CN106779127A - It is determined that the method and device of connection Cheng Hangban - Google Patents
It is determined that the method and device of connection Cheng Hangban Download PDFInfo
- Publication number
- CN106779127A CN106779127A CN201611263355.5A CN201611263355A CN106779127A CN 106779127 A CN106779127 A CN 106779127A CN 201611263355 A CN201611263355 A CN 201611263355A CN 106779127 A CN106779127 A CN 106779127A
- Authority
- CN
- China
- Prior art keywords
- flight
- port
- mtc
- leaves
- cheng hangban
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/02—Reservations, e.g. for tickets, services or events
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/0601—Electronic shopping [e-shopping]
- G06Q30/0633—Lists, e.g. purchase orders, compilation or processing
- G06Q30/0635—Processing of requisition or of purchase orders
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Finance (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Accounting & Taxation (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Development Economics (AREA)
- Human Resources & Organizations (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Entrepreneurship & Innovation (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of method and device for determining connection Cheng Hangban, wherein, the method includes:Obtain the flight data of entering a port in connection Cheng Hangban;The specified MTC of flight data of being entered a port according to default Smallest connection time MTC data storehouse is determined for compliance with;Determine whether the flight that leaves the port in the Cheng Hangban is reasonable according to the specified MTC.By the present invention, solve the problems, such as of the prior art to cause to make a reservation for unreasonable flight because being unaware of joining the MTC of journey leg.
Description
Technical field
The present invention relates to data processing field, in particular to a kind of method and device for determining connection Cheng Hangban.
Background technology
Passenger can generate a booking record, here it is PNR in system after the letter system booking of middle CA for passenger.
Including name of passenger, leg, personally identifiable information, contact method, the ticket information subscribed etc..Connection journey leg, is do not having
In the case of having through plane service, or some economic causes, passenger can select multiple legs, mesh is reached by way of transfer
Ground.For example from Qingdao-Chongqing, " Qingdao-Chengdu-Chongqing " can be selected to join journey, wherein comprising " Qingdao-Chengdu ", " Chengdu-
Two, Chongqing " leg, Chengdu is transfer.Two legs in connection journey leg are carried by different flights respectively, the former be referred to as into
Port flight, the latter is the flight that leaves the port;
The flight arrival of entering a port of Smallest connection time (Minimum Connect Time, referred to as MCT)-connection journey leg
The time on transfer airport, with the time difference that the flight that leaves the port leaves transfer airport.This time determines passenger on transfer airport
Residence time, airline ground ensure the time required for servicing.
At present, airline increasingly tends to build the transportation network of oneself with the mode of " branch line+hinge ".Pass through
Branch line flight, focuses on hub, then the powerful transport power for passing through hub, quickly by carriage of passengers by scattered passenger
To other various regions.So, transport power just can all be focused on hub by airline, and the small-sized of branch line economy flies
Machine.Can either ensure that flight visits rate, but all types of aircraft resources to airline have rational configuration and utilize.Finish
Unexpectedly, if all course lines are all through, transport power and resource to airline all will be huge wastes.
The transportation network of this " branch line+hinge ", the ground safeguard ability to airline proposes requirement higher.Trip
The stroke of visitor is changed into the connection journey leg of two or more from leg is flown nonstop to, and airline will face increasingly complex air approach control
And resource allocation problem.Wherein, the connecting time scope for how setting connection Cheng Hangban is exactly a prominent problem.And will the trip of allowing
Visitor understand these complicated time restrictions, and then specification itself reservation behavior.
Airline wants to realize efficiently joining journey, on the transfer airport as hinge, it is necessary to provide one it is fair and sensible
The flight connecting time with realize join Cheng Hangban seamless connection.During this period, airline ground support personnel needs
The transfer connection journey for the treatment of passenger, luggage and other retinue goods, it is ensured that interline passenger and its luggage approached on flight, can
Smoothly change to leaving the port on flight.Flight dispatching plan, ground supports and service ability, course line marketing plan according to itself
Omit, airline has formulated a more detailed connection journey favourable turn ground safeguard timetable for hub, here it is connection Cheng Hang
Class Smallest connection time (MCT-Minimum Connect Time).Middle CA's letter has what a each airline formulated, bag
The MCT data of the organic field of institute containing the world, come from world-renowned aeronautical data provider OAG, i.e. Britain Ou Aiji aviations state
Border Co., Ltd.Its meeting periodic collection simultaneously issues the newest MCT data of each airline.
For example, passenger subscribes two connection journey legs CA123 and CA456, in Shanghai transfer.Wherein, CA123 be from Beijing to
PVG, CA456 is from Hongqiao in Shanghai to Haikou, 3 hours to be spaced between the two connection Cheng Hangban.That is, passenger
3 times of hour are reserved for the transfer from CA123 to CA456, it be all that, in Shanghai, the time of 3 hours should to keep in mind
Carry out having changed between two airports enough!In fact, very possible CA123 stop be PVG remote seat in the plane,
After passenger gets off the plane, also to take ferry bus and get to terminal, then get to Hongqiao machine by some working hard again
.This delay, passenger for not accounting for CA123 flights itself also also need to cabin luggage etc. factor sometimes.Anyway, aviation is public
The MCT times between Pudong International Airport to Hongqiao Airport that department is given all are at least 4 hours, some flights even 5
Individual hour.
Once passenger does not catch up with the flight that leaves the port, will not generally be considered oneself there is no reasonable arrangement plan of travel, but
Complaining airline does not have accurate flight planning.
For above mentioned problem present in correlation technique, at present it is not yet found that the solution of effect.
The content of the invention
A kind of method and device for determining connection Cheng Hangban is the embodiment of the invention provides, it is of the prior art at least to solve
Cause to make a reservation for the problem of unreasonable flight because being unaware of joining the MTC of journey leg.
According to one embodiment of present invention, there is provided it is a kind of determine connection Cheng Hangban method, including:Obtain connection Cheng Hangban
In flight data of entering a port;Flight data of being entered a port according to default Smallest connection time MTC data storehouse is determined for compliance with specify
MTC;Determine whether the flight that leaves the port in the Cheng Hangban is reasonable according to the specified MTC.
Alternatively, determine whether the flight that leaves the port in the Cheng Hangban rationally includes according to the specified MTC:Calculate institute
State the connecting time of enter a port flight and the flight that leaves the port;When the connecting time the specified MTC is more than, determine described
Flight is left the port in Cheng Hangban rationally, when the connecting time the specified MTC is more than or equal to, determine the Cheng Hangban
In the flight that leaves the port it is unreasonable.
Alternatively, after it is determined that the flight that leaves the port in the Cheng Hangban is unreasonable, methods described also includes:Terminate institute
The acknowledgement of orders of connection Cheng Hangban is stated, and/or, export the warning information of the order failure for indicating the Cheng Hangban.
Alternatively, after it is determined that the flight that leaves the port in the Cheng Hangban is unreasonable, methods described also includes:Stop institute
State the inquiry of connection Cheng Hangban or select seat, and/or, export the warning information of the order mistake for indicating the Cheng Hangban.
Alternatively, after it is determined that the flight that leaves the port in the Cheng Hangban is unreasonable, methods described also includes:Recommendation refers to
Determine leave the port flight of the flight as the Cheng Hangban, wherein, the specified flight is big with the connecting time of the flight that enters a port
In the specified MTC.
Alternatively, the flight data of entering a port includes:Acknowledgement of consignment airline, flight number, transfer airport, flight number, institute
Category countries and regions, flight type.
Alternatively, the specified MTC of flight data of being entered a port according to default MTC data storehouse is determined for compliance with includes:By lattice
The flight data of entering a port is converted to the format fields for meeting the default MTC data storehouse for formula conversion;Use the format words
Section obtains meeting the specified MTC of the flight data of entering a port in the default MTC data library searching.
According to another embodiment of the invention, there is provided it is a kind of determine connection Cheng Hangban device, including:Acquisition module,
For obtaining the flight data of entering a port in connection Cheng Hangban;First determining module, for according to default Smallest connection time MTC data
Storehouse is determined for compliance with the specified MTC of the flight data of entering a port;Second determining module, described in being determined according to the specified MTC
Whether the flight that leaves the port in connection Cheng Hangban is reasonable.
Alternatively, second determining module includes:Computing unit, for calculating enter a port flight and the boat of leaving the port
The connecting time of class;Determining unit, for when the connecting time the specified MTC is more than, in determining the Cheng Hangban
Leave the port flight rationally, when the connecting time the specified MTC is more than or equal to, determine leaving the port in the Cheng Hangban
Flight is unreasonable.
Alternatively, described device also includes:First processing module, for it is determined that the flight that leaves the port in the Cheng Hangban
After unreasonable, terminate the acknowledgement of orders of the Cheng Hangban, and/or, export for indicating the order of the Cheng Hangban to lose
The warning information for losing.
Alternatively, described device also includes:Second processing module, for it is determined that the flight that leaves the port in the Cheng Hangban
After unreasonable, stop the inquiry of the Cheng Hangban or select seat, and/or, export the order for indicating the Cheng Hangban
The warning information of mistake.
Alternatively, described device also includes:3rd processing module, for it is determined that the flight that leaves the port in the Cheng Hangban
After unreasonable, recommend to specify flight as the flight that leaves the port of the Cheng Hangban, wherein, the specified flight enters a port with described
The connecting time of flight is more than the specified MTC.
Alternatively, the flight data of entering a port includes:Acknowledgement of consignment airline, flight number, transfer airport, flight number, institute
Category countries and regions, flight type.
Alternatively, the first determining module includes:Walk around unit, turn the flight data of entering a port for being changed by form
It is changed to the format fields for meeting the default MTC data storehouse;Search unit, for being preset described using the format fields
MTC data library searching obtains meeting the specified MTC of the flight data of entering a port.
By the present invention, the flight data of entering a port in connection Cheng Hangban is obtained;According to default Smallest connection time MTC data storehouse
It is determined for compliance with the specified MTC of the flight data of entering a port;The flight that leaves the port in the Cheng Hangban is determined according to the specified MTC
It is whether reasonable.The real-time verification of connection journey leg Smallest connection time is realized, during passenger ticket reservation, verification can be with real time
Passenger's reservation error, irrational journey leg are prevented, solves of the prior art because being unaware of joining the MTC of journey leg
And cause to make a reservation for the problem of unreasonable flight, by the real-time control of early stage, the rule of airline is timely informed into passenger,
The stroke of as passenger optimizes consideration, has also shared the risk of airline.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair
Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the method for determination connection Cheng Hangban according to embodiments of the present invention;
Fig. 2 is the structured flowchart of the device of determination connection Cheng Hangban according to embodiments of the present invention;
Fig. 3 is the design flow diagram of the embodiment of the present invention;
Fig. 4 is the block process schematic diagram of the embodiment of the present invention;
Fig. 5 is the overview flow chart of the embodiment of the present invention;
Fig. 6 is the alternative schematic flow sheet of the embodiment of the present invention.
Specific embodiment
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that not conflicting
In the case of, the feature in embodiment and embodiment in the application can be mutually combined.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing
Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.
Embodiment 1
A kind of method for determining connection Cheng Hangban is provided in the present embodiment, and Fig. 1 is determination according to embodiments of the present invention
Join the flow chart of the method for Cheng Hangban, as shown in figure 1, the flow comprises the following steps:
Step S102, obtains the flight data of entering a port in connection Cheng Hangban;
Step S104, the specified MTC of the flight data that is determined for compliance with entering a port according to default Smallest connection time MTC data storehouse;
Step S106, determines whether the flight that leaves the port in connection Cheng Hangban is reasonable according to specified MTC.
By above-mentioned steps, the flight data of entering a port in connection Cheng Hangban is obtained;According to default Smallest connection time MTC data
Storehouse is determined for compliance with the specified MTC of the flight data of entering a port;The boat of leaving the port in the Cheng Hangban is determined according to the specified MTC
Whether class is reasonable.The real-time verification of connection journey leg Smallest connection time is realized, during passenger ticket reservation, verification can in real time
To prevent passenger's reservation error, irrational journey leg, solve of the prior art because being unaware of joining journey leg
MTC and cause make a reservation for unreasonable flight problem, by the real-time control of early stage, the rule of airline is timely informed into trip
The stroke of visitor, as passenger optimizes consideration, has also shared the risk of airline.
Alternatively, the executive agent of above-mentioned steps can be seat reservation system, such as terminal, server, but not limited to this.
Optionally, determine whether the flight that leaves the port in connection Cheng Hangban rationally includes according to specified MTC:
S11, calculating is entered a port flight and the connecting time of the flight that leaves the port;
S12, when the connecting time specified MTC is more than, it is determined that leave the port flight rationally in connection Cheng Hangban, it is big in the connecting time
When specified MTC, it is determined that the flight that leaves the port in connection Cheng Hangban is unreasonable.
In the optional embodiment of the present embodiment, it is determined that connection Cheng Hangban in the flight that leaves the port it is unreasonable after, also wrap
Include:
Terminate the acknowledgement of orders of connection Cheng Hangban, and/or, export the alarm letter of the order failure for indicating connection Cheng Hangban
Breath;
Stop the inquiry of connection Cheng Hangban or select seat, and/or, export the alarm letter of the order mistake for indicating connection Cheng Hangban
Breath;
Recommend to specify flight as the flight that leaves the port of connection Cheng Hangban, wherein, specify the connecting time of flight and the flight that enters a port
More than specified MTC.
Optionally, flight data of entering a port includes:Acknowledgement of consignment airline, flight number, transfer airport, flight number, belonging country
Family area, flight type.
Optionally, included according to default MTC data storehouse be determined for compliance with the entering a port specified MTC of flight data:
S21, is changed by form and for flight data of entering a port to be converted to the format fields for meeting default MTC data storehouse;
S22, obtains meeting the specified MTC of flight data of entering a port using format fields in default MTC data library searching.
Default Smallest connection time MTC data storehouse, formulates, comprising institute of world organic field from each airline
MCT data, or come from aeronautical data provider OAG, such as Britain Ou Aiji aviations international corporation, periodic collection are concurrent
The newest MCT data of each airline of cloth.Can also be according to the complaint suggestion of user or the real-time road letter of city airport
Cease to determine.
Through the above description of the embodiments, those skilled in the art can be understood that according to above-mentioned implementation
The method of example can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but a lot
In the case of the former be more preferably implementation method.Based on such understanding, technical scheme is substantially in other words to existing
The part that technology contributes can be embodied in the form of software product, and computer software product storage is in a storage
In medium (such as ROM/RAM, magnetic disc, CD), including some instructions are used to so that a station terminal equipment (can be mobile phone, calculate
Machine, server, or network equipment etc.) method that performs each embodiment of the invention.
Embodiment 2
Additionally provide in the present embodiment it is a kind of determine connection Cheng Hangban device, the device be used for realize above-described embodiment and
Preferred embodiment, had carried out repeating no more for explanation.As used below, term " module " can realize predetermined work(
The combination of the software and/or hardware of energy.Although the device described by following examples is preferably realized with software, firmly
Part, or the realization of the combination of software and hardware is also that may and be contemplated.
Fig. 2 is the structured flowchart of the device of determination connection Cheng Hangban according to embodiments of the present invention, as shown in Fig. 2 the device
Including:
Acquisition module 20, for obtaining the flight data of entering a port in connection Cheng Hangban;
First determining module 22, for being determined for compliance with flight data of entering a port according to default Smallest connection time MTC data storehouse
Specified MTC;
Second determining module 24, for whether reasonable according to the flight that leaves the port for specifying MTC to determine to join in Cheng Hangban.
Optionally, the second determining module includes:Computing unit, during for the transfer for calculating enter a port flight and the flight that leaves the port
Between;Determining unit, for the connecting time be more than specify MTC when, it is determined that connection Cheng Hangban in leave the port flight rationally, in transfer
Between more than or equal to specify MTC when, it is determined that connection Cheng Hangban in the flight that leaves the port it is unreasonable.
In being originally embodiment, device also includes:First processing module, for it is determined that connection Cheng Hangban in the flight that leaves the port
After unreasonable, terminate the acknowledgement of orders of connection Cheng Hangban, and/or, export the alarm of the order failure for indicating connection Cheng Hangban
Information;Second processing module, for it is determined that connection Cheng Hangban in the flight that leaves the port it is unreasonable after, stop connection Cheng Hangban inquiry
Or seat is selected, and/or, export the warning information of the order mistake for indicating connection Cheng Hangban;3rd processing module, for it is determined that
Connection Cheng Hangban in the flight that leaves the port it is unreasonable after, recommend specify flight as connection Cheng Hangban the flight that leaves the port, wherein, specify boat
Class is more than specified MTC with the connecting time of the flight that enters a port.
Optionally, flight data of entering a port includes:Acknowledgement of consignment airline, flight number, transfer airport, flight number, belonging country
Family area, flight type.
Optionally, the first determining module includes:Walk around unit, be converted to for changing the flight data that will enter a port by form
Meet the format fields in default MTC data storehouse;Search unit, for being obtained in default MTC data library searching using format fields
Meet the specified MTC of flight data of entering a port.
It should be noted that above-mentioned modules can be by software or hardware to realize, for the latter, Ke Yitong
Cross in the following manner realization, but not limited to this:Above-mentioned module is respectively positioned in same processor;Or, above-mentioned modules are with any
The form of combination is located in different processors respectively.
Embodiment 3
The present embodiment is according to an alternative embodiment of the invention, for being carried out specifically to the application with reference to specific scene
It is bright:
The invention provides a kind of technical scheme so that when the reservation leg of passenger, can just calculate immediately selected
The MCT times of the connection journey leg selected.If the connection journey leg favourable turn time of passenger's selection is less than MCT, then Ticket booking system can be stood
Carve and remind passenger, and refuse the reservation request of passenger.
The present invention be for checking passenger ticket reservation PNR in, whether the Smallest connection time for joining Cheng Hangban meets airline
In the MCT time restrictions that designated airport specifies.Fig. 3 is the design flow diagram of the embodiment of the present invention, including three phases, design life
Imitated in " acknowledgement of orders " stage.
Fig. 4 is the block process schematic diagram of the embodiment of the present invention, and three modules are mainly included in the present invention:Key condition is received
Collection, the treatment of MCT checksum results.
That is, when passenger carries out " acknowledgement of orders " operation, except original inspection logic, can also be embedded in new
MCT is verified.Check logic is key condition collection module at the beginning.The module can collect the reservation created in passenger ticket reservation PNR
Leg, selects two legs for wherein joining journey each other, and the content according to connection journey leg sorts out the key condition in connection journey leg,
Including the acknowledgement of consignment airline into and out of port leg, flight number, transfer airport, flight number, belonging country area, flight type
Etc., and these key conditions are transmitted compare to MCT correction verification modules.
MCT correction verification modules receive the key condition packet sent front end, it is necessary to be formatted, and being transformed into can be with
The form that field in MCT databases is compared, then starts to search for MCT databases, until found out from MCT tables meeting this
The MCT times of a little conditions.Find after the MCT times that airline specifies, this MCT time is sent to last mould
Block:Result treatment.
Result treatment module is compared the actual transfer for joining journey leg in this MCT time and passenger ticket reservation PNR is actual
Compared with.Once it was found that the connecting time of passenger's selection is less than MCT, then terminate " acknowledgement of orders " operation, and outputting alarm information at once,
Remind the passenger coupon journey leg connecting time too short, it is necessary to reselect more rational journey leg.Fig. 5 is the embodiment of the present invention
Overview flow chart.
The present embodiment realizes the real-time verification of connection journey leg Smallest connection time.In the process of passenger ticket reservation PNR generations
In, verification in real time can prevent passenger's reservation error, irrational journey leg, and remind it to select the connection of other times
Journey leg, by risk control seat-reservation early stage.By the real-time control of early stage, timely the rule of airline is accused
Know passenger, the stroke of as passenger optimizes consideration, also shared the risk of airline.
Optionally, in the design of the present embodiment, MCT check logics are embedded in " acknowledgement of orders " stage, are in order to whole
The centralized Control and cost constraint of individual booking logic considers.But, if expanding verification scope, it is also possible to by the school of MCT
Test logic to continue to advance to " seat-reservation " stage, even " flight inquiring " stage.Fig. 6 is the optional of the embodiment of the present invention
Protocol procedures schematic diagram.Such design can also realize the function described in embodiment, in simply increasing seat-reservation
Control logic, and the business scenario of influence is also much more than the scheme in " acknowledgement of orders ".
Embodiment 4
Embodiments of the invention additionally provide a kind of storage medium.Alternatively, in the present embodiment, above-mentioned storage medium can
To be arranged to storage for performing the program code of following steps:
S1, obtains the flight data of entering a port in connection Cheng Hangban;
S2, the specified MTC of flight data of being entered a port according to default Smallest connection time MTC data storehouse is determined for compliance with;
S3, determines whether the flight that leaves the port in the Cheng Hangban is reasonable according to the specified MTC.
Alternatively, in the present embodiment, above-mentioned storage medium can be included but is not limited to:USB flash disk, read-only storage (ROM,
Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disc or
CD etc. is various can be with the medium of store program codes.
Alternatively, in the present embodiment, processor is performed according to the program code stored in storage medium and obtains connection journey
Flight data of entering a port in flight;
Alternatively, in the present embodiment, processor is performed according to default according to the program code stored in storage medium
Smallest connection time MTC data storehouse is determined for compliance with the specified MTC of the flight data of entering a port;
Alternatively, in the present embodiment, processor is performed according to according to the program code stored in storage medium
Specified MTC determines whether the flight that leaves the port in the Cheng Hangban is reasonable.
Alternatively, the specific example in the present embodiment may be referred to described in above-described embodiment and optional embodiment
Example, the present embodiment will not be repeated here.
Obviously, those skilled in the art should be understood that above-mentioned of the invention each module or each step can be with general
Computing device realize that they can be concentrated on single computing device, or be distributed in multiple computing devices and constituted
Network on, alternatively, the program code that they can be can perform with computing device be realized, it is thus possible to they are stored
Performed by computing device in the storage device, and in some cases, can be with different from shown in order execution herein
The step of going out or describe, or they are fabricated to each integrated circuit modules respectively, or by the multiple modules in them or
Step is fabricated to single integrated circuit module to realize.So, the present invention is not restricted to any specific hardware and software combination.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair
Change, equivalent, improvement etc., should be included within the scope of the present invention.
Claims (14)
1. a kind of method that determination joins Cheng Hangban, it is characterised in that including:
Obtain the flight data of entering a port in connection Cheng Hangban;
The specified MTC of flight data of being entered a port according to default Smallest connection time MTC data storehouse is determined for compliance with;
Determine whether the flight that leaves the port in the Cheng Hangban is reasonable according to the specified MTC.
2. method according to claim 1, it is characterised in that in determining the Cheng Hangban according to the specified MTC
Whether the flight that leaves the port rationally includes:
Entered a port flight and the connecting time of the flight that leaves the port described in calculating;
When the connecting time the specified MTC is more than, determine that the flight that leaves the port in the Cheng Hangban is reasonable, in described
When turning the time more than or equal to the specified MTC, determine that the flight that leaves the port in the Cheng Hangban is unreasonable.
3. method according to claim 2, it is characterised in that it is determined that the flight that leaves the port in the Cheng Hangban is unreasonable
Afterwards, methods described also includes:
Terminate the acknowledgement of orders of the Cheng Hangban, and/or, export the alarm of the order failure for indicating the Cheng Hangban
Information.
4. method according to claim 2, it is characterised in that it is determined that the flight that leaves the port in the Cheng Hangban is unreasonable
Afterwards, methods described also includes:
Stop the inquiry of the Cheng Hangban or select seat, and/or, export the announcement of the order mistake for indicating the Cheng Hangban
Alert information.
5. method according to claim 2, it is characterised in that it is determined that the flight that leaves the port in the Cheng Hangban is unreasonable
Afterwards, methods described also includes:
Recommend to specify flight as the flight that leaves the port of the Cheng Hangban, wherein, the specified flight and the flight that enters a port
Connecting time is more than the specified MTC.
6. method according to claim 1, it is characterised in that the flight data of entering a port includes:Acknowledgement of consignment airline, boat
Class number, transfer airport, flight number, belonging country area, flight type.
7. method according to claim 1, it is characterised in that boat of being entered a port according to default MTC data storehouse is determined for compliance with
The specified MTC of class's data includes:
Changed by form and the flight data of entering a port is converted into the format fields for meeting the default MTC data storehouse;
Obtain meeting the specified MTC of the flight data of entering a port in the default MTC data library searching using the format fields.
8. a kind of determination joins the device of Cheng Hangban, it is characterised in that including:
Acquisition module, for obtaining the flight data of entering a port in connection Cheng Hangban;
First determining module, for being determined for compliance with the flight data of entering a port according to default Smallest connection time MTC data storehouse
Specify MTC;
Second determining module, for determining whether the flight that leaves the port in the Cheng Hangban is reasonable according to the specified MTC.
9. device according to claim 8, it is characterised in that second determining module includes:
Computing unit, for calculating described entering a port flight and the connecting time of the flight that leaves the port;
Determining unit, for when the connecting time the specified MTC is more than, determining the flight that leaves the port in the Cheng Hangban
Rationally, when the connecting time the specified MTC is more than or equal to, determine that the flight that leaves the port in the Cheng Hangban does not conform to
Reason.
10. device according to claim 9, it is characterised in that described device also includes:
First processing module, for after it is determined that the flight that leaves the port in the Cheng Hangban is unreasonable, terminating the Cheng Hang
The acknowledgement of orders of class, and/or, export the warning information of the order failure for indicating the Cheng Hangban.
11. devices according to claim 9, it is characterised in that described device also includes:
Second processing module, for after it is determined that the flight that leaves the port in the Cheng Hangban is unreasonable, stopping the Cheng Hang
Seat is selected in the inquiry of class, and/or, export the warning information of the order mistake for indicating the Cheng Hangban.
12. devices according to claim 9, it is characterised in that described device also includes:
3rd processing module, for after it is determined that the flight that leaves the port in the Cheng Hangban is unreasonable, recommending to specify flight to make
It is the flight that leaves the port of the Cheng Hangban, wherein, the specified flight is more than the finger with the connecting time of the flight that enters a port
Determine MTC.
13. devices according to claim 8, it is characterised in that the flight data of entering a port includes:Acknowledgement of consignment airline,
Flight number, transfer airport, flight number, belonging country area, flight type.
14. devices according to claim 8, it is characterised in that the first determining module includes:
Walk around unit, the default MTC data storehouse is met for changing to be converted to the flight data of entering a port by form
Format fields;
Search unit, for obtaining meeting the flight that enters a port in the default MTC data library searching using the format fields
The specified MTC of data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611263355.5A CN106779127A (en) | 2016-12-30 | 2016-12-30 | It is determined that the method and device of connection Cheng Hangban |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611263355.5A CN106779127A (en) | 2016-12-30 | 2016-12-30 | It is determined that the method and device of connection Cheng Hangban |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106779127A true CN106779127A (en) | 2017-05-31 |
Family
ID=58954990
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611263355.5A Pending CN106779127A (en) | 2016-12-30 | 2016-12-30 | It is determined that the method and device of connection Cheng Hangban |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106779127A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107992576A (en) * | 2017-12-03 | 2018-05-04 | 飞友科技有限公司 | A kind of connecting flight optimizes recommendation method |
CN108038508A (en) * | 2017-12-12 | 2018-05-15 | 携程旅游网络技术(上海)有限公司 | Method for pushing, system, storage medium and the electronic equipment of connecting flight |
CN110929945A (en) * | 2019-11-28 | 2020-03-27 | 海南太美航空股份有限公司 | Prediction method and system for airline fulfillment and electronic equipment |
CN111461616A (en) * | 2020-04-07 | 2020-07-28 | 中国民航信息网络股份有限公司 | Method and device for early warning delay of transfer luggage |
CN111506614A (en) * | 2020-04-22 | 2020-08-07 | 中国民航信息网络股份有限公司 | Method and device for identifying luggage transferred in civil aviation and storage medium |
CN113408944A (en) * | 2021-07-14 | 2021-09-17 | 携程旅游网络技术(上海)有限公司 | Method and system for pushing transit flight, electronic equipment and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070198694A1 (en) * | 2004-02-13 | 2007-08-23 | Kohei Nishino | Data transmission method, data transmission system, data transmission device, and data structure |
CN105630979A (en) * | 2015-12-25 | 2016-06-01 | 中国民航信息网络股份有限公司 | Flight query method, device and system |
CN105654312A (en) * | 2015-12-28 | 2016-06-08 | 中国民航信息网络股份有限公司 | Involuntary passenger identification method and involuntary passenger identification system |
-
2016
- 2016-12-30 CN CN201611263355.5A patent/CN106779127A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070198694A1 (en) * | 2004-02-13 | 2007-08-23 | Kohei Nishino | Data transmission method, data transmission system, data transmission device, and data structure |
CN105630979A (en) * | 2015-12-25 | 2016-06-01 | 中国民航信息网络股份有限公司 | Flight query method, device and system |
CN105654312A (en) * | 2015-12-28 | 2016-06-08 | 中国民航信息网络股份有限公司 | Involuntary passenger identification method and involuntary passenger identification system |
Non-Patent Citations (2)
Title |
---|
刘振: "《枢纽机场航班波优化研究》", 《交通企业管理》 * |
齐莉: "《a--基于航班波运行的枢纽机场航班时刻优化研究》", 《CNKI数据库》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107992576A (en) * | 2017-12-03 | 2018-05-04 | 飞友科技有限公司 | A kind of connecting flight optimizes recommendation method |
CN108038508A (en) * | 2017-12-12 | 2018-05-15 | 携程旅游网络技术(上海)有限公司 | Method for pushing, system, storage medium and the electronic equipment of connecting flight |
CN110929945A (en) * | 2019-11-28 | 2020-03-27 | 海南太美航空股份有限公司 | Prediction method and system for airline fulfillment and electronic equipment |
CN110929945B (en) * | 2019-11-28 | 2023-07-04 | 海南太美航空股份有限公司 | Prediction method and system for route opening and electronic equipment |
CN111461616A (en) * | 2020-04-07 | 2020-07-28 | 中国民航信息网络股份有限公司 | Method and device for early warning delay of transfer luggage |
CN111461616B (en) * | 2020-04-07 | 2023-05-23 | 中国民航信息网络股份有限公司 | Method and device for delay early warning of transfer baggage |
CN111506614A (en) * | 2020-04-22 | 2020-08-07 | 中国民航信息网络股份有限公司 | Method and device for identifying luggage transferred in civil aviation and storage medium |
CN113408944A (en) * | 2021-07-14 | 2021-09-17 | 携程旅游网络技术(上海)有限公司 | Method and system for pushing transit flight, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106779127A (en) | It is determined that the method and device of connection Cheng Hangban | |
US20200293958A1 (en) | Restricting airplane pushback based on gate hold times | |
US20140278036A1 (en) | Departure sequencing systems and methods | |
Sun et al. | A bus route evaluation model based on GIS and super-efficient data envelopment analysis | |
US20110137666A1 (en) | Multi-travel aggregator | |
CN103412934A (en) | Large traffic searching method and system | |
Teng et al. | Development of a behavior-based passenger flow assignment model for urban rail transit in section interruption circumstance | |
Zhu et al. | Measuring multi-modal connections and connectivity radiations of transport infrastructure in China | |
CN106528720A (en) | Transfer station recommendation method and transfer station recommendation system | |
CN106802944A (en) | A kind of flight searching system and method | |
CN103064909B (en) | A kind of base station database check method based on Drools regulation engine | |
CN106097060A (en) | A kind of university students is left unused Cycle Hire software screening method system and its implementation | |
CN104636457A (en) | Method and device for location search cognition | |
CN108810060B (en) | Method for providing, receiving and aggregating service information, server and client | |
CN111340301B (en) | Conflict verification method, system, equipment and medium for user order information | |
Chen et al. | A simple process simulation model for strategic planning on the airside of an airport: a case study | |
Xu et al. | Why China must build Sichuan-Tibet railway: From the perspective of regional comprehensive transportation network optimization | |
Haque et al. | A literature review on park-and-rides | |
CA2824381C (en) | System and method for processing complex queries | |
Radović et al. | The concept of a data aggregation platform in the function of a decision-making system for urban mobility management | |
CN102567927A (en) | Scheduled bus arranging method and realization of cross-regional travel distribution center operating system | |
CN109801110A (en) | A kind of recognition methods of travel information input error | |
CN111832820A (en) | Method and system for predicting pedestrian flow of each gate at airport | |
Songbai et al. | The design and realization of vehicle transportation support DSS under contingency logistics | |
Faizrahnemoon et al. | A Google-like model for public transport |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |