CN106808458A - Datum line draws method on the outside of H profile steel component flange plate - Google Patents

Datum line draws method on the outside of H profile steel component flange plate Download PDF

Info

Publication number
CN106808458A
CN106808458A CN201510851947.8A CN201510851947A CN106808458A CN 106808458 A CN106808458 A CN 106808458A CN 201510851947 A CN201510851947 A CN 201510851947A CN 106808458 A CN106808458 A CN 106808458A
Authority
CN
China
Prior art keywords
web
flange plate
datum
profile steel
steel component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510851947.8A
Other languages
Chinese (zh)
Inventor
李显峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201510851947.8A priority Critical patent/CN106808458A/en
Publication of CN106808458A publication Critical patent/CN106808458A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H7/00Marking-out or setting-out work
    • B25H7/04Devices, e.g. scribers, for marking

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

Datum line draws method on the outside of a kind of H profile steel component flange plate, comprises the following steps:1. general model is made:The model includes featuring the outer floor of the working panel of scale label, framework, framework inner rib plate, multiple stiffeners and web contact base plate;2. general model is connected across the diverse location of H profile steel component flange plate, web contact base plate will steadily be contacted with web surface during placement, framework inner rib plate is close near the side of scale label and with flange plate;3. web half thickness value is read on scale label, datum mark is marked in this position, the datum mark line of diverse location is then formed into part datum line;4. amendment is checked.The present invention as positioning datum with web because can directly ensure that datum line and web thickness center line overlap on the outside of the flange plate for drawing, draw Mass accuracy high, influence and restraining factors few, low to operation deviation and deformation requirements, amendment is convenient, so as to substantially increase efficiency and reduce construction cost.

Description

Datum line draws method on the outside of H profile steel component flange plate
Technical field:
The invention belongs to steel construction system peace technical field, it is related to one kind to be carried out using general model The method that datum line draws on the outside of H profile steel component flange plate.
Background technology:
Datum line is mainly used for carrying out flange plate side attached on the outside of the flange plate of H profile steel steel member The installation of the group weldering positioning and integrated member of part is checked and (can just accomplish precision based on unified benchmark Ensure), consider that it should overlap with web thickness center line for design stress.Generally draw The method of the datum line by part Steel Ruler 3 in diverse location as shown in figure 1, measure the edge of a wing The widthwise central point 4 of plate 5, the widthwise central point 4 for then connecting diverse location forms datum line 5, or directly using drawing, in the web group on flange plate 5, to position line, (2 groups of web is welded in the wing Position line on listrium 5) regard datum line.
Above method draws on the outside of flange plate datum line because it exists so that flange plate is positioned in itself Following shortcoming:
1st, datum line draw influence factor it is many (flange plate cutting stock precision, assembling precision, Welding deformation etc.), quality should not ensure (it is difficult to ensure that in flange plate datum line and web thickness Heart line overlaps);
2nd, the precision because being largely determined by flange plate in itself and its with web group pair, therefore under The process quality requirement of material, group pair and welding is relatively tight, so as to cause cost increase, claim for eot;
3rd, difficulty is modified to the datum line deviation caused by factors above big, can be caused into This increase, efficiency reduction.
The content of the invention:
It is an object of the invention to provide the datum line side of drawing on the outside of a kind of H profile steel component flange plate Method, the method is simple to operate, efficient, because can directly ensure to draw as positioning datum with web Datum line and web thickness center line overlap on the outside of the flange plate of system, draw Mass accuracy it is high, Influence and restraining factors are few, low to operation deviation and deformation requirements, and amendment is convenient, so that greatly It is big to improve efficiency and reduce construction cost.
As above conceive, the technical scheme is that:A kind of outer side base of H profile steel component flange plate Directrix draws method, it is characterised in that:Comprise the following steps:
1. general model is made:The model includes featuring working panel, the framework of scale label Outer floor, framework inner rib plate, multiple stiffeners and web contact base plate;The outer floor of the framework With framework inner rib plate along working panel inside and outside periphery bending group weld, the multiple stiffener with Formed after working panel vertical welding as the stable ∏ types framework of general model main body;It is described steady Determine the affixed web contact base plate in a side end face of ∏ type frameworks, being formed with scale in other end side carves Degree;
2. general model is placed and looked for a little:General model is connected across H profile steel component flange plate not Same position, web contact base plate will steadily be contacted with web surface during placement, it is ensured that working panel Vertical with web surface, framework inner rib plate is close near the side of scale label and with flange plate;
3. datum mark draws and line:General model is connected across H profile steel component flange plate not After with position, web half thickness value is read on scale label, benchmark is marked in this position Point, then forms part datum line by the datum mark line of diverse location;
4. amendment is checked:Using general model base is checked in annex group pair or other centre positions The accuracy of directrix, if any error, after the drawing of amendment datum mark is checked in encryption, connects each base On schedule and check amendment datum mark datum mark and formed and check revised datum line.
The bottom surface that 0 position of said scale scale should contact bottom with web is alignd, web contact Base plate and working panel keep vertical.
Aforementioned stable ∏ type frameworks both sides are respectively welded a handle.
The present invention efficiently realizes that the high accuracy of flange plate side base directrix is drawn by a general model Line draws, and completes web thickness center to the accurate transmission of flange plate side.One limb when model is placed Web is contacted with, and is steadily contacted with web surface by web contact base plate, it is ensured that working face Plate is vertical with web surface, so as to reduce error, the framework inner rib plate of model is near scale label Side and be close to flange plate, the point corresponding to web half thickness value is marked by scale label Part datum line is formed between as datum mark, point after line, then can use other positions point to be answered Core amendment.
The present invention is a kind of high accuracy, convenient, the efficient flange plate outside positioned with web Datum line draws method.The method is simple to operate, efficient, because can by positioning datum of web Overlapped with datum line on the outside of the direct flange plate for ensureing and drawing and web thickness center line, drawn Mass accuracy is high, influence and restraining factors are few, low to operation deviation and deformation requirements, amendment It is convenient, so as to substantially increase efficiency and reduce construction cost.
Brief description of the drawings:
Fig. 1 is that Steel Ruler measures H profile steel component flange plate side base directrix schematic diagram;
Fig. 2 is that datum line draws schematic diagram on the outside of H profile steel component flange plate;
Fig. 3 is the schematic diagram of general model of the invention;
Fig. 4 is the side view of Fig. 3;
Fig. 5 is the placement schematic diagram of general model;
Fig. 6 is to check amendment datum line schematic diagram.
In figure:1-H profile steel component web;2-web thickness center line;3-Steel Ruler; 4-flange plate widthwise central point (or drawn datum mark);5-flange plate the datum line that draws or Former web group is to position line;6-flange plate;7-web contact base plate;8-general model;9 - model scale label;10-model handle;The outer floor of 11-framework;12-working panel; 13-stiffener;14-framework inner rib plate;15-check amendment datum mark;16-check amendment Datum line afterwards.
Specific embodiment:
Datum line draws method on the outside of a kind of H profile steel component flange plate, comprises the following steps:
1st, as shown in Figure 3,4:Make general model:The model includes featuring scale label 9 working panel 12, multiple stiffeners 13, the outer floor 11 of framework inner rib plate 14, framework With web contact base plate 7.The outer floor of the framework and framework inner rib plate along working panel, Bending group in neighboring is welded, and is formed as logical after the multiple stiffener and working panel vertical welding With the stable ∏ types framework of model main body;The affixed web in one side end face of the stabilization ∏ type frameworks Contact base plate, scale label is formed with other end side.
General model is made, model will ensure working panel 12 in a plane, and web connects Bottom out plate 7 and keep vertical with working panel 12,0 position of scale label 9 contacts with web The bottom surface of base plate 7 flushes.
2nd, model is placed and looked for a little:
As shown in Figure 2:General model 8 is connected across the diverse location of H profile steel component flange plate (placement location sets with required precision, and required precision is high, takes that a position is near, quantity is more;Together When end nearby and flange plate side has the position that annex group is welded to try one's best setting), during placement such as Fig. 5 Shown web contact base plate 7 will steadily be contacted with web surface 1, it is ensured that working panel 12 with Web surface 1 is vertical.Framework inner rib plate 14 is tight with flange plate 6 near the side of scale label 9 Patch.
3rd, datum mark draws and line:
As shown in Figure 5:Model reads web after diverse location placement on scale label 9 Half thickness value, datum mark 4 is marked in this position.For example:Fig. 5 web thickness is 20mm, Then the dot-dash datum mark 4 at the 10mm scales of scale label 9, then as shown in Figure 2 will not The flange plate datum line 5 for drawing is formed with the line of datum mark 4 of position.
4th, amendment is checked:
As shown in Figure 6:Using general model benchmark is checked in annex group pair or other centre positions The accuracy of line, if any error, after the drawing of amendment datum mark 15 is checked in encryption, connection is each Datum mark 4 checks revised datum line 16 with the datum mark formation of amendment datum mark 15 is checked.

Claims (3)

1. datum line draws method on the outside of a kind of H profile steel component flange plate, it is characterised in that: Comprise the following steps:
1. general model is made:The model includes featuring working panel, the framework of scale label Outer floor, framework inner rib plate, multiple stiffeners and web contact base plate;The outer floor of the framework With framework inner rib plate along working panel inside and outside periphery bending group weld, the multiple stiffener with Formed after working panel vertical welding as the stable ∏ types framework of general model main body;It is described steady Determine the affixed web contact base plate in a side end face of ∏ type frameworks, being formed with scale in other end side carves Degree;
2. general model is placed and looked for a little:General model is connected across H profile steel component flange plate not Same position, web contact base plate will steadily be contacted with web surface during placement, it is ensured that working panel Vertical with web surface, framework inner rib plate is close near the side of scale label and with flange plate;
3. datum mark draws and line:General model is connected across H profile steel component flange plate not After with position, web half thickness value is read on scale label, benchmark is marked in this position Point, then forms part datum line by the datum mark line of diverse location;
4. amendment is checked:Using general model base is checked in annex group pair or other centre positions The accuracy of directrix, if any error, after the drawing of amendment datum mark is checked in encryption, connects each base On schedule and check amendment datum mark datum mark and formed and check revised datum line.
2. the datum line side of drawing on the outside of H profile steel component flange plate according to claim 1 Method, it is characterised in that:0 position of said scale scale should contact the bottom surface pair of bottom with web Together, web contact base plate and working panel keep vertical.
3. the datum line side of drawing on the outside of H profile steel component flange plate according to claim 1 Method, it is characterised in that:Aforementioned stable ∏ type frameworks both sides are respectively welded a handle.
CN201510851947.8A 2015-11-27 2015-11-27 Datum line draws method on the outside of H profile steel component flange plate Pending CN106808458A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510851947.8A CN106808458A (en) 2015-11-27 2015-11-27 Datum line draws method on the outside of H profile steel component flange plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510851947.8A CN106808458A (en) 2015-11-27 2015-11-27 Datum line draws method on the outside of H profile steel component flange plate

Publications (1)

Publication Number Publication Date
CN106808458A true CN106808458A (en) 2017-06-09

Family

ID=59155527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510851947.8A Pending CN106808458A (en) 2015-11-27 2015-11-27 Datum line draws method on the outside of H profile steel component flange plate

Country Status (1)

Country Link
CN (1) CN106808458A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107825389A (en) * 2017-11-21 2018-03-23 上海振华重工(集团)股份有限公司 A kind of scribble method suitable on overlength H type rod members

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB203455A (en) * 1922-07-04 1923-09-13 John William Pearson An improved square
KR100566119B1 (en) * 2004-11-10 2006-03-30 대우조선해양 주식회사 Cutting line marking jig for h beam
CN203642859U (en) * 2013-12-13 2014-06-11 中国二冶集团有限公司 Measuring and positioning device for center line of H-shaped steel
CN204001754U (en) * 2014-08-06 2014-12-10 江苏建筑职业技术学院 I iron and H shaped steel chalker
CN204043548U (en) * 2014-06-26 2014-12-24 广州广船国际股份有限公司 A kind of boats and ships three line Alignment measuring slide calliper rule

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB203455A (en) * 1922-07-04 1923-09-13 John William Pearson An improved square
KR100566119B1 (en) * 2004-11-10 2006-03-30 대우조선해양 주식회사 Cutting line marking jig for h beam
CN203642859U (en) * 2013-12-13 2014-06-11 中国二冶集团有限公司 Measuring and positioning device for center line of H-shaped steel
CN204043548U (en) * 2014-06-26 2014-12-24 广州广船国际股份有限公司 A kind of boats and ships three line Alignment measuring slide calliper rule
CN204001754U (en) * 2014-08-06 2014-12-10 江苏建筑职业技术学院 I iron and H shaped steel chalker

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107825389A (en) * 2017-11-21 2018-03-23 上海振华重工(集团)股份有限公司 A kind of scribble method suitable on overlength H type rod members

Similar Documents

Publication Publication Date Title
CN103028914B (en) Manufacture method for curve plate of steel case girder
CN104724250B (en) Method for drawing hull section margin line
CN104400284B (en) Positioning device and buckling positioning method of longitudinal beam
CN101972922B (en) Method for processing H-shaped crankle beam
CN103523169B (en) A kind of Double-casing boats and ships manufacture method
CN106808458A (en) Datum line draws method on the outside of H profile steel component flange plate
CN205278015U (en) Stand crossbeam connection structure
CN106734570A (en) A kind of mould punching process in automobile panel
CN102338612A (en) Testing method of integral panel parts with double curvatures
CN103527215B (en) A kind of universal wedge-shaped segment ring of extra small radius of curvature shield tunnel
CN104759820B (en) A kind of tyre crane crossbeam rail pressing plate workshop welding method
CN103949904B (en) Turnover fixture
CN104803128A (en) Outer tank reinforcing ring device of tank type container and processing method thereof
CN103286465A (en) Construction method for preventing welding deformation of converter gasholder base plate
CN107972806B (en) Shape preserving method of hyperbolic outer plate and hyperbolic outer plate structure
CN204606711U (en) A kind of outer tank reinforcing pad device of tank container
CN102658481B (en) A kind of carriage of mining self-unloading vehicle annex rivet welding device and using method
CN105817841B (en) Shape tube forming method
CN103639947A (en) High-precision assembly tool for real reflecting surface
CN104985329B (en) Hyperbolicity solid milling part laser incising type processing method
CN209319079U (en) A kind of Vehicular liquefied natural gas cylinder shell rear head component positioning tool
CN108161364A (en) Hyperbolic bending component processing technology
CN203581428U (en) Positioning jig for adhering film to notebook touchpad
CN207309267U (en) One kind is accurately positioned welding fixture
CN103846319A (en) Method for manufacturing arc-shaped metal plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170609

RJ01 Rejection of invention patent application after publication