CN106812161A - A kind of gallus-type building foundation pit implement - Google Patents

A kind of gallus-type building foundation pit implement Download PDF

Info

Publication number
CN106812161A
CN106812161A CN201710154968.3A CN201710154968A CN106812161A CN 106812161 A CN106812161 A CN 106812161A CN 201710154968 A CN201710154968 A CN 201710154968A CN 106812161 A CN106812161 A CN 106812161A
Authority
CN
China
Prior art keywords
crossbeam
suspender belt
present
implement
gallus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710154968.3A
Other languages
Chinese (zh)
Other versions
CN106812161B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau South China Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710154968.3A priority Critical patent/CN106812161B/en
Publication of CN106812161A publication Critical patent/CN106812161A/en
Application granted granted Critical
Publication of CN106812161B publication Critical patent/CN106812161B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/305Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables specially adapted for tanks, silos or similar vessels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally

Abstract

The invention discloses a kind of gallus-type building foundation pit implement, it is characterised in that including two crossbeams and suspender belt, suspender belt two ends are connected to two stage casings of crossbeam, and the company end of crossbeam is provided with positioning pricker;When the present invention is used, crossbeam two ends are ridden near coal-mine, positioned using pricker is positioned, make strip suspension in hole, now operating personnel can just operate on suspender belt in working face, and the present invention two crossbeams are not drawn close and are rolled with suspender belt by the used time, it is easy to carry, and low cost, can solve the problems, such as to trample working face with large-area applications.

Description

A kind of gallus-type building foundation pit implement
It is on November 16th, 2015, Application No. 2015107803157, entitled " suspention the applying date that the application is The divisional application of the patent of formula foundation ditch apparatus for work ".
Technical field
The present invention relates to a kind of device of field work, particularly a kind of gallus-type building foundation pit implement.
Background technology
Modern civilization is developed so far, and the mankind are still in the tireless exploration world, it is intended to open the history that time immemorial is not described, The origin in the world is solved, only known about just can preferably be created future in the past, and these will be realized by archaeology, as country is right The increase of this respect input, the archaeology cause of China is fast-developing and grows.In the social big progradation built, It is big tear open to build in large scale cause to descend civilization to be found in large quantities, if development records these civilization of having little time to engage in archaeological studies will soon be destroyed, So archaeology scholar just must very first time soldier point multichannel go excavate examine or check, yet with the equipment of digging pit, it is impossible to each investigate Point all gets all archaeology equipment ready, and station is dug in hole such as when digging pit, the historical relic that can be destroyed in hole, but can not be as important excavation Point each pitting like that is equipped with crane, and this is also unpractical, and this is all influential on archaeology efficiency and effect, and these are asked Topic still awaits further solution.
In the foundation ditch operation in construction building site, in the well operation of the sewer pipe of municipal works, ground observation In well operation, and in the well operation of mining, can all there is the interior ground of crater wall and hole because a variety of causes can not be trampled Problem, these problems still await further solution.
The content of the invention
In order to solve the above problems, the invention provides a kind of gallus-type building foundation pit implement.
The technical solution adopted by the present invention is:A kind of gallus-type building foundation pit implement, it is characterised in that including two Crossbeam and suspender belt, suspender belt two ends are connected to two stage casings of crossbeam, and the two ends of crossbeam are provided with positioning pricker.
The present invention could also say that a kind of suspension type archaeology hole apparatus for work, and sleeve pipe is arranged with the every crossbeam, cover Ball or roller are provided between pipe and crossbeam, crossbeam is provided with the track that ball or roller are rolled.
The present invention could also say that a kind of gallus-type enters and cheats implement, and two sections of sleeve pipes are arranged with the every crossbeam, Suspender belt is two, two suspender belts respectively with two crossbeams on homonymy sleeve pipe connection.
Further, the crossbeam is hollow tube, and hollow tube side wall stage casing is provided with longitudinal gap, is provided with and it in hollow tube Coaxial sliding bar, is provided with ball or roller between sliding bar and hollow inside pipe wall, suspender belt two ends are connected with two sliding bars respectively.
Further, two sections of sliding bars are provided with the every crossbeam hollow tube, suspender belt is two, two suspender belts respectively with Homonymy sliding bar connection in two crossbeams.
Further, the sliding bar is respectively arranged at two ends with location hole, coordinates location hole to be provided with fixed pricker.
Further, two suspender belts are connected with the sliding bar.
Further, in two suspender belts wherein one more another it is long.
Further, the center line both sides on the suspender belt length direction are distributed with bandage respectively.
Further, the center line on the suspender belt length direction is respectively provided on two sides with the hook and link that can be mounted.
The present invention can be described as a kind of machinery of building foundation pit operation, can be to be widely used in construction site operation Machinery.
The present invention can be applied in the well operation of the sewer pipe of municipal works, be a kind of lower water of municipal works The implement of pipe.
The present invention can be applied in the well operation of ground observation, be a kind of implement of ground observation.
The present invention can be applied in the well operation of mining, be a kind of implement of mine.
When the present invention is used, crossbeam two ends are ridden over it is near coal-mine, using position pricker position, make strip suspension hole in, now Operating personnel can just operate on suspender belt in working face, and the present invention two crossbeams are not drawn close and are rolled with suspender belt by the used time Come, be easy to carry, and low cost, can solve the problems, such as to trample working face with large-area applications.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the embodiment of the present invention one.
Fig. 2 is the overall structure diagram of the embodiment of the present invention two.
Fig. 3 is the cross section structure diagram of the embodiment of the present invention two and partial enlarged drawing.
Fig. 4 is the cross section structure diagram of the embodiment of the present invention three.
Fig. 5 is the overall structure diagram of the embodiment of the present invention four.
Fig. 6 is the overall structure diagram of the embodiment of the present invention five.
Fig. 7 is the cross section structure diagram of the embodiment of the present invention five and partial enlarged drawing.
Fig. 8 is the cross section structure diagram of the embodiment of the present invention six.
Label title in figure:1 crossbeam;2 suspender belts;3 positioning prickers;4 sleeve pipes;5 balls;6 rollers;7 longitudinal gap;8 Sliding bar;9 location holes.
Specific embodiment
The embodiment of the present invention one is as shown in figure 1, the gallus-type building foundation pit implement, including two crossbeams 1 and suspender belt 2, suspender belt two ends are respectively fixedly connected with two stage casings of crossbeam, and the two ends of crossbeam are provided with positioning pricker 3;When the present embodiment is used, Crossbeam two ends are ridden over it is near coal-mine, using position pricker position, make strip suspension hole in, now examine or check personnel just can be on suspender belt In working face operation, and the present invention two crossbeams are not drawn close and are rolled with suspender belt by the used time, be easy to carry, and low cost, Can solve the problems, such as to trample working face with large-area applications.
As shown in Figure 2,3, the gallus-type building foundation pit implement is arranged with the embodiment of the present invention two on every crossbeam Pipe 4, is provided with ball 5 between sleeve pipe and crossbeam, the track of ball rolling is equipped with crossbeam and sleeve pipe, and suspender belt can be indulged when using To movement, operation of being more convenient for can also connect two suspender belts on sleeve pipe during implementation.
The embodiment of the present invention three is as shown in figure 4, the gallus-type building foundation pit implement exists with the difference of embodiment two Replace in ball roller 6, sleeve pipe can equally slided on crossbeam.
The embodiment of the present invention four on the gallus-type building foundation pit every crossbeam of implement as shown in figure 5, be arranged with two sections Sleeve pipe, suspender belt is two, two suspender belts respectively with two crossbeams on homonymy sleeve pipe connection, in two suspender belts wherein one it is more another One long, is adapted to different height working face operation, and two suspender belt spacing are adjustable, can two people operation, more convenient, implementation When two suspender belts can also same height.
As shown in Figure 6,7, the gallus-type building foundation pit implement crossbeam is hollow tube, hollow tube to the embodiment of the present invention five Side wall stage casing is provided with longitudinal gap 7, and the sliding bar 8 being coaxial therewith is provided with hollow tube, is provided between sliding bar and hollow inside pipe wall Ball or roller, suspender belt two ends are connected with two sliding bars respectively, and sliding bar is respectively arranged at two ends with location hole 9, coordinate location hole to set There is fixed pricker;Crossbeam is fixed near coal-mine when the present embodiment is used, and sliding bar movement can vertically move suspender belt, and it is appropriate to move to Behind position can with positioning pricker by location hole insert bottom surface be positioned, can also more steadily, on the slide bar connect two or even More suspender belts, meet the demand of more multistation.
The embodiment of the present invention six in the every crossbeam hollow tube of gallus-type building foundation pit implement as shown in figure 8, be provided with Two sections of sliding bars, suspender belt is two, and two suspender belts are connected with the homonymy sliding bar in two crossbeams respectively, and two suspender belts can be independent Slide, be more convenient for using.
During implementation, center line both sides that can also be on suspender belt length direction are distributed with bandage respectively, or in suspender belt length direction On center line be respectively provided on two sides with the hook and link that can be mounted, such suspender belt just can by hook and link mounting, tie up Band makes suspender belt fold or pile up, adjustment length with bandage stitch, adapts to the excavation of more dell;Positioning pricker can also be for foldable structure just In storage.
It is only in sum the specific embodiment of the invention, but is not limited to embodiment, can also each technical characteristic group again Close more implementations, it is all without departing from the inventive concept, the equivalent modification and prior art done according to the application Addition is accordingly to be regarded as the technology of the present invention category.

Claims (1)

1. a kind of gallus-type building foundation pit implement, it is characterised in that including two crossbeams and suspender belt, suspender belt, the two ends of crossbeam It is provided with positioning pricker;Positioning pricker is foldable structure;Sleeve pipe is arranged with every crossbeam, sleeve pipe is arranged with every crossbeam, sleeve pipe with Ball is provided between crossbeam, crossbeam is provided with the track of ball rolling;Two sections of sleeve pipes are arranged with the every crossbeam, suspender belt is Two, two suspender belts respectively with two crossbeams on homonymy sleeve pipe connection.
CN201710154968.3A 2015-11-16 2015-11-16 A kind of gallus-type building foundation pit operating equipment Active CN106812161B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710154968.3A CN106812161B (en) 2015-11-16 2015-11-16 A kind of gallus-type building foundation pit operating equipment

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510780315.7A CN105275023B (en) 2015-11-16 2015-11-16 Suspension type foundation ditch apparatus for work
CN201710154968.3A CN106812161B (en) 2015-11-16 2015-11-16 A kind of gallus-type building foundation pit operating equipment

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510780315.7A Division CN105275023B (en) 2015-11-16 2015-11-16 Suspension type foundation ditch apparatus for work

Publications (2)

Publication Number Publication Date
CN106812161A true CN106812161A (en) 2017-06-09
CN106812161B CN106812161B (en) 2019-01-08

Family

ID=55144780

Family Applications (10)

Application Number Title Priority Date Filing Date
CN201710154872.7A Active CN106930332B (en) 2015-11-16 2015-11-16 Gallus-type foundation pit operating equipment
CN201710154969.8A Active CN106894419B (en) 2015-11-16 2015-11-16 The foundation pit operating equipment of ground observation
CN201710154873.1A Pending CN106894624A (en) 2015-11-16 2015-11-16 The foundation ditch apparatus for work of construction
CN201710154871.2A Pending CN106894623A (en) 2015-11-16 2015-11-16 The downhole operation equipment of mine
CN201710154968.3A Active CN106812161B (en) 2015-11-16 2015-11-16 A kind of gallus-type building foundation pit operating equipment
CN201710154823.3A Active CN106759368B (en) 2015-11-16 2015-11-16 A kind of operating equipment of mine
CN201710154825.2A Active CN106759370B (en) 2015-11-16 2015-11-16 A kind of tunneling equipment of the downcomer of municipal works
CN201710154824.8A Active CN106759369B (en) 2015-11-16 2015-11-16 A kind of operating equipment of ground observation
CN201710154967.9A Active CN106812160B (en) 2015-11-16 2015-11-16 A kind of device of building foundation pit operation
CN201510780315.7A Active CN105275023B (en) 2015-11-16 2015-11-16 Suspension type foundation ditch apparatus for work

Family Applications Before (4)

Application Number Title Priority Date Filing Date
CN201710154872.7A Active CN106930332B (en) 2015-11-16 2015-11-16 Gallus-type foundation pit operating equipment
CN201710154969.8A Active CN106894419B (en) 2015-11-16 2015-11-16 The foundation pit operating equipment of ground observation
CN201710154873.1A Pending CN106894624A (en) 2015-11-16 2015-11-16 The foundation ditch apparatus for work of construction
CN201710154871.2A Pending CN106894623A (en) 2015-11-16 2015-11-16 The downhole operation equipment of mine

Family Applications After (5)

Application Number Title Priority Date Filing Date
CN201710154823.3A Active CN106759368B (en) 2015-11-16 2015-11-16 A kind of operating equipment of mine
CN201710154825.2A Active CN106759370B (en) 2015-11-16 2015-11-16 A kind of tunneling equipment of the downcomer of municipal works
CN201710154824.8A Active CN106759369B (en) 2015-11-16 2015-11-16 A kind of operating equipment of ground observation
CN201710154967.9A Active CN106812160B (en) 2015-11-16 2015-11-16 A kind of device of building foundation pit operation
CN201510780315.7A Active CN105275023B (en) 2015-11-16 2015-11-16 Suspension type foundation ditch apparatus for work

Country Status (1)

Country Link
CN (10) CN106930332B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB930552A (en) * 1958-12-04 1963-07-03 Gutehoffnungshuette Sterkrade Improvements relating to guides for mine or other shafts
CN2575352Y (en) * 2002-10-29 2003-09-24 蔡盛忠 Energy-saving expansion screw bolt
CN101898715A (en) * 2010-06-30 2010-12-01 中煤第五建设有限公司 Vertical shaft bucket
CN102251742A (en) * 2011-05-16 2011-11-23 王万兴 Working panel and working platform ladder with same
CN202520316U (en) * 2012-04-13 2012-11-07 中铁十七局集团第三工程有限公司 Suspended safety isolator used in construction of tunnel shaft
CN103754750A (en) * 2014-01-21 2014-04-30 亚洲铝业(中国)有限公司 Spreader
CN203596548U (en) * 2013-10-23 2014-05-14 国家电网公司 Replacing work tool for power transmission line stockbridge damper

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007126862A (en) * 2005-11-02 2007-05-24 Fuji Shoji Kk Flood damage, snow damage and sediment disaster countermeasure structure for building
CN201362556Y (en) * 2009-01-09 2009-12-16 中建三局建设工程股份有限公司 Earthwork overhead hoist
CN201524360U (en) * 2009-09-29 2010-07-14 武汉胜发机电研究所 Automatic lifting fire escaping device for high buildings
CN202687753U (en) * 2012-05-24 2013-01-23 福建祥锦实业有限公司 Pan head lifting device
JP5978081B2 (en) * 2012-09-19 2016-08-24 樋脇 就三 Cutting machine
CN203079512U (en) * 2013-01-16 2013-07-24 马晓锋 Folding type lifting appliance
CN203755638U (en) * 2014-01-26 2014-08-06 中铁建工集团有限公司 Suspending slippage type high-altitude inverted oblique plane operation hanging basket
CN203889878U (en) * 2014-04-23 2014-10-22 中建一局钢结构工程有限公司 Vertical conveying tool of color plate
CN204125032U (en) * 2014-09-01 2015-01-28 浙江尚鼎工业炉有限公司 A kind of material tool hoisting mechanism
CN204645580U (en) * 2015-05-17 2015-09-16 高伟 A kind of building suspension bracket

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB930552A (en) * 1958-12-04 1963-07-03 Gutehoffnungshuette Sterkrade Improvements relating to guides for mine or other shafts
CN2575352Y (en) * 2002-10-29 2003-09-24 蔡盛忠 Energy-saving expansion screw bolt
CN101898715A (en) * 2010-06-30 2010-12-01 中煤第五建设有限公司 Vertical shaft bucket
CN102251742A (en) * 2011-05-16 2011-11-23 王万兴 Working panel and working platform ladder with same
CN202520316U (en) * 2012-04-13 2012-11-07 中铁十七局集团第三工程有限公司 Suspended safety isolator used in construction of tunnel shaft
CN203596548U (en) * 2013-10-23 2014-05-14 国家电网公司 Replacing work tool for power transmission line stockbridge damper
CN103754750A (en) * 2014-01-21 2014-04-30 亚洲铝业(中国)有限公司 Spreader

Also Published As

Publication number Publication date
CN106759368A (en) 2017-05-31
CN105275023B (en) 2017-12-12
CN106759369A (en) 2017-05-31
CN106894624A (en) 2017-06-27
CN106759370B (en) 2019-02-12
CN106759368B (en) 2018-12-18
CN106894623A (en) 2017-06-27
CN106930332B (en) 2019-01-25
CN106759370A (en) 2017-05-31
CN106812160A (en) 2017-06-09
CN106759369B (en) 2019-01-11
CN105275023A (en) 2016-01-27
CN106894419A (en) 2017-06-27
CN106930332A (en) 2017-07-07
CN106894419B (en) 2019-01-08
CN106812160B (en) 2019-03-26
CN106812161B (en) 2019-01-08

Similar Documents

Publication Publication Date Title
CN107060796A (en) One kind uses Slurry Balanced Pipe Jacking Construction technique
CN106869110A (en) The construction method of underground continuous wall of existing underground structure
CN104314578A (en) Construction method for continuous construction by using shield construction machine and matched station thereof
CN204002832U (en) A kind of shield tunnel portal structure
CN105275022B (en) A kind of building foundation pit apparatus for work
CN106894624A (en) The foundation ditch apparatus for work of construction
CN205894100U (en) Underground transfer passage
CN101736763A (en) Foundation pit excavator
CN205204778U (en) Suspension type archaeology hole operation device
CN106996100A (en) A kind of plane ditch for agricultural irrigation is built canals device
CN210342173U (en) Municipal administration is pipeline laying buffer structure for sewage treatment
CN208010362U (en) The new supporting structure of duct pieces of shield tunnel opening
CN209369865U (en) A kind of protected seam gas drainage structure
CN207011221U (en) A kind of portable device of digging
CN108517870B (en) Foundation pit construction method based on honeycomb type guide hole excavation means
CN206487410U (en) A kind of drilling mechanism and small-sized pipe laying equipment
CN206090526U (en) Hand -held foundation pit backfilling soil tamping device
CN104131574A (en) Step water lowering method of phreatic water fully-penetrating well inclined shaft
CN211038518U (en) Novel non-excavation drill bit
CN207556505U (en) A kind of simple building enclosure invades limit survey tool
CN208050988U (en) A kind of civil engineering work positioning drilling device
CN207212262U (en) Portable earthing pole drilling machine
CN206815343U (en) A kind of temporary frame work rod structure for being used to expand shared fender post amputation working space
Iseley et al. Lessons learnt from horizontal auger boring school
CN204552617U (en) A kind of petroleum pipeline down-hole drilling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181123

Address after: 362000 Xinya 229, Yubancun, Dongyuan Town, Taiwanese Investment District, Quanzhou City, Fujian Province

Applicant after: Huang Meifen

Address before: 330003 song Bai lane, Xihu District, Nanchang, Jiangxi Province, No. 47

Applicant before: Wu Min

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190516

Address after: 202172 Room 1260, No. 495 Yuejin South Road, Xinhai Town, Chongming District, Shanghai (Guangming Rice Industry Economic Park)

Patentee after: Advocating Creation (Shanghai) Consulting Management Firm

Address before: 362000 Xinya 229, Yubancun, Dongyuan Town, Taiwanese Investment District, Quanzhou City, Fujian Province

Patentee before: Huang Meifen

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230808

Address after: Room 289, No. 333 Jiufo Jianshe Road, Zhongxin Guangzhou Knowledge City, Guangzhou, Guangdong Province, 510700 (self declared)

Patentee after: China Construction Eighth Engineering Bureau South China Construction Co.,Ltd.

Address before: Room 1260, building 5, No. 495, Yuejin South Road, Xinhai Town, Chongming District, Shanghai 202172

Patentee before: Advocating Creation (Shanghai) Consulting Management Firm

TR01 Transfer of patent right