment unit.Converter plant controls the frequency of frequency converter according to the flow set for unit, The automatic rotating speed for changing pump motor, is finally reached the purpose of regulation unit operation power.
(2) whole unit of start and stop:
The operation regulating strategy large and fast speed of load variations amount, for the unit for not installing converter plant, will appear from larger Temporary impact electric current, influence is likely to result on power network.
Operation regulating strategy be integrated with to separate unit water pump assembly at times regulation and control, to many connection at times of water pump assembly Close the aspect strategy of regulation and control two;
Separate unit water pump assembly regulates and controls to refer at times for same water pump assembly, and necessity is run not according to its day part Together, the start and stop state or flow of its day part are adjusted.
Combined regulating refers to drainage and irrigation hyelectric power system to being made up of many units at times for many water pump assemblies, with Whole Response It is target that situation is optimal, and when needing load to cut down, the inessential operating unit of prioritizing selection is closed down, and reduces the shadow to irrigation and drainage effect Ring;
Can be used to responding the regenerative resource that issues of demand response server to dissolve order, for what is be polymerized by many water pumps Drainage and irrigation hyelectric power system, on the premise of response requirement is met, to avoid causing other economic losses, each moment presses unit Necessary and urgency level according to operation is ranked up, and prioritizing selection opens urgent unit.
Meanwhile, in demand response implementation procedure, drainage and irrigation hyelectric power facility relevant parameter by Real-time Collection, and will also be sent to Monitoring system of user's control system or demand response executing agency etc..
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention rather than its limitations, institute The those of ordinary skill in category field specific embodiment of the invention can still be modified with reference to above-described embodiment or Equivalent, these are applying for this pending hair without departing from any modification of spirit and scope of the invention or equivalent Within bright claims.

Claims (21)

1. a kind of demand response regulation device for being applied to drainage and irrigation hyelectric power facility, it is characterised in that described device includes microprocessor Device module, communication module, security module, interface module, data acquisition module, data memory module, real-time clock module, guard the gate Dog module and power management module;
The communication module, security module, interface module, data acquisition module, data memory module, real-time clock module, see Door dog module is bi-directionally connected with microprocessor module, and the power management module is with microprocessor module and interface module simultaneously Unidirectional connection.
2. the demand response regulation device for being applied to drainage and irrigation hyelectric power facility according to claim 1, it is characterised in that described Microprocessor module is based on the demand response strategy in demand response policy library, and the operation matched in operation regulating strategy storehouse is adjusted Control strategy, and then generating run regulation and control instruction.
3. the demand response regulation device for being applied to drainage and irrigation hyelectric power facility according to claim 1, it is characterised in that described Communication module is communicated by communication network with demand response server and customer mobile terminal, and it is by drainage and irrigation hyelectric power facility Power information is sent to demand response server and customer mobile terminal, and receives the electricity price information that demand response server is issued And excitation information, while receiving the user's control instruction that customer mobile terminal is issued.
4. the demand response regulation device for being applied to drainage and irrigation hyelectric power facility according to claim 3, it is characterised in that described Data acquisition module is used to gathering the running state parameter of drainage and irrigation hyelectric power facility, and running state parameter to gathering is supervised Survey, while being additionally operable to measure the electrical parameter and ambient parameter of drainage and irrigation hyelectric power facility;
The electrical parameter includes the electrical parameter of each main frame and the electrical parameter of relevant components part;
The ambient parameter includes soil moisture, water level and temperature.
5. the demand response regulation device for being applied to drainage and irrigation hyelectric power facility according to claim 4, it is characterised in that described The built-in demand response policy library of data memory module and operation regulating strategy storehouse, its basic letter for being used to store drainage and irrigation hyelectric power facility Breath, running state parameter, electrical parameter, ambient parameter and historical data;
The essential information includes numbering, address, subscriber phone and the power supply priority of drainage and irrigation hyelectric power facility.
6. the demand response regulation device for being applied to drainage and irrigation hyelectric power facility according to claim 5, it is characterised in that described Demand response server passes through to call and match the essential information of drainage and irrigation hyelectric power facility, distinguishes and search drainage and irrigation hyelectric power facility.
7. the demand response regulation device for being applied to drainage and irrigation hyelectric power facility according to claim 1, it is characterised in that described Security module is used for running state parameter, electrical parameter and the ambient parameter of the drainage and irrigation hyelectric power facility for verifying data collecting module collected Legitimacy, and feedback signal is encrypted, while being maintained secrecy to user basic information, it is ensured that user basic information safety Do not outflow, play a part of to protect privacy of user.
8. the demand response regulation device for being applied to drainage and irrigation hyelectric power facility according to claim 1, it is characterised in that described Micro treatment module completes issuing for operation regulation and control instruction by interface module, and the interface module includes that digital interface, simulation connect Mouth, RJ45, RS232 and RS485;
The analog interface gathers analog signal, and the module by signal of collection is processed, and produces and export simulation control afterwards Signal processed;
The digital interface gathers data signal, and for judging the running status of each water pump assembly in drainage and irrigation hyelectric power facility, it Digital controlled signal is produced and exported afterwards.
9. the demand response regulation device for being applied to drainage and irrigation hyelectric power facility according to claim 1, it is characterised in that described Real-time clock module provides Perfect Time for described device, prevents the situation of core dumped during drainage and irrigation hyelectric power facility operation, protects Card operation regulating strategy is normally performed;
The watchdog module is used to monitor whether described device is normally run;
The power management module is responsible for the management and distribution of described device electric energy.
10. the demand response regulation device for being applied to drainage and irrigation hyelectric power facility according to claim 3, it is characterised in that institute Stating customer mobile terminal includes smart mobile phone and panel computer, and user passes through customer mobile terminal real-time remote monitoring drainage and irrigation hyelectric power The running status of facility, and when user's refusal is according to operation regulating strategy regulation and control drainage and irrigation hyelectric power facility, issued artificially by user Control instruction, when the operation regulation and control instruction that the manual control instruction that user issues is issued with microprocessor module conflicts, electric power The manual control instruction operation that irrigation and drainage facility is issued according to user.
A kind of 11. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility, it is characterised in that methods described includes:
Demand response event information is received, and judges demand response classification;
According to different demand response categorical match corresponding demand response policies;
Response policy performs operation regulating strategy according to demand.
The 12. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 11, it is characterised in that institute Reception demand response event information is stated, and judges that demand response classification is specifically included:
Receive the demand response event information that demand response server is issued;
Response events information judges demand response classification according to demand, the demand response classification include stimulable type demand response and Electricity price type demand response.
The 13. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 12, it is characterised in that institute State and specifically included according to different demand response categorical match corresponding demand response policies:
If demand response classification is stimulable type demand response, first receives and parses through load eliminating tolerancing signal or regenerative resource is dissolved letter Number, corresponding demand response policy is then matched according to stimulable type demand response;
If demand response classification is electricity price type demand response, electricity price signal is first received, then matched according to electricity price type demand response Corresponding demand response policy.
The 14. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 13, it is characterised in that institute State includes according to after different demand response categorical match corresponding demand response policies:
If demand response classification is stimulable type demand response, electrical parameter, ambient parameter and the operation shape of drainage and irrigation hyelectric power facility are gathered State parameter, then determines response grade and response capacity, and uploads feedback signal, finally judges whether to meet demand response event It is required that, confirmation signal is issued if meeting and receiving demand response server, load abatement letter is continued to and parsed if being unsatisfactory for Number or regenerative resource dissolve and signal and perform subsequent operation;
If demand response classification is electricity price type demand response, electrical parameter, ambient parameter and the operation shape of drainage and irrigation hyelectric power facility are gathered State parameter, then determines response grade and response capacity, and uploads feedback signal, and demand response server is according under feedback signal Hair confirmation signal.
The 15. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 14, it is characterised in that institute State and judge whether that meeting demand response event requirements specifically includes:
Load reduction plan or the regenerative resource plan of dissolving are uploaded to demand response server, the demand response server Signaled according under summarized results, be divided into situations below:
If 1) summarized results meets demand response event requirements, the demand response server issues confirmation signal;
If 2) summarized results is unsatisfactory for demand response event requirements, the demand response server is issued reformulates demand response Policy signal, continues to and parses load eliminating tolerancing signal or regenerative resource is dissolved signal, and demand response strategy is matched again And feed back, until remittance result meets demand response event requirements, now demand response server issues confirmation signal.
The 16. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 15, it is characterised in that institute Response policy execution operation regulating strategy according to demand is stated to specifically include:
Receive the confirmation signal that demand response server is issued;
Response policy and confirmation signal perform operation regulating strategy according to demand.
The 17. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 16, it is characterised in that institute Stating after response policy according to demand performs operation regulating strategy includes:
According to response grade, judge whether demand response belongs to emergency demand response;If being not belonging to emergency demand response, use Family selection is in a manual manner or automated manner carries out spatial load forecasting;If belonging to emergency demand response, user must be with automatic side Formula carries out spatial load forecasting;
Demand response strategy is performed, and based on the operation regulating strategy in operation regulating strategy storehouse, generating run regulation and control instruction;
Electrical parameter, the ambient parameter of drainage and irrigation hyelectric power facility during record demand response time started, end time, demand response And after running state parameter, and the above- mentioned information encryption that will be recorded, send to demand response server.
The 18. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 17, it is characterised in that institute State user's selection in a manual manner or automated manner carries out spatial load forecasting and specifically includes:
If user's selection automated manner carries out spatial load forecasting, opening for each water pump assembly is automatically controlled according to operation regulating strategy Stop;
If user selection manual mode carry out spatial load forecasting, by user voluntarily as desired response policy and operation regulating strategy Implementing result regulates and controls to drainage and irrigation hyelectric power facility.
The 19. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 16, it is characterised in that institute Stating demand response strategy includes that response participates in object information, response object running state information and response time arrangement information.
The 20. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 13, it is characterised in that pin To price type demand response and stimulable type demand response, corresponding demand response policy all should be with can not be to making produce in irrigated area Raw influence is principle, is specifically divided into situations below:
For the drainage and irrigation hyelectric power facility only containing separate unit water pump assembly, work of the water pump assembly in the demand response period is first confirmd that State, the demand response period is divided according to the necessary and urgency level that water pump assembly runs, it is necessary to load is excellent when cutting down First flow is closed down or reduces in the inessential operation period;
For the drainage and irrigation hyelectric power facility being polymerized by least two water pump assemblies, on the premise of demand response requirement is met, respectively need Water pump assembly is needed the unit of response according to necessity and urgency level selection of operation to ask the response period, and concrete operations are to need Prioritizing selection inessential operation water pump assembly when wanting load to cut down, it is necessary to prioritizing selection urgent water pump assembly when load is dissolved, most Response load is determined eventually.
The 21. demand response regulation and control methods for being applied to drainage and irrigation hyelectric power facility according to claim 13, it is characterised in that institute State whole water pump assembly of flow and start and stop that operation regulating strategy adjusts water pump assembly using converter plant.
CN201710137896.1A 2017-03-09 2017-03-09 Demand response regulation and control device and method applied to electric power irrigation and drainage facilities Active CN106816878B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710137896.1A CN106816878B (en) 2017-03-09 2017-03-09 Demand response regulation and control device and method applied to electric power irrigation and drainage facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710137896.1A CN106816878B (en) 2017-03-09 2017-03-09 Demand response regulation and control device and method applied to electric power irrigation and drainage facilities

Publications (2)

Publication Number Publication Date
CN106816878A true CN106816878A (en) 2017-06-09
CN106816878B CN106816878B (en) 2020-07-24

Family

ID=59114775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710137896.1A Active CN106816878B (en) 2017-03-09 2017-03-09 Demand response regulation and control device and method applied to electric power irrigation and drainage facilities

Country Status (1)

Country Link
CN (1) CN106816878B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110380407A (en) * 2019-07-05 2019-10-25 河海大学 A kind of power distribution network running optimizatin method considering the electric irrigation and drainage load of agricultural
CN113794285A (en) * 2021-10-22 2021-12-14 成都汉度科技有限公司 Intelligent flexible regulation and control method for agricultural motor-pumped well cluster
CN114740764A (en) * 2021-08-20 2022-07-12 百倍云(浙江)物联科技有限公司 Intelligent agricultural greenhouse edge cloud cooperative synchronous control system and control method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102738801A (en) * 2012-05-28 2012-10-17 深圳市科陆电子科技股份有限公司 Power demand responding method and system
CN103679357A (en) * 2013-12-06 2014-03-26 国网山东省电力公司 Power demand response intelligent decision method based on price and excitation
CN105258306A (en) * 2015-09-30 2016-01-20 中国电力科学研究院 Automatic demand response device oriented to central air conditioning system and application method
CN105470971A (en) * 2016-01-12 2016-04-06 中国电力科学研究院 Flexible adaptive power load control system and control method thereof
WO2016110833A2 (en) * 2015-01-06 2016-07-14 Cmoo Systems Itd. A method and apparatus for power extraction in a pre-existing ac wiring infrastructure
CN105958640A (en) * 2016-04-21 2016-09-21 九州方圆实业控股(集团)有限公司 Residential user requirement response system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102738801A (en) * 2012-05-28 2012-10-17 深圳市科陆电子科技股份有限公司 Power demand responding method and system
CN103679357A (en) * 2013-12-06 2014-03-26 国网山东省电力公司 Power demand response intelligent decision method based on price and excitation
WO2016110833A2 (en) * 2015-01-06 2016-07-14 Cmoo Systems Itd. A method and apparatus for power extraction in a pre-existing ac wiring infrastructure
CN105258306A (en) * 2015-09-30 2016-01-20 中国电力科学研究院 Automatic demand response device oriented to central air conditioning system and application method
CN105470971A (en) * 2016-01-12 2016-04-06 中国电力科学研究院 Flexible adaptive power load control system and control method thereof
CN105958640A (en) * 2016-04-21 2016-09-21 九州方圆实业控股(集团)有限公司 Residential user requirement response system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110380407A (en) * 2019-07-05 2019-10-25 河海大学 A kind of power distribution network running optimizatin method considering the electric irrigation and drainage load of agricultural
CN110380407B (en) * 2019-07-05 2022-09-16 河海大学 Power distribution network operation optimization method considering agricultural electric irrigation and drainage loads
CN114740764A (en) * 2021-08-20 2022-07-12 百倍云(浙江)物联科技有限公司 Intelligent agricultural greenhouse edge cloud cooperative synchronous control system and control method thereof
CN113794285A (en) * 2021-10-22 2021-12-14 成都汉度科技有限公司 Intelligent flexible regulation and control method for agricultural motor-pumped well cluster

Also Published As

Publication number Publication date
CN106816878B (en) 2020-07-24

Similar Documents

Publication Publication Date Title
CN103299882B (en) Economize on water intelligent irrigation system in a kind of field, irrigated area
CN106096772A (en) Energy based on intelligent power and load corporate management system and implementation method
CN104124707A (en) Hydropower station power quick adjustment system and implementation method based on intensive small hydropower station groups
CN104319774B (en) Monitoring method and device for intelligent community
CN105580716A (en) Large-area multi-field-piece automatic water-saving irrigation three-level control system and use method thereof
CN106816878A (en) A kind of demand response regulation device and method for being applied to drainage and irrigation hyelectric power facility
CN206363377U (en) A kind of engineering progress management system
CN203597190U (en) Intelligent water-saving field irrigation system of irrigation district
CN107453364A (en) A kind of energy stream of Regional Energy system and information flow fusion method
CN109858725A (en) Collect regimental hydraulic power plant group economical operation integral system platform architecture
CN102467121A (en) System energy efficiency controller and control method for universal network, and method for controlling terminal equipment
CN106787190B (en) A kind of monitoring system and monitoring method for DC micro power grid system
CN104037805A (en) Power generation margin distribution method for photovoltaic power station based on power grid security constraints
CN106355293A (en) Optimizing allocation method and device for spinning reserve capacity of regional power grid
CN107444148A (en) A kind of Distributed sharing type electric automobile stopping for charging system
CN103490509A (en) Electric energy monitoring method and system for household appliances
CN106559501A (en) A kind of flat industry control method and system
CN102842916B (en) For how wind farm grid-connected information collecting method
CN105226649B (en) One kind predicting improved provincial power network power generation dispatching optimization method based on bus load
CN203149366U (en) Oil field water flooding networking monitoring instrument and oil field water flooding networking control system
CN112381474B (en) Method for participating in electric power auxiliary peak shaving by user side resource aggregation
CN207896679U (en) A kind of concentration parallel net type smart new energy electricity generation system
CN101976845A (en) Wind-power reactive power automatic control method for monitor system of wind power station
CN103475000B (en) Off-peak monitoring method and system of orderly power utilization
CN104050533B (en) Electric power system wind power plant fair-share scheduling method based on minimum wind curtailment control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant