CN106779465A - The well choosing method of production is opened between a kind of low yield liquid measure oil well - Google Patents
The well choosing method of production is opened between a kind of low yield liquid measure oil well Download PDFInfo
- Publication number
- CN106779465A CN106779465A CN201611262595.3A CN201611262595A CN106779465A CN 106779465 A CN106779465 A CN 106779465A CN 201611262595 A CN201611262595 A CN 201611262595A CN 106779465 A CN106779465 A CN 106779465A
- Authority
- CN
- China
- Prior art keywords
- oil well
- low yield
- liquid measure
- well
- yield liquid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Mining
Abstract
The invention discloses the well choosing method that production is opened between a kind of low yield liquid measure oil well, comprise the following steps:Calculate the extraction ability Q of low yield liquid measure oil wellAdopt, further according to the extraction ability Q of low yield liquid measure oil wellAdoptOil well is set up for adopting equilibrium equation, then the actual production information according to low yield liquid measure oil well solves oil well for adopting equilibrium equation, obtain the theoretical Liquid output of low yield liquid measure oil well, what the actual Liquid output of theoretical Liquid output and low yield liquid measure oil well finally according to low yield liquid measure oil well opened production between carrying out low yield liquid measure oil well selects well, what the method opened production between can realizing low yield liquid measure oil well selects well, and reliability is higher, operate relatively simple.
Description
Technical field
The present invention relates to a kind of well choosing method, and in particular to open the well choosing method of production between a kind of low yield liquid measure oil well.
Background technology
It is that domestic hyposmosis, ultra-low penetration oil field carry the major measure hand for imitating consumption reduction at present that production is opened between low liquid measure oil well
Section, the subject matter for facing is a choice-start well problem, i.e., production liquid measure boundary is opened between oil well and determines problem.Literature survey, scene
Investigation finds mainly have following several to open well choosing method at present:One is produced on-site empirical method, i.e., according to oil well actual production
Situation, summarizes well mouth of oil well and goes out liquid law characteristic, substantially determines oil well effective production time, enters in the ranks and opens production, it is clear that be this
Method error is larger, is influenceed by the experience managerial skills height of live oil recovery workman, and the specific implementation amount of getting up to work is big;Two are
Representative oil well is chosen, well head is carried out and is continuously dynamically tested, grope build-up of fluid rule in oil well liquid output rule or pit shaft
Rule, is qualitatively judged, and is opened production between determining oil well and is selected well;The workload of this mode is big, costly, operational not strong;Three
It is that, based on oil well digital management system, continuous acquisition oil well production indicator card judges oil well supply and discharge rule, qualitative determination oil well
Between choice-start well, although this mode has certain reliability, workload is big, with the proviso that setting up in oil field digital management
Or work(figure meter is produced in system-based, is existed compared with big limitation.
The content of the invention
Shortcoming it is an object of the invention to overcome above-mentioned prior art, there is provided open production between a kind of low yield liquid measure oil well
Well choosing method, the method opens the well that selects of production between can realizing low yield liquid measure oil well, and reliability is higher, operation more letter
It is single.
The well choosing method for opening production between above-mentioned purpose, low yield liquid measure oil well of the present invention to reach includes following step
Suddenly:Calculate the extraction ability Q of low yield liquid measure oil wellAdopt, further according to the extraction ability Q of low yield liquid measure oil wellAdoptOil well is set up for adopting flat
Weigh equation, and then the actual production information according to low yield liquid measure oil well solves oil well for adopting equilibrium equation, obtains low yield liquid measure oil well
Theoretical Liquid output, the actual Liquid output of theoretical Liquid output and low yield liquid measure oil well finally according to low yield liquid measure oil well carries out low
That production is opened between Liquid output oil well selects well.
When low yield liquid measure oil well actual Liquid output more than or equal to low yield liquid measure oil well theoretical Liquid output when, then the low yield
Liquid measure oil well should not be needed into the ranks opening production.
When low yield liquid measure oil well actual Liquid output less than low yield liquid measure oil well theoretical Liquid output when, then the low yield liquid measure
Oil well is needed into the ranks opening production.
The extraction ability Q of low yield liquid measure oil wellAdoptExpression formula be:
Wherein, DpIt is the pump footpath of oil well pump, S is the stroke of oil well pump, and λ is loss of plunger stroke, QLeakageIt is the wastage of oil well pump,
ηFillIt is the degree of filling of oil well pump, ηsuoIt is gas compressibility factor.
Wherein, Δ P is the pressure difference of oil pump plunger piston upper and lower side, and δ is the gap of oil pump plunger piston and pump barrel, and T is oil well pump
Working time, μ for liquid viscosity, LcIt is the length of oil pump plunger piston.
Wherein, E is the elastic modelling quantity of steel, LbIt is pump setting depth, P' is fluid column weight, f on plungertIt is oil pipe sectional area, fr
It is conversion rod string sectional area.
The invention has the advantages that:
The well choosing method of production is opened between low yield liquid measure oil well of the present invention in concrete operations, using theoretical calculation with
The mode that produce reality is combined opens the well that selects of production between carrying out low yield liquid measure oil well, specifically first calculate low yield liquid measure oil well
Extraction ability, then calculates the theoretical Liquid output of low yield liquid measure oil well using oil well for adopting equilibrium equation, then will be according to low yield liquid
The theoretical Liquid output of gauging well and the actual Liquid output of low yield liquid measure oil well open the well that selects of production between carrying out low yield liquid measure oil well, behaviour
Make simple, convenient, reliability is higher, provided to open production between hyposmosis, ultra-low penetration oil field low yield liquid measure oil wells in field scale
Well means are selected, well choosing method deficiency is opened between efficiently solving the problems, such as at present, for oil field cost efficiency, benefit exploitation provide theory
Foundation, has important practical significance to oil field production.
Brief description of the drawings
Fig. 1 be open production in embodiment one between low yield liquid measure oil well select well figure.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings:
With reference to Fig. 1, the well choosing method that production is opened between low yield liquid measure oil well of the present invention is comprised the following steps:Calculate low
The extraction ability Q of Liquid output oil wellAdopt, further according to the extraction ability Q of low yield liquid measure oil wellAdoptOil well is set up for adopting equilibrium equation, so
The actual production information according to low yield liquid measure oil well solves oil well for adopting equilibrium equation afterwards, obtains the theoretical of low yield liquid measure oil well and produces liquid
Amount, the actual Liquid output of theoretical Liquid output and low yield liquid measure oil well finally according to low yield liquid measure oil well carries out low yield liquid measure oil well
Between open production select well.
When low yield liquid measure oil well actual Liquid output more than or equal to low yield liquid measure oil well theoretical Liquid output when, then the low yield
Liquid measure oil well should not be needed into the ranks opening production.
When low yield liquid measure oil well actual Liquid output less than low yield liquid measure oil well theoretical Liquid output when, then the low yield liquid measure
Oil well is needed into the ranks opening production.
The extraction ability Q of low yield liquid measure oil wellAdoptExpression formula be:
Wherein, DpIt is the pump footpath of oil well pump, S is the stroke of oil well pump, and λ is loss of plunger stroke, QLeakageIt is the wastage of oil well pump,
ηFillIt is the degree of filling of oil well pump, ηsuoIt is gas compressibility factor.
Wherein, Δ P is the pressure difference of oil pump plunger piston upper and lower side, and δ is the gap of oil pump plunger piston and pump barrel, and T is oil well pump
Working time, μ for liquid viscosity, LcIt is the length of oil pump plunger piston.
Wherein, E is the elastic modelling quantity of steel, LbIt is pump setting depth, P' is fluid column weight, f on plungertIt is oil pipe sectional area, fr
It is conversion rod string sectional area.
Embodiment one
Oil well A, manufacturing parameter is:Stroke is 2.5m, and jig frequency is 1.5 times/min, and it is 1400m that pump is hung, and pump footpath is 28mm, well
The single amount liquid measure of mouth is 1.23m3/d。
By theoretical calculation go out the oil well pump of a diameter of 28mm 1.8m*1.5 times/min, 2.1m*1.5 times/min, 2.5m*
Under four kinds of 1.5 times/min, 3.0m*1.5 times/min (stroke * jig frequencies) etc. different manufacturing parameters and 600-2200m pump setting depth bars
Oil well produced power curve under part, as shown in figure 1, by contrasting the actual well head Liquid outputs of oil well A, theoretical extraction ability, it is found that
Oil well A theory extraction abilities are 1.43m3/ d, more than actual well head Liquid output, shows that oil well A fluid supply capacities are not enough, it is necessary to open
Production, opens production liquid measure boundary as 1.43m between improvement3/d。
Claims (6)
1. the well choosing method of production is opened between a kind of low yield liquid measure oil well, it is characterised in that comprised the following steps:Calculate low yield liquid measure
The extraction ability Q of oil wellAdopt, further according to the extraction ability Q of low yield liquid measure oil wellAdoptOil well is set up for adopting equilibrium equation, then basis
The actual production information of low yield liquid measure oil well solves oil well for adopting equilibrium equation, obtains the theoretical Liquid output of low yield liquid measure oil well, most
Theoretical Liquid output and the actual Liquid output of low yield liquid measure oil well afterwards according to low yield liquid measure oil well is opened between carrying out low yield liquid measure oil well
What is produced selects well.
2. the well choosing method of production is opened between low yield liquid measure oil well according to claim 1, it is characterised in that when low yield liquid measure
The actual Liquid output of oil well more than or equal to low yield liquid measure oil well theoretical Liquid output when, then the low yield liquid measure oil well should not need into
In the ranks open production.
3. the well choosing method of production is opened between low yield liquid measure oil well according to claim 1, it is characterised in that when low yield liquid measure
The actual Liquid output of oil well less than low yield liquid measure oil well theoretical Liquid output when, then the low yield liquid measure oil well is needed into the ranks opening life
Produce.
4. the well choosing method of production is opened between low yield liquid measure oil well according to claim 1, it is characterised in that low yield liquid measure oil
The extraction ability Q of wellAdoptExpression formula be:
Wherein, DpIt is the pump footpath of oil well pump, S is the stroke of oil well pump, and λ is loss of plunger stroke, QLeakageIt is the wastage of oil well pump, ηFillFor
The degree of filling of oil well pump, ηsuoIt is gas compressibility factor.
5. the well choosing method of production is opened between low yield liquid measure oil well according to claim 4, it is characterised in that
Wherein, Δ P is the pressure difference of oil pump plunger piston upper and lower side, and δ is the gap of oil pump plunger piston and pump barrel, and T is the work of oil well pump
Make the time, μ is the viscosity of liquid, LcIt is the length of oil pump plunger piston.
6. the well choosing method of production is opened between low yield liquid measure oil well according to claim 5, it is characterised in that
Wherein, E is the elastic modelling quantity of steel, LbIt is pump setting depth, P' is fluid column weight, f on plungertIt is oil pipe sectional area, frIt is folding
Calculate rod string sectional area.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611262595.3A CN106779465A (en) | 2016-12-30 | 2016-12-30 | The well choosing method of production is opened between a kind of low yield liquid measure oil well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611262595.3A CN106779465A (en) | 2016-12-30 | 2016-12-30 | The well choosing method of production is opened between a kind of low yield liquid measure oil well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106779465A true CN106779465A (en) | 2017-05-31 |
Family
ID=58954131
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611262595.3A Pending CN106779465A (en) | 2016-12-30 | 2016-12-30 | The well choosing method of production is opened between a kind of low yield liquid measure oil well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106779465A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4507055A (en) * | 1983-07-18 | 1985-03-26 | Gulf Oil Corporation | System for automatically controlling intermittent pumping of a well |
RO119246B1 (en) * | 2000-12-19 | 2004-06-30 | S.N.P.Ápetromás.A.-Institutuládeácercetăriáşiáproiectăriátehnologice | Automated plant for intermitent pumping, with cycle programmer |
CN2775297Y (en) * | 2004-11-24 | 2006-04-26 | 田景利 | Intelligent controller for oil field intermittent oil pumping well |
WO2007027124A1 (en) * | 2005-09-02 | 2007-03-08 | Nikolay Petrovich Kuzmichev | Method for a short-term well operation by means of an electrically-powered downhole pumping unit (kuzmichev method) |
-
2016
- 2016-12-30 CN CN201611262595.3A patent/CN106779465A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4507055A (en) * | 1983-07-18 | 1985-03-26 | Gulf Oil Corporation | System for automatically controlling intermittent pumping of a well |
RO119246B1 (en) * | 2000-12-19 | 2004-06-30 | S.N.P.Ápetromás.A.-Institutuládeácercetăriáşiáproiectăriátehnologice | Automated plant for intermitent pumping, with cycle programmer |
CN2775297Y (en) * | 2004-11-24 | 2006-04-26 | 田景利 | Intelligent controller for oil field intermittent oil pumping well |
WO2007027124A1 (en) * | 2005-09-02 | 2007-03-08 | Nikolay Petrovich Kuzmichev | Method for a short-term well operation by means of an electrically-powered downhole pumping unit (kuzmichev method) |
Non-Patent Citations (2)
Title |
---|
卢琳等: "低产油井间歇生产工作制度的研究与应用", 《断块油气田》 * |
李红等: "数学模型法确定油井间开制度探讨", 《录井工程》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10060247B2 (en) | Hydrocarbon well performance monitoring system | |
US9810212B2 (en) | Fluid load line calculation and concavity test for downhole pump card | |
CN104265281B (en) | Method for predicting well yield of sealed, unsaturated oil reservoirs through elastic driving water-flooding extraction | |
CN102243163B (en) | Quantitative evaluation method for permeability of faults of coal mine | |
CN105464652A (en) | Dynamic reserve calculation method and system for fracture and cave type carbonatite oil reservoir fracture and cave unit | |
CN107578342A (en) | It is a kind of based on the Model coupling method of exhaustion realize low-permeability oil deposit between open working system method for optimizing | |
CN109519156A (en) | A kind of side water sand rock gas reservoir water drive section model Seepage Experiment method | |
CN105673001B (en) | A kind of carbonate rock individual well drop in formation pressure processing method | |
CN102748007B (en) | Well testing analytical method and device | |
CN103510940B (en) | Mechanical oil well operating mode integrated diagnosing and analyzing method and device | |
Khakimyanov et al. | Control of sucker rod pumps energy consumption | |
CN107130955B (en) | Method for determining bottom hole flowing pressure and method for determining natural energy of reservoir | |
CN104975827A (en) | Substance balance method for predicting carbon dioxide flooding oil reservoir indexes | |
CN107269265A (en) | A kind of system and method for optimizing and revising oilwell produced fluid amount | |
CN103498661B (en) | A kind of method determining oil reservoir physical data under high pressure | |
CN106285630A (en) | A kind of assay method of the peak production capacity of SAGD well | |
CN109696324A (en) | The confining pressure experimental provision in situ of Rock And Soil in a kind of drilling of ground | |
Estepho | Seepage induced consolidation test: characterization of mature fine tailings | |
CN112183800B (en) | Method and device for predicting recoverable reserves of crude oil of water-drive reservoir | |
CN106779465A (en) | The well choosing method of production is opened between a kind of low yield liquid measure oil well | |
RU2700738C1 (en) | Method of improving reliability of water cut monitoring of products of oil producing wells equipped with sucker-rod bottom pumps | |
RU2539445C1 (en) | Method for determining formation pressure in oil producer equipped with submerged electric-driven pump | |
CN108335221A (en) | A kind of oil well oil-pumping pump efficiency Improvement space determines method | |
CN110552685A (en) | Method for calculating working fluid level of oil well by utilizing ground indicator diagram in wax precipitation well | |
CN106837298A (en) | Opening the production time between a kind of low yield liquid measure oil well determines method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |