CN106793174A - A kind of optimization method and device of X2 links - Google Patents
A kind of optimization method and device of X2 links Download PDFInfo
- Publication number
- CN106793174A CN106793174A CN201611089427.9A CN201611089427A CN106793174A CN 106793174 A CN106793174 A CN 106793174A CN 201611089427 A CN201611089427 A CN 201611089427A CN 106793174 A CN106793174 A CN 106793174A
- Authority
- CN
- China
- Prior art keywords
- links
- linked
- load
- information
- link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/30—Connection release
- H04W76/38—Connection release triggered by timers
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/30—Connection release
- H04W76/34—Selective release of ongoing connections
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W92/00—Interfaces specially adapted for wireless communication networks
- H04W92/16—Interfaces between hierarchically similar devices
- H04W92/20—Interfaces between hierarchically similar devices between access points
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The X2 of base station is linked the invention provides a kind of optimization method and device of X2 links, during the maximum number that the X2 for reaching the base station and can set up when the number that the X2 with base station chaining is linked is linked is optimized, it is characterised in that including:When other X2 link foundation requests are received, the combination according to one or more linked in duration, information on load, switching demand disconnects the part X2 for having set up and links, and the number of links of disconnection is not less than the number of the foundation request that the X2 for receiving is linked.The present invention can be in the case where X2 be coupled full configuration and connects deletion condition without triggering X2 interface, when other X2 link foundation requests are received, combination according to one or more linked in duration, information on load, switching demand disconnects existing X2 links, X2 links are safeguarded automatically, ensure that X2 links are optimal, improve resource utilization.
Description
Technical field
The optimization method and dress of a kind of X2 links in the present invention relates to wireless communication system, more particularly to Long Term Evolution
Put.
Background technology
X2 interface in LTE (long term evolution, Long Term Evolution) refers to the interface between two eNB, is used for
Flow interaction between two base stations.
X2 interface is set up four kinds of scenes:One be on eNB electricity when, the X2 that X2 transmission configurations and X2AP parameters have been present connects
Mouth is set up;Two is that the parameter triggering X2 for manually newly increasing X2SCTP and X2AP sets up;Three is human configuration adjacent area, and X2 is self-built to render meritorious service
Can open, system detectio to adjacent area eNB and this eNB do not set up X2 connections, and the automatic X2 that obtains sets up the transmission configuration ginseng for needing
Number, sets up X2 connections automatically;Four is that system carries out adjacent area self-discovery flow for system increases new adjacent area, system detectio with UE
X2 connections are not set up to the corresponding eNB in adjacent area and this eNB, then startup item opposite end eNB obtains X2 and sets up the transmission configuration for needing
Parameter, sets up X2 connections.
The deletion of X2 interface has following several scenes:The X2 for deleting X2AP configuration triggerings is deleted certainly;Neighboring BS relationship is deleted to touch
The X2 of hair is deleted certainly;The X2 of the black list change triggerings of X2 is deleted certainly;The X2 for scanning invalid X2AP triggerings is deleted certainly.
Under normal circumstances, after X2 couplings full configuration, if not triggering above-mentioned several X2 interface connection deletion conditions, cannot
The new X2 interface of addition.It is outside it is in need using the X2 interface resource when, due to X2 interface full configuration, original X2 interface is not
One is set to optimal link, causes the X2 wastings of resources, and cutting off rate is raised, and Consumer's Experience declines.
The content of the invention
It is a primary object of the present invention to provide a kind of optimization method of X2 links, can work as and be linked with the X2 of base station chaining
Number the X2 links of base station are optimized when reaching the maximum number of the X2 links that the base station can set up.The method bag
Include:
When receiving other X2 links and setting up request, according to link duration, information on load, the one kind in switching demand or
Various combinations disconnects the existing X2 links in the part set up, number of links the building not less than the X2 links for receiving of disconnection
The number of vertical request.
One aspect of the invention, disconnects the step of existing X2 is linked according to link duration and specifically including:
X2 most long with the base station chaining time during existing X2 is linked is deleted to link;Wherein,
When the number of the foundation request of the X2 links for receiving is more than one, the order successively decreased successively according to link time
Existing X2 links are deleted, the number of links of deletion is not less than the number of the foundation request of the X2 links for receiving.
One aspect of the invention, disconnects the step of existing X2 is linked according to information on load and specifically including:
Delete the X2 link minimum to end load;Or delete the X2 links of the load difference minimum of opposite end and local terminal;Wherein,
When the number of the foundation request of the X2 links for receiving is more than one, by end load is incremented by successively or opposite end and
The order that the load difference of local terminal is incremented by successively deletes existing X2 links, and the number of links of deletion is not less than the X2 links for receiving
Foundation request number.
One aspect of the invention, disconnects the step of existing X2 is linked according to switching demand and specifically including:
The minimum X2 chains of demand in being higher than original X2 links when the switching demand that the corresponding X2 links of request are set up in X2 links
When connecing, the minimum X2 links of demand during original X2 is linked of replacing are linked with new X2;Wherein, demand minimum in original X2 links
X2 is linked as the minimum X2 links of the switching times based on S1 interfaces;
When the number of the foundation request of the X2 links for receiving is more than one, request is set up into X2 links successively corresponding
The X2 of demand minimum is linked and is compared during the switching demand of X2 links link with original X2.
One aspect of the invention, also includes:The basis by the way of manually selecting or be adaptively selected
The combination for linking one or more in duration, information on load, switching demand disconnects existing X2 links;Wherein,
Specifically included using being disconnected by the way of adaptively selected the step of existing X2 is linked:
When multiple X2 links to be linked are substituted requirement while meeting according to link duration, information on load, switching demand
When, set switching times threshold value and information on load threshold value;
If the switching times of X2 links to be linked are less than switching times threshold value, and its information on load is believed less than load
Breath threshold value, then disconnect existing X2 links according to link duration;
If the switching times of X2 links to be linked are more than switching times threshold value, and its information on load is believed less than load
Breath threshold value, then disconnect existing X2 links according to information on load;
If the switching times of X2 links to be linked are more than switching times threshold value, and its information on load is believed more than load
Breath threshold value, then calculate the threshold parameter of switching times and the threshold parameter of information on load, according to threshold parameter side high respectively
Formula disconnects existing X2 links.
Accordingly, present invention also offers a kind of optimization device of X2 links, for what ought be linked with the X2 of base station chaining
X2 links when number reaches the maximum number of the X2 links that the base station can be set up to base station are optimized, it is characterised in that
Including:
Url management module, for when receive other X2 link set up request when, according to link duration, information on load,
One or more in switching demand of combination disconnects the part X2 links set up, and the number of links of disconnection is not less than receiving
X2 link foundation request number.
One aspect of the invention, the connection management module includes the first administrative unit, for according to chain
Connect duration and disconnect existing X2 links, specifically include:
X2 most long with the base station chaining time during existing X2 is linked is deleted to link;Wherein,
When the number of the foundation request of the X2 links for receiving is more than one, the order successively decreased successively according to link time
Existing X2 links are deleted, the number of links of deletion is not less than the number of the foundation request of the X2 links for receiving.
One aspect of the invention, the connection management module includes the second administrative unit, for according to negative
Lotus information disconnects existing X2 links, specifically includes:
Delete the X2 link minimum to end load;Or delete the X2 links of the load difference minimum of opposite end and local terminal;Wherein,
When the number of the foundation request of the X2 links for receiving is more than one, by end load is incremented by successively or opposite end and
The order that the load difference of local terminal is incremented by successively deletes existing X2 links, and the number of links of deletion is not less than the X2 links for receiving
Foundation request number.
One aspect of the invention, the connection management module includes the 3rd administrative unit, is cut for basis
Change demand and disconnect existing X2 links, specifically include:
The minimum X2 chains of demand in being higher than original X2 links when the switching demand that the corresponding X2 links of request are set up in X2 links
When connecing, the minimum X2 links of demand during original X2 is linked of replacing are linked with new X2;Wherein, demand minimum in original X2 links
X2 is linked as the minimum X2 links of the switching times based on S1 interfaces;
When the number of the foundation request of the X2 links for receiving is more than one, request is set up into X2 links successively corresponding
The X2 of demand minimum is linked and is compared during the switching demand of X2 links link with original X2.
One aspect of the invention, also includes:
Configuration module, for by the way of manually selecting or be adaptively selected according to link duration, information on load, cut
The combination of one or more changed in demand disconnects existing X2 links;Wherein,
Linked when existing X2 is disconnected by the way of adaptively selected, and there are multiple X2 links to be linked while completely
Foot is substituted when requiring according to link duration, information on load, switching demand, and the configuration module is to switching times threshold value and negative
Lotus information threshold value is set;Wherein,
If the switching times of X2 links to be linked are less than switching times threshold value, and its information on load is believed less than load
Breath threshold value, then disconnect existing X2 links according to link duration;
If the switching times of X2 links to be linked are more than switching times threshold value, and its information on load is believed less than load
Breath threshold value, then disconnect existing X2 links according to information on load;
If the switching times of X2 links to be linked are more than switching times threshold value, and its information on load is believed more than load
Breath threshold value, then calculate the threshold parameter of switching times and the threshold parameter of information on load, according to threshold parameter side high respectively
Formula disconnects existing X2 links.
Using technical scheme, full configuration can be coupled and without the feelings of triggering X2 interface connection deletion condition in X2
Under condition, when other X2 link foundation requests are received, according to the one kind or many in link duration, information on load, switching demand
The combination planted disconnects existing X2 links, X2 links is safeguarded automatically, it is ensured that X2 links are optimal, improve the utilization of resources
Rate.
Brief description of the drawings
Fig. 1 is the connected mode schematic diagram of LTE network interface;
Fig. 2 is the optimization method schematic diagram of the X2 links in one embodiment of the invention;
Fig. 3 is the optimization method schematic diagram of the X2 links in another embodiment of the present invention;
The optimization schematic device of the X2 links in Fig. 4 one embodiment of the invention;
The realization of the object of the invention, functional characteristics and advantage will be described further referring to the drawings in conjunction with the embodiments.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
It should be mentioned that some exemplary embodiments are described as before exemplary embodiment is discussed in greater detail
The treatment described as flow chart or method.Although operations to be described as flow chart the treatment of order, therein to be permitted
Multioperation can be implemented concurrently, concomitantly or simultaneously.Additionally, the order of operations can be rearranged.When it
The treatment can be terminated when operation is completed, it is also possible to have the additional step being not included in accompanying drawing.The treatment
Can correspond to method, function, code, subroutine, subprogram etc..
Concrete structure disclosed herein and function detail are only representational, and are for describing of the invention showing
The purpose of example property embodiment.But the present invention can be implemented by many alternative forms, and be not interpreted as
It is limited only by the embodiments set forth herein.
Although it should be appreciated that may have been used term " first ", " second " etc. herein to describe unit,
But these units should not be limited by these terms.It is used for the purpose of a unit and another unit using these terms
Make a distinction.For example, in the case of the scope without departing substantially from exemplary embodiment, it is single that first module can be referred to as second
Unit, and similarly second unit can be referred to as first module.Term "and/or" used herein above include one of them or
Any and all combination of more listed associated items.
Term used herein above is not intended to limit exemplary embodiment just for the sake of description specific embodiment.Unless
Context clearly refers else, and singulative " one " otherwise used herein above, " one " also attempt to include plural number.Should also
When understanding, term used herein above " including " and/or "comprising" specify stated feature, integer, step, operation,
The presence of unit and/or component, and do not preclude the presence or addition of one or more other features, integer, step, operation, unit,
Component and/or its combination.
It should further be mentioned that in some replaces realization modes, the function/action being previously mentioned can be according to different from attached
The order indicated in figure occurs.For example, depending on involved function/action, the two width figures for showing in succession actually may be used
Substantially simultaneously to perform or can perform in a reverse order sometimes.
Technical scheme is described in further detail below in conjunction with the accompanying drawings.
The invention provides a kind of optimization method of X2 links, the number linked with the X2 of base station chaining can be worked as and reach institute
X2 links when stating the maximum number of the X2 links that base station can be set up to base station are optimized.The method includes:When receiving it
When request is set up in his X2 links, the combination according to one or more linked in duration, information on load, switching demand disconnects existing
X2 links, the number of links of disconnection is not less than the number of the foundation request of the X2 links for receiving.
Wherein, the maximum number that the X2 that the number linked with the X2 of base station chaining reaches the base station and can set up is linked can be worked as
Mesh, the X2 for referring to being established the link with base station at present is linked and is not met X2 and link from the condition deleted, i.e., existing X2 links
It is not belonging to delete the X2 links of X2AP configuration triggerings, is not belonging to delete the X2 links of neighboring BS relationship triggering, is not belonging to the black lists of X2
The X2 links of triggering are changed, is also not belonging to scan the X2 links of invalid X2AP triggerings.
Fig. 1 shows the schematic diagram of LTE network interface, as shown in figure 1, because the X2 for being established the link with base station at present is linked
X2 links are not met from the condition deleted, therefore, when there is new X2 linking requests, only pair established the link with base station
X2 links are optimized, and delete the unnecessary X2 links of respective number, could set up new link, so that it is guaranteed that with base station phase
The X2 link moment of connection is all optimal link, improves resource utilization, improves Consumer's Experience.Below, will be with reference to accompanying drawing pair
The optimization method of X2 links of the invention is described in detail.
Referring to Fig. 2, when the maximum number that the X2 that the number that the X2 with base station chaining is linked reaches the base station and can set up is linked
Mesh and receive other X2 link set up request when, can using manually select or it is adaptively selected by the way of select optimization base
The X2 links stood.If selection manual mode is optimized, can according to link duration, information on load, the one kind in switching demand or
Various combinations disconnects existing X2 links.
Specifically, being disconnected the step of existing X2 is linked according to link duration specifically including:In deleting existing X2 link
X2 most long is linked with the base station chaining time, the newly-built X2 links for needing to set up.Particularly, when the foundation of the X2 links for receiving
When the number of request is more than one, the order successively decreased successively according to link time is deleted existing X2 and is linked, the link number of deletion
Mesh is not less than the number of the foundation request of the X2 links for receiving.For example, in one embodiment of the invention, base station eNB 1 is
Through and M1X2 links are set up in individual base station, have reached the maximum X2 link numbers that this base station can be set up, and now have N again1(M1>=N1)
Individual base station meets and eNB1 sets up the demand that X2 is linked, then according to the time length established the link with base station to having established the link
M1Individual X2 links are ranked up, according to link time sequentially opened link time from long to short N most long1It is individual to have connected
X2 is linked, for setting up new connection.
Specifically, being disconnected the step of existing X2 is linked according to information on load specifically including:Delete to end load minimum
X2 is linked;Or delete the X2 links of the load difference minimum of opposite end and local terminal.Load herein is X2 interface transport layer IP laminar flows
Amount, for reflecting system MAC layer load condition, represents network load situation and system processing power, load letter to a certain degree
Breath can have user to be transmitted by UE Signalling exchanges when two minizones carry out S1 switchings;Preferably, due to up-downgoing
Data traffic may be asymmetric, therefore X2 interface flow is divided into two indices:X2 interface uplink traffic and X2 interface downlink traffic
(up-downgoing herein is directed to for base station), the load difference of opposite end and local terminal is X2 interface uplink traffic and X2 interface downstream
Difference between amount.System processing power to end load or opposite end and the load difference minimum specification of the local terminal port is weaker.By
In knowing that the load difference of two cells is exactly to understand user potentially to switch demand, in current operation system, high load capacity is small
User can be switched to adjacent underload cell by area.Therefore, it can to delete in existing connection to end load or opposite end and local terminal
The minimum X2 links of load difference setting up new link.Preferably, when the number of the foundation request of the X2 links for receiving is big
When one, existing X2 chains are deleted by the load difference of incremented by successively or opposite end and local terminal to end load order incremented by successively
Connect, the number of links of deletion is not less than the number of the foundation request of the X2 links for receiving.For example, in one of the invention implementation
In example, base station eNB 1 is and M2X2 links are set up in individual base station, have reached the maximum X2 link numbers that this base station can be set up, now
There is N again2(M2>=N2) individual base station meets and eNB1 sets up the demand of X2 links, then according to end load (or opposite end and local terminal
Load difference) to the M that has established the link2Individual X2 links are ranked up, according to end load (or load difference of opposite end and local terminal)
The sequentially opened N minimum to end load (or load difference of opposite end and local terminal) from low to high2The individual X2 links for having connected, are used for
Set up new connection.
Specifically, being disconnected the step of existing X2 is linked according to switching demand specifically including:Set up when X2 links and ask right
When the switching demand of the X2 links the answered X2 minimum higher than demand in original X2 links is linked, linked with new X2 and replace original X2
The minimum X2 links of demand in link.Specifically, switching demand refers to the switching demand that two minizones are based on X2 interface, according to
The switching times based on S1 interfaces of mesh the first two minizone are obtained, and two minizones are meant that the switching demand based on X2 more
The necessity for setting up X2 interface is strong, therefore optimizes the efficiency that can effectively improve system to X2 links based on demand.It is preferred that
, when the number of the foundation request of the X2 links for receiving is more than one, the corresponding X2 chains of request are set up into X2 links successively
The minimum X2 of demand is linked and is compared during the switching demand for connecing is linked with original X2.For example, in one embodiment of the present of invention
In, base station eNB 1 sets up X2 links with M3 base station, has reached the maximum X2 link numbers that this base station can be set up, now again
There is N3(M3>=N3) individual base station meets and eNB1 sets up the demand that X2 is linked, then according to switching demand respectively to having set up chain
The M for connecing3Individual X2 links and N to be linked3Individual X2 links are ranked up, afterwards, by N to be linked3Switching in individual X2 links needs
Seek maximum link N3-MAXWith M3Switch the minimum link M of demand in individual X2 links3-MINIt is compared.If N3-MAXIt is less than
M3-MIN, then the minimum N of ascending as desired sequentially opened demand2The individual X2 for having connected is linked for setting up new company
Connect;If N3-MAXMore than M3-MIN, then by N to be linked3Switch demand in individual X2 links and be only second to N3-MAXLink N3-MAX-1With
M3-MINIt is compared, if N3-MAX-1Less than M3-MIN, then the minimum N of ascending as desired sequentially opened demand2- 1
The X2 for having connected is linked for setting up except N3-MAXNew connection in addition, then to N if being less than3-MAX-2Less than M3-MINEnter
Row compares, by that analogy.If N to be linked3Switch the minimum link N of demand in individual X2 links3-MAX-NSwitching demand be more than
M3Switch the minimum link M of demand in individual X2 links3-MIN, then illustrate that the switching demand of existing link is optimal, do not turn off existing
Link.
Referring to Fig. 3, the method to the existing X2 links of disconnection of self adaptation in an alternative embodiment of the invention is carried out
Describe in detail, specifically, comprising the following steps:
When multiple X2 links to be linked are substituted requirement while meeting according to link duration, information on load, switching demand
When, set switching times threshold value and information on load threshold value;If the switching times of X2 links to be linked are less than switching time
Number threshold value, and its information on load is less than information on load threshold value, then disconnect existing X2 links according to link duration;If treated
The switching times of the X2 links of link are more than switching times threshold value, and its information on load is less than information on load threshold value, then root
Existing X2 is disconnected according to information on load to link;If the switching times of X2 links to be linked are more than switching times threshold value, and
Its information on load is more than information on load threshold value, then calculate the threshold parameter of switching times and the thresholding ginseng of information on load respectively
Number, existing X2 links are disconnected according to threshold parameter mode high.Wherein, the switching times for X2 to be replaced being linked are divided by institute
State the threshold parameter that switching times thresholding is worth to the switching times;The information on load that X2 to be replaced is linked is divided by described
Cutting load information limit obtains the threshold parameter of the information on load.
One embodiment that wall scroll X2 after the one of the invention X2 link full configuration based on switching statistics is replaced is entered below
Row is described in detail.Manual configuration X2 corresponding strategies first;The strategy refers to the X2 replacement policies based on switching times, for example, have by oneself
Pattern and controlled mode, with regard to carrying out X2 replacements immediately after switching times meet trigger condition, controlled mode is full to free schema
Also manually to be confirmed whether to be replaced after sufficient condition, different patterns indicates mode of operation different, and without influence, the present invention is right
The scheme that X2 is replaced is in itself.
Afterwards, X2 statistics addition switches are opened, by the policy distribution to system.After the X2 of base station links full configuration, add
Plus neighboring BS relationship.Afterwards, system enters measurement period, and terminal reports switching, system statistics institute in a complete measurement period
There is switching (switching in and out) number of times of adjacent area.After time-out is counted, system subtracts position with the switching times that X2 to be added is linked
In the switching times that the formal X2 of tail of the queue is linked, the as a result switching more than configuration offsets threshold value, then starts and replace flow.It
Afterwards, system reports X2 to link and deletes, and deletes the worst formal X2 links of sequence, and reports X2 to link addition, adds switching times
Preferable X2 links.Afterwards, system reports correspondence X2 links monitoring and KPI to operation maintenance personnel.If strategy is configured to free schema,
Then system directly adds X2 links;If controlled mode, then adding procedure needs operation maintenance personnel to be confirmed, if O&M people
Member confirms to continue, then system addition X2 links, if it is confirmed that cancelling, then flow terminates.
When there is a plurality of X2 replacements after X2 link full configurations, the link corresponding strategies of manual configuration X2 first, the strategy bag
Include own pattern and controlled mode.Afterwards, X2 link statistics addition switches are opened, by the policy distribution to system.Work as base station
X2 link full configuration after, add neighboring BS relationship.Afterwards, system enters measurement period, terminal in the complete measurement period on
Report switching, switching (switching in and out) number of times of all adjacent areas of system statistics.After time-out is counted, to all adjacent area switching times
It is ranked up from high to low, and filters out base station to be added and to be deleted, system is successively in list to be added and to be deleted
Base station judged, when the switching times of switching times highest base station in list to be added and switching times in list to be deleted
The difference of the last base station switching times of sequence then meets replacement condition more than or equal to switching skew thresholding, and system continues to list
The carrying out of the middle second place judges that, until screening number reaches the maximum operand of system permission, system enters replaces flow, it
Afterwards, system is according to maximum operand, reports X2 to link and deletes, and deletes the X2 links that condition is met in list to be deleted;Report X2
Link addition, addition meets the X2 links of condition.Afterwards, system reports correspondence X2 links monitoring and KPI to operation maintenance personnel.If plan
Free schema is slightly configured to, then system directly adds X2 links;If controlled mode, then adding procedure needs operation maintenance personnel to enter
Row confirms, if operation maintenance personnel confirms to continue, system addition X2 links, and if it is confirmed that cancelling, then flow terminates.
Referring to Fig. 4, a kind of optimization device 100 of X2 links of present invention offer is shown, for working as and base station chaining
X2 links when the number of X2 links reaches the maximum number of the X2 links that the base station can be set up to base station are optimized, specifically
, the optimization device 100 includes:
Url management module 110, for when other X2 link foundation requests are received, according to link duration, load letter
Breath, one or more in switching demand of combination disconnect the part X2 links set up, and the number of links of disconnection is not less than connecing
The number of the foundation request of the X2 links for receiving.
Preferably, the connection management module includes the first administrative unit 111, existing for being disconnected according to link duration
X2 is linked, and is specifically included:X2 most long with the base station chaining time during existing X2 is linked is deleted to link;Wherein, when receiving
When the number of the foundation request of X2 links is more than one, the order successively decreased successively according to link time is deleted existing X2 and is linked,
The number of links of deletion is not less than the number of the foundation request of the X2 links for receiving.
Preferably, the connection management module includes the second administrative unit 112, existing for being disconnected according to information on load
X2 is linked, and is specifically included:Delete the X2 link minimum to end load;Or delete the X2 chains of the load difference minimum of opposite end and local terminal
Connect;Wherein, when the number of the foundation request of the X2 links for receiving is more than one, by end load is incremented by successively or opposite end and
The order that the load difference of local terminal is incremented by successively deletes existing X2 links, and the number of links of deletion is not less than the X2 links for receiving
Foundation request number.
Preferably, the connection management module includes the 3rd administrative unit 113, existing for being disconnected according to switching demand
X2 is linked, and is specifically included:Demand is most in X2 links set up the switching demand of request corresponding X2 link higher than original X2 links
When small X2 is linked, link the minimum X2 of demand during the original X2 of replacement is linked with new X2 and link;Wherein, needed in original X2 links
Ask minimum X2 to be linked as the minimum X2 of the switching times based on S1 interfaces to link;Set up what is asked when the X2 links for receiving
Demand is most when number is more than one, during the switching demand that request corresponding X2 link is set up in X2 links is linked with original X2 successively
Small X2 links are compared.
Preferably, described device also includes configuration module, for the root by the way of manually selecting or be adaptively selected
Existing X2 is disconnected according to the combination of one or more in link duration, information on load, switching demand to link;Wherein, use is worked as
Adaptively selected mode disconnects existing X2 links, and there are multiple X2 links to be linked while when meeting according to link
Length, information on load, switching demand are substituted when requiring, the configuration module is to switching times threshold value and information on load threshold value
Set;Wherein, if the switching times of X2 links to be linked are less than switching times threshold value, and its information on load is less than
Information on load threshold value, then disconnect existing X2 links according to link duration;If the switching times of X2 links to be linked are big
In switching times threshold value, and its information on load is less than information on load threshold value, then disconnect existing X2 chains according to information on load
Connect;If the switching times of X2 links to be linked are more than switching times threshold value, and its information on load more than information on load door
Limit value, then calculate the threshold parameter of switching times and the threshold parameter of information on load respectively, disconnected according to threshold parameter mode high
Open existing X2 links.
Using technical scheme, full configuration can be coupled and without the feelings of triggering X2 interface connection deletion condition in X2
Under condition, when other X2 link foundation requests are received, according to the one kind or many in link duration, information on load, switching demand
The combination planted disconnects existing X2 links, X2 links is safeguarded automatically, it is ensured that X2 links are optimal, improve the utilization of resources
Rate.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be in other specific forms realized.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires to be limited rather than described above, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.Any reference in claim should not be considered as the claim involved by limitation.This
Outward, it is clear that " including " word is not excluded for other units or step, odd number is not excluded for plural number.The multiple stated in system claims
Unit or device can also be realized by a unit or device by software or hardware.The first, the second grade word is used for table
Show title, and be not offered as any specific order.
Claims (10)
1. a kind of optimization method of X2 links, reaches what the base station can be set up for working as the number linked with the X2 of base station chaining
X2 links during the maximum number of X2 links to base station are optimized, it is characterised in that including:
When other X2 link foundation requests are received, according to one or more in link duration, information on load, switching demand
Combination disconnect the part X2 links set up, the number of links of disconnection is not less than the number of the foundation request of the X2 links for receiving
Mesh.
2. the optimization method that X2 according to claim 1 is linked, it is characterised in that existing X2 is disconnected according to link duration
The step of link, specifically includes:
X2 most long with the base station chaining time during existing X2 is linked is deleted to link;Wherein,
When the number of the foundation request of the X2 links for receiving is more than one, the order successively decreased successively according to link time is deleted
Existing X2 links, the number of links of deletion is not less than the number of the foundation request of the X2 links for receiving.
3. the optimization method that X2 according to claim 1 is linked, it is characterised in that existing X2 is disconnected according to information on load
The step of link, specifically includes:
Delete the X2 link minimum to end load;Or delete the X2 links of the load difference minimum of opposite end and local terminal;Wherein,
When the number of the foundation request of the X2 links for receiving is more than one, by end load is incremented by successively or opposite end and local terminal
Load difference order incremented by successively delete existing X2 links, the number of links of deletion is not less than building for the X2 links that receive
The number of vertical request.
4. the optimization method that X2 according to claim 1 is linked, it is characterised in that existing X2 is disconnected according to switching demand
The step of link, specifically includes:
When the minimum X2 of demand during the switching demand that the corresponding X2 links of request are set up in X2 links is higher than original X2 links is linked,
The minimum X2 links of demand during original X2 is linked of replacing are linked with new X2;Wherein, the minimum X2 chains of demand in original X2 links
It is connected in the minimum X2 links of the switching times based on S1 interfaces;
When the number of the foundation request of the X2 links for receiving is more than one, the corresponding X2 chains of request are set up into X2 links successively
The minimum X2 of demand is linked and is compared during the switching demand for connecing is linked with original X2.
5. the optimization method that the X2 according to any one in claim 1-4 is linked, it is characterised in that also include:Using
Manually select or adaptively selected mode is according to link duration, information on load, one or more in switching demand of group
Make and break opens existing X2 links;Wherein,
Specifically included using being disconnected by the way of adaptively selected the step of existing X2 is linked:
When multiple X2 links to be linked meet simultaneously substituted according to link duration, information on load, switching demand require when, if
Determine switching times threshold value and information on load threshold value;
If the switching times of X2 links to be linked are less than switching times threshold value, and its information on load less than information on load door
Limit value, then disconnect existing X2 links according to link duration;
If the switching times of X2 links to be linked are more than switching times threshold value, and its information on load less than information on load door
Limit value, then disconnect existing X2 links according to information on load;
If the switching times of X2 links to be linked are more than switching times threshold value, and its information on load more than information on load door
Limit value, then calculate the threshold parameter of switching times and the threshold parameter of information on load respectively, disconnected according to threshold parameter mode high
Open existing X2 links.
6. a kind of optimization device of X2 links, reaches what the base station can be set up for working as the number linked with the X2 of base station chaining
X2 links during the maximum number of X2 links to base station are optimized, it is characterised in that including:
Url management module, for when other X2 link foundation requests are received, according to link duration, information on load, switching
One or more in demand of combination disconnects the part X2 links set up, and the number of links of disconnection is not less than the X2 for receiving
The number of the foundation request of link.
7. the optimization device that X2 according to claim 6 is linked, it is characterised in that the connection management module includes first
Administrative unit, for disconnecting existing X2 links according to link duration, specifically includes:
X2 most long with the base station chaining time during existing X2 is linked is deleted to link;Wherein,
When the number of the foundation request of the X2 links for receiving is more than one, the order successively decreased successively according to link time is deleted
Existing X2 links, the number of links of deletion is not less than the number of the foundation request of the X2 links for receiving.
8. the optimization device that X2 according to claim 6 is linked, it is characterised in that the connection management module includes second
Administrative unit, for disconnecting existing X2 links according to information on load, specifically includes:
Delete the X2 link minimum to end load;Or delete the X2 links of the load difference minimum of opposite end and local terminal;Wherein,
When the number of the foundation request of the X2 links for receiving is more than one, by end load is incremented by successively or opposite end and local terminal
Load difference order incremented by successively delete existing X2 links, the number of links of deletion is not less than building for the X2 links that receive
The number of vertical request.
9. the optimization device that X2 according to claim 6 is linked, it is characterised in that the connection management module includes the 3rd
Administrative unit, for disconnecting existing X2 links according to switching demand, specifically includes:
When the minimum X2 of demand during the switching demand that the corresponding X2 links of request are set up in X2 links is higher than original X2 links is linked,
The minimum X2 links of demand during original X2 is linked of replacing are linked with new X2;Wherein, the minimum X2 chains of demand in original X2 links
It is connected in the minimum X2 links of the switching times based on S1 interfaces;
When the number of the foundation request of the X2 links for receiving is more than one, the corresponding X2 chains of request are set up into X2 links successively
The minimum X2 of demand is linked and is compared during the switching demand for connecing is linked with original X2.
10. the optimization device that the X2 according to any one in claim 6-9 is linked, it is characterised in that also include:
Configuration module, for by the way of manually selecting or be adaptively selected according to link duration, information on load, switching need
One or more in asking of combination disconnects existing X2 links;Wherein,
Linked when existing X2 is disconnected by the way of adaptively selected, and there are multiple X2 links to be linked and meet root simultaneously
Substituted according to link duration, information on load, switching demand when requiring, the configuration module is believed switching times threshold value and load
Breath threshold value is set;Wherein,
If the switching times of X2 links to be linked are less than switching times threshold value, and its information on load less than information on load door
Limit value, then disconnect existing X2 links according to link duration;
If the switching times of X2 links to be linked are more than switching times threshold value, and its information on load less than information on load door
Limit value, then disconnect existing X2 links according to information on load;
If the switching times of X2 links to be linked are more than switching times threshold value, and its information on load more than information on load door
Limit value, then calculate the threshold parameter of switching times and the threshold parameter of information on load respectively, disconnected according to threshold parameter mode high
Open existing X2 links.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611089427.9A CN106793174B (en) | 2016-11-30 | 2016-11-30 | X2 link optimization method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611089427.9A CN106793174B (en) | 2016-11-30 | 2016-11-30 | X2 link optimization method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106793174A true CN106793174A (en) | 2017-05-31 |
CN106793174B CN106793174B (en) | 2020-06-30 |
Family
ID=58915306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611089427.9A Active CN106793174B (en) | 2016-11-30 | 2016-11-30 | X2 link optimization method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106793174B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021031723A1 (en) * | 2019-08-22 | 2021-02-25 | 中兴通讯股份有限公司 | Interface connection method, interface connection apparatus, storage medium, and device |
CN113260000A (en) * | 2020-02-10 | 2021-08-13 | 大唐移动通信设备有限公司 | Communication link processing method and device |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101119524A (en) * | 2007-09-12 | 2008-02-06 | 中兴通讯股份有限公司 | Method and device for overload control in communication system |
US20090247159A1 (en) * | 2008-03-31 | 2009-10-01 | Qualcomm Incorporated | Method and system for facilitating execution of automatic neighbor relation functions |
US20100046476A1 (en) * | 2007-04-30 | 2010-02-25 | Huawei Technologies Co., Ltd. | Synchronization method, communication handover method, radio network and node |
CN101835288A (en) * | 2010-04-26 | 2010-09-15 | 华为技术有限公司 | Processing method and device of X2 interface |
CN102301788A (en) * | 2011-04-11 | 2011-12-28 | 华为技术有限公司 | Method and device for establishing X2 link |
CN102457915A (en) * | 2010-10-26 | 2012-05-16 | 株式会社Ntt都科摩 | Method for managing X2 interface, switching method, interference inhibition method and apparatus thereof |
CN103491645A (en) * | 2013-09-11 | 2014-01-01 | 大唐移动通信设备有限公司 | Method and device for managing communication links |
CN103703822A (en) * | 2013-01-30 | 2014-04-02 | 华为技术有限公司 | Method, base stations, network system for automatic depletion of X2 configuration data |
CN103906117A (en) * | 2014-03-31 | 2014-07-02 | 大唐移动通信设备有限公司 | X2 link conflict resolution method and device |
CN103988573A (en) * | 2011-12-14 | 2014-08-13 | 日本电气株式会社 | Radio base station, server, mobile communication system, and operation control method |
CN104507001A (en) * | 2014-11-21 | 2015-04-08 | 宁波翼动通讯科技有限公司 | Music playing method for Bluetooth sound box |
-
2016
- 2016-11-30 CN CN201611089427.9A patent/CN106793174B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100046476A1 (en) * | 2007-04-30 | 2010-02-25 | Huawei Technologies Co., Ltd. | Synchronization method, communication handover method, radio network and node |
CN101119524A (en) * | 2007-09-12 | 2008-02-06 | 中兴通讯股份有限公司 | Method and device for overload control in communication system |
US20090247159A1 (en) * | 2008-03-31 | 2009-10-01 | Qualcomm Incorporated | Method and system for facilitating execution of automatic neighbor relation functions |
CN101835288A (en) * | 2010-04-26 | 2010-09-15 | 华为技术有限公司 | Processing method and device of X2 interface |
CN102457915A (en) * | 2010-10-26 | 2012-05-16 | 株式会社Ntt都科摩 | Method for managing X2 interface, switching method, interference inhibition method and apparatus thereof |
CN102301788A (en) * | 2011-04-11 | 2011-12-28 | 华为技术有限公司 | Method and device for establishing X2 link |
CN103988573A (en) * | 2011-12-14 | 2014-08-13 | 日本电气株式会社 | Radio base station, server, mobile communication system, and operation control method |
CN103703822A (en) * | 2013-01-30 | 2014-04-02 | 华为技术有限公司 | Method, base stations, network system for automatic depletion of X2 configuration data |
CN103491645A (en) * | 2013-09-11 | 2014-01-01 | 大唐移动通信设备有限公司 | Method and device for managing communication links |
CN103906117A (en) * | 2014-03-31 | 2014-07-02 | 大唐移动通信设备有限公司 | X2 link conflict resolution method and device |
CN104507001A (en) * | 2014-11-21 | 2015-04-08 | 宁波翼动通讯科技有限公司 | Music playing method for Bluetooth sound box |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021031723A1 (en) * | 2019-08-22 | 2021-02-25 | 中兴通讯股份有限公司 | Interface connection method, interface connection apparatus, storage medium, and device |
CN113260000A (en) * | 2020-02-10 | 2021-08-13 | 大唐移动通信设备有限公司 | Communication link processing method and device |
Also Published As
Publication number | Publication date |
---|---|
CN106793174B (en) | 2020-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103202089B (en) | For controlling the method reconfigured of the multiple radio access bearers in wireless device | |
CN102056260B (en) | Mobile parameter enquiry and negotiation method and system | |
CN105191403A (en) | Coordinating handover in case of LTE dual-connectivity with the secondary link being a WLAN link | |
US9980164B2 (en) | Measurement method and apparatus, and communications node | |
CN102598786B (en) | Switching method between base stations, base stations and communication system | |
CN109803453A (en) | A kind of communication means, communication equipment and its communication system | |
CN104301955A (en) | Method for switching base stations for user equipment (UE), base stations and UE | |
TW201220866A (en) | An apparatus for clustering cells using neighbor relations | |
CN103037432B (en) | Method and device for controlling carrier aggregation functions | |
CN102209338A (en) | Switching self-optimizing method for mobile communication network | |
CN103188761A (en) | Method and device of multi-network access | |
CN103202092A (en) | A method and a network node for sharing information over an interface in a telecommunications system | |
CN102378242A (en) | Method and device for generating optimal cell list during carrier aggregation switching | |
CN104980980A (en) | Method, system and equipment for connection establishment | |
CN101651608A (en) | Link management method, corresponding management entity, execution node and mobile communication system | |
CN105228263A (en) | Drb conversion method and device | |
CN105282783A (en) | Method, device, and system for reporting power headroom report (PHR) in double connection | |
CN106134256A (en) | The method and apparatus controlling switching in the environment supporting mobile cell | |
CN102547764B (en) | Method, system and device for improving mobile robustness | |
EP2671405B1 (en) | Method and apparatus for managing neighbour relations | |
CN102547952B (en) | Method and device for regulating initial transmitting power of random access channel (RACH) preamble | |
CN106028405A (en) | Method and base station for realizing cell reselection parameter negotiation | |
CN106793174A (en) | A kind of optimization method and device of X2 links | |
CN105103612A (en) | Management of communications with multiple access points based on inter-access point communications | |
CN103369603B (en) | The mutual operation method of self-organizing network and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |