CN106815665A - A kind of implementation method of the extemporaneous preliminary budget of distribution network engineering intelligence - Google Patents
A kind of implementation method of the extemporaneous preliminary budget of distribution network engineering intelligence Download PDFInfo
- Publication number
- CN106815665A CN106815665A CN201510848684.5A CN201510848684A CN106815665A CN 106815665 A CN106815665 A CN 106815665A CN 201510848684 A CN201510848684 A CN 201510848684A CN 106815665 A CN106815665 A CN 106815665A
- Authority
- CN
- China
- Prior art keywords
- engineering
- budget
- distribution network
- preliminary budget
- preliminary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000010586 diagram Methods 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 claims description 20
- 230000008569 process Effects 0.000 claims description 8
- 230000008859 change Effects 0.000 claims description 5
- 238000013461 design Methods 0.000 claims description 5
- 230000004069 differentiation Effects 0.000 claims description 5
- 230000005611 electricity Effects 0.000 claims description 4
- 239000000284 extract Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 230000009466 transformation Effects 0.000 claims description 3
- 238000012795 verification Methods 0.000 claims description 3
- 238000013459 approach Methods 0.000 claims description 2
- 230000003993 interaction Effects 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 1
- 239000003990 capacitor Substances 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000003607 modifier Substances 0.000 description 1
- 230000003252 repetitive effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of implementation method of preliminary budget of intelligently being taken one's seat the present invention relates to distribution network engineering, including:Build engineering equipment machine account warehouse;Set up graphical element model storehouse;Build preliminary budget type storehouse;Determine distribution network engineering preliminary budget according to distribution network engineering wiring diagram, engineering equipment machine account, graphical element model and preliminary budget standard;The result of distribution network engineering preliminary budget is taken one's seat and is represented.Technical solution of the present invention substantially increases the quality and efficiency of Project Budget.
Description
Technical field:
The present invention relates to field of power, a kind of distribution network engineering intelligently extemporaneous preliminary budget is more particularly to
Implementation method.
Background technology:
At present, in distribution network engineering process of construction, Project Budget process is comparatively laborious, and is one
The work pulled one hair and move the whole body of item, cause each preliminary budget be required for spending more manpower and time into
This.When engineering design etc. is changed, it is necessary to re-start Project Budget, even more cause a large amount of
Repetitive operation, easily causes preliminary budget and deviation occurs, while can also be produced to integrated engineering progress certain
Influence.
The content of the invention:
A kind of implementation method of preliminary budget of intelligently being taken one's seat it is an object of the invention to provide distribution network engineering, significantly
Improve the quality and efficiency of Project Budget.
To achieve the above object, the present invention uses following technical scheme:A kind of distribution network engineering is intelligently extemporaneous
The implementation method of preliminary budget, including:
Build engineering equipment machine account warehouse;
Set up graphical element model storehouse;
Build preliminary budget type storehouse;
Determine to match somebody with somebody according to distribution network engineering wiring diagram, engineering equipment machine account, graphical element model and preliminary budget standard
Electricity power engineering preliminary budget;
The result of distribution network engineering preliminary budget is taken one's seat and is represented.
The engineering equipment machine account warehouse includes various electrical equipments, each unit price, each unit
Cost factor and its classification of interaction relation, the model of each electrical equipment and distribution network engineering scale.
The graphical element model storehouse includes pel that is corresponding with the electrical equipment in the warehouse and setting up
Model;And the graphical element model is set up with each self-corresponding electrical equipment relation factor and corresponding topology pass
Set section point.
The preliminary budget type storehouse Bureau of Energy promulgates engineering construction standard, location difference standard and institute
State Bureau of Energy and promulgate engineering construction standard and location difference standard corresponding relation model.
The preliminary budget standard is imported with type stage by stage, carries out each engineering phase classification preliminary budget, electrically
Device class preliminary budget and overall budget.
Comparison study analytic approach carries out preliminary budget check;Its detailed process is respectively that engineering phase classification is general
Budget is analyzed with electrical equipment classification preliminary budget result, completes classification preliminary budget and checks, so that
Ensure the accuracy of overall budget.
According to the distribution network engineering wiring diagram, each pel element on the wiring diagram is analyzed, extract pel
Indicate and associate with stock of equipment storehouse in real time;Setting realizes occurring more than fund in planning and designing or transformation process
Spend stipulations condition construction investment amount and the engineering construction place of warning;The engineering construction place is by knot
Conjunction includes regional construction cost differentiation information and auxiliary material differentiation information, it is ensured that Project Budget accuracy.
According to the change of the distribution network engineering wiring diagram, update mode is extended using caching in real time, will related to
And the engineering factor of change, include overall budget and cached, and in the buffer according to engineering phase type
Division carries out classification preliminary budget, by budget result real time propelling movement, realizes extemporaneous representing.
The engineering phase type is freely divided according to the process of engineering design and examination & verification, realizes each rank of engineering
The extemporaneous of preliminary budget represents section.
With immediate prior art ratio, the present invention provides technical scheme has following excellent effect
1st, technical solution of the present invention can substantially reduce the manpower put into during distribution network engineering preliminary budget
And time cost, improve the quality and efficiency of distribution network engineering preliminary budget;
2nd, technical solution of the present invention improves distribution network engineering construction efficiency;
3rd, technical solution of the present invention extends update method using caching in real time, in feelings such as engineering design changes
Under condition, it is possible to achieve intelligently extemporaneous calculating represents preliminary budget, and raising re-starts the efficiency of preliminary budget.
Brief description of the drawings
Fig. 1 realizes figure for the method for the embodiment of the present invention;
Fig. 2 is the real-time caching extension update mode figure of the embodiment of the present invention.
Specific embodiment
With reference to embodiment, the invention will be described in further detail.
Embodiment 1:
The invention of this example provides the implementation method that a kind of distribution network engineering intelligently takes one's seat preliminary budget, is applied to match somebody with somebody
Preliminary budget is carried out in electricity power engineering construction retrofit design process, procedure schematic diagram is as shown in Figure 1.
The present invention be divided into structure stock of equipment storehouse, build graphical element model storehouse, build preliminary budget type storehouse,
Intelligent preliminary budget, extemporaneous represent 5 steps.
(1) set up comprising various electrical equipments stock of equipment storehouse (refer mainly to transformer, reactor,
Capacitor, distribution box, breaker, transformer, arrester, transmission line of electricity, power cable, ground connection dress
Put, generator, phase modifier, motor, enclosed busbar etc.), and preset its unit cost respectively, and
Set up respective associated flag bit.
(2) graphical element model storehouse is set up, realizes that pel is corresponding with equipment in stock of equipment storehouse, and setting
Building topology relationship factor in standby pel.
(3) preliminary budget type storehouse is set up, Bureau of Energy is imported and is promulgated engineering construction standard with local work
Journey construction criteria, and set up independent assortment association.
(4) according to distribution network engineering wiring diagram, each pel element on analyzed pattern extracts pel mark
And associate with stock of equipment storehouse in real time;Setting stipulations condition construction investment amount (mainly realizes planning and designing
Or occur in transformation process fund remaining warning), engineering construction place (mainly in combination with regional construction cost,
The differentiation information such as relevant auxiliary materials, it is ensured that Project Budget accuracy);
(5) according to the change of distribution network engineering wiring figure wiring diagram, updated using caching extension in real time
Technology, as shown in Fig. 2 engineering correlative factor will be related to, includes overall budget caching, and in the buffer
Classification preliminary budget is carried out according to engineering phase Type division, by budget result real time propelling movement, extemporaneous exhibition is realized
It is existing.(the wherein process such as design, examination & verification of stage division method Main Basiss engineering is freely divided, mainly
Realize that each the extemporaneous of stage preliminary budget of engineering represents.)
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention rather than to it
Limitation, those of ordinary skill in the art with reference to above-described embodiment although should be understood:Still can be right
Specific embodiment of the invention is modified or equivalent, and these are without departing from spirit of the invention and model
Any modification enclosed or equivalent, apply pending claims of the invention it
It is interior.
Claims (9)
1. the implementation method of the intelligent extemporaneous preliminary budget of a kind of distribution network engineering, it is characterised in that:Including:
Build engineering equipment machine account warehouse;
Set up graphical element model storehouse;
Build preliminary budget type storehouse;
Determine distribution according to distribution network engineering wiring diagram, engineering equipment machine account, graphical element model and preliminary budget standard
Net Project Budget;
The result of distribution network engineering preliminary budget is taken one's seat and is represented.
2. the implementation method of the intelligent extemporaneous preliminary budget of a kind of distribution network engineering as claimed in claim 1, it is special
Levy and be:The engineering equipment machine account warehouse includes various electrical equipments, each unit price, each list
Position cost factor and its classification of interaction relation, the model of each electrical equipment and distribution network engineering scale.
3. the implementation method of the intelligent extemporaneous preliminary budget of a kind of distribution network engineering as claimed in claim 1 or 2,
It is characterized in that:What the graphical element model storehouse was set up including corresponding with the electrical equipment in the warehouse
Graphical element model;And the graphical element model is set up with each self-corresponding electrical equipment relation factor and corresponding topology
Relation node.
4. the implementation method of the intelligent extemporaneous preliminary budget of a kind of distribution network engineering as claimed in claim 1, it is special
Levy and be:The preliminary budget type storehouse Bureau of Energy promulgate engineering construction standard, location difference standard and
The Bureau of Energy promulgates engineering construction standard and location difference standard corresponding relation model.
5. the implementation method of the intelligent extemporaneous preliminary budget of a kind of distribution network engineering as claimed in claim 4, it is special
Levy and be:The preliminary budget standard is imported with type stage by stage, carries out each engineering phase classification preliminary budget, electricity
Gas device class preliminary budget and overall budget.
6. the implementation method of the intelligent extemporaneous preliminary budget of a kind of distribution network engineering as claimed in claim 5, it is special
Levy and be:Comparison study analytic approach carries out preliminary budget check;Respectively by engineering phase classification preliminary budget with it is electric
Device class preliminary budget result is analyzed, and completes classification preliminary budget and checks.
7. the implementation method of the intelligent extemporaneous preliminary budget of a kind of distribution network engineering as claimed in claim 4, it is special
Levy and be:According to the distribution network engineering wiring diagram, each pel element on the wiring diagram is analyzed, extract figure
Unit's mark is simultaneously associated with stock of equipment storehouse in real time;Setting realizes occurring more than fund in planning and designing or transformation process
Spend stipulations condition construction investment amount and the engineering construction place of warning;The engineering construction place is by combining
Including regional construction cost differentiation information and auxiliary material differentiation information, it is ensured that Project Budget accuracy.
8. the implementation method of the intelligent extemporaneous preliminary budget of a kind of distribution network engineering as claimed in claim 5, it is special
Levy and be:According to the change of the distribution network engineering wiring diagram, update mode is extended using caching in real time, will
It is related to the engineering factor of change, includes overall budget and cached, and in the buffer according to engineering phase type
Division carries out classification preliminary budget, by budget result real time propelling movement, realizes extemporaneous representing.
9. a kind of implementation method of the intelligent extemporaneous preliminary budget of distribution network engineering as described in claim 5 or 8,
It is characterized in that:The engineering phase type is freely divided according to the process of engineering design and examination & verification, realizes work
Each the extemporaneous of stage preliminary budget represents journey.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510848684.5A CN106815665B (en) | 2015-11-27 | 2015-11-27 | Method for realizing intelligent ad hoc budget estimate of power distribution network engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510848684.5A CN106815665B (en) | 2015-11-27 | 2015-11-27 | Method for realizing intelligent ad hoc budget estimate of power distribution network engineering |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106815665A true CN106815665A (en) | 2017-06-09 |
CN106815665B CN106815665B (en) | 2020-08-18 |
Family
ID=59103196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510848684.5A Active CN106815665B (en) | 2015-11-27 | 2015-11-27 | Method for realizing intelligent ad hoc budget estimate of power distribution network engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106815665B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109978502A (en) * | 2019-03-21 | 2019-07-05 | 广州翔实工程咨询有限公司 | Automatic budget method, system and computer storage medium are changed in engineering design |
CN112036806A (en) * | 2020-07-15 | 2020-12-04 | 远光软件股份有限公司 | Project full life cycle approximate calculation management method, device, equipment and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020138294A1 (en) * | 2000-07-12 | 2002-09-26 | Yoshio Ando | Paint manufacturing method |
CN102646144A (en) * | 2012-03-16 | 2012-08-22 | 江西省电力公司 | ObjectARX-based standardized intelligent design method for rural power network engineering |
CN102999671A (en) * | 2012-11-30 | 2013-03-27 | 江苏省电力公司盱眙县供电公司 | Computer design method of standard distribution network line |
-
2015
- 2015-11-27 CN CN201510848684.5A patent/CN106815665B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020138294A1 (en) * | 2000-07-12 | 2002-09-26 | Yoshio Ando | Paint manufacturing method |
CN102646144A (en) * | 2012-03-16 | 2012-08-22 | 江西省电力公司 | ObjectARX-based standardized intelligent design method for rural power network engineering |
CN102999671A (en) * | 2012-11-30 | 2013-03-27 | 江苏省电力公司盱眙县供电公司 | Computer design method of standard distribution network line |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109978502A (en) * | 2019-03-21 | 2019-07-05 | 广州翔实工程咨询有限公司 | Automatic budget method, system and computer storage medium are changed in engineering design |
CN112036806A (en) * | 2020-07-15 | 2020-12-04 | 远光软件股份有限公司 | Project full life cycle approximate calculation management method, device, equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN106815665B (en) | 2020-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104376416B (en) | Production Managementsystem For Electricpower Network and dispatch automated system graphic interaction method | |
CN104462473B (en) | A kind of method that the inscribed line chart of CIM G forms plant stand is automatically generated based on CIM E electric network models | |
CN108345739B (en) | Method for identifying CIME and SVG model file information to realize protection fixed value on-line check function and obtain model | |
CN103500249A (en) | Visual relay protection setting calculation system and method | |
CN103309988A (en) | Method for automatically generating rail traffic line database | |
CN110852023B (en) | Automatic generation method and device for primary main wiring diagram of intelligent substation | |
US20240119193A1 (en) | Traction power simulation | |
CN106815665A (en) | A kind of implementation method of the extemporaneous preliminary budget of distribution network engineering intelligence | |
CN103838921A (en) | PSCAD-EMTDC simulation model automatic generation method | |
CN109460595A (en) | A kind of power cable laying design method | |
CN105447765A (en) | Distribution network feeder automatic mapping method | |
CN105205238A (en) | Transformer electromagnetic transient simulation modeling method based on PSCAD/EMTDC (power system computer aided design/ electromagnetic transients including DC) software | |
CN106919726A (en) | A kind of implementation method of distribution network engineering wiring diagram intelligent Drawing | |
EP2864943A1 (en) | Method for operating a supply network and supply network | |
CN103366060B (en) | The generation method of three-dimensional design electrical cross-section diagram equipment material table of transformer substation | |
CN104134175A (en) | System and method for automatically generating distribution automation master station looped network graph | |
CN110920697B (en) | Automatic generation method and device for ATS station yard graph | |
CN112347680A (en) | Unmanned aerial vehicle routing inspection path planning method for converter transformer of direct current converter station | |
CN104361151B (en) | Transformer station's image generation method based on pattern | |
CN109816192B (en) | GIL pipe gallery engineering simulation control system | |
EP3244279A1 (en) | Method for operating a fault indicator | |
CN104951487B (en) | The electronic sand table method and system disposed for power emergency | |
CN106304723A (en) | A kind of gadget rack electrical fitting technology based on harness diagram design | |
CN208127744U (en) | A kind of electric substation automation system dynamic analog platform | |
CN105022905B (en) | The update method and device of power system system impedance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |