CN106813376A - Gas heater and its control method - Google Patents

Gas heater and its control method Download PDF

Info

Publication number
CN106813376A
CN106813376A CN201710139493.0A CN201710139493A CN106813376A CN 106813376 A CN106813376 A CN 106813376A CN 201710139493 A CN201710139493 A CN 201710139493A CN 106813376 A CN106813376 A CN 106813376A
Authority
CN
China
Prior art keywords
pipeline
water
hot water
gas heater
circulating pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710139493.0A
Other languages
Chinese (zh)
Other versions
CN106813376B (en
Inventor
刘文谦
巴喜亮
刘斌
连晓静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Midea Smart Kitchen Appliance Manufacturing Co Ltd
Original Assignee
Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd filed Critical Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Priority to CN201710139493.0A priority Critical patent/CN106813376B/en
Publication of CN106813376A publication Critical patent/CN106813376A/en
Application granted granted Critical
Publication of CN106813376B publication Critical patent/CN106813376B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/10Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium
    • F24H1/12Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium in which the water is kept separate from the heating medium
    • F24H1/14Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium in which the water is kept separate from the heating medium by tubes, e.g. bent in serpentine form
    • F24H1/145Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium in which the water is kept separate from the heating medium by tubes, e.g. bent in serpentine form using fluid fuel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/0005Details for water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2035Arrangement or mounting of control or safety devices for water heaters using fluid fuel

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)

Abstract

The invention discloses a kind of gas heater and its control method, the gas heater includes combustion gas main body, heating pipeline, inlet pipeline, hot water line and cold water pipeline, heating pipeline is arranged in combustion gas main body, the heated pipeline of inlet pipeline is connected with hot water line, and inlet pipeline is also connected through cold water pipeline with hot water line;Gas heater also includes driving pipeline, water circulating pump and control device, drives pipeline to be connected in parallel on inlet pipeline, and water circulating pump is arranged on driving pipeline, and control device is electrically connected with water circulating pump;Wherein, control device, for when computer heating control instruction is received, timing simultaneously starts water circulating pump work, to drive the water circulation in heating pipeline, hot water line, cold water pipeline and inlet pipeline to flow, when timing time reaches preset duration T, control water circulating pump is stopped, and controls inlet pipeline to intake.This invention ensures that user can quickly use hot water, convenience and promptness that hot water is used are improved.

Description

Gas heater and its control method
Technical field
The present invention relates to gas heater technical field, more particularly to a kind of gas heater and its control method.
Background technology
Existing gas heater can remain hot water after user has used hot water in hot water line, due to the guarantor of pipeline Temp effect is poor, and the hot water in the residual pipeline will can be cooled down in the short period of time.When user reuses water heater, Because the hot water remained in pipeline has been cooled down or temperature is relatively low and do not reach user's use requirement, user can first by the part Cold water is released, and hot water can be just reused after waiting certain hour, and this not only wastes water source, and to being badly in need of using the use of hot water It is very inconvenient for family, experience poor.
The content of the invention
It is a primary object of the present invention to provide a kind of gas heater, it is intended to ensure that user can quickly use hot water, Improve convenience and promptness that hot water is used.
To achieve the above object, the present invention proposes a kind of gas heater, and the gas heater includes combustion gas main body, heating Pipeline, inlet pipeline, hot water line and cold water pipeline, the heating pipeline are arranged in the combustion gas main body, the water inlet pipe Road connects through the heating pipeline with the hot water line, and the inlet pipeline is also through the cold water pipeline and the hot water line Connection;The gas heater also includes driving pipeline, water circulating pump and control device, the driving pipeline be connected in parallel on it is described enter In water lines, the water circulating pump is arranged on the driving pipeline, and the control device is electrically connected with the water circulating pump;Its In, the control device, for when computer heating control instruction is received, timing simultaneously to start water circulating pump work, to drive heating Water circulation flowing in pipeline, hot water line, cold water pipeline and inlet pipeline, when timing time reaches preset duration T, control Water circulating pump is stopped, and controls inlet pipeline to intake.
Preferably, the inlet pipeline include the first linkage section for being connected with outside water route and with the heating pipeline connection The second linkage section, first linkage section, the second linkage section and the cold water pipeline are interconnected;The driving pipeline is in parallel Stop valve is provided with second linkage section, and on second linkage section.
Preferably, it is provided with first linkage section for unidirectionally flowing to the cold water for the current in the first linkage section First check valve of pipeline and the second linkage section, first check valve is located proximate to described on first linkage section One linkage section is set with the position of second linkage section.
Preferably, the water intaking valve electrically connected with the control device, the water intaking valve are provided with first linkage section The influent side in first check valve on first linkage section.
Preferably, multiple hot water discharge components are provided with the hot water line, for being at least bathroom, washstand, kitchen Room provides hot water.
Preferably, each hot water discharge component includes hot water connecting tube, cold water connecting tube and mixed water pipe, the mixed water pipe One end connected with the hot water line through the hot water connecting tube, the other end of the mixed water pipe through the cold water connecting tube with The cold water pipeline connection, the mixed water pipe has delivery port.
Preferably, each hot water discharge component of correspondence is provided with the second check valve, each institute of correspondence on the hot water line State hot water discharge component set the second check valve water inlet end to should hot water discharge component in hot water connecting tube and the heat The link position side of water lines.
Preferably, expansion tank is additionally provided with the driving pipeline, the expansion tank is in the position of the driving pipeline Setting in the influent side of the water circulating pump.
Preferably, the control device is additionally operable to:
When gas heater is first powered on, control inlet pipeline enters to heating pipeline, hot water line and cold water pipeline Row water filling, and start water circulating pump work;
The duration T1 that current flow through hot water line, cold water pipeline is obtained, the T is reconfigured according to the T1, the T is big In or equal to the T1/2.
Additionally, to achieve the above object, the present invention also proposes a kind of control method of gas heater, and the method includes:
Gas heater receive computer heating control instruct when, timing simultaneously start water circulating pump work, with drive heating pipeline, Water circulation flowing in hot water line, cold water pipeline and inlet pipeline;
When timing time reaches preset duration T, control water circulating pump is stopped, and controls inlet pipeline to intake.
Preferably, the control method of the gas heater also includes:
When gas heater is first powered on, control inlet pipeline enters to heating pipeline, hot water line and cold water pipeline Row water filling, and start water circulating pump work;
The duration T1 that current flow through hot water line, cold water pipeline is obtained, the T is reconfigured according to the T1, the T is big In or equal to the T1/2.
The present invention is being driven on pipeline by being arranged in parallel a driving pipeline on the inlet pipeline of gas heater Water circulating pump is set, then by control device when computer heating control instruction is received, is started water circulating pump and is worked and continue pre- If duration, to drive the water circulation in heating pipeline, hot water line, cold water pipeline and inlet pipeline to flow, so so that heating Hot water afterwards is flow in hot water line, the cold water in hot water line is flow in cold water pipeline, so as to be ensured with the most fast time User can use hot water, it is not necessary to could use upper hot water after as emitting the cold water in hot water line in the prior art, very It is convenient, timely.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Structure according to these accompanying drawings obtains other accompanying drawings.
Fig. 1 is the structural representation of the embodiment of gas heater of the present invention;
Fig. 2 is the schematic flow sheet of the embodiment of control method one of gas heater of the present invention;
Fig. 3 is the schematic flow sheet of another embodiment of control method of gas heater of the present invention.
The realization of the object of the invention, functional characteristics and advantage will be described further referring to the drawings in conjunction with the embodiments.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not paid it is all its His embodiment, belongs to the scope of protection of the invention.
If it is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only in the embodiment of the present invention For explaining relative position relation, motion conditions between each part under a certain particular pose (as shown in drawings) etc., if When the particular pose changes, then directionality indicates also correspondingly to change therewith.
In addition, it is related to the description of " first ", " second " etc. to be only used for describing purpose in the present invention, and it is not intended that referring to Show or imply its relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " are defined Two " at least one this feature can be expressed or be implicitly included to feature.In addition, the technical scheme between each embodiment can To be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical scheme occurs It is conflicting or when cannot realize it will be understood that the combination of this technical scheme does not exist, also not in the protection model of application claims Within enclosing.
The present invention proposes a kind of gas heater.
Reference picture 1, in an embodiment of the present invention, the gas heater includes combustion gas main body 10, heating pipeline 20, water inlet Pipeline 30, hot water line 40 and cold water pipeline 50, the heating pipeline 20 are arranged in the combustion gas main body 10, the water inlet pipe Road 30 connects through the heating pipeline 20 with the hot water line 40, and the inlet pipeline 30 is also through the cold water pipeline 50 and institute Hot water line 40 is stated to connect.Wherein, inlet pipeline 30 connects outside water supply pipe, with to heating pipeline 20 and the cold water pipe Road 50 provides cold water, and hot water line 40 is used for offer all the way or multichannel water outlet, provides to user kitchen, bathroom, washstand etc. Hot water is supplied.Wherein, be input into for the cold water of inlet pipeline 30 by cold water pipeline 50, is carried out by the hot water discharged with hot water line 40 Mixing, to adjust water temperature.
In the present embodiment, due to there is cold water in heating pipeline 20 during in order to avoid using gas heater, and cause to use There is portion of cold water at family using the hot water initial stage, and user needs the problem for waiting, and the gas heater also includes driving pipeline 60, follows Ring water pump 70 and control device (not shown), the driving pipeline 60 are connected in parallel on the inlet pipeline 30, that is, drive pipeline 60 two ends connect with inlet pipeline 30;The water circulating pump 70 is arranged on the driving pipeline 60, the control device Electrically connected with the water circulating pump 70.
In the present embodiment, the control device, for when computer heating control instruction is received, timing simultaneously to start water circulating pump 70 work, to drive the water circulation in heating pipeline 20, hot water line 40, cold water pipeline 50 and inlet pipeline 30 to flow, in meter When time when reaching preset duration T, control water circulating pump 70 is stopped, and controls inlet pipeline 30 to intake.May be appreciated Be, water circulating pump 70 work when, because inlet pipeline 30 is not intake, inlet pipeline 30, heating pipeline 20, hot water line 40 and Cold water pipeline 50 forms closed loop pipeline, then can drive inlet pipeline 30, heating pipeline 20, hot water line 40 and cold water pipeline 50 The circulating chilled water flowing of middle residual, now, the hot water heated in heating pipeline 20 flows to hot water line 40, in hot water line 40 Cold water flow to cold water pipeline 50, i.e., the cold water that water circulating pump 70 is extracted in water pipe is heated in pipeline 20 is heated, and will plus The good hot water of heat cruises in water pipe.Wherein preset duration T can be taken out according to the cold water in hot water line 40 and cold water pipeline 50 Duration T1 required when complete is configured, and will be generally above T1/2, in this way, by rationally setting preset duration T, it is possible to ensure User when hot-water switch is opened, drained only by the cold water in hot water line 40, and the hot water after heating is in hot water line 40 In, so as to ensure that user can use hot water with the most fast time, realize zero cooled water discharge, it is not necessary to as emitting in the prior art Upper hot water could be used after cold water in hot water line 40, it is very convenient, timely.
In above-described embodiment, the concrete structure of the inlet pipeline 30 is not limited, in a preferred embodiment, the water inlet pipe Road 30 includes the first linkage section 31 connected with outside water route and the second linkage section 32 connected with the heating pipeline 20, described First linkage section 31, the second linkage section 32 are interconnected with the cold water pipeline 50;The driving pipeline 60 is connected in parallel on described the On two linkage sections 32.
In the embodiment, further, stop valve 101 is provided with second linkage section 32, for being heated to flow direction The current of pipeline 20 carry out current stabilization, current limliting, when preventing hydraulic pressure excessive, current are excessive, it is too urgent when heating pipeline 20 is impacted, Cause heating unbalanced, sometimes hot and sometimes cold situation occurs in hot water.
In the embodiment, further, the first check valve 102, the first check valve are provided with first linkage section 31 102 are used to unidirectionally flow to the linkage section 32 of the cold water pipeline 50 and second for the current in the first linkage section 31, and described first is single To the position of being located proximate on first linkage section 31 of valve 102 first linkage section 31 and second linkage section 32 Set.First check valve 102 can be opened in water circulating pump 70, prevent the current in cold water pipeline 50 to be back to inlet pipeline 30 The first linkage section 31 in.
In the embodiment, further, it is provided with first linkage section 31 and entering that the control device is electrically connected Water valve 103, the influent side in first check valve 102 on first linkage section 31 of the water intaking valve 103.Water intaking valve 103 under control of the control means, controls the water inlet of inlet pipeline 30.
In the embodiment, further, the 3rd check valve 104 is additionally provided with second linkage section 32, connected for second The current one-way flow of section 32 is connect into heating pipeline 20, it is to avoid backflow, reduce the efficiency of heating surface.
In above-described embodiment, multiple hot water discharge components are provided with the hot water line 40, for being at least bathroom, washing Wash platform, kitchen and hot water is provided.
In the embodiment, it is preferable that each hot water discharge component include hot water connecting tube 201, cold water connecting tube 202 and Mixed water pipe 203, one end of the mixed water pipe 203 connects through the hot water connecting tube 201 with the hot water line 40, the mixed water The other end of pipe 203 is connected through the cold water connecting tube 202 with the cold water pipeline 50, and the mixed water pipe 203 has delivery port, It is first-class that the delivery port of the mixed water pipe 203 is used for connecting sprinkler, the fire hose.
In the embodiment, the hot water after each hot water discharge component can heat the gas heater is output as multichannel, from And provide the user hot water supply in all directions.
In the embodiment, further, each hot water discharge component of correspondence is provided with second on the hot water line 40 Check valve 204, the water inlet end of the second check valve 204 that each hot water discharge component of correspondence is set is to should hot water discharge component The link position side of middle hot water connecting tube 201 and the hot water line 40, i.e. the second check valve 204 are located at hot water connecting tube 201 with the hot water downstream of the link position of the hot water line 40.The current of the heat supply water lines 40 of the second check valve 204 from It flows to that it is connected with cold water pipeline 50 with one end for being connected of heating pipeline 20 one end cold water pipeline 50.Second check valve 204 Setting can ensure hot water pipe non-series-water, it is ensured that the normal of hot and cold water is used.
In above-described embodiment, further, expansion tank 80, the expansion tank are additionally provided with the driving pipeline 60 80 are located at the influent side of the water circulating pump 70 in the position of the driving pipeline 60.Expansion tank 80 can store water, when following Ring water pump 70 works, and when driving current to be flowed in each pipeline, there is air or negative pressure in Ruo Shui Road, may result in flow direction Current in heating pipeline 20 cause the efficiency of heating surface relatively low intermittently, and there is the situation that pipeline 20 is heated in dry combustion method, reduce and add The life-span of pipe line 20.
In above-described embodiment, further, the 4th check valve 105 is additionally provided with the driving pipeline 60, the 4th is unidirectional Valve 105 heats pipeline 20 for the flow direction for driving pipeline 60, it is to avoid the second linkage section of heating pipeline 20 and inlet pipeline 30 Current in 32 flow backward to driving pipeline 60, it is to avoid hot and cold water crossfire.
In above-described embodiment, further, the control device is additionally operable to when gas heater is first powered on, control The heating of inlet pipeline 30 pairs pipeline 20, hot water line 40 and cold water pipelines 50 carry out water filling, and start water circulating pump 70 and work;And And, the control device is additionally operable to obtain the duration T1 that current flow through hot water line 40, cold water pipeline 50, according to the T1 again The T is configured, the T is more than or equal to the T1/2.
In the present embodiment, hot water line 40, cold can be flowed through by judging that flow rate of water flow, hydraulic pressure, temperature etc. obtain current The duration T1 of water lines 50.It should be noted that for different users, room layout and area all may be different, this If judging according to the pre-set time, then when hot water route is shorter, hot water heating is excessive, causes hot water to follow for sample Repeat-heating after ring, wastes the energy;And when hot water route is more long, then not necessarily can guarantee that hot water reaches hot water line 40 most Distal end.In the present embodiment, the duration T1 of hot water line 40, cold water pipeline 50 is flowed through by obtaining current, it is possible to know hot water The length of pipeline 40, then reasonable disposition T, it is possible to which guarantee just makes full of hot water in hot water line 40, and in cold water pipeline 50 Or during cold water, it is possible to use hot water, i.e., simply make full of hot water in hot water line 40, the heat time is short, so realizing While zero cold water, moreover it is possible to ensure user to use hot water in the most fast time, without being to wait for heating tube road 20, hot water line 40th, after the cold water of cold water pipeline 50 and the remaining of inlet pipeline 30 is all heated, could for users to use, the efficiency of heating surface is greatly promoted.
Also, flow through hot water line 40 by obtaining current, the duration T1 of cold water pipeline 50 reconfigures preset duration T, The distalmost end of hot water line 40 can be ensured to be sent to hot water, it is ensured that user's family can immediately use hot water everywhere.
Additionally, the present invention also provides a kind of control method of gas heater, the method can be based on above-mentioned gas heater Structure realize, or structure based on same principle is realized, do not limit, the present embodiment for convenience of understanding, with above-mentioned The implementation process of the inventive method, reference picture 1 and Fig. 2 are told about as a example by gas heater, the method includes:
When step S10, gas heater receive computer heating control and instruct, timing simultaneously starts water circulating pump 70 and works, to drive Water circulation flowing in dynamic heating pipeline 20, hot water line 40, cold water pipeline 50 and inlet pipeline 30;
It is understood that when water circulating pump 70 works, because inlet pipeline 30 is not intake, then inlet pipeline can be driven 30th, the circulating chilled water flowing remained in heating pipeline 20, hot water line 40 and cold water pipeline 50, now, in heating pipeline 20 The hot water of heating flows to hot water line 40, and the cold water flow in hot water line 40 to cold water pipeline 50, i.e. water circulating pump 70 are taken out Cold water in intake pipe is heated in pipeline 20 is heated, and the hot water that will be heated cruises in water pipe.
Step S20, when timing time reaches preset duration T, control water circulating pump 70 is stopped, and controls water inlet pipe Road 30 intakes.
Duration T1 wherein preset duration T required when can be exhausted according to the cold water in hot water line 40 and cold water pipeline 50 It is configured, will be generally above T1/2, in this way, by rationally setting preset duration T, it is possible to ensures that user opens in opening hot water Guan Shi, the cold water in hot water line 40 is drained only, and the hot water after heating is in hot water line 40, so as to it is most fast when Between ensure that user can use hot water, realize zero cooled water discharge, it is not necessary to cold in hot water line 40 as emitting in the prior art Upper hot water could be used after water, it is very convenient, timely.
Further, reference picture 3, the control method of the gas heater also includes:
Step S30, when gas heater is first powered on, the control heating pipelines 20, hot water line of inlet pipeline 30 pairs 40 and cold water pipeline 50 carry out water filling, and start water circulating pump 70 and work;
Step S40, acquisition current flow through the duration T1 of hot water line 40, cold water pipeline 50, are reconfigured according to the T1 The T, the T are more than or equal to the T1/2.
In the present embodiment, hot water line 40, cold can be flowed through by judging that flow rate of water flow, hydraulic pressure, temperature etc. obtain current The duration T1 of water lines 50.It should be noted that for different users, room layout and area all may be different, this If judging according to the pre-set time, then when hot water route is shorter, hot water heating is excessive for sample, causes to repeat to add Heat, wastes the energy, when hot water route is more long, then not necessarily can guarantee that hot water reaches the distalmost end of hot water line 40, this implementation Hot water line 40 is flowed through by obtaining current, the duration T1 of cold water pipeline 50 reconfigures preset duration T, it is ensured that will in example Hot water is sent to the distalmost end of hot water line 40.
In the present embodiment, hot water line 40, cold can be flowed through by judging that flow rate of water flow, hydraulic pressure, temperature etc. obtain current The duration T1 of water lines 50.It should be noted that for different users, room layout and area all may be different, this If judging according to the pre-set time, then when hot water route is shorter, hot water heating is excessive, causes hot water to follow for sample Repeat-heating after ring, wastes the energy;And when hot water route is more long, then not necessarily can guarantee that hot water reaches hot water line 40 most Distal end.In the present embodiment, the duration T1 of hot water line 40, cold water pipeline 50 is flowed through by obtaining current, it is possible to know hot water The length of pipeline 40, then reasonable disposition T, it is possible to which guarantee just makes full of hot water in hot water line 40, and in cold water pipeline 50 Or during cold water, it is possible to use hot water, i.e., simply make full of hot water in hot water line 40, the heat time is short, so realizing While zero cold water, moreover it is possible to ensure user to use hot water in the most fast time, without being to wait for heating tube road 20, hot water line 40th, after the cold water of cold water pipeline 50 and the remaining of inlet pipeline 30 is all heated, could for users to use, the efficiency of heating surface is greatly promoted.
Also, flow through hot water line 40 by obtaining current, the duration T1 of cold water pipeline 50 reconfigures preset duration T, The distalmost end of hot water line 40 can be ensured to be sent to hot water, it is ensured that user's family can immediately use hot water everywhere.
The preferred embodiments of the present invention are the foregoing is only, the scope of the claims of the invention is not thereby limited, it is every at this Under the inventive concept of invention, the equivalent structure transformation made using description of the invention and accompanying drawing content, or directly/use indirectly It is included in scope of patent protection of the invention in other related technical fields.

Claims (11)

1. a kind of gas heater, including combustion gas main body, heating pipeline, inlet pipeline, hot water line and cold water pipeline, it is described to add Pipe line is arranged in the combustion gas main body, and the inlet pipeline is connected through the heating pipeline with the hot water line, described Inlet pipeline is also connected through the cold water pipeline with the hot water line;Characterized in that, the gas heater also includes driving Dynamic pipeline, water circulating pump and control device, the driving pipeline are connected in parallel on the inlet pipeline, and the water circulating pump is arranged on On the driving pipeline, the control device is electrically connected with the water circulating pump;Wherein, the control device, for receiving When being instructed to computer heating control, timing simultaneously starts water circulating pump work, to drive heating pipeline, hot water line, cold water pipeline and enter In water lines water circulation flowing, when timing time reaches preset duration T, control water circulating pump be stopped, and control into Water lines are intake.
2. gas heater as claimed in claim 1, it is characterised in that the inlet pipeline includes what is connected with outside water route First linkage section and the second linkage section with the heating pipeline connection, first linkage section, the second linkage section are cold with described Water lines are interconnected;It is described driving pipeline be connected in parallel on second linkage section, and be provided with second linkage section cut Only valve.
3. gas heater as claimed in claim 2, it is characterised in that be provided with for supplying first on first linkage section Current in linkage section unidirectionally flow to the first check valve of the cold water pipeline and the second linkage section, and first check valve is in institute First linkage section that is located proximate to stated on the first linkage section is set with the position of second linkage section.
4. gas heater as claimed in claim 3, it is characterised in that be provided with first linkage section and the control The water intaking valve of device electrical connection, water intaking valve influent side in first check valve on first linkage section.
5. gas heater as claimed in claim 1, it is characterised in that multiple hot water discharges are provided with the hot water line Component, for being at least bathroom, washstand, kitchen offer hot water.
6. gas heater as claimed in claim 5, it is characterised in that each hot water discharge component includes hot water connection Pipe, cold water connecting tube and mixed water pipe, one end of the mixed water pipe connects through the hot water connecting tube with the hot water line, described Through the cold water connecting tube and the cold water pipeline connection, the mixed water pipe has delivery port to the other end of mixed water pipe.
7. gas heater as claimed in claim 6, it is characterised in that each hot water discharge of correspondence on the hot water line Component is provided with the second check valve, and the water inlet end of the second check valve that each hot water discharge component of correspondence is set is to should hot water The link position side of hot water connecting tube and the hot water line in discharge component.
8. the gas heater as described in any one of claim 1 to 7, it is characterised in that be additionally provided with the driving pipeline Expansion tank, the expansion tank is located at the influent side of the water circulating pump in the position of the driving pipeline.
9. the gas heater as described in any one of claim 1 to 7, it is characterised in that the control device is additionally operable to:
When gas heater is first powered on, control inlet pipeline is noted to heating pipeline, hot water line and cold water pipeline Water, and start water circulating pump work;
Obtain current and flow through the duration T1 of hot water line, cold water pipeline, the T is reconfigured according to the T1, the T be more than or Person is equal to the T1/2.
10. a kind of control method of gas heater, it is characterised in that the method includes:
When gas heater receives computer heating control instruction, timing simultaneously starts water circulating pump work, to drive heating pipeline, hot water Water circulation flowing in pipeline, cold water pipeline and inlet pipeline;
When timing time reaches preset duration T, control water circulating pump is stopped, and controls inlet pipeline to intake.
The control method of 11. gas heaters as claimed in claim 10, it is characterised in that the control of the gas heater Method also includes:
When gas heater is first powered on, control inlet pipeline is noted to heating pipeline, hot water line and cold water pipeline Water, and start water circulating pump work;
Obtain current and flow through the duration T1 of hot water line, cold water pipeline, the T is reconfigured according to the T1, the T be more than or Person is equal to the T1/2.
CN201710139493.0A 2017-03-09 2017-03-09 Gas water heater and control method thereof Active CN106813376B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710139493.0A CN106813376B (en) 2017-03-09 2017-03-09 Gas water heater and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710139493.0A CN106813376B (en) 2017-03-09 2017-03-09 Gas water heater and control method thereof

Publications (2)

Publication Number Publication Date
CN106813376A true CN106813376A (en) 2017-06-09
CN106813376B CN106813376B (en) 2021-01-08

Family

ID=59116166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710139493.0A Active CN106813376B (en) 2017-03-09 2017-03-09 Gas water heater and control method thereof

Country Status (1)

Country Link
CN (1) CN106813376B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109323454A (en) * 2018-10-27 2019-02-12 朱岚 A kind of water-saving system of water heater
CN110345629A (en) * 2019-08-07 2019-10-18 Tcl家用电器(中山)有限公司 Control method, gas heater and the readable storage medium storing program for executing of gas heater
CN110953727A (en) * 2019-12-16 2020-04-03 华帝股份有限公司 Constant temperature control method of gas water heater
CN113310220A (en) * 2021-06-02 2021-08-27 常州工业职业技术学院 Zero-cold-water control system, control method and readable storage medium
CN114963543A (en) * 2021-02-19 2022-08-30 芜湖美的厨卫电器制造有限公司 Water heater, control method thereof and computer storage medium
CN116642272A (en) * 2023-07-24 2023-08-25 杭州老板电器股份有限公司 Control method of gas water heating system and gas water heating system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013242066A (en) * 2012-05-18 2013-12-05 Rinnai Corp Circulation type water heater
CN104697177A (en) * 2015-02-09 2015-06-10 芜湖美的厨卫电器制造有限公司 Water heater as well as control method and control system thereof
CN105299875A (en) * 2015-09-30 2016-02-03 威能(无锡)供热设备有限公司 Gas-fired water heating equipment with pre-heating function
CN205245580U (en) * 2015-12-11 2016-05-18 广东万家乐燃气具有限公司 Thermostatic type gas heater
US20160178240A1 (en) * 2014-12-19 2016-06-23 Rinnai Corporation Hot water supply system
CN106091399A (en) * 2016-08-11 2016-11-09 广东万家乐燃气具有限公司 A kind of hot water circulating device, hot water circuit control method and water heater

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013242066A (en) * 2012-05-18 2013-12-05 Rinnai Corp Circulation type water heater
US20160178240A1 (en) * 2014-12-19 2016-06-23 Rinnai Corporation Hot water supply system
CN104697177A (en) * 2015-02-09 2015-06-10 芜湖美的厨卫电器制造有限公司 Water heater as well as control method and control system thereof
CN105299875A (en) * 2015-09-30 2016-02-03 威能(无锡)供热设备有限公司 Gas-fired water heating equipment with pre-heating function
CN205245580U (en) * 2015-12-11 2016-05-18 广东万家乐燃气具有限公司 Thermostatic type gas heater
CN106091399A (en) * 2016-08-11 2016-11-09 广东万家乐燃气具有限公司 A kind of hot water circulating device, hot water circuit control method and water heater

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109323454A (en) * 2018-10-27 2019-02-12 朱岚 A kind of water-saving system of water heater
CN110345629A (en) * 2019-08-07 2019-10-18 Tcl家用电器(中山)有限公司 Control method, gas heater and the readable storage medium storing program for executing of gas heater
CN110953727A (en) * 2019-12-16 2020-04-03 华帝股份有限公司 Constant temperature control method of gas water heater
CN114963543A (en) * 2021-02-19 2022-08-30 芜湖美的厨卫电器制造有限公司 Water heater, control method thereof and computer storage medium
CN113310220A (en) * 2021-06-02 2021-08-27 常州工业职业技术学院 Zero-cold-water control system, control method and readable storage medium
CN113310220B (en) * 2021-06-02 2022-09-20 常州工业职业技术学院 Zero-cold-water control system, control method and readable storage medium
CN116642272A (en) * 2023-07-24 2023-08-25 杭州老板电器股份有限公司 Control method of gas water heating system and gas water heating system
CN116642272B (en) * 2023-07-24 2023-11-24 杭州老板电器股份有限公司 Control method of gas water heating system and gas water heating system

Also Published As

Publication number Publication date
CN106813376B (en) 2021-01-08

Similar Documents

Publication Publication Date Title
CN106813376A (en) Gas heater and its control method
CN106369807B (en) Zero cold water gas heater of one kind and its system
CN201688572U (en) Cold-water recycling and reusing hot-water system
CN106766231B (en) Shower system and its control method without cold water and Recovery of the hot water
CN205481794U (en) Zero cold water heating water system
CN102072560A (en) Hot water discharging temperature rapid-stabilizing structure of central gas water heater
CN106322768A (en) Water heater and control method thereof
CN206875689U (en) A kind of zero cold water water heater
CN106091356A (en) Gas heater
CN205579990U (en) Domestic hot water ware water temperature control system
CN206670005U (en) Gas heater
CN201449061U (en) Anti-freezing and rapid hot water output control system of solar water heater
CN101303170B (en) Intelligent backwater treating device and method
CN210861700U (en) Zero-cold-water wall-mounted gas furnace system
CN208779523U (en) Heat pump unit
CN204718138U (en) The gas heater of built-in buffer tank and apply its water route pipe network
CN104207697A (en) Energy-saving shower system utilizing shower waste water heat to regulate shower water temperature
CN206670066U (en) Gas heater
CN208886900U (en) A kind of energy-efficient hot-water supply system
CN109631312A (en) Anti-freezing gas water heater and control method thereof
CN108775707A (en) A kind of storage-type external circulation heating electric heater
CN207865698U (en) A kind of air energy thermal water installations of sustainability supplying hot water
CN207880925U (en) Energy saving nature microcirculation household instant hot water's system
CN110906543B (en) Water-saving temperature control system of heat pump water heater
CN209558685U (en) A kind of hot water circulating device and the hot-water heating system using the device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221228

Address after: 241000 west side of 3 / F, No.5 office building, new energy and new materials gathering area, Fuzhou Road, Jiangbei District, Wuhu City, Anhui Province

Patentee after: Wuhu Midea intelligent kitchen electricity Manufacturing Co.,Ltd.

Address before: 241009 Wan Chun East Road, East District, Wuhu economic and Technological Development Zone, Anhui

Patentee before: WUHU MIDEA KITCHEN AND BATH APPLIANCES MFG. Co.,Ltd.

TR01 Transfer of patent right