CN106777778A CN201710017080.5A CN201710017080A CN106777778A CN 106777778 A CN106777778 A CN 106777778A CN 201710017080 A CN201710017080 A CN 201710017080A CN 106777778 A CN106777778 A CN 106777778A
Authority
CN
China
Prior art keywords
suspension bridge
bridge
girder
towing rope
main push
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710017080.5A
Other languages
Chinese (zh)
Other versions
CN106777778B (en
Inventor
王立彬
李立斌
陈林强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN201710017080.5A priority Critical patent/CN106777778B/en
Publication of CN106777778A publication Critical patent/CN106777778A/en
Application granted granted Critical
Publication of CN106777778B publication Critical patent/CN106777778B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of curved beam suspension bridge modeling method of Novel unilateral suspention, and the method includes several aspects:1) camber beam one side suspension bridge is reduced to " a straight line girder vertical single cable plane " suspension bridge under gravity equivalence principle, and calculates the initial linear of determination main push-towing rope.2) its anchor point is overlapped with ground anchor point the rotation of " a straight line girder vertical single cable plane " suspension bridge end bay main push-towing rope, set up " tri linear girder vertical single cable plane " suspension bridge model.3) iteration hoist cable angle and tension force so that main push-towing rope is progressively outward-dipping, ultimately form unilateral suspention Space Curved-Beam suspension bridge into bridge model.The inventive method " with straight Dai Qu ", the modeling of the ingenious camber beam suspension bridge for realizing complexity, result of calculation is accurate, and computational efficiency is high, for the design of complex curve bridge, construction provide effective method.

Description

A kind of curved beam suspension bridge modeling method of unilateral suspention
Technical field
The present invention relates to a kind of novel bridge structure finite element modeling method, i.e., the curved beam suspension bridge of one side suspention is limited Meta Model method, belongs to science of bridge building field and structure finite element Modeling Calculation analysis technical field.
Background technology
The curved beam suspension bridge of one side suspention is a kind of novel bridge, the characteristics of it has suspension bridge and Curved Beam Bridge simultaneously, It is the new structure for combining two kinds of complicated bridge type i.e. suspension bridges and Curved Beam Bridge, is generally used for foot bridge.External such bridge Beam has totally 2, Kai Erhaimu bridges, the Sa Sinici bridges of Germany, Santiago harbour bridge in the U.S., free bridge, peaceful bridge 3. The Shanghai international tourism holiday resort Landscape Bridge that the country builds up for only 2015.
One side suspention curved beam suspension bridge be made up of king-tower, main push-towing rope, girder, hoist cable and anchorage, structure have merrily and lightheartedly have a thorough knowledge of, Line style is graceful, the characteristics of span ability is stronger.After king-tower lateral displacement on the outside of girder or inner side side suspention girder.Its master The form of beam is curve.It is in space curve that main push-towing rope deviates vertical guide certain angle, and king-tower top both sides main push-towing rope forms notable angle. The unilateral eccentric suspention girder of hoist cable, only one hoist cable rope face, and hoist cable tensioning forms space curved surface.
Main push-towing rope arranges that wherein suspension centre is equal along curve girder under hoist cable with the rope face of hoist cable composition in complicated Spatial Cable face The tangent line at suspension centre is vertical with girder for the facade of even laying, hoist cable and girder radius of curvature composition, the intersection point of the facade and main push-towing rope Hoist cable is hung oneself a position as on main push-towing rope.Main push-towing rope and hoist cable composition space curved surface, surface geometry form is complicated, therefore how to determine So complicated turns into control Bridge Design, the key of construction success or not into the linear of bridge space main push-towing rope and hanging rope face.Close The realization of shape method and Spatial Cable face forming method or its finite element modeling is looked in such special-shaped bridge main push-towing rope line style, in existing state Related content is showed no in inside and outside document.
At present, both at home and abroad on setting up straight beam rope bridge model, lead to as earth anchored suspension bridge and self-anchored suspension bridge Cross professional bridge finite element software to realize, such as Midas/Civil finite element softwares.But such software is not provided with this kind of The professional method of novel unilateral suspention shaped form girder suspension bridge, more no template can be applied mechanically carries out the limited of such bridge Unit sets up model.
The innovative point of this patent is the space main push-towing rope that curved beam suspension bridge is realized based on Midas/Civil finite element softwares And rope face manufacturing process, it is proposed that a kind of modeling method of the curved beam suspension bridge of unilateral suspention.
The content of the invention
Technical problem
One side suspention single cable plane curve suspension bridge beam bridge is bridge complex, the characteristics of have Curved Beam Bridge and suspension bridge concurrently, tool There are a series of complex features such as " curve girder ", " space inclination main push-towing rope ", " single rope face ", effective finite element modeling is lacked at present Method carries out structural analysis.How to be asked as key with solving the problems, such as curve suspension bridge using present straight line suspension bridge modeling technique Topic.Needle of the present invention is to this complicated bridge type, the thought based on " with straight Dai Qu ", it is proposed that a kind of effective modeling method, calculates High precision, powerful measure is provided to such Bridge Design.
Technical scheme
1. a kind of curved beam suspension bridge modeling method of unilateral suspention, it is characterised in that the method is comprised the following steps that:
1) set up camber beam one side suspension bridge and be reduced to " a straight line girder vertical single cable plane " suspension bridge, determine the first of main push-towing rope Initial line shape.
(1) according to girder, tower, cable geometrical relationship, draft need set up equivalent straight beam suspension bridge physical dimension data. Including end bay main span girder length, king-tower height, hoisting point position etc., method is as follows:
" a straight line girder vertical single cable plane " suspension bridge is somebody's turn to do to be made up of both sides span and middle span.The distance between Sarasota is i.e. It is equivalent straight beam suspension bridge stage casing girder length.Equivalent straight beam suspension bridge end bay segment length is Sarasota top and curved beam anchorage line Projected length in the horizontal plane.Sarasota height is highly identical with curved beam Suspension Bridge Tower.After establishing equivalent straight beam beam length, select Suitable ratio of rise to span, according still further to former hoist cable in the position of curved beam suspension centre, according to equivalent straight beam and the position relationship of curved beam, counts one by one Calculate the anchorage point of equivalent straight beam sling of suspension bridge and girder.Although it should be noted that former curved beam hoisting point position is equidistant Distribution, the equivalent straight beam sling of suspension bridge spacing that conversion is obtained not to be equally spaced, need to successively be calculated hoist cable spacing.
(2) segmentation calculates equivalent straight beam beam weight G '.
Assuming that the equivalent straight beam girder of suspension bridge length l ' of (1) gained, former curved beam length is l, and weight is G, then equivalent straight beam Beam weight G '=l '/lG.
(3) according to the parameters obtained in (1), (2) step, equivalent straight beam suspension bridge model is quickly set up;
(4) all equivalent girder unit in the model set up in delete step (3), constrains main push-towing rope tower-top node, while Girder, hoist cable are equivalent to joint load form for the effect of main push-towing rope, are loaded on main push-towing rope node, account for big displacement Geometrical nonlinear analysis.
" a straight line girder vertical single cable plane " suspension bridge is obtained by above step, and main push-towing rope is determined only by vertical masterpiece It is initial linear.
2) " tri linear girder vertical single cable plane " suspension bridge model is set up
According to step 1) in the position of " a straight line girder vertical single cable plane " suspension bridge and unilateral suspention curved beam suspension bridge Relation, the axis centered on two overhead vertical projection lines, by " a straight line girder vertical single cable plane " side of suspension bridge two Across main push-towing rope to the respective rotation alpha angle in curved beam center of circle direction, its anchor point is overlapped with ground anchor point, obtain " tri linear girder vertical Single cable plane " suspension bridge model, finally obtain only by vertical force effect main push-towing rope " three rope faces " form it is initial linear.
3) set up Space Curved-Beam suspension bridge into bridge model
(1) shaped form girder FEM model is set up, vertical elastic support is all set up at girder correspondence suspension centre, so that shape Into rigid support continuous girder model.Computing is carried out for this model, bearing reaction at each suspension centre can be obtained, this counter-force can recognize To be hoist cable vertical force component.
(2) according to step 2) initial linear, the binding curve girder position of main push-towing rope " three rope faces " form that obtains, it is determined that The angle of inclination of every hoist cable and sling length, so each hoist cable vertical force component obtained by step (1) to calculate hoist cable power big It is small.In the process, due to three-dimensional effect, every hoist cable inclination angle differs, so needing to calculate hoist cable power by root.
(3) by space force resolution, the form for being converted into joint load is carried in master to the hoist cable power for obtaining step (2) On cable node, and the geometrical nonlinear analysis of big displacement are accounted for for main push-towing rope, obtain new main cable alignment;Note now joining With the equivalent joint load that the power of computing is replacement hoist cable power, the active force that main push-towing rope bears is non-coplanar force.
(4) the new main cable alignment obtained according to (3), with reference to the position of virgin curve girder, both can obtain new again Geometrical relationship, and then new Suo Li can be calculated;
(5) repeat step (3), (4) iteration several times, until after last time computing, each modal displacement of main push-towing rope meets to be received Condition is held back, that is, obtains main cable alignment.During this cycle calculations, basic principle is to maintain that curved beam position is constant and each suspension centre Place's hoist cable vertical force component is constant, by the constantly position of amendment main push-towing rope node and internal force size, finally meets convergent requirement.
By taking one section of main push-towing rope as an example, iterative step (2), (3), the mathematical formulae of (4) are described as follows:
Step (2):In n+1 main push-towing rope sections, the corresponding node serial number of load are divided into by n load across main push-towing rope Be followed successively by 1,2,3 ..., i, i+1 ... n, coordinate is respectively (x1, y1, z1)、(x2, y2, z2)、...、(xi, yi, zi)、(xi+1, yi+1, zi+1)、...、(xn, yn, zn), the hoist cable that is connected with each node numbering is designated as 1,2,3 ..., i, i+1 ..., n, hoist cable Suo Li is F1、F2、...、Fi、Fi+1、...、Fn, hoist cable and curved beam anchoring point coordinates are respectively (x '1, y '1, z '1)、(x’2, y '2, z’2)、...、(x’i, y 'i, z 'i)、(x’i+1, y 'i+1, z 'i+1)、...、(x’n, y 'n, z 'n), rigid support Continuous Beam Model is hung Bearing reaction Q at point1、Q2、...、Qi、Qi+1、...、Qn
Step (3):If main push-towing rope sections internal force is T between node i and i-1i-1 k-1, between node i and i+1 in main push-towing rope sections Power isI-th hoist cable is equivalent to (F for the active force of node ixi k-1, Fyi k-1, Fzi k-1), i.e., at k-1 iteration end, section Point i is in Ti-1 k-1, Ti k-1And (Fxi k-1, Fyi k-1, Fzi k-1) effect be issued to balance, modal displacement is 0, foundation geometrical relationship, kth Load suffered by secondary iteration start node i is Fi k(x, y, z).
Load computing formula described in step (3) of the present invention is:
Notice that the hoist cable power that is now calculated and its equivalent load are calculation when not considering that hoist cable pendency is acted on, Think the length that sling length is the upper and lower suspension centre line of hoist cable.In practical application, because this bridge type sling length is smaller, calculate Precision fully meets requirement of engineering.
Step (4):Power (the F that step (3) is obtainedxi k, Fyi k, Fzi k) replace (Fxi k-1, Fyi k-1, Fzi k-1), calculate main push-towing rope Displacement (Δ x under this group of power effecti k, Δ yi k, Δ zi k) and now main push-towing rope sections internal force Ti k, displacement is added to kth -1 time Coordinate (the x of kth time iteration node i is can obtain on the node coordinate of iterationi k, yi k, zi k)。
Coordinate (the x obtained in step 3i k, yi k, zi k) iterative formula is:
(6) the space main cable alignment obtained using step (5), re-establishes girder unit, hoist cable unit, dorsal funciculus unit simultaneously Corresponding boundary condition is set, full-bridge FEM model under bridge completion state is finally established.
Beneficial effect
The present invention is targetedly proposed based on the modeling " with straight Dai Qu " according to this key feature of camber beam Spatial Cable Method, effectively solves the complicated modeling problem of curve suspension bridge.
The method initially sets up " a straight line girder vertical single cable plane " etc. for suspension bridge, obtains main cable alignment, then rotates Two end bay main push-towing ropes set up " tri linear girder vertical single cable plane " suspension bridge model, are realized finally by nonlinear iteration method The model of " tri linear inclination single cable plane " unilateral suspention suspension bridge.Three step simplicity, from ripe straight line suspension bridge modeling side Method starts, and the modeling method of curve suspension bridge has been done step-by-step.
The characteristics of this method has quick, accurate, efficient, for the modeling of such bridge type provides a kind of practicable modeling Method.
Brief description of the drawings
Lower accompanying drawing is only intended to, in schematic illustration and explanation is done to the present invention, not delimit the scope of the invention.
The curved beam suspension bridge bridge type space schematic diagram of the unilateral suspention of Fig. 1 present invention;
The curved beam suspension bridge bridge type elevational schematic view of the unilateral suspention of Fig. 2 present invention;
The curved beam suspension bridge bridge type floor map of the unilateral suspention of Fig. 3 present invention;
The equivalent straight beam of Fig. 4 present invention and former curved beam position relationship schematic diagram;
The equivalent straight beam suspension bridge schematic diagram of Fig. 5 present invention;
The equivalent pure cable stress diagram of straight beam suspension bridge of Fig. 6 present invention;
Fig. 7 present invention is only by the initial linear stress diagram of main push-towing rope of vertical force effect;
Fig. 8 curved beam method of continuous beam with rigidity support schematic diagrames of the present invention;
Main push-towing rope stress diagram of Fig. 9 present invention by non-coplanar force effect;
Figure 10 hoist cable locus schematic diagrames of the present invention;
Figure 11 curved beam suspension bridge global finite element models of the present invention;
Figure 12 model bridge completion state Suo Li of the present invention and reaction of bearing comparison diagram.
Main cable alignment under Figure 13 model bridge completion states of the present invention;
Figure 14 model bridge completion state girder bending moment diagrams of the present invention;
Figure 15 model bridge completion state Torsion of main beam figures of the present invention;
Figure 16 model bridge completion state girder stress diagraies of the present invention;
Reference:1- curve girders;2- main push-towing ropes;3- hoist cables;4- Sarasotas;5- dorsal funciculus;6- curved beam anchorages;7- end bay masters Cable;Across main push-towing rope in 8-;The equivalent straight beams of 9-;10- straight beam anchorages;11- straight beam Suspension Bridge Towers;
Specific embodiment
To make purpose, modeling process and the advantage of present invention implementation clearer, below in conjunction with accompanying drawing of the present invention, to this The modeling method of invention is further described in more detail.
The invention provides a kind of curved beam suspension bridge modeling method of unilateral suspention, its Bridges is as Figure 1-3, main To be made up of curve girder 1, main push-towing rope 2, hoist cable 3, Sarasota 4, dorsal funciculus 5 and curved beam anchorage 6, wherein main push-towing rope 2 can be divided into end bay master Cable 7 is with across main push-towing rope 8.
A kind of curved beam suspension bridge modeling method of unilateral suspention of the present invention, comprises the following steps.
1. set up only initially linear by the space main push-towing rope of vertical force effect;
1) according to curve girder 1, main push-towing rope 2, Sarasota 4 geometrical relationship, draft need set up equivalent straight beam suspension bridge, such as Shown in Fig. 4.The summit position of equivalent straight beam Suspension Bridge Tower 4 set up is identical with former 4 summits of curved beam Suspension Bridge Tower, and two The distance between Sarasota 4 is equivalent straight beam girder of suspension bridge main span length, and equivalent straight beam girder of suspension bridge end bay length is rope The top of tower 4 and the line of curved beam anchorage 6 projected length in the horizontal plane.
2) equivalent straight beam beam weight G ' is calculated;
3) according to parameters, equivalent straight beam suspension bridge model as shown in Figure 5 is set up;
4) straight beam element in case-deleted models, while equivalent straight beam 9, hoist cable 3 are equivalent into section for the effect of main push-towing rope 2 Point loading form, is loaded on main push-towing rope node, as shown in Figure 6.
5) according to equivalent straight beam suspension bridge and the position relationship of curved beam suspension bridge, in Midas/Civil FEM models, By straight beam suspension bridge model both sides end bays main push-towing rope 7 to the respective rotation alpha angle in curved beam center of circle direction so that equivalent straight beam suspension bridge anchor Heavy stone used as an anchor 10 is fallen within former curved beam Analysis of Suspension Bridges ' Anchorage 6, you can obtain only initially linear by the main push-towing rope of vertical force effect, as shown in Figure 7;
2. the only FEM model containing curved beam is set up using method of continuous beam with rigidity support, obtain hoist cable vertical force component, and then According to the spatial relation of space main push-towing rope, girder and hoist cable, by continuous iteration hoist cable power size and angle, so as to be received Main cable alignment under non-coplanar force effect;
3. " tri linear vertical rope face " space main cable alignment is utilized, the unit of curve girder 1, the unit of hoist cable 3, the back of the body is re-established The unit of rope 5 simultaneously sets corresponding boundary condition, finally establishes full-bridge FEM model under bridge completion state.
Specially:
1) shaped form girder FEM model as shown in Figure 8 is set up, all sets up vertical at the corresponding suspension centre of curve girder 1 Resilient support, so as to form rigid support continuous girder model.Computing is carried out for this model, can obtain being supported instead at each suspension centre Power, this counter-force is to be regarded as hoist cable vertical force component;
2) initial linear, the position of binding curve girder 1 of main push-towing rope " three rope faces " form, determines the every inclination angle of hoist cable Degree and sling length, and then each hoist cable vertical force component being calculated calculates hoist cable power size.In the process, because space is imitated Should, every hoist cable inclination angle differs, so needing to calculate hoist cable power by root.
3) by the above-mentioned hoist cable power that obtains by space force resolution, the form for being converted into joint load is carried in main push-towing rope node Upper (figure
9) geometrical nonlinear analysis of big displacement, and for main push-towing rope are accounted for, new main cable alignment is obtained;Note now The power for participating in computing is the equivalent joint load for substituting hoist cable power, and the active force that main push-towing rope bears is non-coplanar force.
4) according to the new main cable alignment that 3) obtains, with reference to the position of virgin curve girder 1, both can obtain new several again What relation, and then new Suo Li can be calculated;
5) repeat step 3), 4) iteration several times, until after last time computing, each modal displacement of main push-towing rope meets convergence bar Part, that is, obtain main cable alignment.During this cycle calculations, basic principle be to maintain that curved beam position is constant and each suspension centre at hang Rope vertical force component is constant, by the constantly position of amendment main push-towing rope node and internal force size, finally meets convergent requirement.
In as a example by, iterative step 2), mathematical formulae 3), 4) is described as follows:
Step 2):In n+1 main push-towing rope sections, the corresponding node serial number of load are divided into by n load across main push-towing rope 8 Be followed successively by 1,2,3 ..., i, i+1 ... n, coordinate is respectively (x1, y1, z1)、(x2, y2, z2)、...、(xi, yi, zi)、(xi+1, yi+1, zi+1)、...、(xn, yn, zn), the hoist cable that is connected with each node numbering is designated as 1,2,3 ..., i, i+1 ..., n, hoist cable Suo Li is F1、F2、...、Fi、Fi+1、...、Fn, hoist cable and curved beam anchoring point coordinates are respectively (x '1, y '1, z '1)、(x’2, y '2, z’2)、...、(x’i, y 'i, z 'i)、(x’i+1, y 'i+1, z 'i+1)、...、(x’n, y 'n, z 'n), rigid support Continuous Beam Model is hung Bearing reaction Q at point1、Q2、...、Qi、Qi+1、...、Qn
Step 3):If main push-towing rope sections internal force is T between node i and i-1i-1 k-1, main push-towing rope sections internal force between node i and i+1 It is Ti k-1, i-th hoist cable be equivalent to (F for the active force of node ixi k-1, Fyi k-1, Fzi k-1), i.e., at k-1 iteration end, node I is in Ti-1 k-1, Ti k-1And (Fxi k-1, Fyi k-1, Fzi k-1) effect is issued to balance, modal displacement is 0, and according to geometrical relationship, kth is secondary Load suffered by iteration start node i is Fi k(x, y, z).
Step 3 of the present invention) described in load, according to shown in Figure 10, computing formula is:
Notice that the hoist cable power that is now calculated and its equivalent load are calculation when not considering that hoist cable pendency is acted on, Think the length that sling length is the upper and lower suspension centre line of hoist cable.In practical application, because this bridge type sling length is smaller, calculate Precision fully meets requirement of engineering.
Step 4):By step 3) power (F that obtainsxi k, Fyi k, Fzi k) replace (Fxi k-1, Fyi k-1, Fzi k-1), calculate main push-towing rope and exist Displacement (Δ x under this group of power effecti k, Δ yi k, Δ zi k) and now main push-towing rope sections internal force Ti k, displacement is added to kth -1 time repeatedly Coordinate (the x of kth time iteration node i is can obtain on the node coordinate in generationi k, yi k, zi k)。
Coordinate (the x obtained in step 3i k, yi k, zi k) iterative formula is:
6) using step 5) the space main cable alignment that obtains, re-establish girder unit, hoist cable unit, dorsal funciculus unit and set Fixed corresponding boundary condition, finally establishes full-bridge FEM model under bridge completion state.
The inventive method specific embodiment:
1. science of bridge building overview
This bridge main design parameters are:Girder center line is located on the circular curve of R=44.5m, and correspondence central angle is 150 °, Bridge floor 3.1m wide, bridge span 87.8m, overall length 119m;Sarasota uses cylindrical steel Sarasota, is 63 ° with ground angle, at top Dorsal funciculus is set, and dorsal funciculus anchor is on the anchorage of ground;Main push-towing rope, hoist cable, dorsal funciculus use carbon guy of twisted steel cable, yield strength 1560MPa, The a diameter of 85mm of main push-towing rope, in across vertical ratio of rise to span be 1/13;Hoist cable diameter is divided into 23mm and two kinds of 38mm, wherein common hoist cable is straight Footpath 23mm, with a diameter of 38mm of hoist cable that Sarasota is joined directly together.Main push-towing rope is divided into three sections, in across main push-towing rope two ends and both sides end bay main push-towing rope It is anchored on Sarasota respectively, does not set saddle, span is respectively 39.7m, 74.2m, 39.7m.Totally 49, hoist cable, wherein in across 23 Root, each 13 of both sides end bay, along symmetrical on the outside of curved beam.
2. bridge structure finite element is set up and its interpretation of result:
According to the inventive method, bridge completion state main cable alignment is calculated first, it is linear according to this, set up full-bridge FEM model (Figure 11).
Wherein, curve girder 1 is simulated using beam element, and Sarasota 4 is simulated using truss element, main push-towing rope 2, hoist cable 3, dorsal funciculus 5 Simulated using cable elements, hoist cable 3 is connected by the simulation that is rigidly connected with curve girder 1.
Complete after modeling analysis, computing be analyzed to model, you can obtain main cable alignment under bridge completion state, internal force, Parameters such as hoist cable internal force, hoist cable inclination angle, and list some numerical results, when wherein Figure 12 is bridge completion state the actual Suo Li of hoist cable and Method of continuous beam with rigidity support hoist cable vertical force component comparison diagram, as a result shows that two hoist cable power being joined directly together with Sarasota 4 occur Increase by a relatively large margin, remaining hangs cable force near the vertical force that method of continuous beam with rigidity support is obtained, and this kind of feature meets this The characteristics of class bridge type " coupling hardness with softness ", hoist cable power is reasonably distributed;Figure 13 is main cable alignment under bridge completion state, and bridge completion state is linear suitable Slide without mutation, meet the linear requirement of design;Figure 14-16 is bridge completion state girder bending moment diagram, torque diagram and stress diagram, bridge completion state The moment of flexure of girder 1, moment of torsion are reasonably distributed, and maximum stress is much smaller than the bursting stress of the material of girder 1, and result above shows, adopts This kind of method is used, the curved beam suspension bridge bridge completion state FEM model of rational unilateral suspention, its result of calculation essence can be set up It is really reliable.
Modeling method of the present invention is not limited by the examples described above, as long as scope of the present invention patent and specification The equal change that content is done and modification, should all remain within the scope of the patent.

Claims (2)

1. the curved beam suspension bridge modeling method that a kind of one side is suspended in midair, it is characterised in that comprise the following steps:
1) camber beam one side suspension bridge is reduced to " a straight line girder vertical single cable plane " suspension bridge, determines the initial line of main push-towing rope Shape.
(1) according to girder, tower, cable geometrical relationship, draft need set up equivalent straight beam suspension bridge physical dimension data.
(2) segmentation calculates equivalent straight beam beam weight G '.
(3) according to the parameters obtained in (1), (2) step, equivalent straight beam suspension bridge model is quickly set up.
(4) all equivalent girder unit in the model set up in delete step (3), constrains main push-towing rope tower-top node, while will be main Beam, hoist cable are equivalent to joint load form for the effect of main push-towing rope, are loaded on main push-towing rope node, account for the geometry of big displacement Nonlinear analysis, obtains " a straight line girder vertical single cable plane " suspension bridge, and main push-towing rope is determined only by the initial of vertical force effect It is linear.
2) " tri linear girder vertical single cable plane " suspension bridge model is set up.
According to step 1) in " a straight line girder vertical single cable plane " suspension bridge that obtains and unilateral suspention curved beam suspension bridge position Relation, the axis centered on two overhead vertical projection lines, by " a straight line girder vertical single cable plane " side of suspension bridge two Each rotated to an angle to curved beam center of circle direction across main push-towing rope, its anchor point is overlapped with ground anchor point, obtain " tri linear girder lead Hang down single cable plane " suspension bridge model, finally obtain only by vertical force effect main push-towing rope " three rope faces " form it is initial linear.
3) iteration set up Space Curved-Beam suspension bridge into bridge model.
(1) shaped form girder FEM model is set up, vertical elastic support is all set up at girder correspondence suspension centre, so as to be formed just Property supporting Continuous Beam Model.Computing is carried out for this model, bearing reaction at each suspension centre can be obtained, this counter-force is to be regarded as Hoist cable vertical force component.
(2) according to step 2) main push-towing rope of " tri linear girder vertical rope face " form that obtains is initially linear, binding curve girder position Put, determine angle of inclination and the sling length of every hoist cable, and then each hoist cable vertical force component obtained by step (1) is calculated and hung Suo Li sizes.In the process, due to three-dimensional effect, every hoist cable inclination angle differs, so needing to calculate hoist cable power by root.
(3) by space force resolution, the form for being converted into joint load is carried in main push-towing rope section to the hoist cable power for obtaining step (2) On point, and the geometrical nonlinear analysis of big displacement are accounted for for main push-towing rope, obtain new main cable alignment;Note now participating in fortune The power of calculation is the equivalent joint load for substituting hoist cable power, and the active force that main push-towing rope bears is non-coplanar force.
(4) the new main cable alignment obtained according to (3), with reference to the position of virgin curve girder, both can obtain new geometry again Relation, and then new Suo Li can be calculated;
(5) repeat step (3), (4) are until after last time computing, each modal displacement of main push-towing rope meets the condition of convergence, that is, led Cable shape.During this cycle calculations, basic principle be to maintain that curved beam position is constant and each suspension centre at hoist cable vertical force component It is constant, by the constantly position of amendment main push-towing rope node and internal force size, finally meet convergent requirement.
(6) the space main cable alignment obtained using step (5), is re-established girder unit, hoist cable unit, dorsal funciculus unit and set Corresponding boundary condition, finally establishes full-bridge FEM model under bridge completion state.
2. bridge finite element modeling method according to claim 1, it is characterised in that step 1) (1st) step in institute The straight beam sized data that stating to draft is specially:
The equivalent straight beam Suspension Bridge Tower position set up is identical with former curved beam suspension bridge.The distance between Sarasota be etc. Effect straight beam suspension bridge stage casing girder length.Equivalent straight beam suspension bridge end bay segment length is Sarasota top and curved beam anchorage line in water Projected length in plane.Sarasota height is highly identical with curved beam Suspension Bridge Tower.
After establishing equivalent straight beam beam length, suitable ratio of rise to span is selected, according still further to former hoist cable in the position of curved beam suspension centre, according to equivalent Straight beam and the position relationship of curved beam, calculate the anchorage point of equivalent straight beam sling of suspension bridge and girder one by one.It should be noted that Although former curved beam hoisting point position is to equidistantly distribute, the equivalent straight beam sling of suspension bridge spacing that conversion is obtained is not equidistant cloth Put, need to successively be calculated hoist cable spacing.
CN201710017080.5A 2017-01-05 2017-01-05 A kind of curved beam suspension bridge modeling method of unilateral suspention Active CN106777778B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710017080.5A CN106777778B (en) 2017-01-05 2017-01-05 A kind of curved beam suspension bridge modeling method of unilateral suspention

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710017080.5A CN106777778B (en) 2017-01-05 2017-01-05 A kind of curved beam suspension bridge modeling method of unilateral suspention

Publications (2)

Publication Number Publication Date
CN106777778A true CN106777778A (en) 2017-05-31
CN106777778B CN106777778B (en) 2019-12-03

Family

ID=58948947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710017080.5A Active CN106777778B (en) 2017-01-05 2017-01-05 A kind of curved beam suspension bridge modeling method of unilateral suspention

Country Status (1)

Country Link
CN (1) CN106777778B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107391787A (en) * 2017-06-09 2017-11-24 中国电力科学研究院 The carrying rope of fixed cableway and hauling rope coupled system computational methods and device
CN108388716A (en) * 2018-02-08 2018-08-10 长沙理工大学 Plane equivalent analysis method and model of space stay cable
CN108491635A (en) * 2018-03-26 2018-09-04 东南大学 A kind of suspension bridge sunpender power and main cable alignment combined calculation method
CN110990913A (en) * 2019-11-13 2020-04-10 中铁大桥勘测设计院集团有限公司 Side span shape finding method adopting horizontal plane internal force control
CN111931400A (en) * 2020-07-17 2020-11-13 中铁大桥勘测设计院集团有限公司 Method for determining quantity of crossed slings of bridge of cooperative system
JP2021182231A (en) * 2020-05-19 2021-11-25 株式会社巴コーポレーション Suspension member shape design method in structure including long wire
CN114136582A (en) * 2021-11-29 2022-03-04 陕西墨斗星智能科技有限公司 Bridge wave vibration monitoring device, stabilization system and use method
CN114910031A (en) * 2022-06-27 2022-08-16 重庆交通大学 Suspension bridge health monitoring method and system, computer equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101221433A (en) * 2007-12-28 2008-07-16 中交第二公路工程局有限公司 Integrated control system of suspension bridge main rope winding machine
WO2012009838A1 (en) * 2010-07-20 2012-01-26 Wang Dingfeng Method for fabricating single-sided circuit board using apposition wires
CN103604628A (en) * 2013-12-09 2014-02-26 东南大学 Problematic cable/concentrated load progressive recognition method on basis of linear displacement angle monitoring

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101221433A (en) * 2007-12-28 2008-07-16 中交第二公路工程局有限公司 Integrated control system of suspension bridge main rope winding machine
WO2012009838A1 (en) * 2010-07-20 2012-01-26 Wang Dingfeng Method for fabricating single-sided circuit board using apposition wires
CN103604628A (en) * 2013-12-09 2014-02-26 东南大学 Problematic cable/concentrated load progressive recognition method on basis of linear displacement angle monitoring

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107391787B (en) * 2017-06-09 2022-09-09 中国电力科学研究院 Method and device for calculating coupling system of bearing cable and traction cable of fixed cableway
CN107391787A (en) * 2017-06-09 2017-11-24 中国电力科学研究院 The carrying rope of fixed cableway and hauling rope coupled system computational methods and device
CN108388716A (en) * 2018-02-08 2018-08-10 长沙理工大学 Plane equivalent analysis method and model of space stay cable
CN108388716B (en) * 2018-02-08 2021-07-02 长沙理工大学 Plane equivalent analysis method of space stay cable and construction method of model
CN108491635B (en) * 2018-03-26 2022-04-12 东南大学 Method for jointly calculating boom force and main cable line shape of suspension bridge
CN108491635A (en) * 2018-03-26 2018-09-04 东南大学 A kind of suspension bridge sunpender power and main cable alignment combined calculation method
CN110990913A (en) * 2019-11-13 2020-04-10 中铁大桥勘测设计院集团有限公司 Side span shape finding method adopting horizontal plane internal force control
CN110990913B (en) * 2019-11-13 2022-06-03 中铁大桥勘测设计院集团有限公司 Side span shape finding method adopting horizontal plane internal force control
JP2021182231A (en) * 2020-05-19 2021-11-25 株式会社巴コーポレーション Suspension member shape design method in structure including long wire
JP6992120B2 (en) 2020-05-19 2022-01-13 株式会社巴コーポレーション Shape design method for suspension materials in structures including long wire rods
WO2022012100A1 (en) * 2020-07-17 2022-01-20 中铁大桥勘测设计院集团有限公司 Method for determining number of crossed hangers for cooperative system bridge
CN111931400A (en) * 2020-07-17 2020-11-13 中铁大桥勘测设计院集团有限公司 Method for determining quantity of crossed slings of bridge of cooperative system
CN111931400B (en) * 2020-07-17 2023-08-22 中铁大桥勘测设计院集团有限公司 Method for determining number of crossed slings of bridge of cooperative system
CN114136582A (en) * 2021-11-29 2022-03-04 陕西墨斗星智能科技有限公司 Bridge wave vibration monitoring device, stabilization system and use method
CN114136582B (en) * 2021-11-29 2023-09-22 陕西墨斗星智能科技有限公司 Bridge wave vibration monitoring device, stabilizing system and use method
CN114910031A (en) * 2022-06-27 2022-08-16 重庆交通大学 Suspension bridge health monitoring method and system, computer equipment and storage medium
CN114910031B (en) * 2022-06-27 2023-07-04 重庆交通大学 Suspension bridge health monitoring method, system, computer equipment and storage medium

Also Published As

Publication number Publication date
CN106777778B (en) 2019-12-03

Similar Documents

Publication Publication Date Title
CN106777778B (en) A kind of curved beam suspension bridge modeling method of unilateral suspention
CN101200916B (en) Construction method of prestressed suspension type building structure
CN114086669B (en) Modularized rapid construction method for large-scale space special-shaped curved surface steel net rack
CN110886423A (en) BIM technology-based steel structure tension beam roof construction method
CN111695188B (en) Rapid and fine analysis method for dynamic characteristics of ground anchor type suspension bridge
CN111395532B (en) Installation and construction method for large-span half-opening elliptical spherical reticulated shell
CN102179651A (en) On-site plane trusses of extra-large welded ball net frame and method for splicing three-dimensional sections
CN104846747A (en) Self-anchored suspension bridge boom tensioning technology based on self-equilibrium system
CN111783201A (en) Rapid analysis method for dynamic characteristics of three-span self-anchored suspension bridge
Liu et al. Designing efficient grid structures considering structural imperfection sensitivity
CN111980418A (en) Construction method for hoisting steel structure roof of beam string dome in large-scale public building engineering
Asgari et al. Optimization of pre-tensioning cable forces in highly redundant cable-stayed bridges
CN103043543A (en) Device for reinforcing tower crane in coastal zone
CN112395797B (en) Oil-gas pipe suspension cable crossing simulation analysis method
CN104196245B (en) The sectional making assembling method of large-scale steel pipe truss variable cross-section curved beam
Fernandes et al. Tectonic design of elastic timber gridshells
CN105781126B (en) A kind of beam-string structure passively establishes pre-stressed construction method
CN104481028A (en) Prestressed space grid structure
CN103306211B (en) A kind of No. 0 block reinforcing bar binding construction method of growing up based on framework beam
Yang et al. The dismantling method of wheel-spoke cable-strut tension structures based on experimental and numerical study
CN112524334B (en) Construction method for large-scale cable crossing of oil and gas pipeline and tower dynamic stabilization process thereof
CN111502098B (en) Suspended dome structure suitable for square boundary and calculation method thereof
CN112464534A (en) Oil-gas pipe suspension cable crossing simulation analysis model and construction method thereof
Neri Pier Luigi Nervi’s reduced scale models for hp shells
CN102808515A (en) Construction method of planar heavy roof beam string structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant