CN106761743B CN201710093425.5A CN201710093425A CN106761743B CN 106761743 B CN106761743 B CN 106761743B CN 201710093425 A CN201710093425 A CN 201710093425A CN 106761743 B CN106761743 B CN 106761743B
Authority
CN
China
Prior art keywords
filling
band
dead zone
pillar
ore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710093425.5A
Other languages
Chinese (zh)
Other versions
CN106761743A (en
Inventor
赖伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Institute of Mining Research Co Ltd
Original Assignee
Changsha Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Institute of Mining Research Co Ltd filed Critical Changsha Institute of Mining Research Co Ltd
Priority to CN201710093425.5A priority Critical patent/CN106761743B/en
Publication of CN106761743A publication Critical patent/CN106761743A/en
Application granted granted Critical
Publication of CN106761743B publication Critical patent/CN106761743B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a kind of continuous slitting pocket types to fill room-and-pillar method dead zone stooping pillaring method, comprising the following steps: dead zone is divided into dead zone band and comprising the ore pillar band of multiple ore pillars by a, according to ore pillar and dead zone situation;B, dead zone band is filled;C, the pillar recovery in ore pillar band is carried out after the dead zone band of ore pillar band two sides fills;D, step b and step c, the lower ore pillar band of back production are repeated;E, it completes in dead zone after all pillar recoveries, carries out ore pillar band and adopt rear Mined-out area disposal.Process for stoping is simple, high production efficiency;The ore pillar rate of recovery is high;Safety is good, environmental-friendly;It is at low cost.It is very thin to lean ore body suitable for room-and-pillar method pillar recovery and Mined-out area disposal, especially low-angle dip.

Description

Continuous slitting pocket type fills room-and-pillar method dead zone stooping pillaring method
Technical field
The present invention relates to mine ore pillar mining technique fields, particularly, are related to a kind of continuous slitting pocket type filling room-and-pillar method Dead zone stooping pillaring method.
Background technique
Mine back production is carried out using room-and-pillar method, in order to support the top plate of excavation, the ore pillar of rule is stayed in barnyard.According to Investigation, according to mining technique condition, when being exploited using Fuzzy measure theory method, general institute's pillar mine amount reaches the 5 of nugget mine amount ~30%, when ore value is not high, some can reach 40~60%.
The characteristic of mineral resources be it is non-renewable, with the continuous exploitation of mineral resources, oil in place is reduced year by year.Loss Rate is very big, if not recycling, will cause the serious waste of resource.For the rate of extraction for increasing mineral resources, need to former mining process In stay the ore pillar set carry out back production.
Existing room-and-pillar method pillar recovery scheme mainly has: extraction method cuts column method, the replacement of artificial pillar, fills heir comprehensively Back production, Caving Method with Large Space back production etc. afterwards.
Extraction method: according to the distribution situation of ore pillar, back production only is carried out to part ore pillar.The rate of extraction be generally ore pillar 10~ 50%, the rate of extraction is low, and back production carries out in dead zone, and dead zone top plate exposed area increased dramatically after back production, and safety is poor.
It cuts column method: ore pillar is whittled into the ore pillar of the shapes such as kidney-shaped, back taper.This stoping method is easy to operate, but recycles Rate generally only has the 20%~50% of ore pillar, has been eliminated now as a kind of individual pillar recovery method.Since ore pillar is " thin Body " seriously, is stablized and is deteriorated, there are security risks.
Artificial pillar replacement: constructing artificial pillar roof supporting, then stooping pillaring around to stooping pillaring, artificial to prop up Constructing for column is at high cost, and construction technology is complicated, and when special orebody thickness is larger, it is greatly and at high cost to construct difficulty.
Filling afterwards back production comprehensively: first filling dead zone, and then driving adopts cutting journey and carries out mine in obturation Column back production.Since the stope dead zone outlet after room-and-pillar method back production is more, barricade constructs that quantity is more, and project amount is big;Goaf needs whole High-intensitive filling is carried out, filling cost is high;A large amount of obturation, tunnel in obturation need to be tunneled and be had bad luck to the process of stooping pillaring Driving, branch maintenance difficulties are big.
On the whole, the back production safety of existing scheme is poor, loss late is big, process for stoping is complicated, back production low efficiency and return It adopts at high cost.
Summary of the invention
The present invention provides a kind of continuous slitting pocket types to fill room-and-pillar method dead zone stooping pillaring method, to solve the existing pillars of a house Method pillar recovery, the technical problem that safety is poor, loss late is big, process for stoping is complicated, back production low efficiency and stoping cost are high.
The present invention provides a kind of continuous slitting pocket type filling room-and-pillar method dead zone stooping pillaring method, comprising the following steps: a, root According to ore pillar and dead zone situation, dead zone is divided into dead zone band and comprising the ore pillar band of multiple ore pillars;B, dead zone band is filled; C, the pillar recovery in ore pillar band is carried out after the dead zone band of ore pillar band two sides fills;D, repeat step b and Step c, the lower ore pillar band of back production;E, it completes in dead zone after all pillar recoveries, carries out ore pillar band and adopt rear Mined-out area disposal.
Further, the dead zone in step a divides, dead zone band and ore pillar band interphase distribution and continuous arrangement.Ore pillar For at least one of a column, continuous strip column, studding, top pillar, foundation.Ore pillar band includes multiple ore pillars, dead zone band and The shape of ore pillar band is linear type, shaped form or multistage line style combined strip band, so that more ore pillars are located at same ore pillar Band so as to back production and improves back production scale.
Further, it is cementing to carry out pocket type to dead zone band according to the band of division for the filling dead zone band in step b Filling, in dead zone, band is laid with filling bag, conveys filling slurry into filling bag so that filling bag obtain filling and it is automatic comprehensively Top is connect, band forms filling support bar band in dead zone;According to dead zone band and filling process, the placement method of dead zone band is used The comprehensive filling method of dead zone band, dead zone strip portion filling method, large span dead zone band at least one of slitting filling method again.
Further, the comprehensive filling method of dead zone band specifically: using dead zone band two sides ore pillar as enclosing when filling And form the filling band at middle part;As ore pillar spacing < 3m, reinforced anchor bolt is beaten on ore pillar, mesh sheet is fixed on anchor pole; As ore pillar spacing >=3m, pillar is added between ore pillar, and to reduce mesh sheet exposure span, reinforced anchor bolt is beaten on ore pillar, it will Mesh sheet is fixed on anchor pole and pillar;After the good mesh sheet of enclosing, it is laid with filling bag along filling band overall length, is supported by two sides mesh sheet Fill bag.
Further, dead zone strip portion filling method specifically: dead zone band is divided into the reserved space of two sides in The filling band in portion carries out enclosing in filling band two sides;Support pillar, pillar installation rule are installed along filling band boundaries overall length Lattice are 0.2m/ root~2m/ root, in the fixed mesh sheet of post inboard;After the good mesh sheet of enclosing, it is laid with filling bag along filling band overall length, Filling bag is supported by two sides mesh sheet.
Further, large span dead zone band slitting filling method again specifically: dead zone band is divided into the hollow of middle part The filling band of band and two sides;When filling band enclosing, side is beaten on ore pillar using ore pillar as ore pillar spacing < 3m Mesh sheet is fixed on anchor pole by reinforced anchor bolt, and as ore pillar spacing >=3m, pillar is added between ore pillar, sudden and violent to reduce mesh sheet Reveal span, reinforced anchor bolt is beaten on ore pillar, mesh sheet is fixed on anchor pole and pillar;The other side is along filling band boundaries overall length branch Pillar is supportted, pillar installation specification is 0.2m/ root~2m/ root, and in the fixed mesh sheet of post inboard, support filling bag is in stowing operation Not external drum;After the good mesh sheet of enclosing, it is laid with filling bag along filling band overall length, filling bag is supported by two sides mesh sheet.
Further, after the completion of preparation, the filling operation for filling bag can be started, using pipeline slurry to filling It fills out bag to be filled, it is desirable that Tight filling;When filling, in order to reduce filling slurry to the lateral pressure of filling bag, prevent from filling The damaged spillage of bag, according to dead zone height, filling slurry filling uses primary filling;Or filling slurry filling is using repeatedly progress Filling, each packed height are 0.5m~4m, start to fill next time again after filling slurry final set.
Further, when ore body is nearly horizontal ore body, when filling bag filling will not the sliding of across strike direction when, using layering Pocket type stacks the mode of filling, and along dead zone, short transverse is divided into multiple layerings, and filling bag height is dead zone layer height, filling Bag height is 0.2m~2m;Filling band is not required to enclosing at this time, saves the filling that enclosing constructs step and directly carries out filling bag.
Further, filling bag specification is customized according to the bulk for filling band in the band of dead zone;According to dead zone band Length, the plagioclase or dead zone band for filling a length of dead zone band of bag are divided into multistage along its length, fill a length of of bag The section length of dead zone band;The width for filling bag is the width of dead zone strip filling part;Fill a height of dead zone band of bag Highly;Fill the membrane material that bag material is geotechnological dry goods or the permeable impermeable aggregate for weaving dry goods.
Further, the pillar recovery in step c, specifically: after ore pillar band adjacent both sides dead zone strip filling, And obturation maintenance reaches design strength 0.2MPa~2MPa, can start the actual mining of ore pillar;When pillar recovery, from mine Column band one end is to other end back production or both ends to intermediate back production;After pillar recovery, the strip filling body roof supporting on both sides;Mine When column bandwidth is larger, pillar recovery dead zone span is larger, and ore pillar band is divided into multiple bands along strip width direction Back production is carried out, stooping pillaring subregion is filled according still further to the placement method of dead zone band.
Further, the Mined-out area disposal in step e, specifically: after ore pillar has been adopted in whole region, block all to be filled Dead zone regional export, then fills dead zone, when filling, according to safety requirements, is starched using low intensive all-tailing cemented filling material Or classified tailings filling;Or in whole region after ore pillar has been adopted, all dead zone regional exports to be filled are blocked, without filling It fills out.
The invention has the following advantages:
The continuous slitting pocket type of the present invention fills room-and-pillar method dead zone stooping pillaring method, by after room-and-pillar method back production dead zone and ore pillar Be respectively divided into continuous dead zone band and ore pillar band, after the strip filling of dead zone, ore pillar be located at the dead zone band after filling it Between, without obturation between ore pillar in ore pillar band, when back production, can directly carry out back production from the both ends of ore pillar band, not need to dig It adopts cutting journey into other and is tunneled in obturation, when pillar recovery, the scope of freedom is more, and the mine amount of onepull is big, can be same When operation working face it is more, process for stoping is simple, high production efficiency.Dead zone band after filling effectively can support dead zone to push up Plate can be recycled all using this method ore pillar, and the ore pillar rate of recovery is high.When pillar recovery, protected in continuously filling support bar band Shield is lower to be carried out, can effective roof supporting, provide safety guarantee for pillar recovery.After pillar recovery, dead zone can be carried out Filling comprehensively is conducive to protect earth's surface, and lithic drainage, regional geological environment etc., safety is good, environmental-friendly.It is only empty to part Area is filled, and filling cost is shared less, at low cost.Suitable for room-and-pillar method pillar recovery and Mined-out area disposal, especially low-angle dip It is very thin to arrive lean ore body.
Other than objects, features and advantages described above, there are also other objects, features and advantages by the present invention. Below with reference to figure, the present invention is described in further detail.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart element of the continuous slitting pocket type filling room-and-pillar method dead zone stooping pillaring method of the preferred embodiment of the present invention Figure;
Fig. 2 is the structural schematic diagram of the comprehensive filling method of dead zone band of the preferred embodiment of the present invention;
Fig. 3 is the A-A sectional view of Fig. 2;
Fig. 4 is the structural schematic diagram of the dead zone strip portion filling method of the preferred embodiment of the present invention;
Fig. 5 is the structural schematic diagram of the large span dead zone band slitting filling method again of the preferred embodiment of the present invention.
Marginal data:
1, ore pillar;2, dead zone band;3, ore pillar band;4, bag is filled;5, filling slurry;6, pillar;7, stooping pillaring Subregion;8, the quick-fried heap of ore pillar.
Specific embodiment
The embodiment of the present invention is described in detail below in conjunction with attached drawing, but the present invention can be limited by following and The multitude of different ways of covering is implemented.
Fig. 1 is the flow chart element of the continuous slitting pocket type filling room-and-pillar method dead zone stooping pillaring method of the preferred embodiment of the present invention Figure;Fig. 2 is the structural schematic diagram of the comprehensive filling method of dead zone band of the preferred embodiment of the present invention;Fig. 3 is the A-A sectional view of Fig. 2; Fig. 4 is the structural schematic diagram of the dead zone strip portion filling method of the preferred embodiment of the present invention;Fig. 5 is the preferred embodiment of the present invention The structural schematic diagram of large span dead zone band slitting filling method again.
As shown in Figure 1, the continuous slitting pocket type of the present embodiment fills room-and-pillar method dead zone stooping pillaring method, including following step Rapid: dead zone is divided into dead zone band 2 and ore pillar band 3 comprising multiple ore pillars 1 by a, according to ore pillar 1 and dead zone situation;B, it fills It fills a vacancy area's band 2;C, the ore pillar 1 carried out after the dead zone band 2 of 3 two sides of ore pillar band fills in ore pillar band 3 returns It adopts;D, step b and step c, the lower ore pillar band 3 of back production are repeated;E, it completes in dead zone after all 1 back production of ore pillar, carries out ore pillar Band adopts rear Mined-out area disposal.The continuous slitting pocket type of the present invention fills room-and-pillar method dead zone stooping pillaring method, after room-and-pillar method back production Dead zone and ore pillar 1 are respectively divided into continuous dead zone band 2 and ore pillar band 3, and after dead zone band 2 fills, ore pillar 1 is located at filling Between dead zone band 2 afterwards, without obturation between ore pillar 1 in ore pillar band 3, when back production, can be straight from the both ends of ore pillar band 3 Tap into row back production, do not need to tunnel it is other adopt cutting journey and tunneled in obturation, when 1 back production of ore pillar, the scope of freedom is more, one The mine amount of separate explosion is big, can simultaneously operation working face it is more, process for stoping is simple, high production efficiency.2 energy of dead zone band after filling Enough effective support dead zone top plates, can all be recycled, 1 rate of recovery of ore pillar is high using this method ore pillar 1.When 1 back production of ore pillar, Continuous filling support bar band protection is lower to be carried out, can effective roof supporting, provide safety guarantee for 1 back production of ore pillar.Ore pillar 1 After back production, dead zone can be filled comprehensively, be conducive to protect earth's surface, lithic drainage, regional geological environment etc., safety It is good, it is environmental-friendly.Only part dead zone is filled, filling cost is shared less, at low cost.Using mould pocket type filling method, filling 4 mould bags of bag can be process using membrane materials such as low-cost geotextiles, without constructing complexity, Gao Chengben filling counterfort. It is reusable to fill 4 enclosing material of bag, reduces material consumption.Dead zone uses low intensive consolidated fill after 1 back production of ore pillar Body and classified tailings, Mined-out area disposal are at low cost;Due to there is the support of continuous strip obturation, or even can not fill, it is ensured that Dead zone safety.It is very thin to lean ore body suitable for room-and-pillar method pillar recovery and Mined-out area disposal, especially low-angle dip.Optionally, dead zone Band 2 and/or ore pillar band 3 be of a straight line type, one of shaped form or multistage line style combined strip band.Optionally, in step b Filling dead zone band 2, can using concrete block masonry, brick it is mixed build, the mixing of air bag slurry is built, filling bag be piled up, concrete It pours, at least one of prefabricated board assembly.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 5, in the present embodiment, filling dead zone band 2 in step b, according to division Band, to dead zone band 2 carry out pocket type consolidated fill.In dead zone, band 2 is laid with filling bag, conveys filling into filling bag 4 Slurry 5, so that filling bag 4 is filled and connects top comprehensively automatically.In dead zone, band 2 forms filling support bar band.According to dead zone The placement method of band 2 and filling process, dead zone band 2 is filled using the comprehensive filling method of dead zone band 2,2 part of dead zone band Method, large span dead zone band 2 again at least one of slitting filling method can according to ore pillar distribution situation, ore pillar span situation with And dead zone situation, different slitting completion methods is selected, to form the filling bag of band subregion and safety convenient for 1 back production of ore pillar 4 fillings connect topmast support structure.After the filling of filling bag 4 forms the filling support bar band of strip in dead zone band 2, can effectively it prop up Dead zone top plate is supportted, can all be recycled using this method ore pillar 1,1 rate of recovery of ore pillar is high.When 1 back production of ore pillar, continuously filling The protection of support bar band is lower to be carried out, can effective roof supporting, provide safety guarantee for 1 back production of ore pillar.It is filled using mould pocket type Method, filling bag mould bag can be process using the membrane materials such as low-cost geotextiles, without constructing complicated, high cost filling Barricade.It is reusable to fill bag enclosing material, reduces material consumption.Dead zone cementing is filled using low intensive after pillar recovery Body and classified tailings are filled out, Mined-out area disposal is at low cost;Due to there is the support of continuous strip obturation, or even can not fill, Ke Yibao Demonstrate,prove dead zone safety.
As shown in Figure 1, Figure 2 and Figure 3, in the present embodiment, the comprehensive filling method of dead zone band 2 specifically: sky is utilized when filling 2 two sides ore pillar 1 of area's band as enclosing and formed middle part filling band.As 1 spacing < 3m of ore pillar, steel is broken on ore pillar 1 Muscle anchor pole, mesh sheet is fixed on anchor pole.As 1 spacing of ore pillar >=3m, pillar 6 is added between ore pillar 1, it is sudden and violent to reduce mesh sheet Reveal span, beats reinforced anchor bolt on ore pillar 1, mesh sheet is fixed on anchor pole and pillar 6.After the good mesh sheet of enclosing, along filling band Overall length is laid with filling bag 4, supports filling bag 4 by two sides mesh sheet.Optionally, mesh sheet is reinforced mesh.
As shown in Figure 1 and Figure 4, in the present embodiment, 2 part filling method of dead zone band specifically: be divided into dead zone band 2 The reserved space of two sides and the filling band at middle part carry out enclosing in filling band two sides.It is installed along filling band boundaries overall length Pillar 6 is supported, 6 installation specification of pillar is 0.2m/ root~2m/ root, fixes mesh sheet on the inside of pillar 6.After the good mesh sheet of enclosing, edge is filled It fills out band overall length and is laid with filling bag 4, filling bag 4 is supported by two sides mesh sheet.Optionally, mesh sheet is reinforced mesh.
As shown in Figure 1 and Figure 5, in the present embodiment, the slitting filling method again of large span dead zone band 2 specifically: by dead zone item The filling band of the hollow band and two sides that are divided into middle part with 2.When filling band enclosing, side utilizes ore pillar 1, when ore pillar 1 When spacing < 3m, beat reinforced anchor bolt on ore pillar 1, mesh sheet be fixed on anchor pole, as 1 spacing of ore pillar >=3m, ore pillar 1 it Between add pillar 6, with reduce mesh sheet exposure span, beat reinforced anchor bolt on ore pillar 1, mesh sheet be fixed on anchor pole and pillar 6. The other side supports pillar 6 along filling band boundaries overall length, and 6 installation specification of pillar is 0.2m/ root~2m/ root, solid on the inside of pillar 6 Determine mesh sheet, support filling bag 4 not external drum in stowing operation.After the good mesh sheet of enclosing, it is laid with filling bag 4 along filling band overall length, Filling bag 4 is supported by two sides mesh sheet.Optionally, mesh sheet is reinforced mesh.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 5, in the present embodiment, after the completion of preparation, can start to fill bag 4 Filling operation, using pipeline slurry to filling bag 4 fill, it is desirable that Tight filling.When filling, in order to reduce filling The lateral pressure of 5 pairs of slurry filling bags 4 prevents the damaged spillage of filling bag 4, and according to dead zone height, the filling of filling slurry 5 uses one Secondary filling.Optionally, for the filling of filling slurry 5 using repeatedly being filled, each packed height is 0.5m~4m, filling slurry 5 Start to fill next time again after final set.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 5, in the present embodiment, when ore body is nearly horizontal ore body, filling bag 4 is filled When Shi Buhui across strike direction is slided, in such a way that layering pocket type stacks filling, along dead zone, short transverse is divided into multiple points Layer, filling 4 height of bag are dead zone layer height, and filling 4 height of bag is 0.2m~2m.Filling band is not required to enclosing at this time, saves Enclosing constructs step and directly carries out the filling of filling bag 4.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 5, in the present embodiment, filling 4 specification of bag is filled according in dead zone band 2 The bulk of band customizes.According to 2 length of dead zone band, the plagioclase or dead zone item of a length of dead zone band 2 of bag 4 are filled Band 2 is divided into multistage along its length, fills the section length of a length of dead zone band 2 of bag 4.The width for filling bag 4 is dead zone item Width with 2 pack portions;Fill the height of a height of dead zone band 2 of bag 4.Filling 4 material of bag is geotechnological dry goods or woven cloth The membrane material of the permeable impermeable aggregate of class.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 5, in the present embodiment, 1 back production of ore pillar in step c, specifically: work as mine After the adjacent both sides dead zone band 2 of column band 3 fills, and obturation maintenance reaches design strength 0.2MPa~2MPa Start the actual mining of ore pillar 1.When 1 back production of ore pillar, from 3 one end of ore pillar band to other end back production or both ends to intermediate back production. After 1 back production of ore pillar, the strip filling body roof supporting on both sides.When 3 width of ore pillar band is larger, ore pillar 1 return mined-out area span compared with Greatly, ore pillar band 3 is divided into multiple bands along strip width direction and carries out back production, stooping pillaring subregion 7 is according still further to dead zone The placement method of band 2 is filled.As shown in Fig. 2,3,4,5, explosion is carried out to ore pillar 1 one by one in ore pillar band 3 and is formed The quick-fried heap 8 of ore pillar, and gradually export the quick-fried heap 8 of ore pillar.To improve efficiency.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 5, in the present embodiment, the dead zone in step a is divided, dead zone band 2 and mine 3 interphase distribution of column band and continuous arrangement, ore pillar 1 are at least one of point column, continuous strip column, studding, top pillar, foundation. Mined-out area disposal in step e, specifically: after ore pillar 1 has been adopted in whole region, all dead zone regional exports to be filled are blocked, so After fill dead zone, when filling, according to safety requirements, filled using low intensive all-tailing cemented filling material slurry or classified tailings. Optionally, after ore pillar 1 has been adopted in whole region, all dead zone regional exports to be filled are blocked, without filling.After pillar recovery Dead zone uses low intensive cemented fill and classified tailings, and Mined-out area disposal is at low cost.Due to there is the branch of continuous strip obturation Support, or even can not fill, it is ensured that dead zone safety.
When implementation, a kind of continuous slitting pocket type filling room-and-pillar method dead zone stooping pillaring method is provided, specific implementation step is as follows:
(1) stope is arranged
According to ore pillar and dead zone situation, ore pillar and dead zone are divided into alternate continuous dead zone band and ore pillar band. Ore pillar includes point column, continuous strip ore pillar, studding, top pillar and foundation etc..
(2) Filling mine-out area
According to the band of division, pocket type consolidated fill is carried out to dead zone band.According to dead zone band and filling process, dead zone The placement method of band: 1) the comprehensive filling method of dead zone band;2) dead zone strip portion filling method;3) large span dead zone band divides again Filling method.
1) the comprehensive filling method of dead zone band
Filling filling band two sides are that ore pillar using ore pillar as enclosing when filling beats reinforced anchor bolt on ore pillar comprehensively, Mesh sheet is fixed on anchor pole;But as ore pillar spacing >=3m, pillar is added between ore pillar, reduces mesh sheet exposure span, net The main function of piece is to support filling bag, behind the good dead zone of enclosing, is laid with along filling band overall length and fills bag.
2) dead zone strip portion filling method
Dead zone band is divided into two sides reserved space and middle part filling band, carries out enclosing, edge in filling band two sides Filling band boundaries overall length installs support pillar, and pillar installation specification is 0.2~2m/ root, in the fixed mesh sheet of post inboard, mesh sheet Main function be support filling bag, behind the good dead zone of enclosing, be laid with filling bag along filling band overall length.
3) large span dead zone band slitting filling method again
Dead zone band is divided into middle part dead zone band and two sides filling band, when filling band enclosing, side utilizes mine Column beats reinforced anchor bolt on ore pillar, and reinforced mesh is fixed on anchor pole, but as ore pillar spacing >=3m, adds between ore pillar If pillar;The other side supports pillar along filling band boundaries overall length, and pillar installation specification is 0.2m/ root~2m/ root, in pillar Mesh sheet, support filling bag not external drum in stowing operation are fixed in side.Behind the good dead zone of enclosing, filling is laid with along filling band overall length Bag.
Filling bag specification is customized according to the bulk that need to fill dead zone band, a length of dead zone plagioclase, and width is that need to fill sky Area's strip width, a height of dead zone height.Fill the membrane material that bag material is the permeable impermeable aggregates such as geotextiles, woven cloth.
After the completion of filling preparation, filling operation can be started, filled using pipeline slurry, it is desirable that filling Connect top.When filling, in order to reduce filling slurry to the lateral pressure of filling bag, filling bag breakage spillage is prevented, according to dead zone height Degree be divided into it is one or many filled, each packed height 0.5m~4m starts to fill next time after filling slurry final set again.
When ore body is nearly horizontal ore body, when filling bag filling will not the sliding of across strike direction when, can be using layering bag Formula stacks the mode of filling, and along dead zone, short transverse is divided into multiple layerings, and filling bag height is dead zone layer height, fills bag Height is 0.2m~2m.Filling band is not required to enclosing at this time, can directly be filled.
(3) pillar recovery
After ore pillar band adjacent both sides dead zone strip filling, and obturation maintenance reach design strength (0.2~ 2MPa.), the actual mining of ore pillar can be started.When pillar recovery, from ore pillar band one end to other end back production.Pillar recovery Afterwards, the strip filling body roof supporting on both sides.
When ore pillar strip width is larger, dead zone span is larger after pillar recovery, can be by ore pillar band along strip width side Back production is carried out to multiple bands are divided into, the dead zone after back production is filled according still further to the placement method of dead zone band, then again The lower band of back production.
(4) Mined-out area disposal
After ore pillar has been adopted in whole region, all dead zone regional exports to be filled are blocked, then fill dead zone, when filling, It, can be using low intensive all-tailing cemented filling material slurry or classified tailings filling according to safety requirements.
The continuous slitting pocket type fills room-and-pillar method dead zone stooping pillaring method, has the advantages that
(1) process for stoping is simple, high production efficiency.Dead zone after room-and-pillar method back production and ore pillar are respectively divided into continuous sky Area's band and ore pillar band.After the strip filling of dead zone, ore pillar be located at filling after dead zone band between, in ore pillar band ore pillar it Between without obturation, when back production, can directly carry out back production from the both ends of ore pillar band, do not need to tunnel it is other adopt cutting journey and It is tunneled in obturation.When pillar recovery, the scope of freedom is more, and the mine amount of onepull is big;The working face of back production simultaneously is more, production It is high-efficient.
(2) the ore pillar rate of recovery is high.Filling band can effectively support dead zone top plate, can be whole using this method ore pillar Recycling.
(3) safety is good, environmental-friendly.When pillar recovery, carries out, can effectively support under continuously filling band protection Top plate provides safety guarantee for pillar recovery.After pillar recovery, dead zone can be filled comprehensively, be conducive to protecting field Table, lithic drainage, regional geological environment etc..
(4) at low cost.Only part dead zone is filled, filling cost is shared few.Using mould pocket type filling method, mould bag is adopted It is process with membrane materials such as low-cost geotextiles, without constructing complexity, Gao Chengben filling counterfort.Enclosing material is repeatable It utilizes, reduces material consumption.After pillar recovery dead zone use low intensive cemented fill and classified tailings, Mined-out area disposal at This is low;Due to there is the support of continuous strip obturation, or even can not fill.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of continuous slitting pocket type fills room-and-pillar method dead zone stooping pillaring method, which is characterized in that
The following steps are included:
A, according to ore pillar (1) and dead zone situation, dead zone is divided into dead zone band (2) and ore pillar item comprising multiple ore pillars (1) Band (3);
B, dead zone band (2) are filled;
Filling dead zone band (2) in step b carries out pocket type consolidated fill to dead zone band (2) according to the band of division, Dead zone band (2) is laid with filling bag, to bag (4) interior conveying filling slurry (5) is filled, so that filling bag (4) obtains filling simultaneously certainly It is dynamic to connect top comprehensively;In dead zone, band (2) forms filling support bar band;
Bag (4) specification is filled to be customized according to the bulk of filling band in dead zone band (2);
According to dead zone band (2) length, the plagioclase of a length of dead zone band (2) of bag (4) is filled;Or dead zone band (2) is along length Degree direction is divided into multistage, fills the section length of a length of dead zone band (2) of bag (4);
The width for filling bag (4) is the width of dead zone band (2) pack portion;Fill the height of a height of dead zone band (2) of bag (4) Degree;
After the completion of preparation, can start fill bag (4) filling operation, using pipeline slurry to filling bag (4) into Row filling, it is desirable that Tight filling;When filling, in order to reduce filling slurry (5) to the lateral pressure of filling bag (4), prevent from filling The damaged spillage of bag (4), according to dead zone height, filling slurry (5) filling uses primary filling;Or filling slurry (5) filling is adopted With repeatedly being filled, each packed height is 0.5m~4m, starts to fill next time again after filling slurry (5) final set;
When ore body is nearly horizontal ore body, when filling bag (4) filling will not the sliding of across strike direction when, filled using layering pocket type stacking The mode filled out, along dead zone, short transverse is divided into multiple layerings, and filling bag (4) is highly dead zone layer height, and filling bag (4) is high Degree is 0.2m~2m, fills band at this time and is not required to enclosing, saves the filling that enclosing constructs step and directly carries out filling bag (4);
C, the ore pillar (1) carried out after the dead zone band (2) of ore pillar band (3) two sides fills in ore pillar band (3) returns It adopts;
After the strip filling of dead zone, ore pillar is located between the dead zone band (2) after filling, nothing between ore pillar band (3) interior ore pillar (1) Obturation directly carries out back production from the both ends of ore pillar band (3) when back production, does not need to tunnel and other adopts cutting journey and in obturation Inside tunneled;When ore pillar (1) back production, the scope of freedom is more, and the mine amount of onepull is big;The working face of back production simultaneously is more, production effect Rate is high;
D, step b and step c, the lower ore pillar band (3) of back production are repeated;
E, it completes in dead zone after all ore pillar (1) back production, carries out ore pillar band (3) and adopt rear Mined-out area disposal.
2. continuous slitting pocket type according to claim 1 fills room-and-pillar method dead zone stooping pillaring method, which is characterized in that
In the step b, according to dead zone band (2) and filling process, the placement method of dead zone band (2) uses dead zone band (2) comprehensively filling method, dead zone band (2) part filling method, large span dead zone band (2) again in slitting filling method at least one Kind.
3. continuous slitting pocket type according to claim 2 fills room-and-pillar method dead zone stooping pillaring method, which is characterized in that
The comprehensive filling method of the dead zone band (2) specifically:
When filling using dead zone band (2) two sides ore pillar (1) as enclosing and formed middle part filling band;
As ore pillar (1) spacing < 3m, reinforced anchor bolt is beaten on ore pillar (1), mesh sheet is fixed on anchor pole;
As ore pillar (1) spacing >=3m, pillar (6) are added between ore pillar (1), to reduce mesh sheet exposure span, in ore pillar (1) It is upper to beat reinforced anchor bolt, mesh sheet is fixed on anchor pole and pillar (6);
After the good mesh sheet of enclosing, it is laid with filling bag (4) along filling band overall length, filling bag (4) is supported by two sides mesh sheet.
4. continuous slitting pocket type according to claim 2 fills room-and-pillar method dead zone stooping pillaring method, which is characterized in that
Dead zone band (2) part filling method specifically:
Dead zone band (2) is divided into the reserved space of two sides and the filling band at middle part, carries out enclosing in filling band two sides;
Support pillar (6) is installed along filling band boundaries overall length, pillar (6) installation specification is 0.2m/ root~2m/ root, in pillar (6) the fixed mesh sheet in inside;
After the good mesh sheet of enclosing, it is laid with filling bag (4) along filling band overall length, filling bag (4) is supported by two sides mesh sheet.
5. continuous slitting pocket type according to claim 2 fills room-and-pillar method dead zone stooping pillaring method, which is characterized in that
Large span dead zone band (2) slitting filling method again specifically:
Dead zone band (2) is divided into the hollow band at middle part and the filling band of two sides;
When filling band enclosing,
Side beats reinforced anchor bolt on ore pillar (1), mesh sheet is fixed on anchor using ore pillar (1) as ore pillar (1) spacing < 3m On bar, as ore pillar (1) spacing >=3m, pillar (6) are added between ore pillar (1), to reduce mesh sheet exposure span, in ore pillar (1) reinforced anchor bolt is beaten on, and mesh sheet is fixed on anchor pole and pillar (6);
The other side is 0.2m/ root~2m/ root along filling band boundaries overall length support pillar (6), pillar (6) installation specification, is being propped up Fixed mesh sheet on the inside of column (6), support filling bag (4) not external drum in stowing operation;
After the good mesh sheet of enclosing, it is laid with filling bag (4) along filling band overall length, filling bag (4) is supported by two sides mesh sheet.
6. continuous slitting pocket type according to any one of claim 1 to 5 fills room-and-pillar method dead zone stooping pillaring method, special Sign is,
Fill the membrane material that bag (4) material is geotechnological dry goods or the permeable impermeable aggregate for weaving dry goods.
7. continuous slitting pocket type according to any one of claim 1 to 5 fills room-and-pillar method dead zone stooping pillaring method, special Sign is,
Ore pillar (1) back production in the step c, specifically:
After ore pillar band (3) adjacent both sides dead zone band (2) filling, and obturation maintenance reaches design strength 0.2MPa ~2MPa can start the actual mining of ore pillar (1);
When ore pillar (1) back production, from ore pillar band (3) one end to other end back production or both ends to intermediate back production;Ore pillar (1) back production Afterwards, the strip filling body roof supporting on both sides;
When ore pillar band (3) width is larger, ore pillar (1) time mined-out area span is larger, by ore pillar band (3) along strip width direction It is divided into multiple bands and carries out back production,
Stooping pillaring subregion (7) is filled according still further to the placement method of dead zone band (2).
8. continuous slitting pocket type according to any one of claim 1 to 5 fills room-and-pillar method dead zone stooping pillaring method, special Sign is,
Dead zone in the step a divides, dead zone band (2) and ore pillar band (3) interphase distribution and continuous arrangement, ore pillar (1) For at least one of a column, continuous strip column, studding, top pillar, foundation;
Mined-out area disposal in the step e, specifically:
After ore pillar (1) has been adopted in whole region, all dead zone regional exports to be filled are blocked, then fill dead zone, when filling, root According to safety requirements, filled using low intensive all-tailing cemented filling material slurry or classified tailings;
Or in whole region after ore pillar (1) has been adopted, all dead zone regional exports to be filled are blocked, without filling.
CN201710093425.5A 2017-02-21 2017-02-21 Continuous slitting pocket type fills room-and-pillar method dead zone stooping pillaring method Active CN106761743B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710093425.5A CN106761743B (en) 2017-02-21 2017-02-21 Continuous slitting pocket type fills room-and-pillar method dead zone stooping pillaring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710093425.5A CN106761743B (en) 2017-02-21 2017-02-21 Continuous slitting pocket type fills room-and-pillar method dead zone stooping pillaring method

Publications (2)

Publication Number Publication Date
CN106761743A CN106761743A (en) 2017-05-31
CN106761743B true CN106761743B (en) 2019-07-30

Family

ID=58958700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710093425.5A Active CN106761743B (en) 2017-02-21 2017-02-21 Continuous slitting pocket type fills room-and-pillar method dead zone stooping pillaring method

Country Status (1)

Country Link
CN (1) CN106761743B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178366B (en) * 2017-07-28 2019-11-05 长沙矿山研究院有限责任公司 A kind of stoping method of column ore body
CN108533265B (en) * 2018-05-22 2019-10-15 福州大学 Utilize the filling mining method of concrete component assembling foundation
CN112127889B (en) * 2020-09-09 2022-04-22 湖北杉树垭矿业有限公司 Strip wet-type filling roof-contacting mining method
CN112412455B (en) * 2020-11-24 2022-11-18 武汉理工大学 One-step roadway filling mining method for precast concrete
CN112593940A (en) * 2020-12-16 2021-04-02 中煤能源研究院有限责任公司 Arrangement process for remaining coal pillars and processing ground gangue by stope-type coal mining method
CN112832854B (en) * 2020-12-29 2022-05-03 河海大学 Tailing filling auxiliary roof connecting device and construction method thereof
CN113700481B (en) * 2021-09-16 2024-01-05 安徽铜冠产业技术研究院有限责任公司 Zone control filling continuous mining method for underground goaf tray zone isolated ore pillar

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105129A (en) * 2007-07-16 2008-01-16 中南大学 Mining environment reconstructed continuous mining afterwards filling mining method
CN103161467A (en) * 2013-02-25 2013-06-19 湖北杉树垭矿业科技开发有限公司 Horizontal moderately thick mine body compartment type filling mining method
CN103967493A (en) * 2014-05-23 2014-08-06 山东黄金矿业(莱州)有限公司三山岛金矿 Pillar mining method for gentle dip thin ores
CN104373125A (en) * 2014-09-11 2015-02-25 长沙矿山研究院有限责任公司 Two-step upward high-layering bagging cut-and-filling stoping method
CN104453900A (en) * 2014-11-28 2015-03-25 贵州晨辉达矿业工程设计有限公司 Filling mining method of near-horizontal ore body
CN105626071A (en) * 2015-12-30 2016-06-01 北京矿冶研究总院 Mining method for gently inclined thin ore body
CN106089205A (en) * 2016-08-19 2016-11-09 贵州晨辉达矿业工程设计有限公司 A kind of room-and-pillar method filling mining method being applicable to very thin ore body under water body
CN106382118A (en) * 2016-11-30 2017-02-08 长沙矿山研究院有限责任公司 Separation-wall-free initiative top filling wall type filling mining method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AUPR582001A0 (en) * 2001-06-20 2001-07-12 Banjura Pty Ltd Protection of blast holes

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105129A (en) * 2007-07-16 2008-01-16 中南大学 Mining environment reconstructed continuous mining afterwards filling mining method
CN103161467A (en) * 2013-02-25 2013-06-19 湖北杉树垭矿业科技开发有限公司 Horizontal moderately thick mine body compartment type filling mining method
CN103967493A (en) * 2014-05-23 2014-08-06 山东黄金矿业(莱州)有限公司三山岛金矿 Pillar mining method for gentle dip thin ores
CN104373125A (en) * 2014-09-11 2015-02-25 长沙矿山研究院有限责任公司 Two-step upward high-layering bagging cut-and-filling stoping method
CN104453900A (en) * 2014-11-28 2015-03-25 贵州晨辉达矿业工程设计有限公司 Filling mining method of near-horizontal ore body
CN105626071A (en) * 2015-12-30 2016-06-01 北京矿冶研究总院 Mining method for gently inclined thin ore body
CN106089205A (en) * 2016-08-19 2016-11-09 贵州晨辉达矿业工程设计有限公司 A kind of room-and-pillar method filling mining method being applicable to very thin ore body under water body
CN106382118A (en) * 2016-11-30 2017-02-08 长沙矿山研究院有限责任公司 Separation-wall-free initiative top filling wall type filling mining method

Also Published As

Publication number Publication date
CN106761743A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN106761743B (en) Continuous slitting pocket type fills room-and-pillar method dead zone stooping pillaring method
CN106761744B (en) Utricule reserves lane and actively connects top room-and-pillar method pillar recovery method
CN108412542B (en) A kind of wide lane digging gangue paste body filling of high seam is at lane method
CN101818643B (en) Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN105971606B (en) A kind of thick sandstone coal wall recovery method
CN108643907B (en) Non-pillar mining method for broken direct roof caving roadway
CN108194088A (en) A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion
CN101858217A (en) House pillar changeable panel upward demix filling mining method
CN102661169A (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN106968676B (en) Method for tunneling through cavity
CN102011611A (en) Strip-type filling method of high water-swelling material for controlling movement and deformation of overlying strata
CN109356582B (en) A kind of filling mining method for comprehensive extracting and caving face
CN109538210A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN107191208A (en) Rigid protection body Support Method in flexible support Ti Yu lanes by gob side entry retaining lane
CN110714760B (en) Mining method for coal-aluminum symbiotic layered induction collaborative mining
CN109595029B (en) Goaf partial stowage supporting structure and its construction method under the conditions of tight roof
CN110331978A (en) A kind of environment reconstruction segmentation medium-length hole afterwards filling mining method
CN102852551A (en) Gob-side entry retaining method using high-water material filling columns
CN110410076A (en) A kind of filling mining method for leaving Pillar Recovery for old pillars of a house goaf
CN102261249B (en) Creasing-type sill-pillar-free stage caving stopping method based on steel structured artificial top
CN210948688U (en) Artificial false lane
CN106894838B (en) Large area penetrates through dead zone bag type partition substep filling administering method
CN106285692B (en) A kind of construction method of gob side entry retaining
CN107654232B (en) The moat ditch collection mine mining methods of inclined orebody
CN110219650A (en) A kind of environment remodeling stage deep hole afterwards filling mining method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant