CN106769614A - A kind of experimental rig and method for assessing surface of aggregate asphalt membrane block-water performance - Google Patents

A kind of experimental rig and method for assessing surface of aggregate asphalt membrane block-water performance Download PDF

Info

Publication number
CN106769614A
CN106769614A CN201710057082.7A CN201710057082A CN106769614A CN 106769614 A CN106769614 A CN 106769614A CN 201710057082 A CN201710057082 A CN 201710057082A CN 106769614 A CN106769614 A CN 106769614A
Authority
CN
China
Prior art keywords
basket
meausring apparatus
asphalt membrane
water
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710057082.7A
Other languages
Chinese (zh)
Other versions
CN106769614B (en
Inventor
张久鹏
谭好奇
裴建中
朱存贞
屈甜
胡壮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201710057082.7A priority Critical patent/CN106769614B/en
Publication of CN106769614A publication Critical patent/CN106769614A/en
Application granted granted Critical
Publication of CN106769614B publication Critical patent/CN106769614B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N5/00Analysing materials by weighing, e.g. weighing small particles separated from a gas or liquid
    • G01N5/02Analysing materials by weighing, e.g. weighing small particles separated from a gas or liquid by absorbing or adsorbing components of a material and determining change of weight of the adsorbent, e.g. determining moisture content

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a kind of experimental rig and method for testing surface of aggregate asphalt membrane block-water performance, including environmental cabinet, computer and the cistern in environmental cabinet, lowering or hoisting gear, the first basket, the second basket, the first meausring apparatus for weighing the first basket weight and the second meausring apparatus for weighing the second basket weight;Cistern is fixed on the bottom of environmental cabinet, first basket and the second basket are fixed on the top of environmental cabinet by lowering or hoisting gear, first basket and the second basket are located at the top of cistern, first meausring apparatus and the second meausring apparatus are connected with computer, and the device and method can realize the assessment of surface of aggregate asphalt membrane block-water performance.

Description

A kind of experimental rig and method for assessing surface of aggregate asphalt membrane block-water performance
Technical field
The present invention relates to a kind of experimental rig and method, and in particular to a kind of assessment surface of aggregate asphalt membrane block-water performance Experimental rig and method.
Background technology
Bituminous paving has the advantages that driving is comfortable and performance is good, can guarantee that automobile quickly and low noise it is capable Sail, and bituminous paving has the advantages that construction speed is fast, open to traffic is fast, easy to maintenance, recoverable, thus it is extensive It is applied to all over the world.In recent years, as some High Grade Bitumen Pavement highways there occurs more serious Moisture Damage problem, this Plant the attention that destruction situation gradually causes various countries researchers.At present, the experiment of test bituminous paving anti-water damage ability is as frozen Melt diametral compression test etc. to still have several drawbacks, it is impossible to for determining surface of aggregate asphalt membrane block-water performance in asphalt water resistant Acted on played in infringement ability.
The Moisture Damage of so-called bituminous paving, refer to bituminous paving in the presence of moisture, undergo the anti-of traffic loading Multiple effect, moisture is progressively invaded on the interactive interface of asphalt and aggregate, simultaneously because hydrodynamic effect, causes surface of aggregate Asphalt membrane and the cohesive force between gathering materials gradually are lost and bituminous paving is broken ring.The mechanism of action of Water Damage on Asphalt Pavement and two The process of kind is relevant, is first to reduce asphalt adhesion during water energy invades pitch, so as to cause the intensity of asphalt and strength Degree reduces, and secondly, water energy blocks the mutual bonding of asphalt and aggregate, due to surface of aggregate into asphalt film and between gathering materials Absorption affinity to water is stronger than pitch, causes the contact on asphalt and aggregate surface to reduce, and pitch is peeled off from surface of aggregate, pitch mixing The intensity of material is gradually reduced, and under the synergy of traffic load, Water Damage substantially aggravates, and causes asphalt concrete pavement to produce The structural destruction of rut, loose, pit and part, however, the experiment of existing test bituminous paving anti-water damage ability is all Do not considered that surface of aggregate asphalt membrane block-water performance was acted on played in asphalt anti-water damage ability, it is therefore desirable to design Go out a kind of device and method, the device and method can realize the assessment of surface of aggregate asphalt membrane block-water performance.
The content of the invention
Shortcoming it is an object of the invention to overcome above-mentioned prior art, there is provided one kind test surface of aggregate asphalt membrane resistance The experimental rig and method of aqueous energy, the device and method can realize the assessment of surface of aggregate asphalt membrane block-water performance.
To reach above-mentioned purpose, the experimental rig of assessment surface of aggregate asphalt membrane block-water performance of the present invention includes ring Border case, computer and the cistern in environmental cabinet, lowering or hoisting gear, the first basket, the second basket, for weighing the first net First meausring apparatus of basket weight and the second meausring apparatus for weighing the second basket weight;
Cistern is fixed on the bottom of environmental cabinet, and the first basket and the second basket are fixed on environmental cabinet by lowering or hoisting gear Top, the first basket and the second basket be located at the top of cistern, the first meausring apparatus and the second meausring apparatus with calculating Machine is connected.
Lowering or hoisting gear include the first elevating lever, the second elevating lever, the 3rd elevating lever, the first pressure-bearing platform, the second pressure-bearing platform and 3rd pressure-bearing platform, wherein, the upper end of the upper end of the first elevating lever, the upper end of the second elevating lever and the 3rd elevating lever is both secured to ring The top of border case, the first pressure-bearing platform, the second pressure-bearing platform and the 3rd pressure-bearing platform be individually fixed in the lower end of the first elevating lever, second liter The lower end of bar and the lower end of the 3rd elevating lever are dropped, and the first meausring apparatus is fixed between the first pressure-bearing platform and the second pressure-bearing platform, the Two meausring apparatuses are fixed between the second pressure-bearing platform and the 3rd pressure-bearing platform, and the first net is suspended on the first meausring apparatus, and second Net is suspended on the second meausring apparatus.
Base plate is provided between environmental cabinet and cistern, wherein, the upper surface of base plate is offered for being fixed on cistern Groove, wherein, the bottom of cistern is embedded in the groove.
Temperature sensor is provided with cistern, heating system and refrigeration system are provided with environmental cabinet, wherein, temperature sensor Output end be connected with the input of computer, the control end of heating system and the control end of refrigeration system with computer Output end is connected.
Side at the top of cistern is provided with overfall.
The bottom of cistern is provided with delivery port.
Between first meausring apparatus and the first pressure-bearing platform, between the first meausring apparatus and the second pressure-bearing platform, second weigh dress Put between the second pressure-bearing platform and be equipped with rubber support between the second meausring apparatus and the 3rd pressure-bearing platform.
First meausring apparatus is connected by the first fishhook with the first basket, and the second meausring apparatus is by the second fishhook and the Two baskets are connected.
First meausring apparatus and the second meausring apparatus are balance.
The test method of assessment surface of aggregate asphalt membrane block-water performance of the present invention is comprised the following steps:
Dried to gathering materials, then will gather materials and be equally divided into two parts, wherein, first part is gathered materials and second part of quality gathered materials It is m0, first part is gathered materials and is placed into dry environment, second part is gathered materials and is immersed in pitch, then take out second part of collection Material, makes second part of asphalt solidification of surface of aggregate form asphalt membrane, and second part of quality m for gathering materials then is weighed again0′
First part is gathered materials and second part is gathered materials and be respectively placed in the first basket and the second basket, then control lowering or hoisting gear First basket and the second basket are immersed in cistern, first is weighed respectively by the first meausring apparatus and the second meausring apparatus The weight of basket and the second basket;Obtain the i-th unit interval surface of aggregate asphalt membrane water blocking rate αi=(gather materials in the i-th unit interval Water suction quality miThe water suction quality m that asphalt membrane parcel gathers materials in-the i-th unit intervali′The water suction gathered materials in the unit interval of)/i-th Quality mi, wherein, the water suction qualitative data m gathered materials in the i-th unit intervaliIn=the i-th unit interval after water suction first part gather materials Quality mn-m0, the second water suction quality m for gathering materials in the i-th unit intervali′In=the i-th unit interval after water suction second part gather materials Quality mn′-m0′, obtain the water blocking rate α of the surface of aggregate asphalt membrane that N number of unit interval detection is obtained1, α2, α3...αN, then test set Expect surface asphalt membrane water blocking rate α be:
Water blocking rate α according to experiment surface of aggregate asphalt membrane assesses surface of aggregate asphalt membrane block-water performance.
The invention has the advantages that:
The experimental rig and method of test surface of aggregate asphalt membrane block-water performance of the present invention, will in concrete operations First part gather materials and there is asphalt membrane on surface second part gather materials and be placed into the first basket and the second basket, then by the first basket and Second basket is positioned in cistern, and weighs its quality in real time by the first meausring apparatus and the second meausring apparatus, according to Portion gathers materials and second part of water blocking rate of the change calculations experiment surface of aggregate asphalt membrane of aggregate quality, is then gathered materials according to experiment The water blocking rate assessment surface of aggregate asphalt membrane block-water performance of surface asphalt membrane, it is simple to operate, it is test bituminous paving anti-water damage Ability provides technical support.
Further, overfall is provided with the top of cistern, when water is added in cistern, when the water surface of cistern reclaimed water During more than the overfall, then the water in cistern is discharged through overfall, and finally makes the liquid level and overfall of cistern reclaimed water Flush, so that the effective amount to cistern reclaimed water is controlled.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the structural representation of cistern 3 in the present invention;
Fig. 3 is the structural representation of the first basket 4 and the second basket in the present invention;
Fig. 4 is the structural representation of lowering or hoisting gear in the present invention.
Wherein, 1 be environmental cabinet, 2 be base plate, 3 be cistern, 4 be the first basket, 5 be the first fishhook, 6 be first lifting Bar, 7 be power set, 8 be the second meausring apparatus, 9 be rubber support, 10 be the 3rd pressure-bearing platform, 11 be overfall, 12 be water outlet Mouthful, 13 be computer, 14 be bolt, 15 be sensor, 16 be groove, 17 be valve.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings:
With reference to Fig. 1, assess the experimental rig of surface of aggregate asphalt membrane block-water performance include environmental cabinet 1, computer 13 and Cistern 3, lowering or hoisting gear, the first basket 4, the second basket in environmental cabinet 1, for weigh the weight of the first basket 4 One meausring apparatus and the second meausring apparatus 8 for weighing the second basket weight;Cistern 3 is fixed on the bottom of environmental cabinet 1, First basket 4 and the second basket are fixed on the top of environmental cabinet 1 by lowering or hoisting gear, and the first basket 4 and the second basket are located at The top of cistern 3, the first meausring apparatus and the second meausring apparatus 8 are connected with computer 13.
Lowering or hoisting gear include the first elevating lever 6, the second elevating lever, the 3rd elevating lever, the first pressure-bearing platform, the second pressure-bearing platform and 3rd pressure-bearing platform 10, wherein, the upper end of the upper end, the upper end of the second elevating lever and the 3rd elevating lever of the first elevating lever 6 is fixed In the top of environmental cabinet 1, the first pressure-bearing platform, the second pressure-bearing platform and the 3rd pressure-bearing platform 10 are individually fixed under the first elevating lever 6 The lower end of end, the lower end of the second elevating lever and the 3rd elevating lever, the first meausring apparatus is fixed on the first pressure-bearing platform and the second pressure-bearing Between platform, the second meausring apparatus 8 is fixed between the second pressure-bearing platform and the 3rd pressure-bearing platform 10, and the first net is suspended to the first weighing On device, the second net is suspended on the second meausring apparatus 8.
Base plate 2 is provided between environmental cabinet 1 and cistern 3, wherein, the upper surface of base plate 2 is offered for being fixed on retaining The groove 16 in pond 3, wherein, the bottom of cistern 3 is embedded in the groove 16;Temperature sensor 15, ring are provided with cistern 3 Heating system and refrigeration system are provided with border case 1, wherein, the output end of temperature sensor 15 is connected with the input of computer 13 Connect, the output end of the control end of heating system and the control end of refrigeration system with computer 13 is connected;The top of cistern 3 Side is provided with overfall 11;The bottom of cistern 3 is provided with delivery port 12.
Between first meausring apparatus and the first pressure-bearing platform, between the first meausring apparatus and the second pressure-bearing platform, second weigh dress Put 8 and second and be equipped with rubber support 9 between pressure-bearing platform and between the second meausring apparatus 8 and the 3rd pressure-bearing platform 10;First claims Amount device is connected by the first fishhook 5 with the first basket 4, and the second meausring apparatus 8 is connected by the second fishhook with the second basket Connect;First meausring apparatus and the second meausring apparatus 8 are balance.
The test method of assessment surface of aggregate asphalt membrane block-water performance of the present invention is comprised the following steps:
Dried to gathering materials, then will gather materials and be equally divided into two parts, wherein, first part is gathered materials and second part of quality gathered materials It is m0, first part is gathered materials and is placed into dry environment, second part is gathered materials and is immersed in pitch, then take out second part of collection Material, makes second part of asphalt solidification of surface of aggregate form asphalt membrane, and second part of quality m for gathering materials then is weighed again0′
First part is gathered materials and second part is gathered materials and be respectively placed in the first basket 4 and the second basket, then control lifting to fill Put and the first basket 4 and the second basket are immersed in cistern 3, claimed respectively by the first meausring apparatus and the second meausring apparatus 8 Take the weight of the first basket 4 and the second basket;Obtain the i-th unit interval surface of aggregate asphalt membrane water blocking rate αi=(the i-th unit interval The water suction quality m for inside gathering materialsiThe water suction quality m that asphalt membrane parcel gathers materials in-the i-th unit intervali′Gather materials in the unit interval of)/i-th Water suction quality mi, wherein, the water suction qualitative data m gathered materials in the i-th unit intervaliIn=the i-th unit interval first part after water suction The quality m for gathering materialsn-m0, the second water suction quality m for gathering materials in the i-th unit intervali′In=the i-th unit interval second part after water suction The quality m for gathering materialsn′-m0′, obtain the water blocking rate α of the surface of aggregate asphalt membrane that N number of unit interval detection is obtained1, α2, α3...αN, then Test surface of aggregate asphalt membrane water blocking rate α be:
Water blocking rate α according to experiment surface of aggregate asphalt membrane assesses surface of aggregate asphalt membrane block-water performance.
Base plate 2 is fixed in environmental cabinet 1 by bolt 14, and constant level in cistern 3 can be made by overfall 11, is passed through The delivery port 12 of cistern 3 can play a part of draining, change water, and valve 17 is provided with delivery port 12;By temperature sensor 15, Computer 13, refrigeration system and heating system realize that the temperature of the reclaimed water of cistern 3 is constant, the first elevating lever 6, the second elevating lever and 3rd elevating lever is driven by power set 7.
The present invention can surface of aggregate asphalt membrane block-water performance be tried to conventional sense, cracking state and under ageing state Test, specially:
The process of the test of surface of aggregate asphalt membrane block-water performance is under conventional sense:
1) before the test, the temperature in the temperature adjustment environmental cabinet 1 according to test requirements document, closes the bottom of cistern 3 Delivery port 12, then toward addition clean water in cistern 3 untill overfall 11 there are flowing out;
2) dried to gathering materials, then will gather materials and be equally divided into two parts, wherein, first part is gathered materials and second part of matter gathered materials Amount is m0, first part is gathered materials and is placed into dry environment, second part is gathered materials and is immersed in pitch, then take out second part Gather materials, second part of asphalt solidification of surface of aggregate is formed asphalt membrane, second part of quality m for gathering materials then is weighed again0′
3) first part is gathered materials and second part is gathered materials and be respectively placed in the first basket 4 and the second basket, then control lifting Be immersed in cistern 3 for first basket 4 and the second basket by device, is distinguished by the first meausring apparatus and the second meausring apparatus 8 Weigh the weight of the first basket 4 and the second basket;Obtain the i-th unit interval surface of aggregate asphalt membrane water blocking rate αi=(during the i-th unit The interior water suction quality m for gathering materialsiThe water suction quality m that asphalt membrane parcel gathers materials in-the i-th unit intervali′Collection in the unit interval of)/i-th The water suction quality m of materiali, wherein, the water suction qualitative data m gathered materials in the i-th unit intervaliIn=the i-th unit interval first after water suction The quality m that part is gathered materialsn-m0, the second water suction quality m for gathering materials in the i-th unit intervali′In=the i-th unit interval second after water suction The quality m that part is gathered materialsn′-m0′, obtain the water blocking rate α of the surface of aggregate asphalt membrane that N number of unit interval detection is obtained1, α2, α3...αN, Then the water blocking rate α of experiment surface of aggregate asphalt membrane is:
The determination process of surface of aggregate asphalt membrane water blocking rate is under cracking state:
Dried to gathering materials, then will gather materials and be equally divided into two parts, wherein, first part is gathered materials and second part of quality gathered materials It is m0, first part is gathered materials and is placed into dry environment, second part is gathered materials and is immersed in pitch, then take out second part of collection Material, makes the asphalt solidification of second part of surface of aggregate form asphalt membrane, if then cut out arterial highway crack in asphalt membrane upper slitter, then claim again Take second part of quality m for gathering materials0′, repeat step 3), obtain surface of aggregate asphalt membrane water blocking rate under cracking state.
The determination process of surface of aggregate asphalt membrane water blocking rate is under ageing state:
Dried to gathering materials, then will gather materials and be equally divided into two parts, wherein, first part is gathered materials and second part of quality gathered materials It is m0, first part is gathered materials and is placed into dry environment, second part is gathered materials be immersed in it is aging after pitch in, then take out Second part is gathered materials, and the asphalt solidification of second part of surface of aggregate is formed asphalt membrane, if then cut out arterial highway crack in asphalt membrane upper slitter, Then second part of quality m for gathering materials is weighed again0′, repeat step 3), obtain surface of aggregate asphalt membrane water blocking rate under ageing state.
The determination process of surface of aggregate asphalt membrane water blocking rate warming coefficient is under conventional sense:
When the temperature of the reclaimed water of cistern 3 is T1When, measurement obtains testing the water blocking rate α of surface of aggregate asphalt membrane1′;Work as retaining The temperature of the reclaimed water of pond 3 is T2When, measurement obtains testing the water blocking rate α of surface of aggregate asphalt membrane2′, then surface of aggregate under conventional sense Asphalt membrane water blocking rate warming coefficient lambda is:

Claims (10)

1. it is a kind of assess surface of aggregate asphalt membrane block-water performance experimental rig, it is characterised in that including environmental cabinet (1), calculate Machine (13) and the cistern (3) in environmental cabinet (1), lowering or hoisting gear, the first basket (4), the second basket, for weighing First meausring apparatus of one basket (4) weight and the second meausring apparatus (8) for weighing the second basket weight;
Cistern (3) is fixed on the bottom of environmental cabinet (1), and the first basket (4) and the second basket are fixed on by lowering or hoisting gear The top of environmental cabinet (1), the first basket (4) and the second basket are located at the top of cistern (3), and the first meausring apparatus and second claim Amount device (8) is connected with computer (13).
2. it is according to claim 1 assessment surface of aggregate asphalt membrane block-water performance experimental rig, it is characterised in that lifting Device includes the first elevating lever (6), the second elevating lever, the 3rd elevating lever, the first pressure-bearing platform, the second pressure-bearing platform and the 3rd pressure-bearing platform (10), wherein, the upper end of the upper end, the upper end of the second elevating lever and the 3rd elevating lever of the first elevating lever (6) is both secured to environment The top of case (1), the first pressure-bearing platform, the second pressure-bearing platform and the 3rd pressure-bearing platform (10) are individually fixed under the first elevating lever (6) The lower end of end, the lower end of the second elevating lever and the 3rd elevating lever, the first meausring apparatus is fixed on the first pressure-bearing platform and the second pressure-bearing Between platform, the second meausring apparatus (8) is fixed between the second pressure-bearing platform and the 3rd pressure-bearing platform (10), and the first net is suspended to first On meausring apparatus, the second net is suspended on the second meausring apparatus (8).
3. it is according to claim 1 assessment surface of aggregate asphalt membrane block-water performance experimental rig, it is characterised in that environment Base plate (2) is provided between case (1) and cistern (3), wherein, the upper surface of base plate (2) is offered for being fixed on cistern (3) Groove (16), wherein, the bottom of cistern (3) is embedded in the groove (16).
4. it is according to claim 1 assessment surface of aggregate asphalt membrane block-water performance experimental rig, it is characterised in that retaining It is provided with pond (3) in temperature sensor (15), environmental cabinet (1) and is provided with heating system and refrigeration system, wherein, temperature sensor (15) output end is connected with the input of computer (13), the control end of heating system and the control end of refrigeration system with The output end of computer (13) is connected.
5. it is according to claim 1 assessment surface of aggregate asphalt membrane block-water performance experimental rig, it is characterised in that retaining Side at the top of pond (3) is provided with overfall (11).
6. it is according to claim 1 assessment surface of aggregate asphalt membrane block-water performance experimental rig, it is characterised in that retaining The bottom in pond (3) is provided with delivery port (12).
7. it is according to claim 2 assessment surface of aggregate asphalt membrane block-water performance experimental rig, it is characterised in that first Between meausring apparatus and the first pressure-bearing platform, between the first meausring apparatus and the second pressure-bearing platform, the second meausring apparatus (8) holds with second Rubber support (9) is equipped between presenting a theatrical performance as the last item on a programme and between the second meausring apparatus (8) and the 3rd pressure-bearing platform (10).
8. it is according to claim 1 assessment surface of aggregate asphalt membrane block-water performance experimental rig, it is characterised in that first Meausring apparatus is connected by the first fishhook (5) with the first basket (4), and the second meausring apparatus (8) is by the second fishhook and second Basket is connected.
9. it is according to claim 1 assessment surface of aggregate asphalt membrane block-water performance experimental rig, it is characterised in that first Meausring apparatus and the second meausring apparatus (8) are balance.
10. it is a kind of assess surface of aggregate asphalt membrane block-water performance test method, it is characterised in that based on described in claim 1 Assessment surface of aggregate asphalt membrane block-water performance experimental rig, comprise the following steps:
Dried to gathering materials, then will gather materials and be equally divided into two parts, wherein, first part is gathered materials and second part of quality gathered materials is m0, first part is gathered materials and is placed into dry environment, second part is gathered materials and is immersed in pitch, then take out second part and gather materials, Second part of asphalt solidification of surface of aggregate is formed asphalt membrane, second part of quality m for gathering materials then is weighed again0′
First part is gathered materials and second part is gathered materials and be respectively placed in the first basket (4) and the second basket, then control lowering or hoisting gear First basket (4) and the second basket are immersed in cistern (3), by the first meausring apparatus and the second meausring apparatus (8) point Another name takes the weight of the first basket (4) and the second basket;Obtain the i-th unit interval surface of aggregate asphalt membrane water blocking rate αi=(i-th is single The water suction quality m gathered materials in the time of positioniThe water suction quality m that asphalt membrane parcel gathers materials in-the i-th unit intervali′The unit interval of)/i-th The water suction quality m for inside gathering materialsi, wherein, the water suction qualitative data m gathered materials in the i-th unit intervaliIn=the i-th unit interval after water suction First part of quality m for gathering materialsn-m0, the second water suction quality m for gathering materials in the i-th unit intervali′In=the i-th unit interval after water suction Second part of quality m for gathering materialsn′-m0′, obtain the water blocking rate α of the surface of aggregate asphalt membrane that N number of unit interval detection is obtained1, α2, α3...αN, then test surface of aggregate asphalt membrane water blocking rate α be:
α = 1 N Σ i = 1 N α i ;
Water blocking rate α according to experiment surface of aggregate asphalt membrane assesses surface of aggregate asphalt membrane block-water performance.
CN201710057082.7A 2017-01-22 2017-01-22 A kind of experimental rig and method for assessing surface of aggregate asphalt membrane block-water performance Active CN106769614B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710057082.7A CN106769614B (en) 2017-01-22 2017-01-22 A kind of experimental rig and method for assessing surface of aggregate asphalt membrane block-water performance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710057082.7A CN106769614B (en) 2017-01-22 2017-01-22 A kind of experimental rig and method for assessing surface of aggregate asphalt membrane block-water performance

Publications (2)

Publication Number Publication Date
CN106769614A true CN106769614A (en) 2017-05-31
CN106769614B CN106769614B (en) 2019-05-17

Family

ID=58942075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710057082.7A Active CN106769614B (en) 2017-01-22 2017-01-22 A kind of experimental rig and method for assessing surface of aggregate asphalt membrane block-water performance

Country Status (1)

Country Link
CN (1) CN106769614B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108375524A (en) * 2018-01-18 2018-08-07 张中华 A kind of experimental rig that evaluation aging influences asphalt membrane block-water performance and method
CN109030273A (en) * 2018-07-30 2018-12-18 盐城帝佳妮服饰有限公司 A kind of raw material humidity detection device for shoes production

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204649600U (en) * 2015-06-07 2015-09-16 西安外事学院 The adhesiveness test device of a kind of pitch and coarse aggregate
CN104931385A (en) * 2015-05-19 2015-09-23 湖南省交通科学研究院 Method for measuring density and water absorption of regenerated coarse aggregate
CN105588778A (en) * 2016-03-16 2016-05-18 哈尔滨工程大学 Concrete water absorption experimental device
CN106018171A (en) * 2016-05-10 2016-10-12 长安大学 Device and method for determining gross volume density of bituminous mixture through wax sealing
CN106226193A (en) * 2016-09-22 2016-12-14 中国矿业大学(北京) A kind of coal petrography capillary water absorption measuring method
CN106290052A (en) * 2016-08-12 2017-01-04 武汉理工大学 Gathered materials by mass loss rate evaluation the method for asphalt adhesion

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104931385A (en) * 2015-05-19 2015-09-23 湖南省交通科学研究院 Method for measuring density and water absorption of regenerated coarse aggregate
CN204649600U (en) * 2015-06-07 2015-09-16 西安外事学院 The adhesiveness test device of a kind of pitch and coarse aggregate
CN105588778A (en) * 2016-03-16 2016-05-18 哈尔滨工程大学 Concrete water absorption experimental device
CN106018171A (en) * 2016-05-10 2016-10-12 长安大学 Device and method for determining gross volume density of bituminous mixture through wax sealing
CN106290052A (en) * 2016-08-12 2017-01-04 武汉理工大学 Gathered materials by mass loss rate evaluation the method for asphalt adhesion
CN106226193A (en) * 2016-09-22 2016-12-14 中国矿业大学(北京) A kind of coal petrography capillary water absorption measuring method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108375524A (en) * 2018-01-18 2018-08-07 张中华 A kind of experimental rig that evaluation aging influences asphalt membrane block-water performance and method
CN108375524B (en) * 2018-01-18 2021-03-05 张中华 Test method for evaluating influence of aging on water resistance performance of asphalt membrane
CN109030273A (en) * 2018-07-30 2018-12-18 盐城帝佳妮服饰有限公司 A kind of raw material humidity detection device for shoes production

Also Published As

Publication number Publication date
CN106769614B (en) 2019-05-17

Similar Documents

Publication Publication Date Title
US6799471B1 (en) System and method for conditioning and detection of moisture damage in asphalt mixes
CN108169044A (en) Composite recycled material road surface full scale structure antiscour experimental rig and test method
CN101907548B (en) Bituminous pavement material hydrodynamic pressure washing tester
Delatte et al. Field and laboratory evaluation of pervious concrete pavements
CN206772740U (en) A kind of rainwater on road surface washes away and load simulating on coupling device
CN106769614A (en) A kind of experimental rig and method for assessing surface of aggregate asphalt membrane block-water performance
CN102507410A (en) Device and method for simultaneously testing water seepage and drainage capacities of asphalt mixture
Salour et al. Moisture-sensitive and stress-dependent behavior of unbound pavement materials from in situ falling weight deflectometer tests
Chen Slippage failure of a new hot-mix asphalt overlay
KR20160067660A (en) Vane type rheometer considering water flow characteristics, and method for obtaining rheological analysis technique using thereof
CN205780984U (en) A kind of Auto-drainage valve for controlling paddy field water level
CN206057294U (en) A kind of lichen litter interception measurement apparatus
Harber Applicability of no-fines concrete as a road pavement
CN104931365B (en) A kind of detect twists device and its assay method that stranding effect damages road surface
CN207336277U (en) Composite recycled material road surface full scale structure antiscour experimental rig
CN204330559U (en) A kind of for evaluating pitch and the test unit of adhesion of gathering materials
CN2591616Y (en) Testing device for slope type soils infiltration rate
CN104655560A (en) Aggregate and asphalt adhesion measuring device
CN216560011U (en) Test device for measuring soil body humidifying deformation
CN205679492U (en) A kind of asphalt pavement material flowing pressure generation assay device
CN207007638U (en) A kind of concrete water bleeding degree measurement device
CN208805522U (en) A kind of experimental rig of simulated groundwater position variation and alternation of wetting and drying and axis pressure coupling
CN208819499U (en) A kind of railway bed is risen soil teaching demonstration device
CN1137379C (en) Method for measuring shear strength of soil surface
CN207610944U (en) A kind of programmable water-stable gravel two-phase rolls scouring instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant