A kind of resource allocation methods and equipment Download PDFInfo
- Publication number
- CN106792924A CN106792924A CN201510815749.6A CN201510815749A CN106792924A CN 106792924 A CN106792924 A CN 106792924A CN 201510815749 A CN201510815749 A CN 201510815749A CN 106792924 A CN106792924 A CN 106792924A
- Authority
- CN
- China
- Prior art keywords
- resource
- unavailable
- predistribution
- terminal
- resource block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/16—Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
- H04W28/26—Resource reservation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/53—Allocation or scheduling criteria for wireless resources based on regulatory allocation policies
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Quality & Reliability (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a kind of resource allocation methods, it is applied in Long Term Evolution LTE system, the method includes:It is determined that being the predistribution resource of the pre-assigned down channel of terminal of request when resource allocation request is received;It is judged as whether there is the not available unavailable resource of terminal in terminal predistribution resource;And when judged result is to be, unavailable resource is deleted from predistribution resource, while the power of unavailable resource is superimposed upon into predistribution resource deleting in the remaining resource after unavailable resource, and distribute to terminal;Pass sequentially through power convergence, untapped power is assembled and is adjusted on the resource location of scheduling, realize further lifting user equipment downlink signal intensity, improve lower row decoding accuracy, so as to lift cell entire throughput, increase MPS process area, and lifting cell edge is successfully accessed rate.
Description
Technical field
The invention relates to communication technical field, more particularly to a kind of resource allocation methods.The application
Embodiment also relates to a kind of resource allocation apparatus.
Background technology
At present in LTE (Long Term Evolution, Long Term Evolution) communication system, base station it is descending
When some frequency ranges have strong jamming, downlink business is disturbed influence, causes cell downlink handling capacity entire lowering.
Particularly with the user for being in cell edge, terminal receives the downlink data of base station when there is strong jamming
SINR (Signal-to-Interference plus Noise Ratio, Signal to Interference plus Noise Ratio) will be very
Low, the handling capacity of the user will be very poor, now needs for the problem, and existing solution is right
The scheduling of downlink business is adjusted, and is removed by the resource of descending interference sections, and priority scheduling is not done
Disturb or low interference resource.
Namely in the prior art, when downlink frequency choosing method carries out resource selection scheduling, due to channel
The presence of interference, part resource is not dispatched, and the corresponding descending power of this part resource is not just used,
The waste of power is result in, the no significant change of covering of so actually cell causes the whole of cell
The decline of body handling capacity.
The content of the invention
For defect of the prior art, the present invention proposes a kind of resource allocation methods, is applied to long-term
In evolution LTE system, the method includes:
It is determined that when resource allocation request is received, for request the pre-assigned down channel of terminal it is pre-
Distribution resource;
It is judged as whether there is the not available unavailable resource of the terminal in the predistribution resource;
If the determination result is YES, then the unavailable resource is deleted from the predistribution resource, while
The power of unavailable resource is superimposed upon the predistribution resource and deletes the remaining resource after unavailable resource
On, and distribute to the terminal.
Preferably, it is described be judged as it is described predistribution resource in the presence or absence of the terminal it is not available not
Available resources, specifically include:
Periodically obtain the resource interference situation of down channel;
Timing judges to exceed threshold with the presence or absence of interference in the predistribution resource based on the resource interference situation
The disturbed resource of value;
If the determination result is YES, it is determined that there is the not available unavailable resource of the terminal.
Preferably, the periodicity obtains the resource interference situation of down channel, specifically includes:
When the LTE system is LTE-TDD systems, the resource interference feelings of up channel are periodically obtained
Condition;
The mirror of the up-downgoing channel based on LTE-TDD systems and the resource interference feelings of up channel
Condition determines the resource interference situation of down channel.
Preferably, the resource interference situation is identified especially by interference noise lifting IoT.
Preferably, the power by unavailable resource is superimposed upon the predistribution resource and deletes unavailable money
In remaining resource behind source, specifically include:
Determine the first resource block included by the unavailable resource and deleted not in the predistribution resource
The Secondary resource block of the remaining resource after available resources;
The quantity of the Resource Block group RBG based on the first resource block, descending sub frame number and the terminal
The downlink port quantity of place cell determines the power of the first resource block;
Determine the quantity of the Resource Block group RBG of the Secondary resource block, and based on the Secondary resource block
The quantity of Resource Block group RBG determines the quantity of the resource element RE of the Secondary resource block;
The power of the first resource block is evenly distributed to each RE of Secondary resource block.
The invention allows for a kind of resource allocation apparatus, it is applied in Long Term Evolution LTE system, including:
Forward allocator module, for determining when resource allocation request is received, for the terminal of request is divided in advance
The predistribution resource of the down channel matched somebody with somebody;
Judge module, for be judged as it is described predistribution resource in the presence or absence of the terminal it is not available
Unavailable resource;
Processing module, for when judged result is to be, by the unavailable resource from the predistribution money
Deleted in source, while the power of unavailable resource is superimposed upon into the predistribution resource deletes unavailable resource
In remaining resource afterwards, and distribute to the terminal.
Preferably, the judge module, specifically for:
Periodically obtain the resource interference situation of down channel;
Timing judges to exceed threshold with the presence or absence of interference in the predistribution resource based on the resource interference situation
The disturbed resource of value;
If the determination result is YES, it is determined that there is the not available unavailable resource of the terminal.
Preferably, the judge module periodically obtains the resource interference situation of down channel, specifically includes:
When the LTE system is LTE-TDD systems, the resource interference feelings of up channel are periodically obtained
Condition;
The mirror of the up-downgoing channel based on LTE-TDD systems and the resource interference feelings of up channel
Condition determines the resource interference situation of down channel.
Preferably, the resource interference situation is identified especially by interference noise lifting IoT.
Preferably, the power of unavailable resource is superimposed upon the predistribution resource and deleted by the processing module
In remaining resource after unavailable resource, specifically include:
Determine the first resource block included by the unavailable resource and deleted not in the predistribution resource
The Secondary resource block of the remaining resource after available resources;
The quantity of the Resource Block group RBG based on the first resource block, descending sub frame number and the terminal
The downlink port quantity of place cell determines the power of the first resource block;
Determine the quantity of the Resource Block group RBG of the Secondary resource block, and based on the Secondary resource block
The quantity of Resource Block group RBG determines the quantity of the resource element RE of the Secondary resource block;
The power of the first resource block is evenly distributed to each RE of Secondary resource block.
Compared with prior art, whether there is the end during the present invention is by being judged as that terminal pre-allocates resource
The not available unavailable resource in end;And when judged result is to be, by the unavailable resource from described
Deleted in predistribution resource, while the power of unavailable resource is superimposed upon into the predistribution resource deleting not
In remaining resource after available resources, and distribute to the terminal;Power convergence is passed sequentially through, will not
The power for using is assembled and is adjusted on the resource location of scheduling, realizes further lifting user equipment downlink signal
Intensity, improves lower row decoding accuracy, so that cell entire throughput is lifted, increase MPS process face
Product, and lifting cell edge is successfully accessed rate.
Brief description of the drawings
Fig. 1 is a kind of schematic flow sheet of resource allocation methods disclosed in the embodiment of the present invention;
Fig. 2 is a kind of schematic flow sheet of resource allocation methods disclosed in the embodiment of the present invention;
Fig. 3 is a kind of CRS of the descending different lower 3 kinds of port forms of CP standards disclosed in the embodiment of the present invention
The schematic diagram of pattern;
Fig. 4 is a kind of CRS of the descending different lower 3 kinds of port forms of CP standards disclosed in the embodiment of the present invention
The schematic diagram of pattern;
Fig. 5 is a kind of structural representation of resource allocation apparatus disclosed in the embodiment of the present invention.
Specific embodiment
As stated in the Background Art, in the prior art, the waste of power can be caused, and causes the entirety of cell
The decline of handling capacity;Therefore, the embodiment of the invention discloses a kind of resource allocation methods, being applied to long-term
In evolution LTE system, as shown in figure 1, the method is comprised the following steps:
Step 101, determine when resource allocation request is received, for request terminal it is pre-assigned descending
The predistribution resource of channel.
During specific, as shown in Fig. 2 when cell is set up, during the cell in terminal access system,
Due to there is service needed to process, therefore can ask to distribute resource, therefore, system can be in advance should
The resource location of the resource of terminal distribution down channel, such as distribution is【PRB_A,PRB_B】, wherein PRB
(Physical Resource Block) is Physical Resource Block.Specifically, a kind of resource distribution mode is Type
0 resource distribution mode, the Resource Block of its scheduling is with RBG (Resource Block Group, Resource Block group)
It is unit, and RBG is the combination of multiple continuous P BR, in this mode, the descending systems of RBG Size vs.
Regiment commander's relation wide is as shown in table 1:
Table 1
Step 102, be judged as it is described predistribution resource in the presence or absence of the terminal it is not available unavailable
Resource.
It is this specific deterministic process because resource is not using interference is possible as, can be as follows:
Periodically obtain the resource interference situation of down channel;Timing is judged based on the resource interference situation
Disturbed resource in the predistribution resource with the presence or absence of interference more than threshold value;If the determination result is YES,
Then determine there is the not available unavailable resource of the terminal.
During specific, as shown in Fig. 2 because disturbed condition can change, it is therefore desirable to the cycle
Property obtain the resource interference situation of down channel, and timing judges super with the presence or absence of interference in predistribution resource
Cross the disturbed resource of threshold value, namely IOT (its in base station physical layer upward cycle T detection full bandwidths
In, IOT detection thresholds are IOT_LEVEL), and except interference causes resource not in the case of,
It is also possible to it is different the reason for cause unavailable, for example terminal cannot be applicable, and frequency where the resource is not supported
Section etc., no longer carries out going to live in the household of one's in-laws on getting married chatting herein, as long as it is unavailable, and system itself is for the part is unavailable
Resource allocation have power.
It is determined that after the disturbed condition of full bandwidth, as shown in Fig. 2 the resource location of terminal scheduling will be given
【PRB_A,PRB_B】With the position of the PRB higher than thresholding IOT_LEVEL【PRB_X,PRB_Y】
It is compared, by determining whether exist in predistribution resource between both judgements with the presence or absence of overlapping
Disabled resource.
And in a specific embodiment, such as when the LTE system is LTE-TDD systems, institute
The resource interference situation for periodically obtaining down channel is stated, is specifically included:
When the LTE system is LTE-TDD systems, the resource interference feelings of up channel are periodically obtained
Condition;The resource interference situation is especially by interference IoT (Interference over Thermal, noise lift
Rise) it is identified.The mirror and up channel of the up-downgoing channel based on LTE-TDD systems
Resource interference situation determine the resource interference situation of down channel.
This is the mirror based on the up-downgoing channel of specific LTE-TDD systems carries out up channel
Resource interference situation determination, naturally it is also possible to the resource interference situation of direct access up channel, example
Such as direct measurement, specific disturbed condition, the disturbed condition of the various pieces for identifying resource,
Interference IoT can be specifically selected to be identified, certainly it is also an option that other parameters, such as disturb
Intensity etc..And other systems, such as LTE-FDD systems, then can by direct measurement, or
The method proposed based on the self character of its system, is not carrying out superfluous chatting herein.
As shown in Fig. 2 when judged result is to be, then performing subsequent step 103;And if judged result
It is no, namely does not exist unavailable resource in predistribution resource, then is carried out to terminal based on predistribution resource
Distribution, to cause that terminal demodulates downstream signal using the resource of distribution.
Step 103, if the determination result is YES, then delete the unavailable resource from the predistribution resource
Remove, while the power of unavailable resource is superimposed upon surplus after the predistribution resource unavailable resource of deletion
In remaining resource, and distribute to the terminal.
Within a particular process, when it is determined that there is unavailable resource, lap will be found out first
Position where resource, as shown in Fig. 2 can be for【PRB_W,PRB_V】, the wherein quantity of PRB
It is U, and is resource that terminal redistributes down channel based on this, specifically, by lap
Resource is deleted, while allocative decision is updated based on remaining resource, in a specific embodiment
Kind, descending PDSCH (Physical Downlink can be updated by updating descending RESBITMAP
Shared Channel, Physical Downlink Shared Channel) scheduling resource position.And start to perform follow-up work(
Rate is converged, also will the power of unavailable resource be superimposed upon after the predistribution resource deletes unavailable resource
Remaining resource on.
And specifically, the power of unavailable resource is superimposed upon into the predistribution resource deletes unavailable resource
In remaining resource afterwards, specifically include:Determine the first resource block included by the unavailable resource with
And the Secondary resource block of the remaining resource after the predistribution resource deletes unavailable resource;Based on institute
The quantity of the Resource Block group RBG of first resource block is stated, cell where descending sub frame number and the terminal
Downlink port quantity determines the power of the first resource block;Determine the Resource Block group of the Secondary resource block
The quantity of RBG, and the quantity of the Resource Block group RBG based on the Secondary resource block determines second money
The quantity of the resource element RE of source block;The power of the first resource block is evenly distributed and gives Secondary resource block
Each RE.
In the particular embodiment, as shown in Fig. 2 first according to overlap PRB position, namely【PRB_W,
PRB_V】And descending sub frame number calculates the quantity M of the RE in the PCSCH regions of interference sections, tool
The computing formula of body is:M=RBG*L* (14-CFI) * 12;Wherein, L is the money for disturbing lap
The RBG quantity in source;CFI:(control format indicator, descending control area takes symbol quantity,
Namely descending sub frame number), the occupancy relation for influenceing descending control area and service area is conventional descending
Subframe value is 1-3, and special descending sub frame value is 1-2;The frequency domain of each PRB is 12 subcarriers.
Secondly, based on CRS (Cell-specific reference signal, cell reference signals), port number
And M determines the M general power of RE, specifically, it is divided into single port, and two kinds of situations of dual-port,
In the case of single port, corresponding diagram 3, the legend of the Tu4Zhong the superiors, computing formula is:
POWER_IOT=CRS_power+10*lg (M), unit dBmw, it is seen that general power is allocated to this
The power 10*lg (M) of part resource adds CRS power sums, and in the present invention, in single port
In the case of, the power that can be allocated refers to 10*lg (M).In the case that also a kind of situation is dual-port,
Corresponding diagram 3, middle legend in Fig. 4, in the case, computing formula is POWER_IOT=
CRS_power ,+10*lg (M)+Pa, wherein, pa=PDSCH_RE_power-CRS_power, specifically,
In the case of dual-port, the value of pa is for span:(-6、-4.77、-3、-1.77、0、1、2、
3db), also it is a kind of be four ports situation, corresponding diagram 3, undermost legend, computing formula in Fig. 4
Be POWER_IOT=CRS_power+10*lg (M)+Pa, but at present for four ports in the case of Pa
Value agreement do not define temporarily.
Still by taking single port as an example, then determine not interfering with the RE sum N of the PRB of resource, to disturb
The power 10*lg (M) of resource gives N number of RE, in subsequent process, the signal that each RE is lifted
Intensity notifies physical layer, to cause that it is not dry that physical layer is issued according to the power summation that the RE of initial schedule is lifted
The RE power of the PDSCH of the resource disturbed, and finally allow that terminal smoothly demodulates downstream signal.
Due to there is power to converge so that signal enhancing, cell inward flange user receives under script disturbed condition
To downstream signal intensity it is weaker, downlink communication quality is poor, the situation of user descending perception difference is able to
Alleviate, downlink business speed is lifted, due to descending MCS (the Modulation and of Cell Edge User
Coding Scheme) grade is relatively low, now uses low-order-modulated mode QPSK (Quadrature
Phase Shift Keyin, QPSK, a kind of digital modulation mode), the lifting of signal intensity is right
The demodulation of QPSK is helpful to, and can increase the downstream rate of descending area coverage and cell edge.
In order to be further detailed to the present invention, the embodiment of the invention also discloses a kind of resource allocation
Equipment, is applied in Long Term Evolution LTE system, as shown in figure 5, including:
Forward allocator module 501, for determining when resource allocation request is received, for the terminal of request is advance
The predistribution resource of the down channel of distribution;
Judge module 502, for be judged as it is described predistribution resource in the presence or absence of the terminal it is not available
Unavailable resource;
Processing module 503, for when judged result is to be, by the unavailable resource from the predistribution
Deleted in resource, while the power of unavailable resource is superimposed upon into the predistribution resource deletes unavailable money
In remaining resource behind source, and distribute to the terminal.
Specifically, the judge module 502, specifically for:
Periodically obtain the resource interference situation of down channel;
Timing judges to exceed threshold with the presence or absence of interference in the predistribution resource based on the resource interference situation
The disturbed resource of value;
If the determination result is YES, it is determined that there is the not available unavailable resource of the terminal.
The judge module 502 periodically obtains the resource interference situation of down channel, specifically includes:
When the LTE system is LTE-TDD systems, the resource interference feelings of up channel are periodically obtained
Condition;
The mirror of the up-downgoing channel based on LTE-TDD systems and the resource interference feelings of up channel
Condition determines the resource interference situation of down channel.
The resource interference situation is identified especially by interference noise lifting IoT.
The power of unavailable resource is superimposed upon the predistribution resource deletion by the processing module 503 can not
With in the remaining resource after resource, specifically include:
Determine the first resource block included by the unavailable resource and deleted not in the predistribution resource
The Secondary resource block of the remaining resource after available resources;
The quantity of the Resource Block group RBG based on the first resource block, descending sub frame number and the terminal
The downlink port quantity of place cell determines the power of the first resource block;
Determine the quantity of the Resource Block group RBG of the Secondary resource block, and based on the Secondary resource block
The quantity of Resource Block group RBG determines the quantity of the resource element RE of the Secondary resource block;
The power of the first resource block is evenly distributed to each RE of Secondary resource block.
The present invention by be judged as terminal pre-allocate resource in the presence or absence of the terminal is not available can not
Use resource;And when judged result is to be, the unavailable resource is deleted from the predistribution resource,
The power of unavailable resource is superimposed upon simultaneously remaining after the predistribution resource unavailable resource of deletion
In resource, and distribute to the terminal;Power convergence is passed sequentially through, untapped power is assembled and is adjusted
Onto the resource location of scheduling, further lifting user equipment downlink signal intensity is realized, improve descending translating
Code accuracy, so as to lift cell entire throughput, increases MPS process area, and lifting cell side
Edge is successfully accessed rate.
Through the above description of the embodiments, those skilled in the art can be understood that this Shen
Please be realized by hardware, it is also possible to realized by the mode of software plus necessary general hardware platform.
Based on such understanding, the technical scheme of the application can be embodied in the form of software product, and this is soft
It (can be CD-ROM, USB flash disk is mobile hard that part product can be stored in a non-volatile memory medium
Disk etc.) in, including some instructions are used to so that a computer equipment (can be personal computer, take
Business device, or the network equipment etc.) perform method described in the application each implement scene.
It will be appreciated by those skilled in the art that accompanying drawing is a schematic diagram for being preferable to carry out scene, in accompanying drawing
Module or necessary to flow not necessarily implements the application.
It will be appreciated by those skilled in the art that the module in device in implement scene can be according to implement scene
Description be distributed in the device of implement scene, it is also possible to is carried out respective change and is disposed other than this implementation
In one or more devices of scene.The module of above-mentioned implement scene can merge into a module, also may be used
To be further split into multiple submodule.
Above-mentioned the application sequence number is for illustration only, and the quality of implement scene is not represented.
Disclosed above is only several specific implementation scenes of the application, but, the application is not limited to
This, the changes that any person skilled in the art can think of should all fall into the protection domain of the application.
Claims (10)
1. a kind of resource allocation methods, it is characterised in that be applied in Long Term Evolution LTE system, the party
Method includes:
It is determined that when resource allocation request is received, for request the pre-assigned down channel of terminal it is pre-
Distribution resource;
It is judged as whether there is the not available unavailable resource of the terminal in the predistribution resource;
If the determination result is YES, then the unavailable resource is deleted from the predistribution resource, while
The power of unavailable resource is superimposed upon the predistribution resource and deletes the remaining resource after unavailable resource
On, and distribute to the terminal.
2. the method for claim 1, it is characterised in that described to be judged as the predistribution resource
In whether there is the not available unavailable resource of the terminal, specifically include:
Periodically obtain the resource interference situation of down channel;
Timing judges to exceed threshold with the presence or absence of interference in the predistribution resource based on the resource interference situation
The disturbed resource of value;
If the determination result is YES, it is determined that there is the not available unavailable resource of the terminal.
3. method as claimed in claim 2, it is characterised in that the periodicity obtains down channel
Resource interference situation, specifically includes:
When the LTE system is LTE-TDD systems, the resource interference feelings of up channel are periodically obtained
Condition;
The mirror of the up-downgoing channel based on LTE-TDD systems and the resource interference feelings of up channel
Condition determines the resource interference situation of down channel.
4. method as claimed in claim 3, it is characterised in that the resource interference situation especially by
Interference noise lifting IoT is identified.
5. the method for claim 1, it is characterised in that the power by unavailable resource is folded
It is added in the predistribution resource to delete in the remaining resource after unavailable resource, specifically includes:
Determine the first resource block included by the unavailable resource and deleted not in the predistribution resource
The Secondary resource block of the remaining resource after available resources;
The quantity of the Resource Block group RBG based on the first resource block, descending sub frame number and the terminal
The downlink port quantity of place cell determines the power of the first resource block;
Determine the quantity of the Resource Block group RBG of the Secondary resource block, and based on the Secondary resource block
The quantity of Resource Block group RBG determines the quantity of the resource element RE of the Secondary resource block;
The power of the first resource block is evenly distributed to each RE of Secondary resource block.
6. a kind of resource allocation apparatus, it is characterised in that be applied in Long Term Evolution LTE system, including:
Forward allocator module, for determining when resource allocation request is received, for the terminal of request is divided in advance
The predistribution resource of the down channel matched somebody with somebody;
Judge module, for be judged as it is described predistribution resource in the presence or absence of the terminal it is not available
Unavailable resource;
Processing module, for when judged result is to be, by the unavailable resource from the predistribution money
Deleted in source, while the power of unavailable resource is superimposed upon into the predistribution resource deletes unavailable resource
In remaining resource afterwards, and distribute to the terminal.
7. equipment as claimed in claim 6, it is characterised in that the judge module, specifically for:
Periodically obtain the resource interference situation of down channel;
Timing judges to exceed threshold with the presence or absence of interference in the predistribution resource based on the resource interference situation
The disturbed resource of value;
If the determination result is YES, it is determined that there is the not available unavailable resource of the terminal.
8. equipment as claimed in claim 7, it is characterised in that under the judge module is periodically obtained
The resource interference situation of row channel, specifically includes:
When the LTE system is LTE-TDD systems, the resource interference feelings of up channel are periodically obtained
Condition;
The mirror of the up-downgoing channel based on LTE-TDD systems and the resource interference feelings of up channel
Condition determines the resource interference situation of down channel.
9. equipment as claimed in claim 8, it is characterised in that the resource interference situation especially by
Interference noise lifting IoT is identified.
10. the method for claim 1, it is characterised in that the processing module is by unavailable money
The power in source is superimposed upon the predistribution resource and deletes in the remaining resource after unavailable resource, specific bag
Include:
Determine the first resource block included by the unavailable resource and deleted not in the predistribution resource
The Secondary resource block of the remaining resource after available resources;
The quantity of the Resource Block group RBG based on the first resource block, descending sub frame number and the terminal
The downlink port quantity of place cell determines the power of the first resource block;
Determine the quantity of the Resource Block group RBG of the Secondary resource block, and based on the Secondary resource block
The quantity of Resource Block group RBG determines the quantity of the resource element RE of the Secondary resource block;
The power of the first resource block is evenly distributed to each RE of Secondary resource block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510815749.6A CN106792924A (en) | 2015-11-23 | 2015-11-23 | A kind of resource allocation methods and equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510815749.6A CN106792924A (en) | 2015-11-23 | 2015-11-23 | A kind of resource allocation methods and equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106792924A true CN106792924A (en) | 2017-05-31 |
Family
ID=58886322
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510815749.6A Pending CN106792924A (en) | 2015-11-23 | 2015-11-23 | A kind of resource allocation methods and equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106792924A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020029070A1 (en) * | 2018-08-07 | 2020-02-13 | Nokia Shanghai Bell Co., Ltd. | Method, apparatus and computer readable media for resource allocation |
CN111130668A (en) * | 2018-10-30 | 2020-05-08 | 中国电信股份有限公司 | Method, device and base station for processing uplink service |
CN115280698A (en) * | 2020-03-19 | 2022-11-01 | 高通股份有限公司 | Receiving rules for revoked cancellations |
WO2024130528A1 (en) * | 2022-12-20 | 2024-06-27 | 华为技术有限公司 | Communication method, communication apparatus and communication system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101291514A (en) * | 2007-04-20 | 2008-10-22 | 中兴通讯股份有限公司 | Method and device for resource distribution in wireless communication system |
CN103220802A (en) * | 2012-01-19 | 2013-07-24 | 中兴通讯股份有限公司 | Processing method and device of downlink data |
CN103369651A (en) * | 2012-03-29 | 2013-10-23 | 中兴通讯股份有限公司 | Method for allocating downlink transmission power in long-term evolution system and device thereof |
CN104411005A (en) * | 2014-11-05 | 2015-03-11 | 大唐移动通信设备有限公司 | Uplink transmission power control method, device and base station |
-
2015
- 2015-11-23 CN CN201510815749.6A patent/CN106792924A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101291514A (en) * | 2007-04-20 | 2008-10-22 | 中兴通讯股份有限公司 | Method and device for resource distribution in wireless communication system |
CN103220802A (en) * | 2012-01-19 | 2013-07-24 | 中兴通讯股份有限公司 | Processing method and device of downlink data |
CN103369651A (en) * | 2012-03-29 | 2013-10-23 | 中兴通讯股份有限公司 | Method for allocating downlink transmission power in long-term evolution system and device thereof |
CN104411005A (en) * | 2014-11-05 | 2015-03-11 | 大唐移动通信设备有限公司 | Uplink transmission power control method, device and base station |
Non-Patent Citations (1)
Title |
---|
啜钢,王文博,常永宁,全庆一: "《移动通信原理与系统(第3版)》", 28 February 2015 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020029070A1 (en) * | 2018-08-07 | 2020-02-13 | Nokia Shanghai Bell Co., Ltd. | Method, apparatus and computer readable media for resource allocation |
CN112544103A (en) * | 2018-08-07 | 2021-03-23 | 上海诺基亚贝尔股份有限公司 | Method, apparatus and computer readable medium for resource allocation |
CN111130668A (en) * | 2018-10-30 | 2020-05-08 | 中国电信股份有限公司 | Method, device and base station for processing uplink service |
CN115280698A (en) * | 2020-03-19 | 2022-11-01 | 高通股份有限公司 | Receiving rules for revoked cancellations |
WO2024130528A1 (en) * | 2022-12-20 | 2024-06-27 | 华为技术有限公司 | Communication method, communication apparatus and communication system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102395132B (en) | The radio resource allocation mechanism improved | |
CN110418399B (en) | NOMA-based Internet of vehicles resource allocation method | |
US10917898B2 (en) | Auxiliary communication method and system, and device having base station function and terminal | |
JP5814225B2 (en) | Method, apparatus, and device for relay user selection and downlink resource allocation | |
EP2587855B1 (en) | Method and base station for adjusting carrier resources dynamically | |
CN106792924A (en) | A kind of resource allocation methods and equipment | |
CN102348216B (en) | A kind of interference processing method and device | |
CN102065550B (en) | Method and device for reducing inter-cell interference of orthogonal frequency division multiplexing system and terminal thereof | |
CN102246571B (en) | Resource regulating method, scheduler and base station | |
TWI633804B (en) | Communication control device, communication control method, and information processing device | |
JP2020109985A (en) | Multiplexing of peer-to-peer (p2p) communication and wide area network (wan) communication | |
CN105722227A (en) | Interference mitigation on uplink control channel in heterogeneous networks | |
CN105764150B (en) | Resource allocation method and device | |
CN111448776A (en) | Apparatus and method for associating resource information with channel metric information in a wireless network | |
KR102046868B1 (en) | Method and apparatus for operating multiple modulation schemes in a wireless communication system | |
US9326293B2 (en) | Selection of a secondary component carrier based on interference information | |
CN104394592A (en) | Method, device and base station for allocation of PRB resources | |
CN103856945B (en) | The up-link interference coordination method of LTE Advanced relay systems | |
JP2007116674A (en) | Method for allocating dynamic sub-channel, transmitter, receiver, and system | |
CN106209304A (en) | A kind of centralized EPDCCH blind detection method based on PRBs sequence | |
EP2863673B1 (en) | Radio terminal, base station apparatus, radio communication system, and computer program | |
CN111245534A (en) | Uplink resource scheduling method and device | |
CN102685899B (en) | Physical source distributing method and apparatus | |
WO2017020162A1 (en) | Resource scheduling method, device and base station | |
Kuo et al. | Adaptive resource allocation for downlink grouped MC-CDMA systems with power and BER constraints |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |