CN106768495A - A kind of commercial circulation heat pump water heater performance testing device and method of testing - Google Patents

A kind of commercial circulation heat pump water heater performance testing device and method of testing Download PDF

Info

Publication number
CN106768495A
CN106768495A CN201710042453.4A CN201710042453A CN106768495A CN 106768495 A CN106768495 A CN 106768495A CN 201710042453 A CN201710042453 A CN 201710042453A CN 106768495 A CN106768495 A CN 106768495A
Authority
CN
China
Prior art keywords
water
temperature
tested machine
standard
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710042453.4A
Other languages
Chinese (zh)
Other versions
CN106768495B (en
Inventor
齐云
韩松
葛猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Win Win Energy Efficiency Technology (qingdao) Co Ltd
Original Assignee
Win Win Energy Efficiency Technology (qingdao) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Win Win Energy Efficiency Technology (qingdao) Co Ltd filed Critical Win Win Energy Efficiency Technology (qingdao) Co Ltd
Publication of CN106768495A publication Critical patent/CN106768495A/en
Application granted granted Critical
Publication of CN106768495B publication Critical patent/CN106768495B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01KMEASURING TEMPERATURE; MEASURING QUANTITY OF HEAT; THERMALLY-SENSITIVE ELEMENTS NOT OTHERWISE PROVIDED FOR
    • G01K17/00Measuring quantity of heat
    • G01K17/06Measuring quantity of heat conveyed by flowing media, e.g. in heating systems e.g. the quantity of heat in a transporting medium, delivered to or consumed in an expenditure device
    • G01K17/08Measuring quantity of heat conveyed by flowing media, e.g. in heating systems e.g. the quantity of heat in a transporting medium, delivered to or consumed in an expenditure device based upon measurement of temperature difference or of a temperature
    • G01K17/10Measuring quantity of heat conveyed by flowing media, e.g. in heating systems e.g. the quantity of heat in a transporting medium, delivered to or consumed in an expenditure device based upon measurement of temperature difference or of a temperature between an inlet and an outlet point, combined with measurement of rate of flow of the medium if such, by integration during a certain time-interval
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01KMEASURING TEMPERATURE; MEASURING QUANTITY OF HEAT; THERMALLY-SENSITIVE ELEMENTS NOT OTHERWISE PROVIDED FOR
    • G01K17/00Measuring quantity of heat
    • G01K17/06Measuring quantity of heat conveyed by flowing media, e.g. in heating systems e.g. the quantity of heat in a transporting medium, delivered to or consumed in an expenditure device
    • G01K17/08Measuring quantity of heat conveyed by flowing media, e.g. in heating systems e.g. the quantity of heat in a transporting medium, delivered to or consumed in an expenditure device based upon measurement of temperature difference or of a temperature
    • G01K17/10Measuring quantity of heat conveyed by flowing media, e.g. in heating systems e.g. the quantity of heat in a transporting medium, delivered to or consumed in an expenditure device based upon measurement of temperature difference or of a temperature between an inlet and an outlet point, combined with measurement of rate of flow of the medium if such, by integration during a certain time-interval
    • G01K17/12Indicating product of flow and temperature difference directly or temperature

Abstract

The present invention relates to a kind of commercial circulation heat pump water heater performance testing device and method of testing.Test device includes:Water inlet temperature element, delivery port temperature element, are respectively arranged at the entery and delivery port of tested machine, inflow temperature, leaving water temperature for testing tested machine;Triple valve, its first entrance is connected with the outlet pipeline of tested machine, and its second entrance is connected with thermostatted water inlet pipeline, and its outlet is connected through the inlet pipeline of standard water tank with standard water tank;Flowmeter, is arranged on the inlet pipeline between triple valve and standard water tank;Water pump, is arranged on the outlet pipeline of standard water tank, the water inlet for heated medium water to be delivered to tested machine.The method for testing commercial circulation heat pump water heater performance using above-mentioned test device includes preparation process, test operating procedure and measuring and calculation step.The test device and method of testing that the present invention is provided reduce disturbing factor, can accurately measure the heat pump heating capacity of commercial circulation heat pump water heater.

Description

A kind of commercial circulation heat pump water heater performance testing device and method of testing
Technical field
The present invention relates to a kind of commercial circulation heat pump water heater performance testing device and method of testing, it is mainly used in commercialization and follows Ring Teat pump boiler aptitude tests, belong to air-conditioning and technical field of heat pumps.
Background technology
Teat pump boiler is similar with air-conditioning, and simply heat transfer medium is water, and the heat of its absorbent refrigeration system condenser is obtained Hot water.The test philosophy of Teat pump boiler is to heat water and heat time by the tested Teat pump boiler of test to calculate heat The heating capacity of pump water heater.Teat pump boiler is divided into four classes:Heated type, commercial circulating heating type, a Domestic circulating heated type With family expenses static state heated type.The method of testing of the commercial circulation heat pump water heater of standard GB/T 21362-2008 regulations is at present With standard water tank analog subscriber water tank, arrangement in standard water tank and tested machine, testing standard water tank is connected by pipeline, water pump Used as test water temperature, because the temperature is measured in tested machine import and export, standard is required 8 RTD mean temperatures The amount of stored heat of leaking heat and water tank is added on the basis of measured heating capacity as the final of commercial circulation heat pump water heater Heating capacity.
The method of testing used test device of the commercial circulation heat pump water heater of current standard GB/T 21362-2008 regulations As depicted in figs. 1 and 2.Fig. 1 is the test device schematic diagram of the Teat pump boiler for providing water pump, and Fig. 2 is the heat for not providing water pump The test device schematic diagram of pump water heater, wherein, 1 is tested unit (tested machine), and 8 is water pump, and 7 is standard water tank, and 9 is temperature Meter;Tested machine 1 is connected with standard water tank 7, water pump 8 by pipeline.This method of testing and test device are due to pipeline and mark The influence of quasi- water tank leakage heat, inherently has larger test uncertainty, so measurement error is larger, uniformity is poor.
The content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide a kind of commercial circulation heat pump water heater test device, should Device can test the ability (i.e. heat pump heating capacity) of commercial circulation heat pump water heater, the test device energy using direct method of testing The disturbing factor in test process is reduced, it is possible to accurately measuring the heat pump heating capacity of commercial circulation heat pump water heater.This hair Bright another object is to provide a kind of commercial circulation heat pump water heater method of testing.
To achieve the above object, the present invention uses following technical scheme:
A kind of commercial circulation heat pump water heater performance testing device, the test device includes:Delivery port temperature element, three Port valve, flowmeter, standard water tank, water pump, water inlet temperature element and connecting line;Wherein,
The delivery port temperature element is arranged at the water outlet of tested machine, and water temperature is gone out for test the tested machine Degree, the tested machine is the commercial circulation heat pump water heater;
The first entrance of the triple valve is connected with the outlet pipeline of the tested machine, the second entrance of the triple valve with Outside thermostatted water inlet pipeline connection, the outlet of the triple valve through the standard water tank inlet pipeline and the standard water Case is connected;
The flowmeter is arranged on the inlet pipeline between the triple valve and the standard water tank;
The standard water tank is used to store heated medium water;
The water pump is arranged on the outlet pipeline of the standard water tank, for the quilt that will be stored in the standard water tank Heating WATER AS FLOW MEDIUM is delivered to the water inlet of the tested machine;
The water inlet temperature element is arranged at the water inlet of the tested machine, the water inlet for testing the tested machine Temperature.
In above-mentioned test device, used as a kind of preferred embodiment, the test device also includes control system, the control System processed is connected with the delivery port temperature element, flowmeter, water inlet temperature element;For Real-time Collection, record test number According to, and specific heat according to the water under instantaneous mass flow, the mean temperature of instantaneous turnover coolant-temperature gage, instant water coming-in temperature and instantaneous Leaving water temperature calculates the transient heat heat pump heating amount of the tested machine, and then obtains being tied to experiment from moment on-test by integrating The heat pump heating capacity at beam moment, moment on-test be the tested machine inflow temperature be set initial temperature when when Carve, the off-test moment is that the leaving water temperature of the tested machine is moment when setting end temp, and the setting is initial Temperature is less than the setting end temp, and more than the temperature of the thermostatted water injected from the thermostatted water inlet pipeline.
In above-mentioned test device, used as a kind of preferred embodiment, the temperature of the thermostatted water is 4 DEG C~7 DEG C.
In above-mentioned test device, used as a kind of preferred embodiment, the control system is also connected with the triple valve, when When water injection rate reaches setting value, to the control system feedback control signal, the control system is according to for the flowmeter Control signal closes the second entrance of the triple valve.
In above-mentioned test device, used as a kind of preferred embodiment, the delivery port temperature element and the water inlet are surveyed Warm element is thermal resistance, thermoelectricity occasionally thermometer.
A kind of commercial circulation heat pump water heater performance test methods, using above-mentioned commercial circulation heat pump water heater performance test Device, methods described includes:
Preparation process, adjusts and controls the environment temperature in test room for set environment temperature, opens the triple valve Second entrance, the thermostatted water of preset capacity flow through successively the thermostatted water inlet pipeline, the triple valve, the flowmeter and Injected after the inlet pipeline of the standard water tank in the standard water tank, the preset capacity is measured by the flowmeter;
Test operating procedure, opens the first entrance of the triple valve, opens the water pump and the tested machine, the mark Water in quasi- water tank carries out reciprocation cycle up to the leaving water temperature of the tested machine reaches setting end temp according to endless form, Endless form is:Water in the standard water tank enters institute after flowing through the outlet pipeline of the standard water tank, the water pump successively State in tested machine and be heated, the water after being heated flows through the outlet pipeline of the tested machine, the triple valve and described successively again Enter in the standard water tank after the inlet pipeline of standard water tank;
Measuring and calculation step, according to formulaThe heating capacity of the tested machine is calculated, wherein, Q is tested The heating capacity of machine, T1The inflow temperature for being the tested machine is moment when setting initial temperature, T2It is the water outlet of the tested machine Temperature is moment when setting end temp, and T is run time, i.e., from T1To T2Time, QiIt is that the instantaneous of tested machine heats Amount, Qi=msi×Cpi×(touti-tini), msiIt is instantaneous mass flow, CpiBe instantaneously turnover coolant-temperature gage mean temperature under The specific heat of water, toutiIt is instantaneous leaving water temperature, tiniIt is instant water coming-in temperature.
In above-mentioned method of testing, used as a kind of preferred embodiment, the temperature of the thermostatted water is initial less than the setting Temperature.
Compared with prior art, the beneficial effects of the invention are as follows:
(1) method of testing of existing standard, because test lead is away from tested machine, the influence of leaking heat is larger, and test is inaccurate Really;The test device that the present invention is provided arranges temperature measuring equipment in tested machine water inlet pipe and water outlet pipe, in water inlet arrangement water pump, in delivery port Arrangement flowmeter, the heat pump heating capacity of tested machine is directly calculated by measured import and export water temperature and water-carrying capacity, be instead of existing Have in technology with the mean temperature of standard water tank as test water temperature way, due to reducing disturbing factor in test process, It is possible to accurately measuring the heat pump heating capacity of commercial circulation heat pump water heater.
(2) test device that the present invention is provided uses triple valve and flowmeter, on the one hand can more accurately control water filling Amount, on the other hand can be ensured before water temperature reaches 15 DEG C by controlling the inflow temperature of thermostatted water to be relatively low temperature Operating mode again stablize and without cooling device;The test device simple structure that the present invention is provided, it is easy to operate.
Brief description of the drawings
Fig. 1 is the test device schematic diagram of the Teat pump boiler of the offer water pump of GB/T 21362-2008 regulations;
Fig. 2 is the test device schematic diagram of the Teat pump boiler for not providing water pump of GB/T 21362-2008 regulations;
Fig. 3 is the commercial circulation heat pump water heater test device schematic diagram in the preferred embodiment of the present invention.
Wherein, the tested machines of 1-, 2- delivery port temperature elements, 3- water inlet temperature elements, 4- triple valves, 5- flowmeters, 6- Thermostatted water inlet pipeline, 7- standard water tanks, 8- water pumps, 9- thermometers.
Specific embodiment
Technical scheme is described in further detail by embodiment below in conjunction with accompanying drawing.
The present invention provides a kind of commercial circulation heat pump water heater test device, referring to Fig. 3, the test device include by from The delivery port temperature element that the pipeline of water inlet of the delivery port of tested machine 1 (i.e. Teat pump boiler) to tested machine 1 is sequentially connected 2nd, triple valve 4, flowmeter 5, standard water tank 7, water pump 8, water inlet temperature element 3, that is, be tested machine 1 outlet pipeline one end with The delivery port connection of tested machine 1, the other end is connected through triple valve 4 with the inlet pipeline of standard water tank 7;The water inlet pipe of tested machine 1 The one end on road is connected with the water inlet of tested machine 1, and the other end is connected through water pump 8 with the outlet pipeline of standard water tank 7, in standard water Flowmeter 5 is provided with the inlet pipeline of case 7, flowmeter 5 is provided with out near the side of triple valve 4 in the water outlet of tested machine 1 Mouth of a river temperature element 2, water inlet temperature element 3 is provided with the water inlet of tested machine 1.Above part is carried out one by one below Explanation.
Delivery port temperature element 2 and water inlet temperature element 3, are separately mounted to delivery port, the water inlet close to tested machine 1 Position, the inflow temperature t of the tested machine 1 of the test of water inlet temperature element 2in, the test of delivery port temperature element 3 tested machine 1 goes out Coolant-temperature gage tout.Temperature element can be thermal resistance such as platinum resistance thermometer sensor, etc., or thermocouple such as nickel chromium triangle-CopperNickel thermocouple etc., Can also be thermometer such as bimetallic thermometer, glass-stem thermometer, semiconductor thermistor thermometer etc..
Triple valve 4, is arranged between delivery port temperature element 2 and flowmeter 5, for connecting the He of delivery port temperature element 2 Pipeline between flowmeter 5, while be also connected with outside thermostatted water inlet pipeline 6, i.e., the first entrance of triple valve 4 with it is tested The other end connection of the outlet pipeline of machine 1, the second entrance of triple valve 4 is connected with thermostatted water inlet pipeline 6, and triple valve 4 goes out Mouth is connected through the inlet pipeline of standard water tank 7 with standard water tank 7.In thermostatted water inlet pipeline 6 temperature of the water of circulation for 4 DEG C~ 7 DEG C, such as 4 DEG C, 4.5 DEG C, 5 DEG C, 6 DEG C, 6.5 DEG C, 7 DEG C.Triple valve 4 has two kinds of work in the test device that the present invention is provided State:When test before from thermostatted water inlet pipeline 6 to test device water filling when, i.e., when to 7 water filling of standard water tank, triple valve 4 should The pipeline (or outlet pipeline of tested machine 1) that closing is connected with the delivery port of tested machine 1, that is, close the first of triple valve 4 and enter Mouthful, the second entrance of triple valve 4 is opened, and cause that thermostatted water inlet pipeline 6 is communicated with standard water tank 7, so that thermostatted water Thermostatted water inlet pipeline 6 can be passed through enter test device, i.e. constant temperature water energy to pass through thermostatted water inlet pipeline 6 through the of triple valve 4 The outlet of two entrances, triple valve 4, into the inlet pipeline of standard water tank 7, eventually enters into standard water tank 7;After water filling is finished, three Port valve 4 should close thermostatted water inlet pipeline 6, that is, close the second entrance of triple valve 4, open the first entrance of triple valve 4, and make The outlet pipeline that machine 1 must be tested is communicated with standard water tank 7, so that the heated medium water warp of the delivery port discharge from tested machine 1 Outlet pipeline, the first entrance of triple valve 4, the outlet of triple valve 4 of tested machine 1, into the inlet pipeline of standard water tank 7, most Eventually enter standard water tank 7, in other words, now be tested machine 1, delivery port temperature element 2, triple valve 4, flowmeter 5, standard water tank 7, Water pump 8, water inlet temperature element 2 are linked together by water lines, and heated medium water will be in this water lines in test process Middle circulation.
Flowmeter 5, is arranged between triple valve 4 and standard water tank 7, and it acts on two kinds of working condition phases with triple valve 4 Adapt to, a water injection rate injected to test device from thermostatted water inlet pipeline 6 when being and starting for measurement and Control release, this hair Flowmeter 5 has automatic accumulating function in bright embodiment, and water injection rate will be automatically calculated after water filling is started, it is ensured that water injection rate is accurate Really;Two is to measure circulating water flow in follow-up measurement experiment.Flowmeter 5 is mass flowmenter in the embodiment of the present invention;Water filling Preceding flowmeter 5 resets and sets integrated flow, when water injection rate reaches setting value (i.e. integrated flow), control system hereafter Will turn off water route, it is ensured that accurate water injection rate is accurate.In the present invention flowmeter 5 can also without automatic accumulating function, but Realized by control system hereafter, flow value when specially water filling starts computer-chronograph or PLC collection beginnings simultaneously calculates tired Meter flow, when integrated flow reaches setting value, the path closed between triple valve 4 and thermostatted water inlet pipeline 6.
Because being needed for commercial circulating heat pump water heater, before test corresponding to standard water tank one hour flow of injection Water, the value participates in the calculating of final heat pump heating capacity, and its accuracy directly affects test result.But standard is simultaneously not known rule It is fixed how water filling because water injection rate is comprising the water in pipeline, if only determining injection by the fluid level scale value of water tank Water in water tank is come to determine water injection rate be inaccurate.Water filling port (or referred to as water supplement port) is set in compared to existing technology In the Teat pump boiler performance testing device on water tank, directly being provided from the design of water tank moisturizing, the present invention, thermostatted water water inlet The water of precise control injection test device (could also say that standard water tank) is capable of in the setting of pipeline 6, triple valve 4 and flowmeter 5 Amount.
Standard water tank 7 is used to store heated medium water in the present invention, unrelated with heat pump heating capacity is calculated.
The heated medium water that water pump 8 is used to be stored in standard water tank 7 is delivered to the water inlet of tested machine, so as to drive Dynamic circulation of the heated medium water in water lines.
Preferably, test device also includes control system, control system and delivery port temperature element 2, flowmeter 5, water inlet Mouth temperature element 3 is connected;For Real-time Collection, record test data, including delivery port temperature element 2 measure leaving water temperature, Inflow temperature and test period that flow that flowmeter 5 is measured, water inlet temperature element 3 are measured, test period is from water inlet Temperature tinThe initial temperature for reaching setting starts (i.e. moment on-test) until leaving water temperature toutReach the end temp of setting When the time used by (off-test moment), and by calculating the instantaneous heat pump of commercial circulation heat pump water heater performance testing device Heating capacity, and then by integrating the heat pump heating capacity that integrating obtains from moment on-test to the off-test moment.Above-mentioned control System can be computer or PLC (Programmable Logic Controller, programmable logic controller (PLC)).Setting Initial temperature, the end temp of the setting relevant regulations that are referred in standard GB/T 21362-2008.For plain edition heat Pump water heater, sets initial temperature as 15 DEG C, sets end temp as 55 DEG C;For low form Teat pump boiler, setting is initial Temperature is 9 DEG C, sets end temp as 55 DEG C.The present invention provide embodiment in the initial temperature for setting be 15 DEG C, if Fixed end temp be 55 DEG C as a example by commercial water circulating pump water heater performance test methods are illustrated.
It is highly preferred that control system is also connected with triple valve 4, when water injection rate reaches setting value, flowmeter 5 is to control System feedback control signal, now control system according to control signal close triple valve 4 second entrance.In specific embodiment In, triple valve can be connected with computer or PLC, and when water injection rate reaches setting value, flowmeter 5 is to computer or PLC feedback controls Signal processed, this computer-chronograph or PLC close the second entrance of triple valve according to control signal.
The preferred embodiments of the present invention provider is as follows with the application method of circulation heat pump water heater test device:Before test Need to inject a certain amount of thermostatted water to test device, the pipeline being connected with tested machine delivery port closed by triple valve 4 first, So that thermostatted water inlet pipeline 6 is communicated with flowmeter 5, by thermostatted water inlet pipeline 6 to test device water filling, flowmeter 5 Automatic accumulating function will automatically calculate water injection rate, it is ensured that water injection rate is accurate;
After water filling is completed, triple valve 4 will close thermostatted water inlet pipeline 6, switch to the outlet pipeline and mark of tested machine 1 Quasi- water tank 7 is communicated;
During into test mode, heat-carrying agent water exits into water pump 8 from standard water tank 7, by water inlet temperature element 2 Enter into tested machine 1, the inflow temperature t of the tested machine 1 of the test of water inlet temperature element 2in, water in tested machine by after heat exchange, Temperature is raised and flowed out from the delivery port of tested machine 1, the leaving water temperature t of test tested machine 1 when flowing through delivery port temperature element 3out, Triple valve 4, flowmeter 5 are again passed through, by the test loop water quality flow M of flowmeter 5, into standard water tank 7, is so back and forth followed Ring, until the leaving water temperature of tested machine 1 reaches design temperature, terminates experiment.Test period is from inflow temperature tinReach setting Initial temperature start, leaving water temperature toutThe end temp for reaching setting terminates.
Calculate (specific heat × (the water outlet of water under instantaneous heating capacity=mass flow × import and export mean temperature of instantaneous heating capacity Temperature-inflow temperature)), then integral heat heat pump heating amount of the integrating from moment on-test to this period at off-test moment.
It is described in detail as a example by the commercial circulating heat pump hydrophone of plain edition below with specified heating capacity as 30kW.
Environment temperature adjusted before on-test and controls to adjust and control in 15 DEG C, thermostatted water in 20 DEG C, ambient humidity Lower water temperature and control at 7 DEG C or so.Tested machine 1 is placed in environment temperature and the controllable test room of humidity, and with Inlet pipeline and the outlet pipeline connection of test device.By calculating, required water injection rate should be 0.646m3, the water at 7 DEG C Density be 999.9kg/m3, so water filling quality is approximately 646kg.Triple valve 4 is closed and the outlet pipeline of tested machine 1 Connection, opens the connection of the inlet pipeline with thermostatted water inlet pipeline 6 and standard water tank 7, from the injection of thermostatted water inlet pipeline 67 DEG C thermostatted water, mass flowmenter 5 resets before water filling, and sets integrated flow for 646kg, when water injection rate reaches 646kg, matter The amount sending signal of flowmeter 5, system will turn off water route, it is ensured that accurate water filling.
After water filling terminates, triple valve 4 is closed into the path with thermostatted water inlet pipeline 6, open the outlet pipe with tested machine 1 The connection on road, is tested machine 1, delivery port temperature element 2, triple valve 4, flowmeter 5, standard water tank 7, water pump 8, water inlet thermometric unit Part 2 is linked together by water lines.Start tested machine 1, water pump 8 etc. and start test.Heated medium water will be in this water route By circulating-heating.
When tested machine 1 starts to start, the temperature and humidity of environment can fluctuate --- and first reduce and raise again, then tend towards stability, From inlet water temperature (being measured by water inlet temperature element 3), 7 DEG C were heated in 15 DEG C of this periods, and environment temperature and humidity can be again Reach stabilization, record inlet water temperature (i.e. inflow temperature) be 15 DEG C of this moment as moment on-test, calculating is opened from this moment Begin, as the operation water temperature of tested machine 1 can gradually rise, until exit water temperature (being measured by delivery port temperature element 2) reaches 55 DEG C this moment as the off-test moment, from the flow of on-test Real-time Collection mass flowmenter 5 simultaneously.
The formula for calculating transient heat heat pump heating amount is as follows:
Qi=msi×Cpi×(touti-tini)
In formula:QiIt is transient heat heat pump heating amount, unit:kW;msiIt is instantaneous mass flow, unit:kg/h;CpiTo enter herein The specific heat of the water under outlet mean temperature, unit:KJ/ (kg DEG C), it is instant water coming-in temperature and wink that this imports and exports mean temperature When leaving water temperature mean temperature, it is equal to (touti+tini)/2;toutiIt is instantaneous leaving water temperature, unit:℃;tiniInstantaneously to enter Coolant-temperature gage, unit:℃.
Then heat pump heating capacity Q is calculated according to following formula:
In formula, T1It is moment on-test, T2It is off-test moment, QiIt is instantaneous heating capacity, T is run time, that is, try Test the time.
During actual test, one group of data can be gathered every certain acquisition interval, such as acquisition interval is 10s, then 10s is adopted Collect one group of data, and calculate corresponding transient heat heat pump heating amount, integrating is from moment on-test to the heat pump at off-test moment Heating capacity.
In the present embodiment, the heat pump heating capacity of the integrating for measuring is 30.25kW;And the standard water tank specified with standard is tested The heat pump heating capacity that method (GB/T 21362-2008) is measured is 27.6kW, and the heat demarcated with caliberating device is 30.1kW.Can See that the heat pump water-heating machine heating capacity that the test device of present invention offer is measured is more accurate.
Above example is only a kind of present invention implementation method therein, and its description is more specific and detailed, but can not Therefore it is interpreted as the limitation to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, Without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection model of the invention Enclose.

Claims (7)

1. a kind of commercial circulation heat pump water heater performance testing device, it is characterised in that the test device includes:Delivery port is surveyed Warm element, triple valve, flowmeter, standard water tank, water pump, water inlet temperature element and connecting line;Wherein,
The delivery port temperature element is arranged at the water outlet of tested machine, the leaving water temperature for testing the tested machine, institute Tested machine is stated for the commercial circulation heat pump water heater;
The first entrance of the triple valve is connected with the outlet pipeline of the tested machine, second entrance and the outside of the triple valve The connection of thermostatted water inlet pipeline, the outlet of the triple valve connects through the inlet pipeline of the standard water tank with the standard water tank Connect;
The flowmeter is arranged on the inlet pipeline between the triple valve and the standard water tank;
The standard water tank is used to store heated medium water;
The water pump is arranged on the outlet pipeline of the standard water tank, for will be stored in being heated in the standard water tank WATER AS FLOW MEDIUM is delivered to the water inlet of the tested machine;
The water inlet temperature element is arranged at the water inlet of the tested machine, and water temperature is entered for test the tested machine Degree.
2. test device according to claim 1, it is characterised in that the test device also includes control system, the control System processed is connected with the delivery port temperature element, flowmeter, water inlet temperature element;For Real-time Collection, record test number According to, and specific heat according to the water under instantaneous mass flow, the mean temperature of instantaneous turnover coolant-temperature gage, instant water coming-in temperature and instantaneous Leaving water temperature calculates the transient heat heat pump heating amount of the tested machine, and then obtains being tied to experiment from moment on-test by integrating The heat pump heating capacity at beam moment, moment on-test be the tested machine inflow temperature be set initial temperature when when Carve, the off-test moment is that the leaving water temperature of the tested machine is moment when setting end temp, and the setting is initial Temperature is less than the setting end temp, and more than the temperature of the thermostatted water injected from the thermostatted water inlet pipeline.
3. test device according to claim 2, it is characterised in that the temperature of the thermostatted water is 4 DEG C~7 DEG C.
4. test device according to claim 2, it is characterised in that the control system is also connected with the triple valve, when When water injection rate reaches setting value, to the control system feedback control signal, the control system is according to for the flowmeter Control signal closes the second entrance of the triple valve.
5. the test device according to any one of claim 1-4, it is characterised in that the delivery port temperature element and described Water inlet temperature element is thermal resistance, thermoelectricity occasionally thermometer.
6. a kind of commercial circulation heat pump water heater performance test methods, using commercial circulation heat pump water heater described in claim 1 Performance testing device, methods described includes:
Preparation process, adjusts and controls environment temperature in test room for set environment temperature, opens the of the triple valve Two entrances, the thermostatted water of preset capacity flows through the thermostatted water inlet pipeline, the triple valve and the standard water tank successively Injected after inlet pipeline in the standard water tank, the preset capacity is measured by the flowmeter;
Test operating procedure, opens the first entrance of the triple valve, opens the water pump and the tested machine, the standard water Water in case carries out reciprocation cycle up to the leaving water temperature of the tested machine reaches setting end temp according to endless form, circulates Mode is:Water in the standard water tank enters the quilt after flowing through the outlet pipeline of the standard water tank, the water pump successively It is heated in survey machine, the water after being heated flows through outlet pipeline, the triple valve and the standard of the tested machine successively again Enter in the standard water tank after the inlet pipeline of water tank;
Measuring and calculation step, according to formulaThe heating capacity of the tested machine is calculated, wherein, Q is the system of tested machine Heat, T1The inflow temperature for being the tested machine is moment when setting initial temperature, T2The leaving water temperature for being the tested machine is At moment during setting end temp, T is run time, i.e., from T1To T2Time, QiIt is the instantaneous heating capacity of tested machine, Qi= msi×Cpi×(touti-tini), msiIt is instantaneous mass flow, CpiIt is the ratio of the water under the mean temperature for instantaneously passing in and out coolant-temperature gage Heat, toutiIt is instantaneous leaving water temperature, tiniIt is instant water coming-in temperature.
7. method of testing according to claim 6, it is characterised in that the temperature of the thermostatted water is less than the initial temperature of the setting Degree.
CN201710042453.4A 2017-01-04 2017-01-20 Commercial circulating heat pump water heater performance testing device and testing method Active CN106768495B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710004576 2017-01-04
CN2017100045769 2017-01-04

Publications (2)

Publication Number Publication Date
CN106768495A true CN106768495A (en) 2017-05-31
CN106768495B CN106768495B (en) 2023-10-31

Family

ID=58944700

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710042453.4A Active CN106768495B (en) 2017-01-04 2017-01-20 Commercial circulating heat pump water heater performance testing device and testing method
CN201720072078.3U Active CN206420588U (en) 2017-01-04 2017-01-20 A kind of commercial circulation heat pump water heater performance testing device

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201720072078.3U Active CN206420588U (en) 2017-01-04 2017-01-20 A kind of commercial circulation heat pump water heater performance testing device

Country Status (1)

Country Link
CN (2) CN106768495B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107131978A (en) * 2017-06-13 2017-09-05 中标能效科技(青岛)有限公司 The caliberating device and scaling method of commercial circulation heat pump water heater test device
CN107389227A (en) * 2017-08-09 2017-11-24 国家电网公司 The measure device and its measuring method of a kind of phase-changing energy storage material residue amount of stored heat
CN107478454A (en) * 2017-08-23 2017-12-15 广州迪森家居环境技术有限公司 A kind of heated water circulator's detection means
CN108776042A (en) * 2018-07-19 2018-11-09 珠海格力电器股份有限公司 water heater test device and test method
CN109596375A (en) * 2018-12-29 2019-04-09 河北省产品质量安全检测技术中心 Heating furnace hot property and coal energy-saving agent, combustion adjuvant efficiency detection device and method
KR20200013489A (en) * 2018-07-30 2020-02-07 한국산업기술시험원 An energy performance test apparatus and test method which can control accurately the schedules of variable flow rate and variable calorie following the real usage pattern
CN110763497A (en) * 2019-10-12 2020-02-07 青岛海信日立空调系统有限公司 Laboratory test system and method suitable for air source heat pump hot water system
CN111750547A (en) * 2020-06-11 2020-10-09 常熟市工程质量检测中心 Device and method for testing efficiency of solar water heater
CN113029627A (en) * 2021-03-30 2021-06-25 广东省计量科学研究院(华南国家计量测试中心) Calibration method for energy efficiency index of standard gas water heater
CN113252380A (en) * 2021-06-22 2021-08-13 浙江创能新能源股份有限公司 Automatic test platform of multi-functional heat pump
CN113375839A (en) * 2021-06-03 2021-09-10 北京航天计量测试技术研究所 Small-flow circulating water load system with accurate temperature control function
CN114112469A (en) * 2021-11-29 2022-03-01 广东纽恩泰新能源科技发展有限公司 Air source heat pump test system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106768495B (en) * 2017-01-04 2023-10-31 中标能效科技(青岛)有限公司 Commercial circulating heat pump water heater performance testing device and testing method
CN110657581B (en) * 2018-06-29 2021-02-26 宁波方太厨具有限公司 Hot water performance test method for gas water heater
CN109916439A (en) * 2019-04-18 2019-06-21 青岛理工大学 A kind of sea water source heat pump front end heat exchanger clogging detecting system and detection method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201965031U (en) * 2010-12-24 2011-09-07 青岛海之新能源有限公司 Testing laboratory for air conditioning system
CN205352721U (en) * 2015-12-08 2016-06-29 四川省建筑科学研究院 Heat pump set comprehensive properties testing system
CN206420588U (en) * 2017-01-04 2017-08-18 中标能效科技(青岛)有限公司 A kind of commercial circulation heat pump water heater performance testing device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201965031U (en) * 2010-12-24 2011-09-07 青岛海之新能源有限公司 Testing laboratory for air conditioning system
CN205352721U (en) * 2015-12-08 2016-06-29 四川省建筑科学研究院 Heat pump set comprehensive properties testing system
CN206420588U (en) * 2017-01-04 2017-08-18 中标能效科技(青岛)有限公司 A kind of commercial circulation heat pump water heater performance testing device

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107131978B (en) * 2017-06-13 2023-04-25 中标能效科技(青岛)有限公司 Calibration device and calibration method for commercial circulating heat pump water heater testing device
CN107131978A (en) * 2017-06-13 2017-09-05 中标能效科技(青岛)有限公司 The caliberating device and scaling method of commercial circulation heat pump water heater test device
CN107389227A (en) * 2017-08-09 2017-11-24 国家电网公司 The measure device and its measuring method of a kind of phase-changing energy storage material residue amount of stored heat
CN107389227B (en) * 2017-08-09 2023-12-08 国家电网公司 Device and method for measuring residual heat accumulation of phase-change energy storage material
CN107478454A (en) * 2017-08-23 2017-12-15 广州迪森家居环境技术有限公司 A kind of heated water circulator's detection means
CN107478454B (en) * 2017-08-23 2019-12-06 广州迪森家居环境技术有限公司 Hot water circulator detection device
CN108776042A (en) * 2018-07-19 2018-11-09 珠海格力电器股份有限公司 water heater test device and test method
KR20200013489A (en) * 2018-07-30 2020-02-07 한국산업기술시험원 An energy performance test apparatus and test method which can control accurately the schedules of variable flow rate and variable calorie following the real usage pattern
KR102129840B1 (en) 2018-07-30 2020-07-03 한국산업기술시험원 An energy performance test apparatus and test method which can control accurately the schedules of variable flow rate and variable calorie following the real usage pattern
CN109596375A (en) * 2018-12-29 2019-04-09 河北省产品质量安全检测技术中心 Heating furnace hot property and coal energy-saving agent, combustion adjuvant efficiency detection device and method
CN110763497B (en) * 2019-10-12 2021-08-03 青岛海信日立空调系统有限公司 Laboratory test system and method suitable for air source heat pump hot water system
CN110763497A (en) * 2019-10-12 2020-02-07 青岛海信日立空调系统有限公司 Laboratory test system and method suitable for air source heat pump hot water system
CN111750547A (en) * 2020-06-11 2020-10-09 常熟市工程质量检测中心 Device and method for testing efficiency of solar water heater
CN113029627A (en) * 2021-03-30 2021-06-25 广东省计量科学研究院(华南国家计量测试中心) Calibration method for energy efficiency index of standard gas water heater
CN113375839A (en) * 2021-06-03 2021-09-10 北京航天计量测试技术研究所 Small-flow circulating water load system with accurate temperature control function
CN113252380A (en) * 2021-06-22 2021-08-13 浙江创能新能源股份有限公司 Automatic test platform of multi-functional heat pump
CN114112469A (en) * 2021-11-29 2022-03-01 广东纽恩泰新能源科技发展有限公司 Air source heat pump test system

Also Published As

Publication number Publication date
CN106768495B (en) 2023-10-31
CN206420588U (en) 2017-08-18

Similar Documents

Publication Publication Date Title
CN206420588U (en) A kind of commercial circulation heat pump water heater performance testing device
CN103234606B (en) A kind of flow verification system and calibration method thereof
CN105020898B (en) A kind of method of water heater with hot water cruise function and automatic setting heating-up temperature
CN203259225U (en) Flow detecting system
CN202041227U (en) Performance detection system based on drainage method of air source heat pump water heater
CN104458063B (en) A kind of energy-saving heat quantity flow calibrating installation and method
CN109781779B (en) Method and device suitable for measuring specific constant pressure heat capacity of dissolved gas fluid
CN110763497B (en) Laboratory test system and method suitable for air source heat pump hot water system
CN201166615Y (en) Tester for exchanging heat of buried tube of earth source heat pump
CN204786682U (en) Constant temperature constant current hot -water heating system
CN108204680A (en) Calculate method, the electric heater of electric heater residue bathing time
KR101301687B1 (en) Hot water measuring device and methods considering temperature difference
CN206145959U (en) Electronic constant temperature formula electric water heater
CN108195067A (en) For calculating method, the electric heater of electric heater residue bathing time
CN102735371B (en) Heat measuring method for solar water heating system
CN105181473B (en) A kind of Detecting data of the circularly-supercharged function of gas heater
CN204964306U (en) Testing platform of gas heater circulation pressure boost function
CN107238450A (en) A kind of cryogenic fluid transfer pipeline leakage heat test device and method
CN107678462A (en) Constant speed groove and constant speed groove constant speed cooling system and constant speed groove constant speed cool-down method
CN207317239U (en) Electric heat accumulation hot-water supply system
CN107131978A (en) The caliberating device and scaling method of commercial circulation heat pump water heater test device
CN209244799U (en) A kind of heat pump water-heating machine testboard
CN110189593B (en) Accurate heat transfer comprehensive experiment device
CN206876310U (en) A kind of cryogenic fluid transfer pipeline leaks heat test device
CN100370192C (en) Electric heating machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant