CN106764002A - The program control valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower and method - Google Patents
The program control valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower and method Download PDFInfo
- Publication number
- CN106764002A CN106764002A CN201611133536.6A CN201611133536A CN106764002A CN 106764002 A CN106764002 A CN 106764002A CN 201611133536 A CN201611133536 A CN 201611133536A CN 106764002 A CN106764002 A CN 106764002A
- Authority
- CN
- China
- Prior art keywords
- piston
- pivot pin
- adsorption tower
- jackscrew
- connecting shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16K—VALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
- F16K31/00—Actuating devices; Operating means; Releasing devices
- F16K31/12—Actuating devices; Operating means; Releasing devices actuated by fluid
- F16K31/122—Actuating devices; Operating means; Releasing devices actuated by fluid the fluid acting on a piston
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Multiple-Way Valves (AREA)
- Lift Valve (AREA)
Abstract
The present invention relates to sequencing valve actuator devices design field, specifically related to a kind of program control valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower and method, the piston support bottom of its piston pivot pin both sides is respectively provided with female hole, groove is set with the corresponding position in female hole at the two ends of piston pivot pin, described two fixed jackscrews are screwed in in female hole respectively, withstand the groove, the upper end of fixed jackscrew and the flush of piston support in the lower end of fixed jackscrew.The fixed jackscrew top is concordant with piston support bottom, and sets sealant on surface.Piston pivot pin fixation, without worrying because producing abrasion after pivot pin is fixed.So considerably increasing the service life of valve actuator by this transformation, fault rate is reduced, and had no side effect, the effective even running for ensureing adsorption tower device.The switch valve of piston is connected suitable for any pivot pin, the intensity of valve piston bindiny mechanism is reinforced.
Description
Technical field
The present invention relates to sequencing valve actuator devices design field, and in particular to a kind of program control valve actuating mechanism piston of adsorption tower
Connecting shaft strengthening mechanism and method.
Background technology
The need for being produced due to chemical industry safety and steady, when adsorption tower switch valve separate unit failure(144 altogether), system can be automatic
Set it to " maintenance state ", be available for instrument maintenance personnel to be repaired to it as early as possible after setting " maintenance state ".Wherein, open
The executing agency piston connection pivot pin problem that comes off for closing valve is the most thorny, and thus causes most of result of failsafe valve to be
Valve cannot be closed, therefore the influence to adsorption tower is very big.
Because the material of piston is aluminium alloy castings, the connection pivot pin of piston and valve rod shift fork is plug-in mounting in piston
In shift fork, the two ends fixed form of pivot pin prevents pivot pin from scurrying out inwardly to pile up at the edge of the piston shift fork pin hole of aluminium alloy,
Because the material hardness and toughness of shift fork are inadequate, piston shift fork bore edges can be caused damaged, cause connection pivot pin to be scurried out, cause valve
Door failure.
The content of the invention
In view of the defect of prior art, the present invention provide a kind of program control valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower with
Method, its switch valve for being practically applicable to long term frequent switch motion specially avoids the adsorption tower of adsorbent equipment frequent movement from switching
Valve, failsafe valve is caused because the connection pivot pin inside executing agency comes off, and is installed jackscrew additional on the shift fork of piston and is fixed pivot pin
Prevent it from coming off, and then prevent failsafe valve from causing adsorption tower technological fluctuation, influence product purity, even causing parking.
To reach above-mentioned purpose, one aspect of the present invention provides a kind of program control valve actuating mechanism piston connecting shaft of adsorption tower and reinforces
Mechanism, it includes piston pivot pin, piston support, two fixed jackscrews;The piston support bottom of piston pivot pin both sides is respectively provided with
With female hole, groove is set with the corresponding position in female hole at the two ends of piston pivot pin, it is described two
Fixed jackscrew is screwed in in female hole respectively, and the groove is withstood in the lower end of fixed jackscrew, the upper end of fixed jackscrew with
The flush of piston support.The fixed jackscrew top is concordant with piston support bottom, and sets sealant on surface.
On the other hand the present invention provides a kind of program control valve actuating mechanism piston connecting shaft reinforcement means of adsorption tower, its specific step
Suddenly it is:
(1)After piston pivot pin takes out, by the both sides piston support lower section drilling of piston pivot pin, then to its tapping, spiral shell in formation
Line;
(2)The position that internal thread is corresponding at two of the two ends of piston pivot pin with Piston Machining laterally processes twice with lathe
Ditch, pivot pin two ends form twice groove;
(3)Will piston pivot pin smear subzero oil after insert piston support in, then will reinforce jackscrew smear anaerobic adhesive after, by it
In the internal thread hole that screw-in is processed, it is ensured that reinforce jackscrew front end top and arrive in the groove of pivot pin, reinforced in jackscrew afterbody after tightening,
Ensure to be oxygen-free environment in jackscrew;
(4)Pivot pin is fixed after finishing, and glue to be sealed returns dress piston after air-drying.
Preferably, step(3)Described in reinforce for smear 704 silica gel.
Preferably, step(2)Described in groove be width 7mm, the ditch of deep 2mm.
Beneficial effects of the present invention:Piston pivot pin fixation, in piston will not play up and down, will not also rotate, axle
Pin is outer to be cased with a rotation steel loop originally, without worry because pivot pin produces abrasion after fixing.So by this transformation significantly
The service life of valve actuator is increased, fault rate is reduced, and had no side effect, it is effective to ensure the flat of adsorption tower device
Steady operation.The switch valve of piston is connected suitable for any pivot pin, the intensity of valve piston bindiny mechanism is reinforced, makes it in high-frequency
Switch operating mode is able to persistently run.
Brief description of the drawings
Fig. 1 is the structural representation of strengthening mechanism of the present invention;
Fig. 2 is that piston supports bottom jewel hole schematic diagram;
Fig. 3 is the female pore structure schematic diagram of piston supporting part;
Fig. 4 is with reeded piston pin arrangement schematic diagram;
Fig. 5 is that bearing pin inserts piston schematic diagram;
Fig. 6 is the structural representation for fixing jackscrew load hole;
Fig. 7 is the schematic diagram after machining;
1 in figure, piston pivot pin(Piston connecting pin), 2, supported on both sides, 3, fixed jackscrew, 4, groove, 5, pin rotating shaft.
Specific embodiment
I takes charge of the type that conventional adsorbing separation grammed switch valve is German FLOWSERVE Flow Control GmbH manufactures
Number it is two kinds of models of RD320, RD160, its piston is identical with the type of attachment of valve rod, is all to do middle connection by shift fork, execution
After mechanism receives gas model, piston driving shift fork transmission valve rod realizes controlled valve, for the operating principle and early stage of this valve
The situation that the connection pivot pin of appearance comes off,
On the one hand, there is provided a kind of program control valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower, as shown in Figure 1:It includes
Piston pivot pin 1, piston supports 2, two fixed jackscrews 3;The piston of the both sides of piston pivot pin 1 supports 2 bottoms to be respectively provided with
The hole of screw thread, groove 4, described two fixations are set at the two ends of piston pivot pin 2 with the corresponding position in female hole
Jackscrew 3 is screwed in in female hole respectively, and the lower end of fixed jackscrew 3 is withstood on inside the groove 4, fixes the upper of jackscrew 3
End supports 2 flush with piston.
On the other hand, there is provided to the fixed form for fixing jackscrew 3 of piston pivot pin 1, as shown in Fig. 2-Fig. 7, its is specific
It is as follows:
First, work equipment prepares:
Piston, interior hexagonal formula jackscrew 4 that pin 1 comes off(The piston of RD320 selects 8mm jackscrews, the piston of RD160 to select 6mm
Jackscrew), 6mm and 8mm drill bits and screw tap, iron hammer, circle punching, thread locking adhesive(Anaerobic adhesive), it is 704 silica gel, low temperature resistant lubricating oil, interior
Die nut, numerically controlled lathe etc..
2nd, specific steps are implemented:
1)After piston pivot pin 1 takes out, by the supported on both sides lower section drilling of piston connecting pins 1, then to its tapping, interior spiral shell is formed
Line;
2)The position that internal thread is corresponding at two of the two ends of piston connecting pin 1 with Piston Machining laterally processes twice with lathe
7mm wide deep two millimeters ditch, the pivot pin of cylinder is upper and lower to form twice groove 4;
3)Inserted in piston support 2 after pivot pin 1 is smeared into subzero oil, then inner hexagon spanner will be used after jackscrew smearing anaerobic adhesive
In the internal thread hole that its screw-in is processed, it is ensured that in the front end of jackscrew 3 top to the groove of pivot pin 1, applied in jackscrew afterbody after tightening
Smear 704 silica gel, it is ensured that be oxygen-free environment in jackscrew 3, be also prevented from jackscrew and scurry out damage valve;
4)Pivot pin 1 is fixed after finishing, and glue to be sealed returns dress piston after air-drying, recover executing agency, and so whole transformation is completed.
This transformation is practically applicable to the switch valve of long term frequent switch motion, specially avoids me from taking charge of adsorbent equipment frequent movement
Adsorption tower switch valve, failsafe valve is caused because the connection pivot pin inside executing agency comes off, and installs top additional on the shift fork of piston
The fixed pivot pin of silk prevents it from coming off, and then prevents failsafe valve from causing adsorption tower technological fluctuation, influence product purity, even causing
Parking.
Claims (6)
1. the program control valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower, it is characterised in that:Including piston pivot pin, piston branch
Support, two fixed jackscrews;The piston support bottom of piston pivot pin both sides is respectively provided with female hole, in piston pivot pin
Two ends set groove with the corresponding position in female hole, and described two fixed jackscrews are screwed in female respectively
Kong Zhong, the lower end of fixed jackscrew withstands on the inside grooves.
2. the program control valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower according to claim 1, it is characterised in that:Institute
State groove 7mm wide, depth 2mm.
3. the program control valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower according to claim 1, it is characterised in that:Institute
State fixed jackscrew top concordant with piston support bottom, and sealant is set on surface.
4. the program control valve actuating mechanism piston connecting shaft reinforcement means of adsorption tower, it is characterised in that:
(1)After piston pivot pin takes out, by the both sides piston support lower section drilling of piston pivot pin, then to its tapping, spiral shell in formation
Line;
(2)The position that internal thread is corresponding at two of the two ends of piston pivot pin with Piston Machining laterally processes twice ditch, pivot pin
Two ends form twice groove;
(3)Will piston pivot pin smear subzero oil after insert piston support in, then will reinforce jackscrew smear anaerobic adhesive after by its
In the internal thread hole that screw-in is processed, it is ensured that reinforce jackscrew front end top and arrive in the groove of pivot pin, jackscrew afterbody is being reinforced after tightening
Reinforce;
(4)Piston pivot pin is fixed after finishing, and glue to be sealed returns dress piston after air-drying.
5. a kind of program control valve actuating mechanism piston connecting shaft reinforcement means of adsorption tower according to claim 4, its feature exists
In:Step(3)Described in reinforce jackscrew afterbody and reinforce be to smear 704 silica gel reinforcing jackscrew afterbody.
6. a kind of program control valve actuating mechanism piston connecting shaft reinforcement means of adsorption tower according to claim 4, its feature exists
In:Step(2)Described in groove be 7mm wide, the ditch of depth 2mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611133536.6A CN106764002B (en) | 2016-12-10 | 2016-12-10 | The program-controlled valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611133536.6A CN106764002B (en) | 2016-12-10 | 2016-12-10 | The program-controlled valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106764002A true CN106764002A (en) | 2017-05-31 |
CN106764002B CN106764002B (en) | 2019-06-21 |
Family
ID=58875217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611133536.6A Active CN106764002B (en) | 2016-12-10 | 2016-12-10 | The program-controlled valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106764002B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111237518A (en) * | 2020-01-11 | 2020-06-05 | 无锡市华诚石化设备有限责任公司 | Special-shaped solid valve capable of improving mass transfer efficiency and stamping die thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3902526A (en) * | 1974-02-11 | 1975-09-02 | Scovill Manufacturing Co | Control valve for a fluid pressure system |
CN202250776U (en) * | 2011-08-12 | 2012-05-30 | 中国石油天然气股份有限公司 | Clamp for connecting power end and hydraulic end of high-pressure plunger pump |
CN103470474A (en) * | 2013-08-31 | 2013-12-25 | 蚌埠高科能源装备有限公司 | Novel small-diameter piston component structure |
CN203670198U (en) * | 2014-01-23 | 2014-06-25 | 韩振利 | Drilling slush pump piston disassembly and assembly device |
CN104564983A (en) * | 2014-12-10 | 2015-04-29 | 马鞍山市益华液压机具有限公司 | Bottom ring hydraulic nut |
CN105757044A (en) * | 2014-12-17 | 2016-07-13 | 天津市鼎瞻石油机械有限公司 | Oil cylinder piston structure of petroleum drilling tool mounting and dismounting machine |
CN205465813U (en) * | 2015-12-31 | 2016-08-17 | 中核建中核燃料元件有限公司 | Material containing device clamping device |
-
2016
- 2016-12-10 CN CN201611133536.6A patent/CN106764002B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3902526A (en) * | 1974-02-11 | 1975-09-02 | Scovill Manufacturing Co | Control valve for a fluid pressure system |
CN202250776U (en) * | 2011-08-12 | 2012-05-30 | 中国石油天然气股份有限公司 | Clamp for connecting power end and hydraulic end of high-pressure plunger pump |
CN103470474A (en) * | 2013-08-31 | 2013-12-25 | 蚌埠高科能源装备有限公司 | Novel small-diameter piston component structure |
CN203670198U (en) * | 2014-01-23 | 2014-06-25 | 韩振利 | Drilling slush pump piston disassembly and assembly device |
CN104564983A (en) * | 2014-12-10 | 2015-04-29 | 马鞍山市益华液压机具有限公司 | Bottom ring hydraulic nut |
CN105757044A (en) * | 2014-12-17 | 2016-07-13 | 天津市鼎瞻石油机械有限公司 | Oil cylinder piston structure of petroleum drilling tool mounting and dismounting machine |
CN205465813U (en) * | 2015-12-31 | 2016-08-17 | 中核建中核燃料元件有限公司 | Material containing device clamping device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111237518A (en) * | 2020-01-11 | 2020-06-05 | 无锡市华诚石化设备有限责任公司 | Special-shaped solid valve capable of improving mass transfer efficiency and stamping die thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106764002B (en) | 2019-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106764002A (en) | The program control valve actuating mechanism piston connecting shaft strengthening mechanism of adsorption tower and method | |
CN103062462B (en) | Incremental digital plug-in mounting overflow valve | |
CN205719739U (en) | A kind of micro-drilling rack device | |
CN202345329U (en) | Balance shaft support | |
CN201241640Y (en) | Adjustable centering side hanging type back pincers | |
CN106014264A (en) | Shortened PDC bit and assembling and disassembling device for shortened PDC bit | |
CN205477435U (en) | Engineering driller can automatic opening -closing fork device | |
CN109530755A (en) | A kind of brake block drilling machine for machining with automatic positioning function | |
CN201731075U (en) | Forged steel stop valve | |
CN205325534U (en) | A fixing device for pipeline location | |
CN201396506Y (en) | Valve control actuator | |
CN2854161Y (en) | Throttle regulating valve | |
CN101659006B (en) | Piston dismounting machine of oil cylinder seal head | |
CN207454735U (en) | A kind of automatic transmission oil level observation structure | |
CN208734292U (en) | A kind of small dimension assembly power pincers | |
CN204771529U (en) | Oil cooler partial shipment system | |
CN204975317U (en) | Dragveyer transmission shaft | |
CN206855360U (en) | A kind of brake caliper piston dust cover assembly tooling | |
CN101469604B (en) | Adjustable centering side hanging back-ups | |
CN2928362Y (en) | Hand and automatic integrated assembling and disassembling machine | |
CN210289669U (en) | Special oil pipe pincers of oil workover rig operation | |
CN206072539U (en) | Novel pipeline suspension and support | |
Sontakke et al. | Design and analysis of drilling cum riveting machine | |
CN219376311U (en) | Quick-change integrated oil return filter structure | |
CN2067618U (en) | Dual-purpose big-caliber tube holing machine operated by electricity or hand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |