CN106789188B - A kind of method of the apparatus self-adaptation addressing of bus type topological structure - Google Patents

A kind of method of the apparatus self-adaptation addressing of bus type topological structure Download PDF

Info

Publication number
CN106789188B
CN106789188B CN201611104477.XA CN201611104477A CN106789188B CN 106789188 B CN106789188 B CN 106789188B CN 201611104477 A CN201611104477 A CN 201611104477A CN 106789188 B CN106789188 B CN 106789188B
Authority
CN
China
Prior art keywords
equipment
registration
instruction
main
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611104477.XA
Other languages
Chinese (zh)
Other versions
CN106789188A (en
Inventor
杨支丹
刘卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Island Instrument Development Co Ltd
Original Assignee
Henan Island Instrument Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Island Instrument Development Co Ltd filed Critical Henan Island Instrument Development Co Ltd
Priority to CN201611104477.XA priority Critical patent/CN106789188B/en
Publication of CN106789188A publication Critical patent/CN106789188A/en
Application granted granted Critical
Publication of CN106789188B publication Critical patent/CN106789188B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/40Bus networks
    • H04L12/40006Architecture of a communication node
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • H04L41/0813Configuration setting characterised by the conditions triggering a change of settings
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L61/00Network arrangements, protocols or services for addressing or naming
    • H04L61/50Address allocation

Abstract

The present invention relates to the software fields of bus-organized system, more particularly to a kind of method of the apparatus self-adaptation addressing of bus type topological structure, this method includes that three kinds of instructions of main equipment selection are manipulated to from equipment, and three kinds of instructions are equipment cancellation, equipment pre-registration and facility registration;The slave equipment that instruction is received after broadcast transmitting apparatus log-out instruction, in bus is both needed to resetting equipment state;After broadcast transmitting apparatus pre-registration instruction, the slave equipment in bus receives instruction, will be operated according to related procedure;After broadcast transmitting apparatus register instruction, the facility registration information to be received sent from equipment is waited.The invention proposes the master-slave equipment data adaptives based on bus type topological structure to obtain way to solve the problem, it only needs three to instruct the apparatus information acquiring that can complete entire bus and updates work, convenient and efficient, reduce the cumbersome link of artificial record registration, accuracy rate is also improved, and then promotes the working efficiency of entire data data acquisition bus.

Description

A kind of method of the apparatus self-adaptation addressing of bus type topological structure
Technical field
The present invention relates to the software field of bus-organized system more particularly to a kind of apparatus self-adaptations of bus type topological structure The method of addressing.
Background technique
Currently, bus type is one of network topology structure the most universal, type of attachment is simple, be easily installed deployment, at This is low, increases and deletes terminal device all relatively flexibly, does not influence the normal operation of network, the expansion performance of system is good.Bus There are a main equipment in type topological structure, it is one or more from equipment, main equipment and from only have between equipment one it is two-way Communication line only allows an equipment to send data information on communication link in the same time, message otherwise will be caused chaotic, number One-to-one or broadcast transmission is carried out by address according to communication.
Original technology scheme, by master-slave equipment relationship, that is, associated address information in manual record bus, by artificial Be entered into server or main equipment memory block in, time-consuming, manpower demand is big, inaccurate rate is high, cumbersome, especially exists After newly being accessed from equipment or being offline, system can not adaptive updates storage slave facility information, cause what the system failure took place frequently to ask Topic.
Summary of the invention
Of the existing technology in order to solve the problems, such as, the present invention is based on the master-slave equipment data of bus type topological structure are adaptive Way to solve the problem should be obtained, a kind of method of the apparatus self-adaptation addressing of bus type topological structure is provided.
The technical solution of the present invention is as follows: the method that a kind of apparatus self-adaptation of bus type topological structure addresses, main equipment choosing It selects three kinds of instructions to manipulate to from equipment, three kinds of instructions are equipment cancellation, equipment pre-registration and facility registration;Broadcast hair The slave equipment that instruction is received after sending equipment log-out instruction, in bus is both needed to resetting equipment state, will be original registered or not Registration or other states reset to unregistered state;After broadcast transmitting apparatus pre-registration instruction, the slave equipment in bus is received To instruction, will be operated according to related procedure;After broadcast transmitting apparatus register instruction, into wait process, wait it is to be received from The facility registration information that equipment is sent, address information of the basis from equipment after receiving, one-to-one transmission confirmation message, so After go successively to wait process, unless not receiving whithin a period of time any from facility information, i.e. time-out time has arrived, default Facility registration is completed in slave equipment in bus, and main equipment exits waiting process, end operation.
The main equipment carries out facility registration to from equipment, and step includes:
Step 1, main equipment broadcast transmitting apparatus register instruction;
Step 2, main equipment enters waiting process, waits the facility registration information to be received sent from equipment;
Step 3, if main equipment is received from facility information, 4 is gone to step, otherwise goes to step 5;
Step 4, main equipment record replys confirmation message, goes to step 2 from facility information;
Step 5, judge whether time-out, if had not timed out, go to step 2, otherwise go to step 6;
Step 6, facility registration is completed in the slave equipment on default bus, and main equipment exits waiting process, end operation.
The slave equipment being connected in bus may have following three kinds of states: unregistered, registered, registered;1) institute It states from equipment unregistered state: may be the equipment for never accessing any bus, i.e., never registered;It is also likely to be to be set by master The equipment that remarks pin is crossed, i.e. unregistered state equipment;2) described from equipment registered state: to may be that registered mistake other masters set Standby, offline equipment, i.e., the registered and existing main equipment of mismatch;3) described from equipment registered state: to be also likely to be Access bus, and matching existing main equipment registered from equipment.
The two states of the main equipment are as follows: never recorded it is any from facility information and have recorded part from equipment believe Breath;
The main equipment never recorded any main equipment for referring to from the state of facility information and newly accessing;
The main equipment have recorded part referred to from the state of facility information recorded part from facility information, and Because accessing from the new of equipment or causing existing record information not update offline.
The command information that main equipment is received from equipment passive type, three kinds of instructions are that equipment is nullified, equipment is infused in advance Volume and facility registration;
After the equipment log-out instruction that equipment receives that main equipment is sent, from equipment replacement equipment of itself state, by state It is changed to unregistered state;
It is described from equipment receive main equipment send equipment log-out instruction after, specific steps include:
Step a judges whether receive equipment log-out instruction from equipment, if receiving instruction, goes to step b, otherwise turns Step c;Step b, from device clear equipment state, state is changed to unregistered state, end operation;Step c, from device end Operation;
The equipment pre-registration instruction that main equipment is sent is received from equipment, the original registration letter of itself is proofreaded since equipment Breath, if equipment of itself is registered and registers main equipment as current master, maintains standing state, end operation;
It is described from equipment receive main equipment send equipment pre-registration instruction after, specific steps include:
Step 1, judge whether receive equipment pre-registration instruction from equipment, if receiving instruction, go to step 2, otherwise Go to step 3;
Step 2, itself original main equipment id information is proofreaded from equipment go to step 4, otherwise if equipment of itself is registered Go to step 6;
Step 3, it is operated from device end;
Step 4, whether judgement is identical as original annotation volume main equipment, then goes to step 5 if they are the same, otherwise goes to step 6;
Step 5, equipment registered state, end operation are kept from equipment;
Step 6, resetting is unregistered from equipment state, and converses unique log-in window phase according to self ID, terminates behaviour Make;
From equipment receive facility registration instruction after, from equipment enter window phase wait process, wait the window of equipment of itself The mouth phase arrives, once window phase arrives, exits waiting process, starts to send registration information to main equipment, be again introduced into later To process, waiting main equipment confirmation is replied, and after receiving main equipment confirmation reply, it is registered for changing from equipment state, is exited Process;If being still not received by return information after a period of time, i.e. time-out time arrives, registration failure, terminates process, specific to walk Suddenly include:
Step a judges whether receive facility registration instruction from equipment, if receiving instruction, goes to step b, otherwise turn Step;
Step b enters window phase from equipment and waits process, the window phase of equipment of itself is waited to arrive;
Step c, judges whether window phase arrives, and goes to step d if window phase arrives, otherwise goes to step b;
Step d sends registration information from equipment to main equipment, is again introduced into waiting process;
Step e judges to wait whether overtime, the registration failure if time-out, end operation;Otherwise d is gone to step;
Step f, waiting main equipment confirmation are replied, and judge whether that receiving main equipment confirmation replys, if receiving reply G is gone to step, d is otherwise gone to step;
Step g, it is registered for changing from equipment state, exits process, end operation.
The window phase refers to that equipment numbers the unique hair different from other main equipments calculated according to self ID Time point is penetrated, data collision will not be occurred from equipment with other by sending data at this time point.
Compared with the existing technology, the invention proposes the master-slave equipment data adaptive acquisitions based on bus type topological structure Way to solve the problem, it is only necessary to which three instruct the apparatus information acquiring that can complete entire bus and update work, convenient height Effect reduces the cumbersome link of artificial record registration, also improves accuracy rate, and then promote the work of entire data data acquisition bus Efficiency.
Detailed description of the invention
Fig. 1 is flow chart one of the invention;
Fig. 2 is flowchart 2 of the invention.
Specific embodiment
With reference to the accompanying drawing 1 and attached drawing 2, the present invention is further illustrated.
In bus type topological structure, due to shared data communication line between master-slave equipment, the initiation of order be all by Main equipment is leading, and the command information of main equipment is passively received from equipment, can only have one to be replied in the same time from equipment, Otherwise information will generate messy code, lead to data perturbation, can not parse.Master-slave equipment is all using microcontroller as the embedding of platform Enter formula equipment, having certain nonvolatile storage space for storing, device status information and device address information etc. are related to be believed Breath.
As shown in Fig. 1, a kind of method of the apparatus self-adaptation addressing of bus type topological structure of the present invention includes main equipment Three kinds of instructions are selected to manipulate to from equipment, three kinds of instructions are equipment cancellation, equipment pre-registration and facility registration;Broadcast The slave equipment that instruction is received after sending device log-out instruction, in bus is both needed to resetting equipment state, by original registered or Unregistered or other states reset to unregistered state;After broadcast transmitting apparatus pre-registration instruction, the slave equipment in bus is connect Instruction is received, will be operated according to related procedure;After broadcast transmitting apparatus register instruction, into process is waited, wait to be received The facility registration information sent from equipment, address information of the basis from equipment after receiving, one-to-one transmission confirmation message, Waiting process is then proceeded to, unless not receiving whithin a period of time any from facility information, i.e. time-out time has arrived, and writes from memory Facility registration is completed in the slave equipment recognized in bus, and main equipment exits waiting process, end operation.
The main equipment carries out facility registration to from equipment, and step includes:
Step 1, main equipment broadcast transmitting apparatus register instruction;
Step 2, main equipment enters waiting process, waits the facility registration information to be received sent from equipment;
Step 3, if main equipment is received from facility information, 4 is gone to step, otherwise goes to step 5;
Step 4, main equipment record replys confirmation message, goes to step 2 from facility information;
Step 5, judge whether time-out, if had not timed out, go to step 2, otherwise go to step 6;
Step 6, facility registration is completed in the slave equipment on default bus, and main equipment exits waiting process, end operation.
The slave equipment being connected in bus may have following three kinds of states: unregistered, registered, registered;1) institute It states from equipment unregistered state: may be the equipment for never accessing any bus, i.e., never registered;It is also likely to be to be set by master The equipment that remarks pin is crossed, i.e. unregistered state equipment;2) described from equipment registered state: to may be that registered mistake other masters set Standby, offline equipment, i.e., the registered and existing main equipment of mismatch;3) described from equipment registered state: to be also likely to be Access bus, and matching existing main equipment registered from equipment.
The two states of the main equipment are as follows: never recorded it is any from facility information and have recorded part from equipment believe Breath;The main equipment never recorded any main equipment for referring to from the state of facility information and newly accessing;The master sets Note part, which is referred to from the state of facility information, recorded part from facility information, and because from equipment it is new access or Existing record information is caused not update offline.
A kind of method of the apparatus self-adaptation addressing of bus type topological structure of the present invention includes further including described from equipment quilt Dynamic formula receives the command information of main equipment, and three kinds of instructions are equipment cancellation, equipment pre-registration and facility registration.
After the equipment log-out instruction that equipment receives that main equipment is sent, from equipment replacement equipment of itself state, by state It is changed to unregistered state;It is described from equipment receive main equipment send equipment log-out instruction after, specific steps include: step A judges whether receive equipment log-out instruction from equipment, if receiving instruction, goes to step b, otherwise goes to step c;Step b, From device clear equipment state, state is changed to unregistered state, end operation;Step c is operated from device end.
The equipment pre-registration instruction that main equipment is sent is received from equipment, the original registration letter of itself is proofreaded since equipment Breath, if equipment of itself is registered and registers main equipment as current master, maintains standing state, end operation;It is described from setting After the standby equipment pre-registration instruction for receiving main equipment transmission, specific steps include:
Step 1, judge whether receive equipment pre-registration instruction from equipment, if receiving instruction, go to step 2, otherwise Go to step 3;
Step 2, itself original main equipment id information is proofreaded from equipment go to step 4, otherwise if equipment of itself is registered Go to step 6;
Step 3, it is operated from device end;
Step 4, whether judgement is identical as original annotation volume main equipment, then goes to step 5 if they are the same, otherwise goes to step 6;
Step 5, equipment registered state, end operation are kept from equipment;
Step 6, resetting is unregistered from equipment state, and converses unique log-in window phase according to self ID, terminates behaviour Make;
From equipment receive facility registration instruction after, from equipment enter window phase wait process, wait the window of equipment of itself The mouth phase arrives, once window phase arrives, exits waiting process, starts to send registration information to main equipment, be again introduced into later To process, waiting main equipment confirmation is replied, and after receiving main equipment confirmation reply, it is registered for changing from equipment state, is exited Process;If being still not received by return information after a period of time, i.e. time-out time arrives, registration failure, terminates process, specific to walk Suddenly include:
Step a judges whether receive facility registration instruction from equipment, if receiving instruction, goes to step b, otherwise turn Step;
Step b enters window phase from equipment and waits process, the window phase of equipment of itself is waited to arrive;
Step c, judges whether window phase arrives, and goes to step d if window phase arrives, otherwise goes to step b;
Step d sends registration information from equipment to main equipment, is again introduced into waiting process;
Step e judges to wait whether overtime, the registration failure if time-out, end operation;Otherwise d is gone to step;
Step f, waiting main equipment confirmation are replied, and judge whether that receiving main equipment confirmation replys, if receiving reply G is gone to step, d is otherwise gone to step;
Step g, it is registered for changing from equipment state, exits process, end operation.
The window phase refers to that equipment numbers the unique hair different from other main equipments calculated according to self ID Time point is penetrated, data collision will not be occurred from equipment with other by sending data at this time point.
What has been described above is only a preferred embodiment of the present invention, it is noted that for those skilled in the art, Without depart from that overall concept of the invention, several changes and improvements can also be made, these also should be considered as of the invention Protection scope.

Claims (6)

1. the method that a kind of apparatus self-adaptation of bus type topological structure addresses, it is characterised in that: three kinds of main equipment selection instructions It is manipulated to from equipment, three kinds of instructions are equipment cancellation, equipment pre-registration and facility registration;
The slave equipment that instruction is received after broadcast transmitting apparatus log-out instruction, in bus is both needed to resetting equipment state, will be original Registered or unregistered or other states reset to unregistered state;
After broadcast transmitting apparatus pre-registration instruction, the slave equipment in bus receives instruction, will be operated according to related procedure;
After broadcast transmitting apparatus register instruction, into process is waited, the facility registration information to be received sent from equipment is waited, is connect According to the address information from equipment after receiving, one-to-one transmission confirmation message then proceedes to waiting process, unless one Do not receive any from facility information in the section time, i.e. time-out time has arrived, and equipment note is completed in the slave equipment on default bus Volume, main equipment exit waiting process, end operation.
2. the method that a kind of apparatus self-adaptation of bus type topological structure according to claim 1 addresses, it is characterised in that: The main equipment carries out facility registration to from equipment, and step includes:
Step 1, main equipment broadcast transmitting apparatus register instruction;
Step 2, main equipment enters waiting process, waits the facility registration information to be received sent from equipment;
Step 3, if main equipment is received from facility information, 4 is gone to step, otherwise goes to step 5;
Step 4, main equipment record replys confirmation message, goes to step 2 from facility information;
Step 5, judge whether time-out, if had not timed out, go to step 2, otherwise go to step 6;
Step 6, facility registration is completed in the slave equipment on default bus, and main equipment exits waiting process, end operation.
3. the method that a kind of apparatus self-adaptation of bus type topological structure according to claim 1 addresses, it is characterised in that: Slave equipment in the bus may have following three kinds of states: unregistered, registered, registered;
1) described from equipment unregistered state: to may be the equipment for never accessing any bus, i.e., never registered;It may also It is the equipment nullified by main equipment, i.e. unregistered state equipment;
2) described from equipment registered state: to may be other main equipments of registered mistake, offline equipment is that is, registered and not Match existing main equipment;
3) described from equipment registered state: it is also likely to be to have accessed bus, and matching existing main equipment registered from equipment.
4. the method that a kind of apparatus self-adaptation of bus type topological structure according to claim 1 addresses, it is characterised in that: The two states of the main equipment are as follows: never recorded and any from facility information and have recorded part from facility information;
The main equipment never recorded any main equipment for referring to from the state of facility information and newly accessing;
The main equipment have recorded part referred to from the state of facility information recorded part from facility information, and because from The new access of equipment causes existing record information not update offline.
5. the method that a kind of apparatus self-adaptation of bus type topological structure according to claim 1 addresses, it is characterised in that: It further include the command information that main equipment is received from equipment passive type, three kinds of instructions are equipment cancellation, equipment pre-registration And facility registration;
After the equipment log-out instruction that equipment receives that main equipment is sent, from equipment replacement equipment of itself state, state is changed For unregistered state;
It is described from equipment receive main equipment send equipment log-out instruction after, specific steps include:
Step a judges whether receive equipment log-out instruction from equipment, if receiving instruction, goes to step b, otherwise goes to step c;
Step b, from device clear equipment state, state is changed to unregistered state, end operation;
Step c is operated from device end;
The equipment pre-registration instruction that main equipment is sent is received from equipment, the original registration information of itself is proofreaded since equipment, If equipment of itself is registered and registers main equipment as current master, standing state, end operation are maintained;
It is described from equipment receive main equipment send equipment pre-registration instruction after, specific steps include:
Step 1, judge whether receive equipment pre-registration instruction from equipment, if receiving instruction, go to step 2, otherwise turn to walk Rapid 3;
Step 2, itself original main equipment id information is proofreaded from equipment and go to step 4 if equipment of itself is registered, otherwise turn to walk Rapid 6;
Step 3, it is operated from device end;
Step 4, whether judgement is identical as original annotation volume main equipment, then goes to step 5 if they are the same, otherwise goes to step 6;
Step 5, equipment registered state, end operation are kept from equipment;
Step 6, resetting is unregistered from equipment state, and converses unique log-in window phase, end operation according to self ID;
From equipment receive facility registration instruction after, from equipment enter window phase wait process, wait the window phase of equipment of itself It arrives, once window phase arrives, exits waiting process, start to send registration information to main equipment, be again introduced into waiting stream later Journey, waiting main equipment confirmation are replied, and after receiving main equipment confirmation reply, it is registered for changing from equipment state, exit process; If being still not received by return information after a period of time, i.e. time-out time arrives, registration failure, terminates process, specific steps packet It includes:
Step a judges whether receive facility registration instruction from equipment, if receiving instruction, goes to step b, otherwise go to step;
Step b enters window phase from equipment and waits process, the window phase of equipment of itself is waited to arrive;
Step c, judges whether window phase arrives, and goes to step d if window phase arrives, otherwise goes to step b;
Step d sends registration information from equipment to main equipment, is again introduced into waiting process;
Step e judges to wait whether overtime, the registration failure if time-out, end operation;Otherwise d is gone to step;
Step f, waiting main equipment confirmation are replied, and judge whether that receiving main equipment confirmation replys, and turns to walk if receiving reply Rapid g, otherwise goes to step d;
Step g, it is registered for changing from equipment state, exits process, end operation.
6. the method that a kind of apparatus self-adaptation of bus type topological structure according to claim 5 addresses, it is characterised in that: The window phase refers to that equipment numbers the unique transmission time point different from other main equipments calculated according to self ID, Data collision will not be occurred from equipment with other by sending data at this time point.
CN201611104477.XA 2016-12-05 2016-12-05 A kind of method of the apparatus self-adaptation addressing of bus type topological structure Active CN106789188B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611104477.XA CN106789188B (en) 2016-12-05 2016-12-05 A kind of method of the apparatus self-adaptation addressing of bus type topological structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611104477.XA CN106789188B (en) 2016-12-05 2016-12-05 A kind of method of the apparatus self-adaptation addressing of bus type topological structure

Publications (2)

Publication Number Publication Date
CN106789188A CN106789188A (en) 2017-05-31
CN106789188B true CN106789188B (en) 2019-09-03

Family

ID=58878683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611104477.XA Active CN106789188B (en) 2016-12-05 2016-12-05 A kind of method of the apparatus self-adaptation addressing of bus type topological structure

Country Status (1)

Country Link
CN (1) CN106789188B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111010286A (en) * 2019-11-11 2020-04-14 杭州中恒电气股份有限公司 Intelligent registration method and device based on serial bus, electronic equipment and medium
CN116455964B (en) * 2023-06-19 2023-09-26 杭州炬华科技股份有限公司 Device registration method, system and medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1349324A2 (en) * 2002-03-28 2003-10-01 Huawei Technologies Co., Ltd. Integrated managing method for local area network switching devices
CN102347878A (en) * 2011-09-30 2012-02-08 深圳市豪恩安全科技有限公司 Multi-point communication system, method and equipment
CN103209183A (en) * 2013-03-25 2013-07-17 中山大学 Method for equipment registration based on digital home network
CN103428040A (en) * 2012-05-18 2013-12-04 中兴通讯股份有限公司 Method and system for automatically detecting auxiliary computer in-place information and host computer
WO2015065013A1 (en) * 2013-10-28 2015-05-07 삼성전자 주식회사 Method and apparatus for multi-users registering home network supporting application based device
CN105978702A (en) * 2016-05-13 2016-09-28 重庆世纪之光科技实业有限公司 Bidirectional communication method and device for point-to-multipoint network

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1349324A2 (en) * 2002-03-28 2003-10-01 Huawei Technologies Co., Ltd. Integrated managing method for local area network switching devices
CN102347878A (en) * 2011-09-30 2012-02-08 深圳市豪恩安全科技有限公司 Multi-point communication system, method and equipment
CN103428040A (en) * 2012-05-18 2013-12-04 中兴通讯股份有限公司 Method and system for automatically detecting auxiliary computer in-place information and host computer
CN103209183A (en) * 2013-03-25 2013-07-17 中山大学 Method for equipment registration based on digital home network
WO2015065013A1 (en) * 2013-10-28 2015-05-07 삼성전자 주식회사 Method and apparatus for multi-users registering home network supporting application based device
CN105978702A (en) * 2016-05-13 2016-09-28 重庆世纪之光科技实业有限公司 Bidirectional communication method and device for point-to-multipoint network

Also Published As

Publication number Publication date
CN106789188A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN102498444B (en) Device and method for addressing a slave unit
CN109656755A (en) The method and system of detection device state
CN103731343A (en) MVB-WTB gateway based on LPC2468 and working method thereof
CN106789188B (en) A kind of method of the apparatus self-adaptation addressing of bus type topological structure
CN112165438A (en) Vehicle communication method and communication system
CN103716420A (en) Automatic station address obtaining method of Modbus ASCII slave station and slave station
CN106416139A (en) Relay device and air conditioning system
CN103684869A (en) Method and device for reporting status information of multi-interface airborne equipment
CN107613023B (en) Equipment connection method and device
US10250434B2 (en) Electronic control apparatus
CN108445788A (en) A kind of hotel's scenery control method and relevant apparatus
CN101827005A (en) Method for automatically configuring home gateway and system
CN106535101B (en) Bluetooth communication method, system and wireless router
CN106130787B (en) Service processing system based on software defined network
CN106850713B (en) Data transmission method and device based on serial server and serial server
CN115657646B (en) Test method and device of CAN controller
RU2010149264A (en) NODE SUBSCRIBER OF A COMMUNICATION SYSTEM WITH A FUNCTIONALLY SEPARATE DEVICE FOR MEMORY OF TRANSMISSION EVENTS
CN114697270B (en) Arbitration method, system, equipment and medium based on EPA network model
US10277674B2 (en) Apparatus for relaying data transmission in SCADA system
CN101909009A (en) Routing method, routing system and service gateway in intelligent home system
CN106027339B (en) The monitoring method of household appliance, apparatus and system
CN110768881B (en) Data interaction system and data interaction method
CN107046493B (en) Communication means and device
CN106412657B (en) A kind of method and system of set-top box programming sequence code
US9608839B2 (en) Transfer of information within an ASIC using a slotted ring based protocol

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant