CN106771811B - A kind of power marketing error connection investigation method and apparatus - Google Patents

A kind of power marketing error connection investigation method and apparatus Download PDF

Info

Publication number
CN106771811B
CN106771811B CN201611229098.3A CN201611229098A CN106771811B CN 106771811 B CN106771811 B CN 106771811B CN 201611229098 A CN201611229098 A CN 201611229098A CN 106771811 B CN106771811 B CN 106771811B
Authority
CN
China
Prior art keywords
calculated result
preset condition
electricity consumption
preset
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611229098.3A
Other languages
Chinese (zh)
Other versions
CN106771811A (en
Inventor
黄文江
周琦
黄鸣俊
陈篪
刘川川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Xiangshan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Xiangshan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Xiangshan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611229098.3A priority Critical patent/CN106771811B/en
Publication of CN106771811A publication Critical patent/CN106771811A/en
Application granted granted Critical
Publication of CN106771811B publication Critical patent/CN106771811B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/66Testing of connections, e.g. of plugs or non-disconnectable joints
    • G01R31/67Testing the correctness of wire connections in electric apparatus or circuits

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of power marketing error connection investigation method and device, by obtaining multiple pre-set users in the first preset time before changing table or batch meter transformation and changing the electricity consumption of the second preset time after table or batch meter transformation, and the electricity consumption difference of calculating between the two, to obtain the electricity consumption fluctuation situation for changing table or batch meter transformation front and back;Then the electricity consumption difference for meeting the first preset condition is added two-by-two, obtains multiple calculated results, the possibility of the smaller two pre-set user wrong lines for illustrating to carry out electricity consumption difference value of calculated result is bigger;Pre-set user corresponding to the calculated result of the second preset condition will be met again labeled as investigation target user;Namely the calculating process by above-mentioned real time data, and then realize the timely investigation of power marketing error connection.

Description

A kind of power marketing error connection investigation method and apparatus
Technical field
The present invention relates to power marketing technical fields more particularly to a kind of power marketing error connection to check method and apparatus.
Background technique
Existing power marketing error connection user investigation needs manually to pay close attention to the electricity data of power information acquisition, or It is fed back by customer complaint, then carries out on-site verification;Some on-site verifications even need the error connection of in-site installation profession to check Hardware device, so that the investigation of error connection is at high cost, working efficiency is low, and higher to the technology specialty level requirement of personnel; Moreover, the above problem is easy to cause the discovery of error connection situation not in time, thus it often will cause customer complaint and tariff recovery wind Danger.
Summary of the invention
In view of this, the present invention provides a kind of power marketing error connections to check method and apparatus, to find misconnection in time Line situation.
To achieve the above object, technical solution provided by the present application is as follows:
A kind of power marketing error connection investigation method, comprising:
It obtains first preset time of multiple pre-set users before changing table or batch meter transformation and changes table or metering The electricity consumption of the second preset time after case transformation;
Multiple pre-set users are calculated in the electricity consumption of first preset time and second preset time Difference;
The electricity consumption difference for meeting the first preset condition is added two-by-two, obtains multiple calculated results;
Pre-set user corresponding to the calculated result of the second preset condition will be met labeled as investigation target user.
Preferably, it is described obtain multiple calculated results after, further includes:
Pre-set user corresponding to the calculated result of third preset condition will be met labeled as investigation suspicion user;
Pre-set user corresponding to the calculated result of the 4th preset condition will be met and be labeled as normal users.
Preferably, pre-set user corresponding to the calculated result of the second preset condition will be met labeled as investigation mesh described After mark user, further includes:
Pre-warning signal is sent according to preset prediction policy and alarm mode.
Preferably, pre-set user corresponding to the calculated result of the second preset condition will be met labeled as investigation mesh described After mark user, further includes:
Using default exhibition method, target user is checked in the electricity consumption of the first preset time and the second preset time by described Amount is shown.
Preferably, the pre-set user is that batch changes table user or user is transformed in batch meter.
Preferably, first preset time and second preset time are 28 days.
Preferably, first preset condition are as follows: the absolute value of electricity consumption difference is more than 10 degree.
Preferably, second preset condition are as follows: in same batch meter, calculated result is less than 8 degree.
Preferably,
The third preset condition are as follows: in same batch meter, calculated result is between 8 degree to 20 degree;
4th preset condition are as follows: in same batch meter, calculated result is greater than 20 degree.
A kind of power marketing error connection examination device, comprising: acquiring unit, the first computing unit, the second computing unit and First marking unit;Wherein:
The acquiring unit be used for obtain multiple pre-set users change table or batch meter transformation before first it is default when Between and change table or batch meter transformation after the second preset time electricity consumption;
First computing unit is for being calculated multiple pre-set users in first preset time and described The electricity consumption difference of second preset time;
Second computing unit is used to for the electricity consumption difference for meeting the first preset condition being added two-by-two, obtains multiple meters Calculate result;
First marking unit will be for that will meet the label of pre-set user corresponding to the calculated result of the second preset condition To check target user.
Preferably, further includes: the second marking unit and third marking unit;Wherein:
Second marking unit is used for after second computing unit obtains multiple calculated results, will meet third Pre-set user corresponding to the calculated result of preset condition is labeled as investigation suspicion user;
The third marking unit is used for after second computing unit obtains multiple calculated results, will meet the 4th Pre-set user corresponding to the calculated result of preset condition is labeled as normal users.
Preferably, further includes: prewarning unit;
The prewarning unit is used to meet corresponding to the calculated result of the second preset condition in first marking unit Pre-set user labeled as investigation target user after, pre-warning signal is sent according to preset prediction policy and alarm mode.
Preferably, further includes: display unit;
The display unit is used to meet corresponding to the calculated result of the second preset condition in first marking unit Pre-set user labeled as investigation target user after, using default exhibition method, in advance first by the investigation target user If the electricity consumption of time and the second preset time is shown.
It is multiple pre- by obtaining by above scheme it is found that the present invention provides a kind of power marketing error connections to check method If user is in the first preset time before changing table or batch meter transformation and changes second pre- after table or batch meter transformation If the electricity consumption of time, and electricity consumption difference between the two is calculated, to obtain the electricity consumption for changing table or batch meter transformation front and back Amount fluctuation situation;Then the electricity consumption difference for meeting the first preset condition is added two-by-two, obtains multiple calculated results, calculate knot The possibility of the smaller two pre-set user wrong lines for illustrating to carry out electricity consumption difference value of fruit is bigger;The second default item will be met again Pre-set user corresponding to the calculated result of part is labeled as investigation target user;Namely the calculating by above-mentioned real time data Journey, and then realize the timely investigation of power marketing error connection.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the flow chart that power marketing error connection provided in an embodiment of the present invention checks method;
Fig. 2 is another flow chart that power marketing error connection provided in an embodiment of the present invention checks method;
Fig. 3 is another flow chart that power marketing error connection provided in an embodiment of the present invention checks method;
Fig. 4 is another flow chart that power marketing error connection provided in an embodiment of the present invention checks method;
Fig. 5 is another flow chart that power marketing error connection provided in an embodiment of the present invention checks method;
Fig. 6 is the structural schematic diagram of power marketing error connection examination device provided in an embodiment of the present invention;
Fig. 7 is another structural schematic diagram of power marketing error connection examination device provided in an embodiment of the present invention;
Fig. 8 is another structural schematic diagram of power marketing error connection examination device provided in an embodiment of the present invention;
Fig. 9 is another structural schematic diagram of power marketing error connection examination device provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of power marketing error connections to check method, to find error connection situation in time.
Specifically, the power marketing error connection checks method referring to Fig. 1, comprising:
S101, obtain the first preset time before changing table or batch meter transformation of multiple pre-set users and change table or The electricity consumption of the second preset time after batch meter transformation;
Specifically, by obtaining first preset time of multiple pre-set users before changing table or batch meter transformation and changing The electricity consumption of table perhaps the second preset time after batch meter transformation can learn that relative users are changing table or batch meter changes Make the electricity consumption fluctuation situation of front and back;If fluctuation is excessive, illustrate the case where being possible to occur wrong line.
In specific practical application, first preset time and the second preset time can be for one month or shorter Time can also be with, such as one week, then estimate one month electricity consumption multiplied by 4 with one week electricity consumption;It does not do herein specific It limits, it can be depending on its specific application environment, within the scope of protection of this application.
S102, multiple pre-set users are calculated in the electricity consumption difference of the first preset time and the second preset time;
Specifically, calculating electricity consumption difference between the two, table or batch meter transformation are changed in embodiment that can be more succinct The electricity consumption of front and back fluctuates situation;Certain electricity consumption difference may be positive value, it is also possible to negative value, according to subtrahend and minuend Setting, the electricity consumption difference can embody electricity consumption increase or reduction result.
S103, the electricity consumption difference for meeting the first preset condition is added two-by-two, obtains multiple calculated results;
Calculated result is smaller, illustrates that the possibility for carrying out two pre-set user wrong lines of electricity consumption difference value is bigger.
S104, pre-set user corresponding to the calculated result of the second preset condition will be met labeled as investigation target user;
Calculated result is small to arrive a certain range, that is, can determine that two pre-set users for carrying out electricity consumption difference value are wrong line User.
The power marketing error connection provided in this embodiment checks method, by the calculating process of above-mentioned real time data, into And realize the timely investigation of power marketing error connection;Meanwhile the work load of base business personnel is alleviated, improve work Efficiency;Also, method is checked by the power marketing error connection, strengthens business norms, improves customer satisfaction with services;Separately Outside, method is checked by the power marketing error connection, additionally it is possible to reinforce risk management, prevent other hidden danger in time.
Another embodiment of the present invention additionally provides another power marketing error connection investigation method, referring to fig. 2, the electric power Marketing error connection checks method
S101, obtain the first preset time before changing table or batch meter transformation of multiple pre-set users and change table or The electricity consumption of the second preset time after batch meter transformation;
S102, multiple pre-set users are calculated in the electricity consumption difference of the first preset time and the second preset time;
S103, the electricity consumption difference for meeting the first preset condition is added two-by-two, obtains multiple calculated results;
S104, pre-set user corresponding to the calculated result of the second preset condition will be met labeled as investigation target user;
S105, pre-set user corresponding to the calculated result of third preset condition will be met labeled as investigation suspicion user;
S106, pre-set user corresponding to the calculated result of the 4th preset condition will be met labeled as normal users.
Preferably, which is that batch changes table user or user is transformed in batch meter.
Preferably, first preset time and the second preset time are 28 days.
Preferably, first preset condition are as follows: the absolute value of electricity consumption difference is more than 10 degree.
Preferably, second preset condition are as follows: in same batch meter, calculated result is less than 8 degree.
Preferably, third preset condition are as follows: in same batch meter, calculated result is between 8 degree to 20 degree;
4th preset condition are as follows: in same batch meter, calculated result is greater than 20 degree.
In specific practical application, method can be checked with the once per week power marketing error connection;Firstly, from battalion Pin system obtains the inventory for changing table user or batch meter transformation user in first 35 days to first 28 days in batches, takes table or batch meter changes Each 14, the 28 days electricity consumptions in front and back and electricity consumption undulating value are made, user's inventory by batch meter and is fluctuated just by clustering algorithm Negative value is sorted out, and user within rejecting fluctuation less than 10 degree continues by the way of being added two-by-two in same batch meter Fluctuation positive is added with negative value, obtains the family number that minimum value is added in current batch meter, at the same according to additive value into Row is sorted out, and target user, suspicion user and normal users are distinguished.
Another embodiment of the present invention additionally provides another power marketing error connection investigation method, referring to Fig. 3, comprising:
S201, obtain the first preset time before changing table or batch meter transformation of multiple pre-set users and change table or The electricity consumption of the second preset time after batch meter transformation;
S202, multiple pre-set users are calculated in the electricity consumption difference of the first preset time and the second preset time;
S203, the electricity consumption difference for meeting the first preset condition is added two-by-two, obtains multiple calculated results;
S204, pre-set user corresponding to the calculated result of the second preset condition will be met labeled as investigation target user.
S205, pre-warning signal is sent according to preset prediction policy and alarm mode.
Preferably, referring to fig. 4, after step s 204, which checks method, further includes:
S206, using default exhibition method, target user will be checked in the use of the first preset time and the second preset time Electricity is shown.
Preferably, referring to Fig. 5, on the basis of Fig. 4, after step S203, the power marketing error connection investigation side Method further include:
S207, pre-set user corresponding to the calculated result of third preset condition will be met labeled as investigation suspicion user;
S208, pre-set user corresponding to the calculated result of the 4th preset condition will be met labeled as normal users.
In specific practical application, the investigation target user obtained according to step S204 can further carry out electric power Marketing is directed to the early warning application in different posies.
It is possible, firstly, to establish grading forewarning system strategy;The abnormal control point that early warning is come out, namely the pre-warning signal sent In included investigation target user family number or address, determine the prediction policy and alarm mode of different levels, specify difference Control level (determining post), construct grading forewarning system system, support classification control realizes that early warning, the classification of alarm data are pre- Alert and control.
It is then also possible to construct early warning view;Specifically strategy can be managed according to grading forewarning system, show current login personnel The early warning of unit one belongs to and alarm quantity penetrate the corresponding warning grade detailed bill of inquiry and constituent parts early warning by the quantity Distribution situation supports personalized early warning short message subscribing manner, and point quantity real-time informing related personnel is managed in early warning.
In specific practical application, it can also carry out visualization according to the investigation target user that step S204 is obtained and wear Analysis thoroughly;Specifically, control can be visualized with Baidu ECHARTS, according to the doubtful use of visiting one house after another of management unit's level Amount amount carries out summarizing displaying with column diagram form, and electricity is to when before and after penetrating according to unit difference progress detailed data, change table Trend of visiting one house after another and high-incidence attaching personnel analysis, while 10 bit string family users carry out emphasis pass before the suspicion index analyzed each issue Note, real-time exhibition user change the table 28 days electricity trend in front and back and electricity ratio to situation.
The power marketing error connection provided in this embodiment checks method, by big data, from high-frequency, large capacity, no With obtaining targeted, valuable information in the data of structure and type.Using the electricity data of Electric Power Marketing System, lead to Intelligence, real time implementation, the power marketing error connection investigation method foundation that analyzing and positioning can be penetrated are crossed, it is wrong that periodic analysis fills table link A possibility that wiring, to filter out doubtful user, timely early warning is likely to occur user's inventory of error connection.Administrative staff can root According to the artificial investigation in this report scene of giving priority in arranging for, finds and correct prior to user, reduce customer complaint probability;Specific practical In, the available mode of user's telephone number can also be periodically determined, guarantee to link up in time with user and contact, thus by hidden Trouble prevents, and risk will be arrived to minimum, reduction customer complaint, raising customer satisfaction with services.
Another embodiment of the present invention additionally provides a kind of power marketing error connection examination device, referring to Fig. 6, comprising: obtains Unit 101, the first computing unit 102, the second computing unit 103 and the first marking unit 104;Wherein:
Acquiring unit 101 is used to obtain first preset time of multiple pre-set users before changing table or batch meter transformation With change table or batch meter transformation after the second preset time electricity consumption;
First computing unit 102 is for being calculated multiple pre-set users in first preset time and described the The electricity consumption difference of two preset times;
Second computing unit 103 is used to for the electricity consumption difference for meeting the first preset condition being added two-by-two, obtains multiple meters Calculate result;
First marking unit 104 is used to meet pre-set user corresponding to the calculated result of the second preset condition and is labeled as Check target user.
The power marketing error connection examination device provided in this embodiment, by the Computing Principle of above-mentioned real time data, into And realize the timely investigation of power marketing error connection;Meanwhile the work load of base business personnel is alleviated, improve work Efficiency;Also, method is checked by the power marketing error connection, strengthens business norms, improves customer satisfaction with services;Separately Outside, method is checked by the power marketing error connection, additionally it is possible to reinforce risk management, prevent other hidden danger in time.
Preferably, which is that batch changes table user or user is transformed in batch meter.
Preferably, first preset time and the second preset time are 28 days.
Preferably, first preset condition are as follows: the absolute value of electricity consumption difference is more than 10 degree.
Preferably, second preset condition are as follows: in same batch meter, calculated result is less than 8 degree.
Preferably, third preset condition are as follows: in same batch meter, calculated result is between 8 degree to 20 degree;
4th preset condition are as follows: in same batch meter, calculated result is greater than 20 degree.
Preferably, referring to Fig. 7, on the basis of Fig. 6, the power marketing error connection examination device further include: the second mark Remember unit 105 and third marking unit 106;Wherein:
Second marking unit 105 is used for after the second computing unit 103 obtains multiple calculated results, pre- by third is met If pre-set user corresponding to the calculated result of condition is labeled as investigation suspicion user;
Third marking unit 106 is used for after the second computing unit 103 obtains multiple calculated results, pre- by meeting the 4th If pre-set user corresponding to the calculated result of condition is labeled as normal users.
Preferably, referring to Fig. 8, on the basis of Fig. 6, the power marketing error connection examination device further include: early warning list Member 107;
Prewarning unit 107 is used to meet corresponding to the calculated result of the second preset condition in the first marking unit 104 After pre-set user is labeled as investigation target user, pre-warning signal is sent according to preset prediction policy and alarm mode.
Preferably, referring to Fig. 9, on the basis of Fig. 6, the power marketing error connection examination device further include: show single Member 108;
Display unit 108 is used to meet corresponding to the calculated result of the second preset condition in the first marking unit 104 After pre-set user is labeled as investigation target user, using default exhibition method, the investigation target user is preset first The electricity consumption of time and the second preset time is shown.
Other specific working principles are same as the previously described embodiments, no longer repeat one by one herein.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with it is other The difference of embodiment, same or similar part may refer to each other between each embodiment.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (9)

1. a kind of power marketing error connection checks method characterized by comprising
It obtains first preset time of multiple pre-set users before changing table or batch meter transformation and changes table or batch meter changes The electricity consumption of the second preset time after making;
Multiple pre-set users are calculated in the electricity consumption difference of first preset time and second preset time;
The electricity consumption difference for meeting the first preset condition is added two-by-two, obtains multiple calculated results;
Pre-set user corresponding to the calculated result of the second preset condition will be met labeled as investigation target user;
It is described obtain multiple calculated results after, further includes:
Pre-set user corresponding to the calculated result of third preset condition will be met labeled as investigation suspicion user;
Pre-set user corresponding to the calculated result of the 4th preset condition will be met and be labeled as normal users;
First preset condition are as follows: the absolute value of electricity consumption difference is more than 10 degree;
Second preset condition are as follows: in same batch meter, calculated result is less than 8 degree;
The third preset condition are as follows: in same batch meter, calculated result is between 8 degree to 20 degree;
4th preset condition are as follows: in same batch meter, calculated result is greater than 20 degree.
2. power marketing error connection according to claim 1 checks method, which is characterized in that second will be met in advance described After if pre-set user corresponding to the calculated result of condition is labeled as investigation target user, further includes:
Pre-warning signal is sent according to preset prediction policy and alarm mode.
3. power marketing error connection according to claim 1 checks method, which is characterized in that second will be met in advance described After if pre-set user corresponding to the calculated result of condition is labeled as investigation target user, further includes:
Using default exhibition method, by the investigation target user the electricity consumption of the first preset time and the second preset time into Row is shown.
4. power marketing error connection according to any one of claims 1 to 3 checks method, which is characterized in that the default use Family is that batch changes table user or user is transformed in batch meter.
5. power marketing error connection according to any one of claims 1 to 3 checks method, which is characterized in that described first is pre- If time and second preset time are 28 days.
6. a kind of power marketing error connection examination device characterized by comprising acquiring unit, the first computing unit, the second meter Calculate unit and the first marking unit;Wherein:
The acquiring unit be used for obtain multiple pre-set users change table or batch meter transformation before the first preset time and Change the electricity consumption of the second preset time after table or batch meter transformation;
First computing unit is for being calculated multiple pre-set users in first preset time and described second The electricity consumption difference of preset time;
Second computing unit is used to for the electricity consumption difference for meeting the first preset condition being added two-by-two, obtains multiple calculating knots Fruit;
First marking unit will be for that will meet pre-set user corresponding to the calculated result of the second preset condition labeled as row Look into target user;
It is described obtain multiple calculated results after, further includes:
Pre-set user corresponding to the calculated result of third preset condition will be met labeled as investigation suspicion user;
Pre-set user corresponding to the calculated result of the 4th preset condition will be met and be labeled as normal users;
First preset condition are as follows: the absolute value of electricity consumption difference is more than 10 degree;
Second preset condition are as follows: in same batch meter, calculated result is less than 8 degree;
The third preset condition are as follows: in same batch meter, calculated result is between 8 degree to 20 degree;
4th preset condition are as follows: in same batch meter, calculated result is greater than 20 degree.
7. power marketing error connection examination device according to claim 6, which is characterized in that further include: the second label is single Member and third marking unit;Wherein:
Second marking unit is used for after second computing unit obtains multiple calculated results, will be met third and is preset Pre-set user corresponding to the calculated result of condition is labeled as investigation suspicion user;
The third marking unit is used for after second computing unit obtains multiple calculated results, will be met the 4th and is preset Pre-set user corresponding to the calculated result of condition is labeled as normal users.
8. power marketing error connection examination device according to claim 6, which is characterized in that further include: prewarning unit;
The prewarning unit is used to meet in first marking unit pre- corresponding to the calculated result of the second preset condition If user's mark is to send pre-warning signal according to preset prediction policy and alarm mode after checking target user.
9. power marketing error connection examination device according to claim 6, which is characterized in that further include: display unit;
The display unit is used to meet in first marking unit pre- corresponding to the calculated result of the second preset condition If user's mark is after checking target user, using default exhibition method, by the investigation target user when first is default Between and the electricity consumption of the second preset time be shown.
CN201611229098.3A 2016-12-27 2016-12-27 A kind of power marketing error connection investigation method and apparatus Active CN106771811B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611229098.3A CN106771811B (en) 2016-12-27 2016-12-27 A kind of power marketing error connection investigation method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611229098.3A CN106771811B (en) 2016-12-27 2016-12-27 A kind of power marketing error connection investigation method and apparatus

Publications (2)

Publication Number Publication Date
CN106771811A CN106771811A (en) 2017-05-31
CN106771811B true CN106771811B (en) 2019-06-25

Family

ID=58922806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611229098.3A Active CN106771811B (en) 2016-12-27 2016-12-27 A kind of power marketing error connection investigation method and apparatus

Country Status (1)

Country Link
CN (1) CN106771811B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107390160A (en) * 2017-08-04 2017-11-24 国网浙江省电力公司 It is a kind of that table wiring mistake determination methods are changed based on electricity fluctuation exception

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102033185A (en) * 2009-09-24 2011-04-27 浙江省电力公司 Method for judging wrong wiring of electric energy meter based on apparent power estimation
CN105720687A (en) * 2016-02-02 2016-06-29 国家电网公司 Electric meter incorrect-installation monitoring system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102033185A (en) * 2009-09-24 2011-04-27 浙江省电力公司 Method for judging wrong wiring of electric energy meter based on apparent power estimation
CN105720687A (en) * 2016-02-02 2016-06-29 国家电网公司 Electric meter incorrect-installation monitoring system

Also Published As

Publication number Publication date
CN106771811A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
US8176095B2 (en) Collecting, sharing, comparing, and displaying resource usage data
Alrawi et al. High-resolution household load profiling and evaluation of rooftop PV systems in selected houses in Qatar
CN109800250B (en) System architecture for no longer configuring enterprise central server
US20130151979A1 (en) System and method for enterprise utility data aggregation, management, and reporting
CN106067137A (en) A kind of credit rating evaluation methodology based on intelligent grid monitoring system
US20190362444A1 (en) Systems And Methods For Improved Monitoring Of Energy And Water Consumption
US11805032B2 (en) Customer service systems and portals
CN110163705A (en) Method and apparatus for pushed information
US20190086234A1 (en) Systems and methods for displaying resource savings
Karavitis et al. Development of the standardised precipitation index for Greece
CN103399186A (en) Method and device for identifying electricity stealing and leakage users based on line loss monitoring
CN105631591A (en) Regional power quality analysis system
CN107341859A (en) A kind of engineering project Work attendance management system
CN105183753A (en) Electricity consumption data visualization method, electricity consumption data visualization device and mobile terminal
CN109359874A (en) A kind of multidimensional index monitoring and early warning method and device
CN108475257A (en) It handles far distance instrument and reads data to analyze consumption pattern
CN102592175B (en) A kind of power system line loss management analysis method and system
CN106771811B (en) A kind of power marketing error connection investigation method and apparatus
US7991567B1 (en) Centralized operating meter for energy technologies
CN113255996B (en) Method, device, equipment and storage medium for managing tagged electric charge balance
CN114187095A (en) Account checking data processing method, account checking data processing device, account checking data processing equipment and storage medium
Yates et al. Using economic and other performance measures to evaluate a municipal drought plan
TW201237371A (en) Analyzing utility consumption
Fowler et al. Energy data management system commercial product summary
Suciu et al. Cloud-Based platform for enhancing energy consumption awareness and substantiating the adoption of energy efficiency measures within SMEs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant