CN106775963A - A kind of method of target constraint in task - Google Patents
A kind of method of target constraint in task Download PDFInfo
- Publication number
- CN106775963A CN106775963A CN201610966835.1A CN201610966835A CN106775963A CN 106775963 A CN106775963 A CN 106775963A CN 201610966835 A CN201610966835 A CN 201610966835A CN 106775963 A CN106775963 A CN 106775963A
- Authority
- CN
- China
- Prior art keywords
- task
- rule
- target
- attribute
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
Abstract
The method that the present invention provides target constraint in a kind of task, comprises the following steps:S1. constraints rule is defined;S2. task is obtained;S3. the information that will be included in the task carries out the judgement of constraints rule, the result that the success that must go out on missions is submitted to.The invention provides a kind of method of dynamic definition, the complicated practical business of user is converted into flexible rule definition, solves the adaptability of program.
Description
Technical field
The present invention relates to task management software technology field, more particularly, to a kind of constraint of target in task
Method.
Background technology
At present, prior art judged specific task names and specific target attribute, qualified
Task can be submitted to;Can not otherwise submit to.Due to the uncertain of task definition, the uncertainty of target, judgement side is caused
Method can not be fixed, it is virtually impossible to realize the support to customer service.
The invention provides a kind of method of dynamic definition, the complicated practical business of user is converted into flexible rule fixed
Justice, solves the adaptability of program.
The present invention defines mission bit stream constraints rule, target information about respectively based on EAP rule definition
Beam conditional plan;In the task of submission to, computing is carried out to these rules, whether passed through with implementing result, whether can as task
The basis for estimation that success is submitted to.
The content of the invention
The present invention is to overcome above mentioned problem or solve the above problems at least in part, there is provided worked in a kind of task
The method of object constraint.
According to an aspect of the present invention, a kind of method that target is constrained in task, comprises the following steps:S1. it is fixed
Adopted constraints rule;S2. task is obtained;S3. the information that will be included in the task carries out the judgement of constraints rule, obtains
The result that success of going out on missions is submitted to.
The method that the application proposes target constraint in a kind of task.Beneficial effects of the present invention:For prior art
Due to the uncertain of task definition, the uncertainty of target, determination methods are caused to fix, it is virtually impossible to which it is right to realize
A kind of problem of the support of customer service, there is provided method of dynamic definition, the complicated practical business of user is converted to flexibly
Rule definition, solve the adaptability of program.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of the method constrained according to target in a kind of task of the embodiment of the present invention;
Fig. 2 is to judge whether task can carry in the method for target constraint according in a kind of task of the embodiment of the present invention
The schematic diagram of the detail flowchart of friendship;
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the invention is described in further detail.Hereinafter implement
Example is not limited to the scope of the present invention for illustrating the present invention.
The invention provides a kind of method of target constraint in task, as shown in figure 1, implementation bag of the invention
Include following steps:S1. constraints rule is defined;
Constraints rule is including at least the one kind in following two:Mission bit stream constraints rule, work are right
Image information constraints rule.
Mission bit stream constraints rule is at least any one in " task " and " references object ":Selection " is appointed
When business " is as constraints rule, object class is about set to current task object class, can not change, and lower section shows the category of object class
Property condition;Attribute includes base attribute " task names " and all extended attributes, can not fill in attribute conditions;
During from " references object " as constraints rule, object class is changed into user's selecting data object class, non-number
Do not shown according to object class, lower section display object class attribute conditions, attribute include base attribute " state, founder, reviser " and
All extended attributes;If not filling in attribute conditions, expression is judged by the object class condition of references object.
The information constrained conditional plan of target comprise at least it is following in any one:Object class name, scope,
Number, constrained type and target attribute conditions:
Scope:Two options, current task and current task and subtask, are defaulted as current task;
Constraint:Two options, it is necessary to and it is optional, it is defaulted as necessary;
Number:It is defaulted as 1;
Object class:Only support data object class;
Attribute conditions:" state " and all extended attributes in including base attribute, can such as define that " state=issue is simultaneously
And material!The condition that=sky " etc. is submitted to as task, does not represent that there is document thinks to meet condition during configuration condition.
S2. task is obtained;
The task comprises at least the one kind in following two information:Mission bit stream, target information.The task letter
Breath is including at least the one kind in following information:Object class name, task attribute condition and references object condition.The target
Information comprises at least the one kind in following information:The object class name of target, scope, number, constrained type and work right
As attribute conditions.
S3. the information that will be included in the task carries out the judgement of constraints rule, and the success that must go out on missions is submitted to
Result;
(1) decision procedure:
When task is submitted to, the nearest constraints rule of its upward recurrence is taken, if current task has been defined for rule,
Take the rule of current task.
In the task of submission to, if it is necessary to which the document of output is not completed, then forbid submission task;If optional,
If without related work object, only being pointed out when submitting to.If the restriction range of target is current task, only judge current
The target of task, otherwise, it is determined that whether have in the target of current task and its all subtasks meeting condition;Such as
Fruit task has multiple references object and defines references object for constraints, then to each references object application rule, come
Judge whether target meets requirement.
(2) handling process that can judgement task be submitted to:
As shown in Figure 2:
1st, for current task, constraint rule set is obtained.Such as the undefined any rule of current task, then recurrence takes upwards
The rule of father's task.As do not obtained any rule yet, then deterministic process is exited, and continue submission task.
2nd, treatment is circulated to constraint rule set, takes the first rule:
<1>Whether verification current task meets this rule;It is unsatisfactory for, returns, removes a rule.
<2>The all working object in the task is obtained, enters line discipline verification respectively to each object;When effective object
When number is more than or equal to setting quantity, indicate that the target of the task meets constraints.
<3>Remove a rule.
3rd, if there is regular ungratified situation, prompting frame is ejected, and return, it is impossible to submit task to.If regular whole
Meet, then start submission task.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding can carry out various changes, modification, replacement to these embodiments without departing from the principles and spirit of the present invention
And modification, the scope of the present invention is by appended claims and its equivalent limits.
Finally, the present processes are only preferably embodiment, are not intended to limit the scope of the present invention.It is all
Within the spirit and principles in the present invention, any modification, equivalent substitution and improvements made etc. should be included in protection of the invention
Within the scope of.
Claims (8)
1. a kind of method that target is constrained in task, it is characterised in that comprise the following steps:
S1, defines constraints rule;
S2, obtains task;
S3, the information that will be included in the task carries out the judgement of constraints rule, the knot that the success that must go out on missions is submitted to
Really.
2. the method for claim 1, it is characterised in that the task comprises at least the one kind in following two information:
Mission bit stream, target information.
3. method as claimed in claim 2, it is characterised in that the mission bit stream comprises at least the one kind in following information:
Object class name, task attribute condition and references object condition.
4. method as claimed in claim 3, it is characterised in that the target information comprises at least in following information
Kind:The object class name of target, scope, number, constrained type and target attribute conditions.
5. method as claimed in claim 4, it is characterised in that the constraints rule is including at least in following two
Kind:Mission bit stream constraints rule, the information constrained conditional plan of target.
6. method as claimed in claim 5, it is characterised in that the mission bit stream constraints rule be at least " task " and
Any one in " references object ":
When selection " task " is as constraints rule, object class is about set to current task object class, can not change, and lower section shows
The attribute conditions of object class;Attribute includes base attribute " task names " and all extended attributes, can not fill in attribute conditions;
During from " references object " as constraints rule, object class is changed into user's selecting data object class, non-data pair
As class does not show, lower section display object class attribute conditions, attribute includes base attribute " state, founder, reviser " and owns
Extended attribute;If not filling in attribute conditions, expression is judged by the object class condition of references object.
7. method as claimed in claim 6, it is characterised in that the information constrained conditional plan of target comprise at least with
Any one in lower:Object class name, scope, number, constrained type and target attribute conditions.
8. method as claimed in claim 7, it is characterised in that the information included in the task " is entered row constraint by the step
The judgement of conditional plan " also includes herein below:
For the information included in current task, institute's Prescribed Properties rule is obtained;Undefined any rule of current task as described
Then, then recurrence takes the rule of father's task upwards;As do not obtained any rule yet, then deterministic process is exited, and continue submission task;
Treatment is circulated to all constraint rules, the first rule is taken:Whether verification current task meets this rule;It is discontented
It is sufficient then return, remove a rule;
The all working object in the task is obtained, enters line discipline verification respectively to each object;When effective object number is more than
During equal to setting quantity, indicate that the target of the task meets constraints;
Remove a rule;
If there is regular ungratified situation, prompting frame is ejected, and return, it is impossible to submit task to;If regular all meet,
Start submission task.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610966835.1A CN106775963A (en) | 2016-10-28 | 2016-10-28 | A kind of method of target constraint in task |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610966835.1A CN106775963A (en) | 2016-10-28 | 2016-10-28 | A kind of method of target constraint in task |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106775963A true CN106775963A (en) | 2017-05-31 |
Family
ID=58972461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610966835.1A Pending CN106775963A (en) | 2016-10-28 | 2016-10-28 | A kind of method of target constraint in task |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106775963A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110119814A (en) * | 2019-04-29 | 2019-08-13 | 武汉开目信息技术股份有限公司 | Knowledge rule modeling and inference method based on object relationship chain |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1700652A (en) * | 2005-06-01 | 2005-11-23 | 合肥工业大学 | Collaborative design method based on collaborative template |
CN101082970A (en) * | 2007-07-05 | 2007-12-05 | 山东浪潮齐鲁软件产业股份有限公司 | Method for realizing government affairs examination and approval workflow engines system |
CN102254246A (en) * | 2011-06-17 | 2011-11-23 | 中国建设银行股份有限公司 | Workflow managing method and system |
US8370386B1 (en) * | 2009-11-03 | 2013-02-05 | The Boeing Company | Methods and systems for template driven data mining task editing |
CN104091222A (en) * | 2014-05-08 | 2014-10-08 | 武大吉奥信息技术有限公司 | Workflow engine supporting multimode driving |
CN105787630A (en) * | 2014-12-26 | 2016-07-20 | 远光软件股份有限公司 | Diversified business flow creating method |
-
2016
- 2016-10-28 CN CN201610966835.1A patent/CN106775963A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1700652A (en) * | 2005-06-01 | 2005-11-23 | 合肥工业大学 | Collaborative design method based on collaborative template |
CN101082970A (en) * | 2007-07-05 | 2007-12-05 | 山东浪潮齐鲁软件产业股份有限公司 | Method for realizing government affairs examination and approval workflow engines system |
US8370386B1 (en) * | 2009-11-03 | 2013-02-05 | The Boeing Company | Methods and systems for template driven data mining task editing |
CN102254246A (en) * | 2011-06-17 | 2011-11-23 | 中国建设银行股份有限公司 | Workflow managing method and system |
CN104091222A (en) * | 2014-05-08 | 2014-10-08 | 武大吉奥信息技术有限公司 | Workflow engine supporting multimode driving |
CN105787630A (en) * | 2014-12-26 | 2016-07-20 | 远光软件股份有限公司 | Diversified business flow creating method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110119814A (en) * | 2019-04-29 | 2019-08-13 | 武汉开目信息技术股份有限公司 | Knowledge rule modeling and inference method based on object relationship chain |
CN110119814B (en) * | 2019-04-29 | 2022-04-29 | 武汉开目信息技术股份有限公司 | Knowledge rule modeling and reasoning method based on object relation chain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8229779B2 (en) | Method and system for workflow management of a business process | |
US20150127583A1 (en) | Reuse of On-Demand Enterprise System Customization Knowledge Utilizing Collective Experience | |
US9977655B2 (en) | System and method for automatic extraction of software design from requirements | |
Samiedaluie et al. | Managing patient admissions in a neurology ward | |
US10540257B2 (en) | Information processing apparatus and computer-implemented method for evaluating source code | |
CN108268575A (en) | Processing method, the device and system of markup information | |
WO2013184685A1 (en) | Systems and methods for automatically generating a résumé | |
US20110106711A1 (en) | Decision support system and method for distributed decision making for optimal human resource deployment | |
Pedrielli et al. | Hybrid order picking strategies for fashion E-commerce warehouse systems | |
CN107369055A (en) | The picking distribution method and device of order messages | |
US20060080128A1 (en) | System and method for providing customized employment interviews | |
JP6506360B2 (en) | Method of generating teacher data, method of generating learned model, learned model, computer and program | |
CN106775963A (en) | A kind of method of target constraint in task | |
KR102312642B1 (en) | Apparatus and method for scheduling process based on machine learning | |
CN106133779B (en) | Electronic commerce enterprise order acceptance algorithm control method and device | |
Terenciani et al. | BPMN*-A Notation for Representation of Variability in Business Process Towards Supporting Business Process Line Modeling. | |
EP3783547B1 (en) | System and methods for reply date response and due date management in manufacturing | |
US11687591B2 (en) | Systems, methods, computing platforms, and storage media for comparing non-adjacent data subsets | |
Reddaiah et al. | Risk management board for effective risk management in scrum | |
Yfantis et al. | Iterative medium-term production scheduling of an industrial formulation plant | |
Cho | Adopting an Agile Culture A User Experience Team's Journey | |
US9639306B1 (en) | Methods and systems for cell design in a production environment | |
US20220297380A1 (en) | System and method for selection of a print head of a three-dimensional printer | |
Richards et al. | App2Adapt: using tablet technology to elicit conditional probabilities for bayesian belief network modelling | |
US20100114785A1 (en) | System and method for allocating jobs to an agent |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |