CN106777154A - A kind of intelligent substation big data based on virtual reality technology excavates application process - Google Patents

A kind of intelligent substation big data based on virtual reality technology excavates application process Download PDF

Info

Publication number
CN106777154A
CN106777154A CN201611183198.7A CN201611183198A CN106777154A CN 106777154 A CN106777154 A CN 106777154A CN 201611183198 A CN201611183198 A CN 201611183198A CN 106777154 A CN106777154 A CN 106777154A
Authority
CN
China
Prior art keywords
big data
intelligent substation
data
application
application process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611183198.7A
Other languages
Chinese (zh)
Inventor
刘世丹
李泉
李一泉
袁亮荣
曾耿晖
竹之涵
程智远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU PTSWITCH COMPUTER TECHNOLOGY Co Ltd
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
GUANGZHOU PTSWITCH COMPUTER TECHNOLOGY Co Ltd
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU PTSWITCH COMPUTER TECHNOLOGY Co Ltd, Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd filed Critical GUANGZHOU PTSWITCH COMPUTER TECHNOLOGY Co Ltd
Priority to CN201611183198.7A priority Critical patent/CN106777154A/en
Publication of CN106777154A publication Critical patent/CN106777154A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/26Visual data mining; Browsing structured data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2465Query processing support for facilitating data mining operations in structured databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

Application process is excavated the present invention relates to a kind of intelligent substation big data based on virtual reality technology, including:Data characteristics and IEC61850 standards according to intelligent substation, the characteristic at least one intelligent substation in region collect;Based on IEC61850 standards, the intelligent substation big data to collecting carries out unified Modeling;The intelligent substation big data that will be obtained after unified Modeling is applied to using in algorithm.The present invention can reliably ensure the relativity and interoperability between intelligent substation big data, be used to solve the problems, such as current intelligent substation big data application reliability, so as to further increase the application level and operational reliability of intelligent substation.

Description

A kind of intelligent substation big data based on virtual reality technology excavates application process
Technical field
The present invention relates to intelligent substation technical field, and in particular to a kind of intelligent substation big data excavates application side Method.
Background technology
At present, domestic each grid company has all carried out intelligent substation pilot, future, in the overall background that intelligent grid is built Under, the fast development of intelligent substation also becomes inexorable trend, how more efficiently using intelligent substation bring it is big Data message is the intelligent substation technology further development and application problem to be solved.
With intelligent substation popularization, develop rapidly and apply, advantage of the intelligent substation relative to traditional transformer station Gradually manifest, intelligent substation can provide more abundant data message and be applied for analysis, rely on intelligent substation data network The extensive construction of network, intelligent substation big data has good application value.But, current intelligent substation big data is not Its is real performance, mainly there is following some problem:1st, it is current both at home and abroad in the technical research of intelligent grid big data and The trial that engineer applied aspect is done, as a whole, still in the starting stage is explored, the research and application of intelligent grid big data are One long-term and complex work;2nd, the Interoperability of intelligent grid Communication Information System is still present, and data model is not yet Unified, this brings practical difficulty to the acquisition and application of data;3rd, there is data point to disperse the characteristics of intelligent substation big data, There is strict relativity between the features such as data volume is big, and data.Intelligent substation big data is broadly divided into two classes, and a class is come From in original sampling data, a class comes from the interoperability data between equipment in addition.This two classes data has in common that number Relativity between, excavates the relativity that application mode considers these data, especially currently without a kind of good big data When it is that big data is related in region multiple intelligent substations, current conventional big data is excavated application mode and cannot more be solved Relativity between data, therefore, how building a kind of reliable intelligent substation big data of offer and excavating application process is to fill The key of intelligent substation big data advantage is waved in distribution.
Further, the data mining application not designed specifically designed for intelligent substation big data feature currently Mode.Relative to traditional transformer station, optical signal instead of electric signal, intelligent substation data samples in intelligent substation Digital message, data networking transmission, the data at each station use network shared resources, the construction of intelligent substation data network For the application of intelligent substation big data provides possibility, also for the more long-distance transmissions of data provide possibility, and due to abiding by IEC61850 standards are kept, data have versatility, but due to having temporal synchronism, i.e., one between substation data Moment voltage and current value should be strict corresponding.Contain intelligent substation equipment in the huge sampled data of intelligent substation The work information of operation, substation equipment can be analyzed by huge sampled data with the electricity consumption situation in the range of analyzed area Ruuning situation, but there are currently no good method by these data summarizations, therefore have no idea to enter using big data Row further analysis application.
Simultaneously as there is strict relativity between intelligent substation data, if using when to destroy this relative Property the reliability of data application will be had a greatly reduced quality, therefore traditional big data being applied in Internet technology excavates application Method cannot wherein play sufficiently effect, thus cannot fully be had for the huge data that intelligent substation is produced The utilization of effect, limits the performance of intelligent substation technical advantage.In summary, there is relativity between intelligent substation data And interoperability, especially when data application is related to multiple transformer stations, and do not have good technological means currently to ensure Relativity and unified interoperability.
The content of the invention
Application side is excavated it is an object of the invention to provide a kind of intelligent substation big data based on virtual reality technology Method, it can reliably ensure the relativity and interoperability between intelligent substation big data, be used to solve current intelligence change The problem of power station big data application reliability, so as to further increase the application level and operational reliability of intelligent substation.
To achieve the above object, the present invention is adopted the following technical scheme that:
A kind of intelligent substation big data based on virtual reality technology excavates application process, and it is comprised the following steps:
(1) big data collects:Data characteristics and IEC61850 standards according to intelligent substation, in region at least one The characteristic of intelligent substation is collected;
(2) big data unified Modeling:Based on IEC61850 standards, to through the big number of intelligent substation obtained by step (1) According to carrying out unified Modeling;
(3) big data application:To be applied to using in algorithm through the intelligent substation big data obtained by step (2).
Above-mentioned intelligent substation big data excavates application process, wherein the big data of the step (1) collects according to described The subscription that application using algorithm to intelligent substation big data needs is carried out.
Above-mentioned intelligent substation big data excavates application process, wherein in the step (1), the data for collecting include adopting Sample value message, switching value action message and station level message.
Above-mentioned intelligent substation big data excavates application process, wherein for the step (2), unified Modeling bag therein Include:
2.1) the SCD models of each intelligent substation are collected;
2.2) different data sources are carried out unified Modeling by the data source demand according to big data application, are each data source Distribute unique APPID information.
Above-mentioned intelligent substation big data excavates application process, wherein the number of the intelligent substation is two or more.
Above-mentioned intelligent substation big data excavates application process, wherein in the step 2.1) in, the SCD models are used for Embody the subscribing relationship of different IED equipment rooms.
Above-mentioned intelligent substation big data excavates application process, wherein the application algorithm in the step (3) is included answering For the big data method for digging of internet.
Above-mentioned intelligent substation big data excavates application process, wherein the application algorithm in the step (3) further comprises At least one in relay protection algorithm, route protection algorithm and differential relaying algorithm.
Above-mentioned intelligent substation big data excavates application process, wherein at least one intelligent substation is set by gateway It is standby to be combined.
The invention has the advantages that:
1st, application process is excavated the invention provides the more efficient reliable intelligent substation big data of one kind, so that significantly Improve the application value of intelligent substation big data;
2nd, intelligent substation data of the present invention can not only derive from single transformer station, while can also derive from many Individual transformer station, such that it is able to provide more sufficient big data basis;
3rd, according to the data characteristics and IEC61850 standards of intelligent substation, (IEC61850 standards are power systems to the present invention Unique universal standard of automatic field), the characteristic in intelligent substation is collected, and big data collects Can be carried out according to subscribing relationship, this is effectively reduced the burden to data network;
4th, the present invention carries out the unified Modeling based on IEC61850 to data for the subscribing relationship of big data application, participates in The data source of modeling is not limited to single transformer station, and the process of unified Modeling ensures independence and synchronism between data, So that the data after modeling have the original relativity and interoperability of intelligent substation, this thereby ensures that later stage big number According to the reliability of application.
Brief description of the drawings
Fig. 1 is the general illustration of the application process environmental structure under the present invention.
Fig. 2 is the overview flow chart of the application process implementation steps under the present invention.
Specific embodiment
Following examples are used to illustrate the present invention, but are not limited to the scope of the present invention.
Application process, such as Fig. 2 are excavated the invention discloses a kind of intelligent substation big data based on virtual reality technology Shown, it is comprised the following steps:
(1) big data collects:Data characteristics and IEC61850 standards according to intelligent substation, in region at least one The characteristic of intelligent substation is collected.
Specifically, the subscription that this step can need according to the application to intelligent substation big data, and carry out the remittance of data Always, i.e. big data collects basis source in specific big data application demand.So, data network just can effectively be mitigated Burden.
For the data for being collected, it can both derive from single intelligent substation, also can be from the power transformation of multiple intelligence Stand (i.e. the number of intelligent substation can be two or more), more sufficient data base can be provided so as to ensure that Plinth.
Also, the data form of combined data includes sampling value message, switching value action message and station level message, these It is the message of clear stipulaties form in IEC61850 standards.
(2) big data unified Modeling:Based on IEC61850 standards, to through the big number of intelligent substation obtained by step (1) According to unified Modeling is carried out, for realizing independence and synchronism between intelligent substation big data.
Wherein, independence refers to the concept for having the strict moment between substation data, i.e., the one voltage electricity at absolute moment Can not be used between stream, all be relatively independent, but when network analysis is carried out, the sampled value between multiple moment is combined Coming can analytic trend.Synchronism refers to that the sampled value between distinct device is synchronous.
Further specifically, unified Modeling therein further comprises:
2.1) the SCD models of each intelligent substation are collected;
2.2) different data sources are carried out unified Modeling by the data source demand according to big data application, are each data source Distribute unique APPID information.
Wherein, SCD models are configuration files main in intelligent substation, and it is mainly used in embodying different IED and sets Subscribing relationship between standby.
When the data source demand according to big data application, when carrying out unified Modeling to different data sources, in modeling process most Crucially (application identities are SV and GOOSE message in IEC61850 standards to the data source APPID in guarantee model file One field) information uniqueness, i.e. the process of unified Modeling is related to a kind of translation process of APPID information.
It is big to intelligent substation based on IEC61850 standards the invention provides a kind of unified method based on the step Data carry out unified Modeling, and the intelligent substation data of participation modeling are not limited to single transformer station (that is, both can be from single Individual transformer station, it is also possible to from multiple transformer stations), emphasis ensures the independence between data and synchronization in rational unified process Property, so that the data after unified Modeling ensure that the relativity and interoperability of intelligent substation big data, and then ensure Later stage big data excavates the reliability of application.
(3) big data application:To be applied to using in algorithm through the intelligent substation big data obtained by step (2).
Under this step, when by concrete application is carried out through the intelligent substation big data after the unified Modeling of step (2), Application algorithm now includes but is not limited to the big data method for digging for being applied to internet of various maturations.
The premise of big data application is that had specific application algorithm, and the invention is not limited in by intelligent power transformation Big data of standing is limited in a certain or several application algorithms, can root according to the intelligent substation big data that step (2) is obtained According to needing to complete various big data applications;Furthermore, the big data application algorithm that the present invention is referred to is a general designation, this Invention is not relevant for specifically using algorithm, and the purpose of the present invention is for these apply algorithm (such as existing various data minings Using algorithm) reliable data source is provided, for a specific application algorithm, only ensure that the reliability of data source Property, can be further ensured that using the reliability of algorithm.
Furthermore, it is understood that by the treatment of above-mentioned steps (1) and step (2), the present invention ensure that intelligent substation Between data relativity and interoperability, so the present invention is exactly based on above method step and constructs an intelligent power transformation Big data of standing platform, so various specific big data application algorithms (or application process) just can be applied on the platform Implement.
In the present invention based on " virtual reality technology " refer to by the data of the actual physical transformer station in region with unification build The mode of mould, constitutes a virtual environment, and in this virtual environment, data are all stood from true, but this Environment is not necessary being.
It is above-mentioned to answer in addition to the various ripe big data method for digging for being applied to internet as further preferred At least one in relay protection algorithm, route protection algorithm and differential relaying algorithm has been may also include with algorithm.These applications Algorithm is currently mainly used in station, but under the data platform environment constructed by the present invention, these are using interior protection of arriving at a station Algorithm or some wide area protection algorithms can be optimized for a kind of big data application algorithm (or method), and derivative is applied to station Between.
It is further noted that clear, complete explanation is carried out to the present invention in order to be further ensured that, so that Those skilled in the art can fully realize technical scheme content, and application number is respectively 201510863689.5 by spy Way of reference is incorporated herein in full with two contents of patent application of 201610569101.X.
From the foregoing, it will be observed that the inventive method is based on IEC61850 standards carries out unified Modeling to the big data applied, so as to protect Demonstrate,prove using the relativity and interoperability of big data, also further provided the side that intelligent substation big data excavates application Method, the big data applied environment built by the method provides the basis of intelligent substation big data application, in this environment, Big data excavates the relativity and interoperability relation that application process need not be concerned about between big data, but is focused on big In the method for data mining application, the method for the present invention provides strong support for intelligent substation big data application, is true Positive intelligent substation big data application provide may, also to solve the protection data application between intelligent substation, provide can Energy.
Additionally, the present invention is by reliably ensureing relativity and interoperability between intelligent substation big data, thus Current intelligent substation big data application reliability is solved the problems, such as, the further applied analysis of intelligent substation big data is The further application of intelligent substation technology provides more abundant data and supports, further improves the application of intelligent substation Level and operational reliability, to ensure to build sturdy power grid.
Further, it is as shown in Figure 1 the general illustration of the application process environmental structure under the present invention.Used in Fig. 1 Three intelligence (physics) transformer stations (stand 1, stand 2 and stand 3) collectively constitute a big data applied environment so that of the invention Data source both from real intelligence (physics) transformer station, to ensure the authenticity of data.
Used as the physical connection equipment in virtual reality technology of the present invention, it is the bearing point of virtual reality technology to gateway. Gateway device belongs to the equipment for landing inventive method in the present invention, and the programmed algorithm in the equipment is to embodiment of the invention; The present invention is combined different real intelligent substations by gateway device, is ensured by the programmed algorithm in gateway device Relativity and interoperability between different intelligent substation data.
Although the present invention is described in detail above to have used general explanation and specific embodiment, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements, belong to the scope of protection of present invention without departing from theon the basis of the spirit of the present invention.

Claims (9)

1. a kind of intelligent substation big data based on virtual reality technology excavates application process, it is characterised in that the method bag Include following steps:
(1) big data collects:Data characteristics and IEC61850 standards according to intelligent substation, at least one intelligence in region The characteristic of transformer station is collected;
(2) big data unified Modeling:Based on IEC61850 standards, to entering through the intelligent substation big data obtained by step (1) Row unified Modeling;
(3) big data application:To be applied to using in algorithm through the intelligent substation big data obtained by step (2).
2. intelligent substation big data as claimed in claim 1 excavates application process, it is characterised in that:The step (1) The subscription that big data collects according to the application algorithm to the application needs of intelligent substation big data is carried out.
3. intelligent substation big data as claimed in claim 1 excavates application process, it is characterised in that:In the step (1) In, the data for collecting include sampling value message, switching value action message and station level message.
4. intelligent substation big data as claimed in claim 1 excavates application process, it is characterised in that:For the step (2), unified Modeling therein is included:
2.1) the SCD models of each intelligent substation are collected;
2.2) different data sources are carried out unified Modeling by the data source demand according to big data application, are the distribution of each data source Unique APPID information.
5. intelligent substation big data as claimed in claim 1 excavates application process, it is characterised in that:The intelligent substation Number be two or more.
6. intelligent substation big data as claimed in claim 4 excavates application process, it is characterised in that:In the step 2.1) In, the SCD models are used to embody the subscribing relationship of different IED equipment rooms.
7. intelligent substation big data as claimed in claim 1 excavates application process, it is characterised in that:In the step (3) Application algorithm include the big data method for digging for being applied to internet.
8. intelligent substation big data as claimed in claim 7 excavates application process, it is characterised in that:In the step (3) Application algorithm further comprises at least one in relay protection algorithm, route protection algorithm and differential relaying algorithm.
9. intelligent substation big data as claimed in claim 1 excavates application process, it is characterised in that:At least one intelligence Energy transformer station is combined by gateway device.
CN201611183198.7A 2016-12-20 2016-12-20 A kind of intelligent substation big data based on virtual reality technology excavates application process Pending CN106777154A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611183198.7A CN106777154A (en) 2016-12-20 2016-12-20 A kind of intelligent substation big data based on virtual reality technology excavates application process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611183198.7A CN106777154A (en) 2016-12-20 2016-12-20 A kind of intelligent substation big data based on virtual reality technology excavates application process

Publications (1)

Publication Number Publication Date
CN106777154A true CN106777154A (en) 2017-05-31

Family

ID=58889500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611183198.7A Pending CN106777154A (en) 2016-12-20 2016-12-20 A kind of intelligent substation big data based on virtual reality technology excavates application process

Country Status (1)

Country Link
CN (1) CN106777154A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110365112A (en) * 2019-07-16 2019-10-22 广东埃文低碳科技股份有限公司 Intelligent substation big data based on virtual reality technology excavates application method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710735A (en) * 2009-12-11 2010-05-19 江西省电力科学研究院 Sharing modeling method of intelligent substation and primary station
CN105335903A (en) * 2015-11-30 2016-02-17 广东电网有限责任公司电力调度控制中心 Intelligent substation modeling method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710735A (en) * 2009-12-11 2010-05-19 江西省电力科学研究院 Sharing modeling method of intelligent substation and primary station
CN105335903A (en) * 2015-11-30 2016-02-17 广东电网有限责任公司电力调度控制中心 Intelligent substation modeling method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李晓海: "数字化变电站综合监测与预警系统研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
肖小兵等: "基于网络报文数据的电网故障诊断分析", 《华东电力》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110365112A (en) * 2019-07-16 2019-10-22 广东埃文低碳科技股份有限公司 Intelligent substation big data based on virtual reality technology excavates application method

Similar Documents

Publication Publication Date Title
CN108334691B (en) Visual automatic drawing method for power distribution network
CN102722764B (en) Integration network optimization computer-aided decision support System
CN102801790B (en) Microgrid energy management system based on IEC (International Electrotechnical Commission) 61850 and multi-agent method
CN102709949A (en) Micro-grid coordinated control system
CN104168138A (en) Electric power communication network system centralized topology generation and display method
CN204030730U (en) Be applied to the electric power small wireless private network system of intelligent grid
CN106777154A (en) A kind of intelligent substation big data based on virtual reality technology excavates application process
Hao et al. Power line communication challenges in the energy internet
CN109670247A (en) A kind of flexibility power distribution network real-time simulation information modelling approach
CN112653246A (en) New energy remote centralized control center communication channel system constructed based on power private network
CN202651896U (en) Coordinated control system of micro power grid
CN109388903A (en) Real-time simulation platform modeling and simulating method based on IEC61850 standard
CN104953706B (en) A kind of intelligence matches somebody with somebody the integrated information interacting method of electricity consumption
CN202076851U (en) Merging unit with dual-network independent sampling function
CN214337926U (en) Protocol conversion gateway device based on intelligent wireless transmission
CN204012919U (en) A kind of intelligent substation network configuration
CN105576827B (en) A kind of implementation method and control system of D.C. high voltage transmission centralized-control center
Chen et al. Using multi-vendor ieds for iec 61850 interoperability and hmi-scada applications
CN111082522A (en) Distribution network state monitoring and fault processing system based on ubiquitous power Internet of things
Cho et al. Building on the distributed energy resources IoT based IEC 61850 XMPP for TPC
Pignolet et al. Future Internet for smart distribution systems
CN105207188A (en) Urban distribution network wide-area protection implementing method based on passive optical network
CN105335903A (en) Intelligent substation modeling method
CN205027857U (en) Ground connection route selection device suitable for intelligent substation
CN110032389A (en) A kind of process layer communication configuration method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531