CN106786246A - One kind is laid and uses high polymer alloy cable testing bridge - Google Patents

One kind is laid and uses high polymer alloy cable testing bridge Download PDF

Info

Publication number
CN106786246A
CN106786246A CN201611176593.2A CN201611176593A CN106786246A CN 106786246 A CN106786246 A CN 106786246A CN 201611176593 A CN201611176593 A CN 201611176593A CN 106786246 A CN106786246 A CN 106786246A
Authority
CN
China
Prior art keywords
backplate
guide part
cutting
slot
fitting portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611176593.2A
Other languages
Chinese (zh)
Other versions
CN106786246B (en
Inventor
郑元和
杨瀚钦
潘逸龙
毛维琴
杨媗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGHONG PLASTICS GROUP IMPERIAL PLASTICS Co Ltd
Original Assignee
CHANGHONG PLASTICS GROUP IMPERIAL PLASTICS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGHONG PLASTICS GROUP IMPERIAL PLASTICS Co Ltd filed Critical CHANGHONG PLASTICS GROUP IMPERIAL PLASTICS Co Ltd
Priority to CN201611176593.2A priority Critical patent/CN106786246B/en
Publication of CN106786246A publication Critical patent/CN106786246A/en
Application granted granted Critical
Publication of CN106786246B publication Critical patent/CN106786246B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0406Details thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The present invention discloses one kind and lays and uses high polymer alloy cable testing bridge, for dredging cable, including:Left backplate;Right backplate;Base plate;Cover plate, wherein:The left backplate, the right backplate, the base plate and the cover plate surround the guide space for dredging the cable, and the two ends of the cover plate form the left fitting portion and the right fitting portion that are respectively formed with for coordinating with the left guide part and the right guide part respectively so that the left fitting portion can prolong the left guide part, the right fitting portion and can prolong right guide part slip simultaneously, and form clamping with the left backplate and the right backplate.The present invention surrounds crane span structure by left backplate, right backplate, cover plate, base plate splicing, it is often more important that:Cover plate can realize Fast Installation by fitting portion and the cooperation of guide part, that is, facilitate transport and carrying before installing, can realize Fast Installation again when in use.

Description

One kind is laid and uses high polymer alloy cable testing bridge
Technical field
Technical field, more particularly to a kind of cabling cable testing bridge are installed the present invention relates to electric power.
Background technology
Crane span structure is the support of a support and payout.Crane span structure is very universal in engineering, as long as laying cable will With crane span structure, cable testing bridge there is no special specification to instruct at present as a supporting project of wiring installation, individual manufacturer Specification formula lacks versatility, therefore, design selection process should be according to the type of each system cable of light current, quantity, rationally choosing Fixed applicable crane span structure.Cable testing bridge have kind it is complete, using wide, intensity it is big, structure is light, low cost, construction are simple, distribution is clever It is living, install standard, it is aesthetic in appearance the features such as.
Cable testing bridge is divided into the structures such as slot type, pellet type and ladder-type, grid type, by support, trailing arm and installation annex etc. Composition.Can independently set up, it is also possible to be attached on various buildings or structures and piping lane support, embody simple structure, the Beauty See, flexible configuration and it is easy to maintenance the features such as, installed in the outer outdoor crane span structure of building, if in neighbouring seashore or belong to rotten Erosion area, then material must be good with anti-corrosion, resistance to moisture, adhesive force, impact strength physical property feature high.
The Split type structure for being structure as a whole crane span structure of the prior art more or being installed by fastener, is installed by fastener Split type structure it is bothersome when mounted laborious, and the crane span structure of integrative-structure is to transporting and carrying is made troubles.
The content of the invention
For above-mentioned technical problem present in prior art, laid The embodiment provides one kind and use macromolecule Alloy cable crane span structure.
In order to solve the above technical problems, the technical scheme that embodiments of the invention are used is:
One kind is laid and uses high polymer alloy cable testing bridge, for dredging cable, including:
Left backplate, its upper end is formed with left guide part, and its lower end is formed with left buttcover plate;
Right backplate, it is oppositely arranged with the left backplate, and the upper end of the right backplate is formed with right guide part, the right shield The lower end of plate is formed with right buttcover plate;
Base plate, it is arranged between the left backplate and the right backplate, and is corresponded to and the left buttcover plate and institute respectively State right buttcover plate relative;
Cover plate, it is oppositely arranged with the base plate, wherein:
The left backplate, the right backplate, the base plate and the cover plate surround the guiding for dredging the cable Space, and the two ends of the cover plate form and are respectively formed with for respectively coordinating with the left guide part and the right guide part Left fitting portion and right fitting portion are so that the left fitting portion can prolong the left guide part, the right fitting portion and can prolong the right side Guide part is slided simultaneously, and forms clamping with the left backplate and the right backplate.
Preferably, the left guide part and the right guide part are and prolong the guiding that the axial direction of the cable extends Groove, the left fitting portion and the right fitting portion are the gib block that can be embedded in the gathering sill.
Preferably, the gathering sill is opening down, and the upper surface of the gib block is relative with the bottom land of the gathering sill, So that the gib block is resisted against the bottom land of the gathering sill straight up.
Preferably, the axial direction that the cable is prolonged on the left buttcover plate offers left slot, and institute is prolonged on the right buttcover plate The axial direction for stating cable offers right slot, and left cutting is formed with the left of the base plate, and left inserting is formed with the right side of the base plate The left slot is inserted in bar, the left cutting, and the right slot is inserted in the right cutting.
Preferably, left snap fit is formed with the left cutting, left draw-in groove is offered in the left slot, with when described left slotting When bar inserts the left slot, the left snap fit is fastened in the left draw-in groove;Right snap fit is formed with the right cutting, it is described Right draw-in groove is offered in right slot, so that when the right slot is inserted in the right cutting, the right snap fit is fastened on the right card In groove.
Preferably, the left backplate, right backplate, base plate and cover plate are made of high polymer alloy.
Compared with prior art, the beneficial effect of crane span structure of the invention is:The present invention by left backplate, right backplate, cover plate, Base plate splicing surrounds crane span structure, it is often more important that:Cover plate can realize Fast Installation by fitting portion with the cooperation of guide part, i.e., just Just transport and carrying before installing, can realize Fast Installation again when in use.
Brief description of the drawings
The dimensional structure diagram of the crane span structure that Fig. 1 is provided for embodiments of the invention.
The decomposition texture schematic diagram of the crane span structure that Fig. 2 is provided for embodiments of the invention.
The planar structure schematic diagram of the crane span structure that Fig. 3 is provided for embodiments of the invention.
Structural representation when snap fit in the crane span structure that Fig. 4 is provided for embodiments of the invention does not engage with draw-in groove.
Structural representation when snap fit in the crane span structure that Fig. 5 is provided for embodiments of the invention engages with draw-in groove.
In figure:
10- left backplates;The left guide parts of 11-;The left buttcover plates of 12-;The left draw-in grooves of 121-;20- right backplates;The right guide parts of 21-; The right buttcover plates of 22-;30- base plates;The left cuttings of 31-;The left snap fits of 311-;The right cuttings of 32-;40- cover plates;The left fitting portions of 41-;42- is right Fitting portion.
Specific embodiment
To make those skilled in the art be better understood from technical scheme, below in conjunction with the accompanying drawings and specific embodiment party Formula elaborates to the present invention.
As depicted in figs. 1 and 2, embodiment of the invention discloses that a kind of cabling cable testing bridge, for dredging line Cable, including:Left backplate 10, its upper end is formed with left guide part 11, and its lower end is formed with left buttcover plate 12;Right backplate 20, its with The left backplate 10 is oppositely arranged, and the upper end of the right backplate 20 is formed with right guide part 21, the lower end shape of the right backplate 20 Into there is right buttcover plate 22;Base plate 30, it is arranged between the left backplate 10 and the right backplate 20, and respectively correspond to it is described Left buttcover plate 12 and the right buttcover plate 22 are relative;Cover plate 40, it is oppositely arranged with the base plate 30, wherein:The left backplate 10th, the right backplate 20, the base plate 30 and the cover plate 40 surround the guide space for dredging the cable, and described The two ends of cover plate 40 form and are respectively formed with for left embedding with what the left guide part 11 and the right guide part 21 coordinated respectively Conjunction portion 41 and right fitting portion 42 are so that the left fitting portion 41 can prolong the left guide part 11, the right fitting portion 42 and can prolong The right guide part 21 is slided simultaneously, and forms clamping with the left backplate 10 and the right backplate 20.
Understood according to above-mentioned, the present invention surrounds crane span structure by left backplate 10, right backplate 20, cover plate 40, the splicing of base plate 30, more It is important that:Cover plate 40 can realize Fast Installation by the cooperation of fitting portion and guide part, that is, facilitate the transport before installing and Carry, can realize Fast Installation again when in use.
In a preferred embodiment of the invention, the left guide part 11 and the right guide part 21 are and prolong the line The gathering sill that the axial direction of cable extends, the left fitting portion 41 and the right fitting portion 42 are that can be embedded in the gathering sill Gib block.
In a preferred embodiment of the invention, the gathering sill is opening down, the upper surface of the gib block with The bottom land of the gathering sill is relative, so that the gib block is resisted against the bottom land of the gathering sill straight up.
In a preferred embodiment of the invention, the axial direction that the cable is prolonged on the left buttcover plate 12 offers left inserting Groove, the axial direction that the cable is prolonged on the right buttcover plate 22 offers right slot, and the left side of the base plate 30 is formed with left cutting 31, the right side of the base plate 30 is formed with left cutting 31, and the left slot is inserted in the left cutting 31, and the right cutting 32 is inserted The right slot.Preferably, used as two mating connectors on base plate 30, base plate 30 includes many for left cutting 31 and right cutting 32 Individual, multiple base plates 30 are laid side by side along vertical cables laying direction more piece.
In a preferred embodiment of the invention, left snap fit 311 is formed with the left cutting 31, in the left slot Left draw-in groove 121 is offered, so that when the left slot is inserted in the left cutting 31, the left snap fit 311 is fastened on the left card In groove 121;Right snap fit is formed with the right cutting 32, right draw-in groove is offered in the right slot, with when the right cutting 32 When inserting the right slot, the right snap fit is fastened in the right draw-in groove.
Cutting (left cutting 31 or right cutting 32) insert slot (correspond to left cutting 31 or right cutting 32 left slot or Right slot) when, snap fit (left snap fit 311 or right snap fit) and draw-in groove (correspond to left snap fit 311 or right snap fit left draw-in groove 121 or Right draw-in groove) clamping is realized, so that backplate realizes clamping with base plate 30, however, the cooperation between snap fit and draw-in groove is but present One defect:It is not easy to split after snap fit and draw-in groove clamping.To solve the problems, such as to be not easy to split, such as the institutes of Fig. 3 to 5 Show, cutting is configured with certain inclination angle for tilting upward, after slot is inserted in cutting, the top of cutting still has certain reserved For for certain thickness stripe board grafting headspace, draw-in groove is opened up on the bottom wall of slot, snap fit is relative with draw-in groove simultaneously When stripe board is not inserted into the headspace, snap fit not with draw-in groove clamping, cutting can arbitrarily from slot plug, when cutting insert After entering in slot and when stripe board is inserted into headspace, stripe board is pushed down on to cutting, cutting elastic deformation so that snap fit card It is located on draw-in groove, so that backplate realizes clamping with base plate 30, when needing dismounting backplate with base plate 30, stripe board is extracted, Cutting elastic reset, so that snap fit and exact separation, cutting can be extracted from slot, so as to realize base plate 30 with backplate Split.
Above example is only exemplary embodiment of the invention, is not used in the limitation present invention, protection scope of the present invention It is defined by the claims.Those skilled in the art can make respectively in essence of the invention and protection domain to the present invention Modification or equivalent are planted, this modification or equivalent also should be regarded as being within the scope of the present invention.

Claims (6)

1. one kind is laid and uses high polymer alloy cable testing bridge, for dredging cable, it is characterised in that including:
Left backplate, its upper end is formed with left guide part, and its lower end is formed with left buttcover plate;
Right backplate, it is oppositely arranged with the left backplate, and the upper end of the right backplate is formed with right guide part, the right backplate Lower end is formed with right buttcover plate;
Base plate, it is arranged between the left backplate and the right backplate, and is corresponded to and the left buttcover plate and the right side respectively Buttcover plate is relative;
Cover plate, it is oppositely arranged with the base plate, wherein:
The left backplate, the right backplate, the base plate and the cover plate surround the guide space for dredging the cable, And the two ends of the cover plate form and are respectively formed with for left embedding with what the left guide part and the right guide part coordinated respectively Conjunction portion and right fitting portion are so that the left fitting portion can prolong the left guide part, the right fitting portion and can prolong the right guiding Portion is slided simultaneously, and forms clamping with the left backplate and the right backplate.
2. one kind according to claim 1 is laid and uses high polymer alloy cable testing bridge, it is characterised in that the left guide part The gathering sill of the axial direction extension for prolonging the cable, the left fitting portion and the right fitting portion are with the right guide part It is the gib block that can be embedded in the gathering sill.
3. one kind according to claim 2 is laid and uses high polymer alloy cable testing bridge, it is characterised in that the gathering sill Opening down, the upper surface of the gib block is relative with the bottom land of the gathering sill so that the gib block straight up against In the bottom land of the gathering sill.
4. one kind according to claim 3 is laid and uses high polymer alloy cable testing bridge, it is characterised in that the left buttcover plate On prolong the axial direction of the cable and offer left slot, the axial direction that the cable is prolonged on the right buttcover plate offers right slot, institute State and be formed with the left of base plate left cutting, left cutting is formed with the right side of the base plate, the left slot is inserted in the left cutting, The right slot is inserted in the right cutting.
5. one kind according to claim 4 is laid and uses high polymer alloy cable testing bridge, it is characterised in that in the left cutting Left snap fit is formed with, left draw-in groove is offered in the left slot, with when the left slot is inserted in the left cutting, the left card Hook is fastened in the left draw-in groove;Right snap fit is formed with the right cutting, right draw-in groove is offered in the right slot, to work as When stating the right cutting insertion right slot, the right snap fit is fastened in the right draw-in groove.
6. the one kind according to claim 1-5 is laid and uses high polymer alloy cable testing bridge, it is characterised in that the left shield Plate, right backplate, base plate and cover plate are made of high polymer alloy.
CN201611176593.2A 2016-12-19 2016-12-19 A kind of laying high polymer alloy cable testing bridge Active CN106786246B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611176593.2A CN106786246B (en) 2016-12-19 2016-12-19 A kind of laying high polymer alloy cable testing bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611176593.2A CN106786246B (en) 2016-12-19 2016-12-19 A kind of laying high polymer alloy cable testing bridge

Publications (2)

Publication Number Publication Date
CN106786246A true CN106786246A (en) 2017-05-31
CN106786246B CN106786246B (en) 2019-02-05

Family

ID=58889753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611176593.2A Active CN106786246B (en) 2016-12-19 2016-12-19 A kind of laying high polymer alloy cable testing bridge

Country Status (1)

Country Link
CN (1) CN106786246B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879508A (en) * 2018-06-08 2018-11-23 江苏中讯电力科技有限公司 A kind of high-performance large span cable bridge rack
CN108980469A (en) * 2018-08-09 2018-12-11 广东天赐湾实验室装备制造有限公司 Combined vertical pole
CN109347021A (en) * 2018-11-23 2019-02-15 常州信息职业技术学院 A kind of antidetonation gantry for cable installation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1893213A (en) * 2005-07-20 2007-01-10 王强 Plastic cable bridge-carriage jointing structure
CN101232159A (en) * 2008-01-24 2008-07-30 王强 Cable bridge rack
CN203585558U (en) * 2013-11-22 2014-05-07 尹晓普 Combined ladder type cable bridge
CN203836377U (en) * 2014-04-21 2014-09-17 黄岩施展塑胶有限公司 Splicing type hollow plastic cable bridge and cover plate thereof
CN204578012U (en) * 2015-04-16 2015-08-19 上海迅茂实业有限公司 A kind of reinforcement electric cable crane span structure
CN205244721U (en) * 2015-12-07 2016-05-18 上海万朗管业有限公司 I shape additional strengthening's high -polymer alloy material protective sheath

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1893213A (en) * 2005-07-20 2007-01-10 王强 Plastic cable bridge-carriage jointing structure
CN101232159A (en) * 2008-01-24 2008-07-30 王强 Cable bridge rack
CN203585558U (en) * 2013-11-22 2014-05-07 尹晓普 Combined ladder type cable bridge
CN203836377U (en) * 2014-04-21 2014-09-17 黄岩施展塑胶有限公司 Splicing type hollow plastic cable bridge and cover plate thereof
CN204578012U (en) * 2015-04-16 2015-08-19 上海迅茂实业有限公司 A kind of reinforcement electric cable crane span structure
CN205244721U (en) * 2015-12-07 2016-05-18 上海万朗管业有限公司 I shape additional strengthening's high -polymer alloy material protective sheath

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879508A (en) * 2018-06-08 2018-11-23 江苏中讯电力科技有限公司 A kind of high-performance large span cable bridge rack
CN108980469A (en) * 2018-08-09 2018-12-11 广东天赐湾实验室装备制造有限公司 Combined vertical pole
CN109347021A (en) * 2018-11-23 2019-02-15 常州信息职业技术学院 A kind of antidetonation gantry for cable installation
CN109347021B (en) * 2018-11-23 2020-08-07 常州信息职业技术学院 A antidetonation crane span structure for cable mounting

Also Published As

Publication number Publication date
CN106786246B (en) 2019-02-05

Similar Documents

Publication Publication Date Title
CN106786246A (en) One kind is laid and uses high polymer alloy cable testing bridge
CN206360298U (en) Architecture indoor cable system
US20130219812A1 (en) Solar panel roof-ridge mounting systems and methods
CN204243217U (en) Fastening parallel groove clamp
CN204732693U (en) A kind of distribution box preventing damaged wire
CN206237087U (en) A kind of cabling cable testing bridge
CN205713445U (en) A kind of grating type protective fence
EP1988613A2 (en) Device for installing energy and data cables and system components
CN207504491U (en) A kind of strong and weak electricity is layered isolated cable testing bridge
CN201877744U (en) Practical and novel multifunctional right triangular wire slot
CN206195271U (en) Strong and weak electrical drainage linear system of family all
CN208316217U (en) A kind of Novel bridge frame using simple connection type
CN204012557U (en) Bus duct insulating support
CN207801367U (en) A kind of cable fixer
CN220585921U (en) Multi-edge line box for fine stone concrete steel bar truss floor carrier plate
CN201829874U (en) Fast slot cover plate installation device
CN210430784U (en) Wire arranging device
CN201365091Y (en) Multifunctional wire slot
CN201838952U (en) Branch groove connecting piece of cable groove
CN203871791U (en) Cable laying device for cranes
CN205742916U (en) A kind of architectural decoration skirting board
CN216436717U (en) Bridge structure for electric power installation
CN203813359U (en) Anti-electromagnetic interference groove type closed bridge frame
CN218005565U (en) Damp-proof complex building weak current case
CN213750432U (en) Optical cable of quick location divides fine case

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant