CN106779178A - The client householder method that a kind of Electric Power Network Planning equipment topological data is set up - Google Patents

The client householder method that a kind of Electric Power Network Planning equipment topological data is set up Download PDF

Info

Publication number
CN106779178A
CN106779178A CN201611066986.8A CN201611066986A CN106779178A CN 106779178 A CN106779178 A CN 106779178A CN 201611066986 A CN201611066986 A CN 201611066986A CN 106779178 A CN106779178 A CN 106779178A
Authority
CN
China
Prior art keywords
equipment
client
user
server
relation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611066986.8A
Other languages
Chinese (zh)
Inventor
王昌照
王雁雄
李彦生
姜建宏
曾为
李爽
杨建康
徐华
刘雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dali Power Supply Bureau of Yunnan Power Grid Co Ltd
Kunming Enersun Technology Co Ltd
Original Assignee
Dali Power Supply Bureau of Yunnan Power Grid Co Ltd
Kunming Enersun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dali Power Supply Bureau of Yunnan Power Grid Co Ltd, Kunming Enersun Technology Co Ltd filed Critical Dali Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority to CN201611066986.8A priority Critical patent/CN106779178A/en
Publication of CN106779178A publication Critical patent/CN106779178A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/043Optimisation of two dimensional placement, e.g. cutting of clothes or wood
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The client householder method that a kind of Electric Power Network Planning equipment topological data is set up, the topological relation is set up by certain step.The beneficial effects of the invention are as follows:When planning personnel carries out mapping, a small amount of operation need to only be added can complete the topological relation foundation of planning apparatus, the map interface of What You See Is What You Get greatly reduces the workload and error rate of manual entry, eliminates the service end topological relationship calculation and more highly difficult software customized design process of consumption high.

Description

The client householder method that a kind of Electric Power Network Planning equipment topological data is set up
Technical field
Set up the invention belongs to power industry grid equipment approaches to IM, especially Electric Power Network Planning equipment topological data Client householder method.
Technical background
Topological relation data are important a kind of spatial relationship datas in grid information system, it describe grid equipment it Between adjoining, comprising, it is intersecting, from etc. relation, be that device connectivity analysis, outage analysis, supply district such as analyze at the business work( Basic data can be provided to support.
For existing grid equipment or the grid equipment of construction plan is listed in, its topological relation is general by production environment During direct measurement draws and stores associated databases.
And for the equipment (for example, the equipment in the Electric Power Network Planning blueprint in following a certain year) in some particular services, its In data obviously cannot direct measurement obtain.Such device-dependent topological data, can be by craft in client typing, or profit Topological software is used, according to its geometry, locus etc., is calculated in server end.
By hand in client typing, this method is cumbersome, time-consuming, and easily error.When equipment changes, safeguard with The topological relation change that equipment variations cause is very difficult.
Generated in server end with topological software, because number of devices is larger (millions are even more more) so that set up effect Rate is relatively low, higher to computer hardware requirement.On the other hand, because the particularity of grid equipment is (for example, more on a shaft tower Bar cable, although they are intersecting on geometric meaning, because terminal is not necessarily identical, it is impossible to think that they connect each other It is logical), it is necessary to topological being customized of software is designed, design difficulty is larger, and the data of Software Create are typically also needed to manually Check and correction and adjustment, can be only achieved accuracy rate higher.
Equipment in planning, is drawn by planning personnel in the client of planning system, set forth herein a kind of method, Auxiliary programming personnel generate corresponding topological relation data, and submit to therewith in rendering apparatus in the way of What You See Is What You Get To service end storage.The method is relative to craft in client typing, simple and efficient to handle, going out when manual entry is greatly reduced Error rate;Relative to service end with topological Software Create, the calculating of consumption high is eliminated, and highly difficult software customized designed Journey, simultaneously because planning personnel is confirmed in client typing to data, the quality of data also before secondary check and correction just There is preferable guarantee.
The content of the invention
The client householder method that a kind of Electric Power Network Planning equipment topological data is set up, the invention is characterised in that, the topology Relation establishing method is comprised the steps of:
Step (1) client calculates the data tile for needing to represent in the range of current map, transmit a request to reverse proxy Server, Reverse Proxy is taken according to the ranks number and rank of request tile by consistency algorithm designated space information A spatial Information Service device in business device cluster, formula used by consistency algorithm is:
Sid=(lv+column+row+tryN) %snum
Wherein tryN be unsuccessfully after number of retries, snum is cluster available server sum, and this formula is meant to ensure that phase Always fall on same server with section, make full use of server buffer;
Grid equipment data in step (2) spatial Information Service device inquiry tile coverage, and via reverse proxy Server returns to client;
After step (3) client receives the data that each cluster is returned, grid equipment is drawn in client, closed by existing topology System's connection grid equipment, and sensitivity requirement according to user preset generates transparent buffering area around grid equipment, obtains Comprising existing equipment, existing equipment topological relation, existing equipment buffering area visualized map;
Step (4) if user customer map such as is dragged, is scaled, being roamed at the operation, repeat step (1)~(3) with Map in the range of generation current screen;
Step (5) is opened up if the additions and deletions that user carries out equipment on map change operation according to specific Operation and Maintenance client Flutter relation:
(5.1) if user carries out newly added equipment operation, when paintbrush is moved in the buffering area of certain equipment, paintbrush can be certainly Dynamic to be adsorbed onto in this equipment, now single-click operation will set up the annexation of new equipment and this equipment, then point out user, if User thinks that new equipment does not have annexation with this equipment, can delete relation;
(5.2) if user carries out equipment deletion action, the related topology information of the equipment of being deleted is removed;
(5.3) if user carries out device location modification operation, the coordinate of the equipment that modification is connected with by modification equipment And shape, it is ensured that its locus without departing from, when by mobile equipment enter certain equipment buffering area in when, by movement set For on meeting automatic absorbing to this equipment, this thing unclamps the annexation that mouse will set up mobile device and this equipment, then Prompting user, if user thinks that mobile device does not have annexation with this equipment, can delete relation;
, if user performs preservation operation after the operation of step (5), client will be amended facility information for step (6) And topological relation is committed to planning server, and it is notified to spatial Information Service device collection pocket transmission message from planning server Update caching.
Compared with prior art, the present invention has advantages below:
When planning personnel carries out mapping, need to only add a small amount of operation can complete the topological relation of planning apparatus Set up, the map interface of What You See Is What You Get greatly reduces the workload and error rate of manual entry, eliminate the clothes of consumption high Business end topological relationship calculation and more highly difficult software customized design process.
Brief description of the drawings
Fig. 1 is the brief Organization Chart of system;
Fig. 2 is brief block diagram.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further details to technical scheme.
Following examples choose In Dali Area, yunnan as an example.
See Fig. 1, Fig. 2, a kind of client householder method that Electric Power Network Planning equipment topological data is set up, feature of present invention exists In the topological relation method for building up is comprised the steps of:
The geography information parameter that step (1) system is used for:Space coordinates are WGS84 coordinate systems, and the origin of coordinates is chosen The Yunnan Province upper left corner, full figure scope is full Yunnan Province, and tile size is 256*256 pixels;
When user opens client map, client is based on current above-mentioned geography information parameter, calculates current map model The ranks number and rank of the interior data tile for needing and representing are enclosed, Reverse Proxy, Reverse Proxy is transmit a request to According to the ranks number and rank of request tile, believed by a space in consistency algorithm designated space information server cluster Server is ceased, formula used by consistency algorithm is:
Sid=(lv+column+row+tryN) %snum
Wherein tryN be unsuccessfully after number of retries, snum is cluster available server sum, and this formula is meant to ensure that phase Always fall on same server with section, make full use of server buffer.Hollow information server cluster of the present embodiment In totally four servers, therefore sunm=4, it is 11 for rank for example to need the section of request, and line number is 8567, and row number is 6544, then Sid=(11+8567+6544+0) %4=2, i.e., should specify No. 2 server process this result, if No. 2 servers go wrong, Then tryN adds 1, i.e. this result of specified No. 3 server process of continuation, by that analogy until asking successfully;It is empty after asking successfully Between information server can caching process result, the direct return cache data when other users ask this to cut into slices, to greatly improve Performance;
Grid equipment data of step (2) the spatial Information Service device from data storage center inquiry tile coverage, The character string of json forms is packaged into, and client is returned to via Reverse Proxy;
After step (3) client receives the json data that each cluster is returned, the spatial positional information in parsing json data And device data, and according to default device model, equipment is plotted on client end interface, if user needs further Understanding equipment other specification (such as apparatus of load situation), can also choose the corresponding situation on interface, now the Show Styles of equipment Also can be according to these parameter respective changes.Meanwhile, client presses existing topological relation connection grid equipment, and according to user preset Sensitivity requirement transparent buffering area is generated around grid equipment, obtain comprising existing equipment, existing equipment topological relation, The visualized map of existing equipment buffering area;
Step (4) if user customer map such as is dragged, is scaled, being roamed at the operation, repeat step (1)~(3) with Map in the range of generation current screen;
Step (5) is opened up if the additions and deletions that user carries out equipment on map change operation according to specific Operation and Maintenance client Flutter relation:
(5.1) if user carries out newly added equipment operation, after the device type that selection needs newly-increased, interface enters draws mould Formula, when paintbrush is moved in the buffering area of certain equipment, on paintbrush meeting automatic absorbing to this equipment, now single-click operation will build The annexation of new equipment and this equipment is erected, user is then pointed out, if user thinks that new equipment does not have with this equipment is connected pass System, can delete relation;
(5.2) if user carries out equipment deletion action, user clicks on the equipment for needing to delete on map, in pop-up box Click on and delete button, system is by deleted equipment and its topology information of correlation;
(5.3) if user carries out device location modification operation, the coordinate of the equipment that modification is connected with by modification equipment And shape, it is ensured that its locus is without departing from for example when user needs to change the position of certain shaft tower, left mouse button is clicked on Shaft tower simultaneously pins dragging, and the circuit being now connected with shaft tower can also be moved;When by mobile equipment into certain equipment When in buffering area, mobile device can automatic absorbing in this equipment, now unclamp mouse will set up mobile device and this The annexation of equipment, then points out user, if user thinks that mobile device does not have annexation with this equipment, can be by relation Delete;
, if user performs preservation operation after the operation of step (5), client will be amended facility information for step (6) And topological relation is committed to planning server, the data storage center that server preserves facility information and topological relation is planned, And to spatial Information Service device collection pocket transmission message, notify that it updates caching, after spatial Information Service device cluster is notified, The section cache tag failure that will be updated, when request next time is to the caching for being marked as failure, produces new section caching To substitute it.

Claims (1)

1. the client householder method that a kind of Electric Power Network Planning equipment topological data is set up, it is characterised in that the topological relation is built Cube method is comprised the steps of:
Step (1) client calculates the data tile for needing to represent in the range of current map, transmit a request to reverse proxy service Device, Reverse Proxy according to request tile ranks number and rank, by consistency algorithm designated space information server A spatial Information Service device in cluster, formula used by consistency algorithm is:
Sid=(lv+column+row+tryN) %snum
Wherein tryN be unsuccessfully after number of retries, snum is cluster available server sum, and this formula is meant to ensure that identical cutting Piece always falls on same server, makes full use of server buffer;
Grid equipment data in step (2) spatial Information Service device inquiry tile coverage, and via reverse proxy service Device returns to client;
After step (3) client receives the data that each cluster is returned, grid equipment is drawn in client, connected by existing topological relation Get access to grid equipment, and sensitivity requirement according to user preset generates transparent buffering area around grid equipment, comprising Existing equipment, existing equipment topological relation, the visualized map of existing equipment buffering area;
, if user customer map such as is dragged, scaled, roamed at the operation, repeat step (1)~(3) are generating for step (4) Map in the range of current screen;
Step (5) is closed if the additions and deletions that user carries out equipment on map change operation according to specific Operation and Maintenance client topology System:
(5.1) if user carries out newly added equipment operation, when paintbrush is moved in the buffering area of certain equipment, paintbrush can be inhaled automatically It is attached in this equipment, now single-click operation will set up the annexation of new equipment and this equipment, then point out user, if user Think that new equipment does not have annexation with this equipment, relation can be deleted;
(5.2) if user carries out equipment deletion action, the related topology information of the equipment of being deleted is removed;
(5.3) if user carries out device location modification operation, the coordinate and shape of the equipment that modification is connected with by modification equipment Shape, it is ensured that its locus without departing from, when by mobile equipment enter certain equipment buffering area in when, mobile device meeting To in this equipment, this thing unclamps the annexation that mouse will set up mobile device and this equipment to automatic absorbing, then points out User, if user thinks that mobile device does not have annexation with this equipment, can delete relation;
If user performs preservation operation after the operation of step (5), client amended facility information and will be opened up step (6) The relation of flutterring is committed to planning server, and notifies that it updates to spatial Information Service device collection pocket transmission message from planning server Caching.
CN201611066986.8A 2016-11-28 2016-11-28 The client householder method that a kind of Electric Power Network Planning equipment topological data is set up Pending CN106779178A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611066986.8A CN106779178A (en) 2016-11-28 2016-11-28 The client householder method that a kind of Electric Power Network Planning equipment topological data is set up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611066986.8A CN106779178A (en) 2016-11-28 2016-11-28 The client householder method that a kind of Electric Power Network Planning equipment topological data is set up

Publications (1)

Publication Number Publication Date
CN106779178A true CN106779178A (en) 2017-05-31

Family

ID=58905047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611066986.8A Pending CN106779178A (en) 2016-11-28 2016-11-28 The client householder method that a kind of Electric Power Network Planning equipment topological data is set up

Country Status (1)

Country Link
CN (1) CN106779178A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107612970A (en) * 2017-08-16 2018-01-19 国网上海市电力公司 Big figure caching method, display methods and system based on power network topology analysis
CN111556170A (en) * 2020-05-25 2020-08-18 郑州大学 Method for realizing rapid transmission of B3dm model network
CN112287423A (en) * 2020-11-02 2021-01-29 国网江苏省电力有限公司泰州供电分公司 Power distribution network visual planning method and terminal based on graph-model integration

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093024A (en) * 2012-11-22 2013-05-08 中国电力科学研究院 Web geographic information system (WEBGIS)-based visualized showing method for planning power grid
CN103837796A (en) * 2014-03-12 2014-06-04 国家电网公司 Transmission line malfunction visualized report method and system based on Web and GIS
CN104794217A (en) * 2015-04-28 2015-07-22 武大吉奥信息技术有限公司 Tile map data and service updating method and system based on parallel computing mode
CN104820706A (en) * 2015-05-13 2015-08-05 北京科东电力控制系统有限责任公司 Geographic information based power distribution network panoramic real-time monitoring system and method thereof
CN104899922A (en) * 2015-06-08 2015-09-09 安徽中兴继远信息技术股份有限公司 Three-dimensional holographic generation method for intelligent power grid visualization application
CN105302830A (en) * 2014-07-09 2016-02-03 方正国际软件(北京)有限公司 Map tile caching method and apparatus
CN105608191A (en) * 2015-12-23 2016-05-25 云南电网有限责任公司 EnersunWebCache based method for dynamically generating cached power grid map tiles
WO2016156937A1 (en) * 2015-03-31 2016-10-06 Yandex Europe Ag System and method of clustering points of interest using a grid

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093024A (en) * 2012-11-22 2013-05-08 中国电力科学研究院 Web geographic information system (WEBGIS)-based visualized showing method for planning power grid
CN103837796A (en) * 2014-03-12 2014-06-04 国家电网公司 Transmission line malfunction visualized report method and system based on Web and GIS
CN105302830A (en) * 2014-07-09 2016-02-03 方正国际软件(北京)有限公司 Map tile caching method and apparatus
WO2016156937A1 (en) * 2015-03-31 2016-10-06 Yandex Europe Ag System and method of clustering points of interest using a grid
CN104794217A (en) * 2015-04-28 2015-07-22 武大吉奥信息技术有限公司 Tile map data and service updating method and system based on parallel computing mode
CN104820706A (en) * 2015-05-13 2015-08-05 北京科东电力控制系统有限责任公司 Geographic information based power distribution network panoramic real-time monitoring system and method thereof
CN104899922A (en) * 2015-06-08 2015-09-09 安徽中兴继远信息技术股份有限公司 Three-dimensional holographic generation method for intelligent power grid visualization application
CN105608191A (en) * 2015-12-23 2016-05-25 云南电网有限责任公司 EnersunWebCache based method for dynamically generating cached power grid map tiles

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107612970A (en) * 2017-08-16 2018-01-19 国网上海市电力公司 Big figure caching method, display methods and system based on power network topology analysis
CN107612970B (en) * 2017-08-16 2020-06-05 国网上海市电力公司 Large graph caching method, large graph display method and large graph display system based on power grid topology analysis
CN111556170A (en) * 2020-05-25 2020-08-18 郑州大学 Method for realizing rapid transmission of B3dm model network
CN112287423A (en) * 2020-11-02 2021-01-29 国网江苏省电力有限公司泰州供电分公司 Power distribution network visual planning method and terminal based on graph-model integration
CN112287423B (en) * 2020-11-02 2022-07-26 国网江苏省电力有限公司泰州供电分公司 Power distribution network visual planning method and terminal based on graph-model integration

Similar Documents

Publication Publication Date Title
US20230359778A1 (en) Configuration of a digital twin for a building or other facility via bim data extraction and asset register mapping
CN104166892A (en) Engineering management and control method and system based on three-dimensional design system
CN112464320B (en) Visual drawing method for power distribution network planning scheme based on standard primitives
CN104361054A (en) Method and system for restructuring, positioning and visualizing line loss of electric power system
CN106779178A (en) The client householder method that a kind of Electric Power Network Planning equipment topological data is set up
CN111222226A (en) EMS (energy management system) to GIS (geographic information System) model conversion and access system and method based on scheduling application visual angle
CN111723424B (en) Data processing method and data processing system
CN109447466B (en) Overall process visual management and control system based on power distribution network communication network construction
CN111135558A (en) Game synchronization method, game client, computer storage medium and electronic device
CN103620626B (en) Physical environment for the modeling of information transmission
CN115345078B (en) Cable management method and device based on cable iteration model
CN115423889A (en) Image processing method and device, electronic equipment and storage medium
CN116050696A (en) Global power grid maintenance method, device, computer equipment and storage medium
CN106685091B (en) Backstage distributing monitoring system based on Google Earth
CN115860877A (en) Product marketing method, device, equipment and medium
CN113220748B (en) Method and system for constructing power distribution network equipment load thermodynamic diagram and data analysis
CN111581758B (en) Power grid graph topology modeling method and computer readable storage medium
CN104468788A (en) Multi-net and multi-terminal data synchronization method
CN113916244A (en) Method and device for setting inspection position, electronic equipment and readable storage medium
CN114219109A (en) Conference room patrol record management method and device and electronic equipment
CN113067746A (en) Network equipment real-time position display method and unified communication management system applied by same
CN104933106A (en) Database device for IFC informatization model
JP2009277142A (en) Operation information management apparatus, operation information management method, and operation information management program
CN114124717B (en) Distribution network line topology visual monitoring method based on Internet of things technology
CN116975399B (en) Historical state power grid geographic diagram display method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170531