CN106807931A - A kind of Dual-layer sealing device of big bag long nozzle - Google Patents

A kind of Dual-layer sealing device of big bag long nozzle Download PDF

Info

Publication number
CN106807931A
CN106807931A CN201710202843.3A CN201710202843A CN106807931A CN 106807931 A CN106807931 A CN 106807931A CN 201710202843 A CN201710202843 A CN 201710202843A CN 106807931 A CN106807931 A CN 106807931A
Authority
CN
China
Prior art keywords
tube
piece
long nozzle
big bag
bag long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710202843.3A
Other languages
Chinese (zh)
Inventor
刘洪银
刘成宝
孙建卫
杨波
王孝科
郝帅
路峰
袁鹏举
亓伟伟
王毅
王奉县
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Group Co Ltd SISG
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201710202843.3A priority Critical patent/CN106807931A/en
Publication of CN106807931A publication Critical patent/CN106807931A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • B22D41/502Connection arrangements; Sealing means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The invention discloses a kind of Dual-layer sealing device of big bag long nozzle, described device is sealed including internal layer, described device is also sealed including outer layer, and the outer layer sealing includes the first tube-like piece (2), the second tube-like piece (7) and the 3rd tube-like piece (12);First tube-like piece (2) sealing is fixed on the steel plate of steel ladle sliding water gap bottom (1), and lower openings;Second tube-like piece (7) and the 3rd tube-like piece (12) are nested together with one heart, and sealing is fixed on top the rim of a bowl lower surface of big bag long nozzle (10), and top the rim of a bowl is included in the 3rd tube-like piece (12);Filling sealing agent (13) in the upper opening interlayer formed between the second tube-like piece (7) and the 3rd tube-like piece (12).Sealing device sealing is relatively simple, and the sealed environment of junction is relatively preferable, is easier to realize high-precision sealing.

Description

A kind of Dual-layer sealing device of big bag long nozzle
Technical field
The invention belongs to technical field of ferrous metallurgy, in particular it relates to a kind of big bag long nozzle is double-deck close Seal apparatus.
Background technology
Typically using big bag long nozzle as the molten steel circulation passage between ladle and tundish during continuous casting, greatly Bag long nozzle top is docked with ladle nozzle, and in bottom insertion tundish molten steel, flow velocity of the molten steel in big bag long nozzle is about 1 ~3 meter per seconds, the effect of the steel miscarriage raw " jet pump " of quick flowing can be in surrounding air suction molten steel, if big bag long nozzle It is poorly sealed between ladle nozzle, it may occur that serious molten steel secondary oxidation problem.Current ladle nozzle and big bag long nozzle Between it is mostly be to be sealed using sealing gasket and logical argon gas, sealing gasket sealing is put between ladle nozzle and big bag long nozzle One sealing gasket, mechanical arm will hold out against between ladle nozzle and big bag long nozzle, but due to ladle nozzle and big bag long nozzle Material be refractory material, in order to prevent damaging the mouth of a river, the pressure between ladle nozzle and big bag long nozzle is limited, so The sealing function of sealing gasket is limited, and argon gas-sealed is to lead to argon gas by the junction of ladle nozzle and big bag long nozzle, with argon Gas excludes air, but due to during continuous casting ladle beam speed often change, in ladle beam produce " injection In the presence of pump ", the suction for sucking gas also often changes, and due to big bag long nozzle and ladle nozzle contact surface stress not Uniformly, and there is a cold steel, if argon blowing rate misoperation often results in suction air phenomenon, molten steel is oxidized.
Big bag long nozzle and the junction of ladle nozzle carry out it is high-precision sealing it is relatively difficult, its reason mainly have with Lower 4 points, one is:It is required for carrying out changing ladle operation after having been poured due to every stove molten steel, big bag long nozzle need to be disassembled, Then the mouth of a river with new ladle is reconnected, and has frequently disassembling section between big bag long nozzle and ladle nozzle, frequently The big bag long nozzle of disassembling section requirement is as simple as possible with the connection equipment of ladle nozzle, and simply connects equipment sealing It is bad.Secondly being:If misoperation in casting process, the interface between big bag long nozzle and ladle nozzle can be caused to have double steel Phenomenon, the molten steel routed up can destroy the sealing of interface, thirdly being:Continuous Cast Molten Steel Temperature is very high, the difficult sealing under hot environment Degree is very big, and it four is:Big faying face between bag long nozzle and ladle nozzle is smaller, and less faying face is unfavorable for sealing.
The content of the invention
In order to solve the deficiency of above technology, the present invention provides a kind of Dual-layer sealing device of big bag long nozzle.The sealing Device sealing is relatively simple, and the sealed environment of junction is relatively preferable, is easier to realize high-precision sealing.
To reach above-mentioned purpose, present invention employs following technical scheme:
A kind of Dual-layer sealing device of big bag long nozzle, described device is sealed including internal layer, and described device also includes outer layer Sealing, the outer layer sealing includes the first tube-like piece 2, the second tube-like piece 7 and the 3rd tube-like piece 12;First tube-like piece 2 is close Sealing is scheduled on the steel plate 1 of steel ladle sliding water gap bottom, and lower openings;The tube-like piece 12 of second tube-like piece 7 and the 3rd is same The heart is nested together, and sealing is fixed on top the rim of a bowl lower surface of big bag long nozzle 10, and top the rim of a bowl is included in into the 3rd pipe In shape part 12;Filling sealing agent 13 in the upper opening interlayer formed between the second tube-like piece 7 and the 3rd tube-like piece 12.
Preferably, the internal layer is sealed into argon gas-sealed.
It is further preferred that the argon gas-sealed includes argon seal apparatus 6, argon gas pipeline 8 and argon gas source 9;The argon gas Pipeline 8 is connected through the bottom of the second tube-like piece 7 with argon seal apparatus 6.
Preferably, first tube-like piece 2 is more than with the internal diameter that ladle nozzle 3 has identical center line, the first tube-like piece 2 The external diameter of ladle nozzle 3, the length of the length of the first tube-like piece 2 more than ladle nozzle 3 outside ladle, ladle nozzle and big After the completion of the docking of bag long nozzle, the lower surface about 5 of top the rim of a bowl of the big bag long nozzle of distance from bottom of the first tube-like piece 2~ 10mm。
Preferably, the internal diameter that the second tube-like piece 7 has identical center line, the second tube-like piece 7 with big bag long nozzle 10 is more than The external diameter of the first tube-like piece 2.
Preferably, second tube-like piece 7 and the height of the 3rd tube-like piece 12 are 50~100mm, the 3rd tube-like piece 12 away from It is 20~40mm with a distance from the outer wall of big bag long nozzle 10.
Preferably, the sealant 13 is the mixture of solid-state organic high molecular compound and fire proofing.
It is further preferred that the solid-state organic high molecular compound is TPI.
The first tube-like piece, the second tube-like piece and the 3rd tube-like piece are made using ferrous material in the present invention, such as iron sheet.
The present invention welds first tube-like piece that Open Side Down as sealing on the steel plate of steel ladle sliding water gap bottom The top half of cover, connects second tube-like piece of opening upwards as close at the top of the big bag long nozzle at the lower surface of the rim of a bowl The latter half of sealing cover, in ladle nozzle and big bag long nozzle docking operation, the bottom insertion lower half of top half seal closure Divide the bottom of seal closure, complete the docking of seal closure, the bound fraction use of top half seal closure and the latter half seal closure Solid-state organic high molecular compound becomes sticky as sealant, solid-state organic high molecular compound in the presence of steel flow heat dissipation And have mobility, and preferably sealing can be realized, there are the 3rd tube-like piece, the 3rd pipe between the second tube-like piece and big bag long nozzle Shape part decapacitation is played a part of to prevent sealant from flowing to outside big bag long nozzle outer wall, moreover it is possible to play heat-insulated effect.
Due to big bag long nozzle and the junction of ladle nozzle carry out it is high-precision sealing it is relatively difficult, so original On the basis of sealing, an additional seal closure, the sealing knot of seal closure around the junction of big bag long nozzle and ladle nozzle At conjunction from molten steel beam farther out, the temperature at this is relatively low, so the requirement to sealed material is relatively low, and the interference without double steel, So carrying out sealing relatively simple to the junction of seal closure.The sealed environment of the junction of seal closure is relatively preferable, compared with Easily realize high-precision sealing.Original water-tight equipment constitutes double-layer seal plus seal closure, can further improve big Bao Changshui Sealing between mouth and ladle nozzle.
Advantages of the present invention
1st, the apparatus and method provided according to the present invention, additional around the junction of big bag long nozzle and ladle nozzle Individual seal closure, from molten steel beam farther out, the temperature at this is relatively low for the sealing junction of seal closure, so the requirement to sealed material It is relatively low, and the interference without double steel, so carrying out sealing relatively simple, the junction of seal closure to the junction of seal closure Sealed environment it is relatively preferable, high-precision sealing can be realized.
2nd, in the docking operation for completing big bag long nozzle and ladle nozzle with mechanical arm, the upper the latter half of seal closure Also docking can be accordingly automatically performed, then under the influence of the radiating of big bag long nozzle, the latter half junction on seal closure Sealant softens and flows, and completes automatic-sealed, and seal operation is simple.
3rd, sealant is solid-state organic high molecular compound, under the influence of the radiating of big bag long nozzle, becomes thick liquid Viscous force between body, with seal closure and big bag long nozzle wall is larger, preferably sealing can be realized, according to air pressure change principle and close The liquid fluctuating for sealing agent may determine that whether argon envelope flow is suitable, then adjust argon envelope flow, improve argon envelope effect.
Brief description of the drawings
Fig. 1 is the structural representation of the Dual-layer sealing device of big bag long nozzle;
Fig. 2 is the vertical cross section of the Dual-layer sealing device of big bag long nozzle;
Fig. 3 is the vertical cross section of the upper and lower two parts junction of seal closure before big bag long nozzle pours into a mould the first stove molten steel;
Fig. 4 is the horizontal sectional drawing of the upper and lower two parts junction of seal closure before big bag long nozzle pours into a mould the first stove molten steel;
Fig. 5 be casting process in, the vertical cross section of the upper and lower two parts junction of seal closure;
Fig. 6 be casting process in, the additional upper and lower two parts junction of seal closure around big bag long nozzle and ladle nozzle Horizontal sectional drawing;
Reference:1st, the steel plate of steel ladle sliding water gap bottom;2nd, the first tube-like piece;3rd, ladle nozzle;4th, ladle nozzle In steel circulation road;5th, sealing gasket;6th, argon seal apparatus;7th, the second tube-like piece;8th, argon gas pipeline;9th, argon gas source;10th, big Bao Changshui Mouthful;11st, the steel circulation road in big bag long nozzle;12nd, the 3rd tube-like piece;13rd, sealant;14th, great circle ring-type organic polymer Compound;15th, roundlet ring-type organic high molecular compound.
Specific embodiment
With the drawings and specific embodiments, the present invention is further detailed explanation below.
The structural representation of the Dual-layer sealing device of big bag long nozzle is as shown in figure 1, the double-layer seal dress of big bag long nozzle As shown in Fig. 2 a kind of Dual-layer sealing device of big bag long nozzle, described device includes internal layer sealing, institute for the vertical cross section put State device also to be sealed including outer layer, the outer layer sealing includes the first tube-like piece 2, the second tube-like piece 7 and the 3rd tube-like piece 12;Institute The sealing of the first tube-like piece 2 is stated to be fixed on the steel plate 1 of steel ladle sliding water gap bottom, and lower openings;The He of second tube-like piece 7 3rd tube-like piece 12 is nested together with one heart, and sealing is fixed on top the rim of a bowl lower surface of big bag long nozzle 10, by top bowl Mouth is included in the 3rd tube-like piece 12;Filled out in the upper opening interlayer formed between the second tube-like piece 7 and the 3rd tube-like piece 12 Fill sealant 13.
Specifically setting up procedure can be:Weld one on the steel plate 1 of steel ladle sliding water gap bottom Open Side Down first As the top half of seal closure, the lower open of the first tube-like piece 2, top and the ladle of the first tube-like piece 2 slide water to tube-like piece 2 The closed soldering of steel plate 1 of mouth bottom.First tube-like piece 2 and ladle nozzle 3 have an identical center line, the first tube-like piece 2 it is interior Footpath is slightly larger than the external diameter of ladle nozzle 3, and the length of the first tube-like piece 2 is exposed to the length outside ladle slightly larger than ladle nozzle 3, Ladle nozzle is bundled into after the completion of the docking of the mouth of a river with big, the following table of big bag long nozzle top the rim of a bowl of distance from bottom of the first tube-like piece 2 Face about 5~10mm.In the manufacturing process of big bag long nozzle, one opening of connection at the lower surface of the rim of a bowl at the top of the big bag long nozzle The second upward tube-like piece 7 as seal closure the latter half, the bottom of the second tube-like piece 7 and big bag long nozzle top the rim of a bowl Lower surface airtight connection, the opened upper end of the second tube-like piece 7, the second tube-like piece 7 has identical center line with big bag long nozzle 10, the Slightly larger than the external diameter of the first tube-like piece 2, the bottom of the second tube-like piece 7 is provided with an aperture, is welded on aperture the internal diameter of two tube-like pieces 7 A steel pipe is connect as argon gas pipeline 8, one end of steel pipe is connected with the argon seal apparatus 6 at the rim of a bowl of big bag long nozzle top, another End is connected with argon gas source 9.The height of the second tube-like piece 7 is 50~100mm, the second tube-like piece 7 and big bag long nozzle top the rim of a bowl Between have the 3rd tube-like piece 12 of a circle opening upwards, the 3rd tube-like piece 12 is 7 highly identical with the second tube-like piece, internal diameter is identical, 3rd tube-like piece 12 is apart from big bag long nozzle outer wall about 20~40mm.
In ladle nozzle 3 and the big docking operation of bag long nozzle 10, the bottom insertion the latter half of top half seal closure is close The interlayer bottom of sealing cover, completes the docking of seal closure, and the sealing between the first tube-like piece 2 and the second tube-like piece 7 uses sealant 13 sealings, big bag long nozzle 10 gives out during continuous casting the heat sealant 13 so that the sealant 13 becomes Obtain sticky and have mobility, preferably sealing can be realized.
The sealant 13 is at normal temperatures solid-state, and its mobility temperature is lower by 30~60 than the temperature around big bag long nozzle DEG C, it is added with fire proofing in the sealant 13 so that within the temperature range of around the big bag long nozzle, the sealant 13 will not Burning, is processed into annular shape by the sealant 13 in advance, is divided into two kinds of shapes of great circle ring-type and roundlet ring-type (respectively large circle Shape organic high molecular compound 14 and roundlet ring-type organic high molecular compound 15), the sealant is attached to sealing to facilitate Place.
Great circle ring-type organic high molecular compound 14 is attached to the first tube-like piece 2 by big bag long nozzle for the first time using preceding Outer surface and the inner surface of the second tube-like piece 7 junction, roundlet ring-type organic high molecular compound 15 is attached to the first pipe The inner surface of shape part 2 and the junction of the outer surface of the 3rd tube-like piece 12, after installation, great circle ring-type organic high molecular compound 14 To the effect in filling seal closure upper and lower two parts junction gap.Roundlet ring-type organic high molecular compound 15 plays filling first The effect in gap between the bottom of tube-like piece 2 and the 3rd tube-like piece 12.After ladle nozzle 3 is docked with big bag long nozzle 10, the first half Divide the interlayer bottom of the bottom insertion the latter half seal closure of seal closure, complete the docking of seal closure.Big bag long nozzle cast the Before one heat steel water, the vertical cross section of the upper and lower two parts junction of seal closure is as shown in figure 3, the upper and lower two parts junction of seal closure Horizontal sectional drawing as shown in figure 4, in casting process, after sealant dissolves, the vertical of the upper and lower two parts junction of seal closure is cutd open Face figure is as shown in figure 5, the horizontal sectional drawing of the upper and lower two parts junction of seal closure is as shown in Figure 6.
, more than the external diameter of the first tube-like piece 2, external diameter is less than the second pipe for the internal diameter of great circle ring-type organic high molecular compound 14 The internal diameter of shape part 7, the thickness of the great circle ring-type organic high molecular compound 14 is the internal diameter and the first tube-like piece of the second tube-like piece 7 The 50%~80% of 2 external diameter difference, the height of the large circle is 50~80mm.
, less than the internal diameter of the first tube-like piece 2, internal diameter is more than the 3rd pipe for the external diameter of roundlet ring-type organic high molecular compound 15 The external diameter of shape part 12, the thickness of the roundlet ring-type organic high molecular compound 15 is the internal diameter and the 3rd tubulose of the first tube-like piece 2 The 50%~80% of the difference of the external diameter of part 12, the height of the small circle ring is 50~80mm.
Before pouring into a mould the first stove molten steel using the big bag long nozzle, sealing gasket 5 is installed in the rim of a bowl on big bag long nozzle top, And great circle ring-type organic high molecular compound 14 is attached to outer surface and the inner surface of the second tube-like piece 7 of the first tube-like piece 2 Junction, roundlet ring-type organic high molecular compound 15 is attached to outside the inner surface of the first tube-like piece 2 and the 3rd tube-like piece 12 The junction on surface, big bag long nozzle 10 then docked and held out against using mechanical arm with ladle nozzle 3, and docking is completed Afterwards, the valve of argon gas source 9 is opened, argon gas is flowed into the argon seal apparatus 6 at the rim of a bowl of big bag long nozzle top, play argon envelope effect. After big bag long nozzle 10 is docked with ladle nozzle 3, bottom insertion great circle ring-type and the organic high score of roundlet ring-type of the first tube-like piece 2 Between sub- compound, with the carrying out of continuous casting, steel stream heats big bag long nozzle 10, in the presence of the radiating of big bag long nozzle 10, Large circle and roundlet ring-type organic high molecular compound soften and flow to the gap and of the upper and lower two parts junction of seal closure Gap between the bottom of one tube-like piece 2 and the 3rd tube-like piece 12, plays the effect of sealing, and according to air pressure change principle, continuous casting is poured Can judge whether argon envelope flow is suitable, reaches the effect that precise control argon seals flow during note according to the liquid fluctuating of sealant Really.If the sealant liquid level between the bottom of the first tube-like piece 2 and the 3rd tube-like piece 12 is raised, illustrate that argon envelope flow is too small, need Argon envelope flow is tuned up, if the sealant liquid level between the bottom of the second tube-like piece 7 and the first tube-like piece 2 is raised, illustrates that argon is sealed Flow is excessive, argon envelope flow need to be turned down.
After pouring the first stove molten steel using the big bag long nozzle 10, carry out changing ladle operation, close the valve of argon gas source 9 Door, disassembles big bag long nozzle 10 with mechanical arm, and adds appropriate organic polymer to the bottom of the second tube-like piece 7 Compound particle, to compensate the loss of sealant 13 in casting process, bale panoramic tables are rotated, after new ladle goes to cast position, Docking and argon envelope operation for big bag long nozzle and ladle nozzle is carried out, is only needed 1~2 minute due to changing the bag time, sealant is still Liquid, in the bottom insertion liquid sealant of the first tube-like piece 2, sealing effectiveness is still good.
Embodiment 1:
The Dual-layer sealing device schematic diagram of big bag long nozzle is as shown in figure 1, the Dual-layer sealing device of big bag long nozzle is vertical Profile as shown in Fig. 2 on the steel plate 1 of steel ladle sliding water gap bottom weld first tube-like piece 2 that Open Side Down as The top half of seal closure, the lower open of the first tube-like piece 2, the top of the first tube-like piece 2 and the steel of steel ladle sliding water gap bottom The closed soldering of plate 1.The internal diameter that first tube-like piece 2 has identical center line, the first tube-like piece 2 with ladle nozzle 3 is slightly larger than steel The external diameter of water-coating port 3, the length of the length of the first tube-like piece 2 slightly larger than ladle nozzle 3 outside ladle, ladle nozzle and It is big to be bundled into after the completion of the docking of the mouth of a river, the lower surface about 5mm of big bag long nozzle top the rim of a bowl of distance from bottom of the first tube-like piece 2.Greatly In the manufacturing process of bag long nozzle, second tubulose of opening upwards is connected at the top of the big bag long nozzle at the lower surface of the rim of a bowl Part 7 as seal closure the latter half, the closed company of lower surface of the bottom of the second tube-like piece 7 and big bag long nozzle top the rim of a bowl Connect, the opened upper end of the second tube-like piece 7, the second tube-like piece 7 has identical center line with big bag long nozzle 10, the second tube-like piece 7 Slightly larger than the external diameter of the first tube-like piece 2, the bottom of the second tube-like piece 7 is provided with an aperture, a steel pipe is welded on aperture internal diameter Used as argon gas pipeline 8, the argon seal apparatus 6 at the rim of a bowl of one end of steel pipe and big bag long nozzle top are connected, the other end and argon gas source 9 Connection.The height of the second tube-like piece 7 is 50mm, have between the second tube-like piece 7 and big bag long nozzle top the rim of a bowl a circle be open to On the 3rd tube-like piece 12, the 3rd tube-like piece 12 is 7 highly identical with the second tube-like piece, internal diameter is identical, the distance of the 3rd tube-like piece 12 Big bag long nozzle outer wall about 20mm.
In ladle nozzle 3 and the big docking operation of bag long nozzle 10, the bottom insertion the latter half of top half seal closure is close The bottom of sealing cover, completes the docking of seal closure, and the sealing between the first tube-like piece 2 and the second tube-like piece 7 is close using sealant 13 Envelope, big bag long nozzle 10 gives out during continuous casting the heat sealant 13 so that the sealant 13 becomes viscous It is thick and have mobility, preferably sealing can be realized.
The sealant 13 is at normal temperatures solid-state, and its mobility temperature is lower by 30~60 than the temperature around big bag long nozzle DEG C, it is added with fire proofing in the sealant 13 so that within the temperature range of around the big bag long nozzle, the sealant 13 will not Burning, considers factors above, and it is TPI to select the sealant 13.In advance by the macromolecular organic compound 13 are processed into annular shape, are divided into two kinds of shapes of great circle ring-type and roundlet ring-type, are installed the macromolecular organic compound with facilitating To sealing.
Great circle ring-type organic high molecular compound 14 is attached to the first tube-like piece 2 by big bag long nozzle for the first time using preceding Outer surface and the inner surface of the second tube-like piece 7 junction, roundlet ring-type organic high molecular compound 15 is attached to the first pipe The inner surface of shape part 2 and the junction of the outer surface of the 3rd tube-like piece 12, after installation, great circle ring-type organic high molecular compound 14 To the effect in filling seal closure upper and lower two parts junction gap.Roundlet ring-type organic high molecular compound 15 plays filling first The effect in gap between the bottom of tube-like piece 2 and the 3rd tube-like piece 12.After ladle nozzle 3 is docked with big bag long nozzle 10, the first half Divide the bottom of the bottom insertion the latter half seal closure of seal closure, complete the docking of seal closure.Big bag long nozzle pours into a mould the first stove Before molten steel, the vertical cross section of the upper and lower two parts junction of seal closure is as shown in figure 3, the water of the upper and lower two parts junction of seal closure Flat sectional drawing as shown in figure 4, in casting process, after sealant dissolves, the vertical cross section of the upper and lower two parts junction of seal closure As shown in figure 5, the horizontal sectional drawing of the upper and lower two parts junction of seal closure is as shown in Figure 6.
, more than the external diameter of the first tube-like piece 2, external diameter is less than the second pipe for the internal diameter of great circle ring-type organic high molecular compound 14 The internal diameter of shape part 7, the thickness of the great circle ring-type organic high molecular compound 14 is the internal diameter and the first tube-like piece of the second tube-like piece 7 The 50%% of 2 external diameter difference, the height of the large circle is 50mm.
, less than the internal diameter of the first tube-like piece 2, internal diameter is more than the 3rd pipe for the external diameter of roundlet ring-type organic high molecular compound 15 The external diameter of shape part 12, the thickness of the roundlet ring-type organic high molecular compound 15 is the internal diameter and the 3rd tubulose of the first tube-like piece 2 The 50% of the difference of the external diameter of part 12, the height of the small circle ring is 50mm.
Before pouring into a mould the first stove molten steel using the big bag long nozzle, sealing gasket 5 is installed in the rim of a bowl on big bag long nozzle top, And great circle ring-type organic high molecular compound 14 is attached to outer surface and the inner surface of the second tube-like piece 7 of the first tube-like piece 2 Junction, roundlet ring-type organic high molecular compound 15 is attached to outside the inner surface of the first tube-like piece 2 and the 3rd tube-like piece 12 The junction on surface, big bag long nozzle 10 then docked and held out against using mechanical arm with ladle nozzle 3, and docking is completed Afterwards, the valve of argon gas source 9 is opened, argon gas is flowed into the argon seal apparatus 6 at the rim of a bowl of big bag long nozzle top, play argon envelope effect. After big bag long nozzle 10 is docked with ladle nozzle 3, bottom insertion great circle ring-type and the organic high score of roundlet ring-type of the first tube-like piece 2 Between sub- compound, with the carrying out of continuous casting, steel stream heats big bag long nozzle 10, in the presence of the radiating of big bag long nozzle 10, Large circle and roundlet ring-type organic high molecular compound soften and flow to the gap and of the upper and lower two parts junction of seal closure Gap between the bottom of one tube-like piece 2 and the 3rd tube-like piece 12, plays the effect of sealing, and according to air pressure change principle, continuous casting is poured Can judge whether argon envelope flow is suitable, reaches the effect that precise control argon seals flow during note according to the liquid fluctuating of sealant Really.If the sealant liquid level between the bottom of the first tube-like piece 2 and the 3rd tube-like piece 12 is raised, illustrate that argon envelope flow is too small, need Argon envelope flow is tuned up, if the sealant liquid level between the bottom of the second tube-like piece 7 and the first tube-like piece 2 is raised, illustrates that argon is sealed Flow is excessive, argon envelope flow need to be turned down.
After pouring the first stove molten steel using the big bag long nozzle 10, carry out changing ladle operation, close the valve of argon gas source 9 Door, disassembles big bag long nozzle 10 with mechanical arm, and adds appropriate organic polymer to the bottom of the second tube-like piece 7 Compound particle, to compensate the loss of sealant 13 in casting process, bale panoramic tables are rotated, after new ladle goes to cast position, Docking and argon envelope operation for big bag long nozzle and ladle nozzle is carried out, is only needed 1~2 minute due to changing the bag time, sealant is still Liquid, in the bottom insertion liquid sealant of the first tube-like piece 2, sealing effectiveness is still good.
After the technology provided using the present invention carries out double-layer seal to big bag long nozzle, big bag long water gap bowl oral area position it is close Envelope effect significantly improve, secondary oxidation of steel degree is further reduced in casting process, in molten steel total oxygen content reduction 5ppm with On.
Embodiment 2:
The Dual-layer sealing device schematic diagram of big bag long nozzle is as shown in figure 1, the Dual-layer sealing device of big bag long nozzle is vertical Profile as shown in Fig. 2 on the steel plate 1 of steel ladle sliding water gap bottom weld first tube-like piece 2 that Open Side Down as The top half of seal closure, the lower open of the first tube-like piece 2, the top of the first tube-like piece 2 and the steel of steel ladle sliding water gap bottom The closed soldering of plate 1.The internal diameter that first tube-like piece 2 has identical center line, the first tube-like piece 2 with ladle nozzle 3 is slightly larger than steel The external diameter of water-coating port 3, the length of the length of the first tube-like piece 2 slightly larger than ladle nozzle 3 outside ladle, ladle nozzle and It is big to be bundled into after the completion of the docking of the mouth of a river, the lower surface about 10mm of big bag long nozzle top the rim of a bowl of distance from bottom of the first tube-like piece 2.Greatly In the manufacturing process of bag long nozzle, second tubulose of opening upwards is connected at the top of the big bag long nozzle at the lower surface of the rim of a bowl Part 7 as seal closure the latter half, the closed company of lower surface of the bottom of the second tube-like piece 7 and big bag long nozzle top the rim of a bowl Connect, the opened upper end of the second tube-like piece 7, the second tube-like piece 7 has identical center line with big bag long nozzle 10, the second tube-like piece 7 Slightly larger than the external diameter of the first tube-like piece 2, the bottom of the second tube-like piece 7 is provided with an aperture, a steel pipe is welded on aperture internal diameter Used as argon gas pipeline 8, the argon seal apparatus 6 at the rim of a bowl of one end of steel pipe and big bag long nozzle top are connected, the other end and argon gas source 9 Connection.The height of the second tube-like piece 7 is 100mm, have between the second tube-like piece 7 and big bag long nozzle top the rim of a bowl a circle be open to On the 3rd tube-like piece 12, the 3rd tube-like piece 12 is 7 highly identical with the second tube-like piece, internal diameter is identical, the distance of the 3rd tube-like piece 12 Big bag long nozzle outer wall about 40mm.
In ladle nozzle 3 and the big docking operation of bag long nozzle 10, the bottom insertion the latter half of top half seal closure is close The bottom of sealing cover, completes the docking of seal closure, and the sealing between the first tube-like piece 2 and the second tube-like piece 7 is close using sealant 13 Envelope, big bag long nozzle 10 gives out during continuous casting the heat sealant 13 so that the sealant 13 becomes viscous It is thick and have mobility, preferably sealing can be realized.
The sealant 13 is at normal temperatures solid-state, and its mobility temperature is lower by 30~60 than the temperature around big bag long nozzle DEG C, it is added with fire proofing in the sealant 13 so that within the temperature range of around the big bag long nozzle, the sealant 13 will not Burning, considers factors above, and it is TPI to select the sealant 13.In advance by the macromolecular organic compound 13 are processed into annular shape, are divided into two kinds of shapes of great circle ring-type and roundlet ring-type, are installed the macromolecular organic compound with facilitating To sealing.
Great circle ring-type organic high molecular compound 14 is attached to the first tube-like piece 2 by big bag long nozzle for the first time using preceding Outer surface and the inner surface of the second tube-like piece 7 junction, roundlet ring-type organic high molecular compound 15 is attached to the first pipe The inner surface of shape part 2 and the junction of the outer surface of the 3rd tube-like piece 12, after installation, great circle ring-type organic high molecular compound 14 To the effect in filling seal closure upper and lower two parts junction gap.Roundlet ring-type organic high molecular compound 15 plays filling first The effect in gap between the bottom of tube-like piece 2 and the 3rd tube-like piece 12.After ladle nozzle 3 is docked with big bag long nozzle 10, the first half Divide the bottom of the bottom insertion the latter half seal closure of seal closure, complete the docking of seal closure.Big bag long nozzle pours into a mould the first stove Before molten steel, the vertical cross section of the upper and lower two parts junction of seal closure is as shown in figure 3, the water of the upper and lower two parts junction of seal closure Flat sectional drawing as shown in figure 4, in casting process, after sealant dissolves, the vertical cross section of the upper and lower two parts junction of seal closure As shown in figure 5, the horizontal sectional drawing of the upper and lower two parts junction of seal closure is as shown in Figure 6.
, more than the external diameter of the first tube-like piece 2, external diameter is less than the second pipe for the internal diameter of great circle ring-type organic high molecular compound 14 The internal diameter of shape part 7, the thickness of the great circle ring-type organic high molecular compound 14 is the internal diameter and the first tube-like piece of the second tube-like piece 7 The 580% of 2 external diameter difference, the height of the large circle is 80mm.
, less than the internal diameter of the first tube-like piece 2, internal diameter is more than the 3rd pipe for the external diameter of roundlet ring-type organic high molecular compound 15 The external diameter of shape part 12, the thickness of the roundlet ring-type organic high molecular compound 15 is the internal diameter and the 3rd tubulose of the first tube-like piece 2 The 80% of the difference of the external diameter of part 12, the height of the small circle ring is 80mm.
Before pouring into a mould the first stove molten steel using the big bag long nozzle, sealing gasket 5 is installed in the rim of a bowl on big bag long nozzle top, And great circle ring-type organic high molecular compound 14 is attached to outer surface and the inner surface of the second tube-like piece 7 of the first tube-like piece 2 Junction, roundlet ring-type organic high molecular compound 15 is attached to outside the inner surface of the first tube-like piece 2 and the 3rd tube-like piece 12 The junction on surface, big bag long nozzle 10 then docked and held out against using mechanical arm with ladle nozzle 3, and docking is completed Afterwards, the valve of argon gas source 9 is opened, argon gas is flowed into the argon seal apparatus 6 at the rim of a bowl of big bag long nozzle top, play argon envelope effect. After big bag long nozzle 10 is docked with ladle nozzle 3, bottom insertion great circle ring-type and the organic high score of roundlet ring-type of the first tube-like piece 2 Between sub- compound, with the carrying out of continuous casting, steel stream heats big bag long nozzle 10, in the presence of the radiating of big bag long nozzle 10, Large circle and roundlet ring-type organic high molecular compound soften and flow to the gap and of the upper and lower two parts junction of seal closure Gap between the bottom of one tube-like piece 2 and the 3rd tube-like piece 12, plays the effect of sealing, and according to air pressure change principle, continuous casting is poured Can judge whether argon envelope flow is suitable, reaches the effect that precise control argon seals flow during note according to the liquid fluctuating of sealant Really.If the sealant liquid level between the bottom of the first tube-like piece 2 and the 3rd tube-like piece 12 is raised, illustrate that argon envelope flow is too small, need Argon envelope flow is tuned up, if the sealant liquid level between the bottom of the second tube-like piece 7 and the first tube-like piece 2 is raised, illustrates that argon is sealed Flow is excessive, argon envelope flow need to be turned down.
After pouring the first stove molten steel using the big bag long nozzle 10, carry out changing ladle operation, close the valve of argon gas source 9 Door, disassembles big bag long nozzle 10 with mechanical arm, and adds appropriate organic polymer to the bottom of the second tube-like piece 7 Compound particle, to compensate the loss of sealant 13 in casting process, bale panoramic tables are rotated, after new ladle goes to cast position, Docking and argon envelope operation for big bag long nozzle and ladle nozzle is carried out, is only needed 1~2 minute due to changing the bag time, sealant is still Liquid, in the bottom insertion liquid sealant of the first tube-like piece 2, sealing effectiveness is still good.
It should be noted last that, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted.Although ginseng The present invention is described in detail according to embodiment, it will be apparent to an ordinarily skilled person in the art that to technical side of the invention Case is modified or equivalent, and without departure from the spirit and scope of technical solution of the present invention, it all should cover in the present invention Right in the middle of.

Claims (8)

1. a kind of Dual-layer sealing device of big bag long nozzle, described device includes internal layer sealing, it is characterised in that described device is also Including outer layer sealing, the outer layer sealing includes the first tube-like piece (2), the second tube-like piece (7) and the 3rd tube-like piece (12);It is described First tube-like piece (2) sealing is fixed on the steel plate of steel ladle sliding water gap bottom (1), and lower openings;Second tube-like piece (7) it is nested together with one heart with the 3rd tube-like piece (12), and sealing is fixed on top the rim of a bowl lower surface of big bag long nozzle (10), Top the rim of a bowl is included in the 3rd tube-like piece (12);What is formed between the second tube-like piece (7) and the 3rd tube-like piece (12) is upper Filling sealing agent (13) in the interlayer of portion opening.
2. the Dual-layer sealing device of big bag long nozzle according to claim 1, it is characterised in that the internal layer is sealed into argon Hermetic seal.
3. the Dual-layer sealing device of big bag long nozzle according to claim 2, it is characterised in that the argon gas-sealed includes Argon seal apparatus (6), argon gas pipeline (8) and argon gas source (9);The argon gas pipeline (8) is through the bottom of the second tube-like piece (7) and argon Seal apparatus (6) are connected.
4. the Dual-layer sealing device of big bag long nozzle according to claim 1, it is characterised in that first tube-like piece (2) there are identical center line, the external diameter of the internal diameter more than ladle nozzle (3) of the first tube-like piece (2), first with ladle nozzle (3) The length of tube-like piece (2) is more than length of the ladle nozzle (3) outside ladle, and ladle nozzle and the docking of big bag long nozzle are completed Afterwards, the lower surface about 5~10mm of top the rim of a bowl of the big bag long nozzle of the distance from bottom of the first tube-like piece (2).
5. the Dual-layer sealing device of big bag long nozzle according to claim 1, it is characterised in that the second tube-like piece (7) with Big bag long nozzle (10) has identical center line, the external diameter of the internal diameter more than the first tube-like piece (2) of the second tube-like piece (7).
6. the Dual-layer sealing device of big bag long nozzle according to claim 1, it is characterised in that second tube-like piece (7) and the 3rd tube-like piece (12) is highly 50~100mm, the 3rd tube-like piece (12) is apart from the outer wall of big bag long nozzle (10) Distance is 20~40mm.
7. the Dual-layer sealing device of big bag long nozzle according to claim 1, it is characterised in that the sealant (13) is The mixture of solid-state organic high molecular compound and fire proofing.
8. the Dual-layer sealing device of big bag long nozzle according to claim 7, it is characterised in that the organic high score of solid-state Sub- compound is TPI.
CN201710202843.3A 2017-03-30 2017-03-30 A kind of Dual-layer sealing device of big bag long nozzle Pending CN106807931A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710202843.3A CN106807931A (en) 2017-03-30 2017-03-30 A kind of Dual-layer sealing device of big bag long nozzle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710202843.3A CN106807931A (en) 2017-03-30 2017-03-30 A kind of Dual-layer sealing device of big bag long nozzle

Publications (1)

Publication Number Publication Date
CN106807931A true CN106807931A (en) 2017-06-09

Family

ID=59116653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710202843.3A Pending CN106807931A (en) 2017-03-30 2017-03-30 A kind of Dual-layer sealing device of big bag long nozzle

Country Status (1)

Country Link
CN (1) CN106807931A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109382506A (en) * 2018-11-20 2019-02-26 山东钢铁股份有限公司 A kind of method of molten steel nitrogen increased amount in reduction continuous casting process

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3612403A1 (en) * 1986-04-12 1987-10-15 Hoesch Stahl Ag Device for sealing the region between lower slide plate and long tube connection in concealed casting of steel melts in long tube technology
EP0282247A1 (en) * 1987-03-06 1988-09-14 Thor Ceramics Limited Refractory assemblies
FR2659880A1 (en) * 1990-03-21 1991-09-27 Siderurgie Fse Inst Rech Linking device between a metallurgical vessel containing a liquid metal and an ingot mould
CN1233984A (en) * 1996-10-17 1999-11-03 维苏维尤斯·克鲁斯布公司 Refractory assemblies
US20040244940A1 (en) * 2002-08-12 2004-12-09 Isamu Nakayama Dual roll casting machine
CN1665620A (en) * 2002-07-10 2005-09-07 达涅利机械工业有限公司 Device for discharging molten metal from a container
CN101748770A (en) * 2009-12-18 2010-06-23 深圳市超纯环保科技有限公司 Liquid level detection type nitrogen-sealed water tank
CN202824647U (en) * 2012-08-28 2013-03-27 石家庄钢铁有限责任公司 Continuous casting bale protecting and pouring sealing gasket
CN104226973A (en) * 2014-08-20 2014-12-24 马钢(集团)控股有限公司 Continuous casting protection casting device of high-quality steel
CN106334789A (en) * 2016-10-25 2017-01-18 新兴铸管股份有限公司 Argon seal protection device for continuous-casting ladle long nozzle
CN207222932U (en) * 2017-03-30 2018-04-13 山东钢铁股份有限公司 A kind of Dual-layer sealing device of big bag long nozzle

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3612403A1 (en) * 1986-04-12 1987-10-15 Hoesch Stahl Ag Device for sealing the region between lower slide plate and long tube connection in concealed casting of steel melts in long tube technology
EP0282247A1 (en) * 1987-03-06 1988-09-14 Thor Ceramics Limited Refractory assemblies
FR2659880A1 (en) * 1990-03-21 1991-09-27 Siderurgie Fse Inst Rech Linking device between a metallurgical vessel containing a liquid metal and an ingot mould
CN1233984A (en) * 1996-10-17 1999-11-03 维苏维尤斯·克鲁斯布公司 Refractory assemblies
CN1233985A (en) * 1996-10-17 1999-11-03 维苏维尤斯·克鲁斯布公司 Molten metal transfer apparatus, operation method and refractory therefor
CN1665620A (en) * 2002-07-10 2005-09-07 达涅利机械工业有限公司 Device for discharging molten metal from a container
US20040244940A1 (en) * 2002-08-12 2004-12-09 Isamu Nakayama Dual roll casting machine
CN101748770A (en) * 2009-12-18 2010-06-23 深圳市超纯环保科技有限公司 Liquid level detection type nitrogen-sealed water tank
CN202824647U (en) * 2012-08-28 2013-03-27 石家庄钢铁有限责任公司 Continuous casting bale protecting and pouring sealing gasket
CN104226973A (en) * 2014-08-20 2014-12-24 马钢(集团)控股有限公司 Continuous casting protection casting device of high-quality steel
CN106334789A (en) * 2016-10-25 2017-01-18 新兴铸管股份有限公司 Argon seal protection device for continuous-casting ladle long nozzle
CN207222932U (en) * 2017-03-30 2018-04-13 山东钢铁股份有限公司 A kind of Dual-layer sealing device of big bag long nozzle

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周川生等: "国内连铸长水口密封结构的实践与看法", 《耐火材料》 *
孙履厚: "《精细化工新材料与技术》", 30 April 1998, 中国石化出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109382506A (en) * 2018-11-20 2019-02-26 山东钢铁股份有限公司 A kind of method of molten steel nitrogen increased amount in reduction continuous casting process

Similar Documents

Publication Publication Date Title
CN1781626B (en) Regulation method for throughflow and bottom nozzle of a metallurgical vessel
CN103397196B (en) One waters die casting aluminium product a refining unit and technique thereof
CN202824647U (en) Continuous casting bale protecting and pouring sealing gasket
CN106881457A (en) Molten steel pours device and part is sealed with argon and the method that part carries out argon envelope is sealed using argon
CN105436472B (en) Melting pool type insulated pouring equipment
CN104226973B (en) Continuous casting protection casting device of high-quality steel
CN207222932U (en) A kind of Dual-layer sealing device of big bag long nozzle
CN207197252U (en) A kind of new automobile casting crucible for smelting stove
CN106807931A (en) A kind of Dual-layer sealing device of big bag long nozzle
CN106694801B (en) A kind of mold and its production method producing rotation tin target
CN107598147B (en) Plastic composite molten steel protection pouring sealing method
CN207255204U (en) Knotting stove formula compression solidification semi-solid aluminium alloy thin-section casting forming machine
CN104057078A (en) Long nozzle and continuous casting method
CN107380741A (en) A kind of manufacture method of strong cool-bag of air-tightness and its cool-bag of manufacture
CN113828735A (en) Gating system and investment casting process of high-temperature alloy elbow
CN207787694U (en) The device of molten steel casting surplus is reduced in a kind of casting process
CN105750528A (en) Sealing structure of riser tube for casting
CN207479546U (en) A kind of airway applied to continuous casting production blowing argon
CN215615054U (en) Ladle long nozzle sealing device
CN209318765U (en) A kind of casting and pouring molten steel argon protective device
CN206643343U (en) Without stopper gravity flow flat metal bath constant displacement pump
CN105880546B (en) It is a kind of that there is the ladle for preventing moment rupture leakage
CN111230090A (en) Ingot smelting and casting method containing three-level filter residues
CN220507663U (en) Molten aluminum transfer device of centralized melting furnace
WO2010130172A1 (en) Automatic drainage device for ladle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170609

RJ01 Rejection of invention patent application after publication