CN106760204A - 一种提高抗扭承载力的混凝土梁或柱及其施工方法 - Google Patents
一种提高抗扭承载力的混凝土梁或柱及其施工方法 Download PDFInfo
- Publication number
- CN106760204A CN106760204A CN201710002695.0A CN201710002695A CN106760204A CN 106760204 A CN106760204 A CN 106760204A CN 201710002695 A CN201710002695 A CN 201710002695A CN 106760204 A CN106760204 A CN 106760204A
- Authority
- CN
- China
- Prior art keywords
- steel
- edge
- wing
- lag
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/293—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Composite Materials (AREA)
- Manufacturing & Machinery (AREA)
- Ceramic Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Claims (10)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810848914.1A CN108972871B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁的施工方法 |
CN201710002695.0A CN106760204B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁 |
CN201810848908.6A CN109057155B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁 |
CN201810848920.7A CN109057157B (zh) | 2017-01-03 | 2017-01-03 | 一种混凝土柱 |
CN201810848913.7A CN109057156B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土柱的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710002695.0A CN106760204B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁 |
Related Child Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810848914.1A Division CN108972871B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁的施工方法 |
CN201810848908.6A Division CN109057155B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁 |
CN201810848920.7A Division CN109057157B (zh) | 2017-01-03 | 2017-01-03 | 一种混凝土柱 |
CN201810848913.7A Division CN109057156B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土柱的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106760204A true CN106760204A (zh) | 2017-05-31 |
CN106760204B CN106760204B (zh) | 2018-12-21 |
Family
ID=58949376
Family Applications (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810848913.7A Active CN109057156B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土柱的施工方法 |
CN201810848914.1A Active CN108972871B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁的施工方法 |
CN201810848920.7A Active CN109057157B (zh) | 2017-01-03 | 2017-01-03 | 一种混凝土柱 |
CN201810848908.6A Active CN109057155B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁 |
CN201710002695.0A Active CN106760204B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁 |
Family Applications Before (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810848913.7A Active CN109057156B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土柱的施工方法 |
CN201810848914.1A Active CN108972871B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁的施工方法 |
CN201810848920.7A Active CN109057157B (zh) | 2017-01-03 | 2017-01-03 | 一种混凝土柱 |
CN201810848908.6A Active CN109057155B (zh) | 2017-01-03 | 2017-01-03 | 一种提高抗扭承载力的混凝土梁 |
Country Status (1)
Country | Link |
---|---|
CN (5) | CN109057156B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112554561B (zh) * | 2020-11-30 | 2022-05-17 | 同济大学建筑设计研究院(集团)有限公司 | 具有良好抗裂性能的梁上翻节点结构及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60181457A (ja) * | 1984-02-28 | 1985-09-17 | 株式会社鴻池組 | Pcテンドンをx形に内蔵緊張したプレストレストコンクリート造柱 |
KR100625304B1 (ko) * | 2006-01-06 | 2006-09-18 | 우경건설 주식회사 | 파형강판을 복부로 설치한 조립식u형스틸거더를 이용한프리스트레스트u형스틸거더교 시공방법 |
CN102296751A (zh) * | 2011-06-01 | 2011-12-28 | 马人乐 | 预应力抗疲劳钢梁 |
CN203603362U (zh) * | 2013-10-24 | 2014-05-21 | 同济大学 | 双腹板预应力纤维增强复合材料组合梁 |
CN105649202A (zh) * | 2016-01-11 | 2016-06-08 | 安徽理工大学 | 预应力装配式框架节点结构及其施工方法 |
CN205604581U (zh) * | 2016-05-11 | 2016-09-28 | 北京城建建设工程有限公司 | 一种大跨度型钢预应力混凝土组合梁 |
Family Cites Families (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE448897B (sv) * | 1983-06-21 | 1987-03-23 | Rolf Nystrom | Stalbalk med sluten tversnittsprofil och en undersida med i sidled utskjutande flensar, s k hattprofil |
JP2002038642A (ja) * | 2000-07-25 | 2002-02-06 | Shimizu Corp | コンクリートスラブおよびその施工方法 |
JP3405328B2 (ja) * | 2000-08-03 | 2003-05-12 | 鹿島建設株式会社 | 柱梁接合部構造 |
CN1212458C (zh) * | 2002-09-04 | 2005-07-27 | 朴在满 | 预应力钢筋混凝土组合梁 |
KR20040065681A (ko) * | 2003-01-15 | 2004-07-23 | 민용기 | 조립식 초경량빔 및 그 제조방법 |
JP4014216B2 (ja) * | 2005-04-25 | 2007-11-28 | 株式会社大三 | 構造材、接続構造体及び構造材の接続方法 |
CN101270604B (zh) * | 2007-04-11 | 2011-06-01 | 张海堂 | 新断面型钢的制造方法及用途 |
KR101012013B1 (ko) * | 2008-06-16 | 2011-01-31 | 서울시립대학교 산학협력단 | 콘크리트 타설 높이 증대를 위한 콘크리트충전 강관 기둥용가설보강대 |
CN201297042Y (zh) * | 2008-11-14 | 2009-08-26 | 李延和 | 加固混凝土梁的体外预应力结构 |
CN102086677A (zh) * | 2009-12-02 | 2011-06-08 | 张吉华 | 预制钢筋砼梁及钢筋砼柱与梁连接节点 |
CN201933634U (zh) * | 2010-10-15 | 2011-08-17 | 清华大学 | 一种h形截面装配式防屈曲支撑构件 |
CN201962808U (zh) * | 2010-12-02 | 2011-09-07 | 西安建筑科技大学 | 一种钢筋混凝土梁组合加固装置 |
US9487954B2 (en) * | 2011-07-05 | 2016-11-08 | Council Of Scientific & Industrial Research | Laced composite system |
CN202248512U (zh) * | 2011-09-08 | 2012-05-30 | 贵州汇通申发钢结构有限公司 | 钢结构支撑梁 |
CN102444292B (zh) * | 2011-10-24 | 2014-05-07 | 哈尔滨工业大学 | 框架-防屈曲支撑体系防倒塌加固方法 |
CN203008127U (zh) * | 2012-12-18 | 2013-06-19 | 中冶建筑研究总院有限公司 | 混合结构钢筋连接节点 |
CN103233525A (zh) * | 2013-04-11 | 2013-08-07 | 北京工业大学 | 槽钢装配式钢结构预应力防屈曲支撑 |
CN103938733B (zh) * | 2014-04-14 | 2017-05-03 | 北京工业大学 | 无粘结预应力连接预制混凝土梁方矩形钢管混凝土柱节点 |
CN204139336U (zh) * | 2014-09-23 | 2015-02-04 | 中国能源建设集团山西省电力建设四公司 | H型钢柱腹板两侧的h型钢梁对接锁紧装置 |
CN104775515B (zh) * | 2015-04-03 | 2017-04-19 | 浙江工业大学 | 一种改善z形柱节点抗扭性能的暗梁增强方法 |
CN204940694U (zh) * | 2015-09-06 | 2016-01-06 | 李卫文 | 一种钢结构梁支撑 |
CN105421586B (zh) * | 2015-10-14 | 2018-06-26 | 中铁五局集团路桥工程有限责任公司 | 一种城市轨道交通高架车站的型钢混凝土柱及其制备方法 |
CN105604245A (zh) * | 2015-12-21 | 2016-05-25 | 天津大学 | 一种型钢混凝土+形截面柱制作方法 |
CN105604241A (zh) * | 2015-12-24 | 2016-05-25 | 安徽伟宏钢结构集团股份有限公司 | 一种建筑用钢构加强横梁 |
CN205296592U (zh) * | 2015-12-29 | 2016-06-08 | 中国建筑第六工程局有限公司 | 跨越型钢混凝土梁抗扭筋连接装置 |
CN205531004U (zh) * | 2016-04-14 | 2016-08-31 | 河海大学 | 一种翼缘双侧加蛇形钢条的h型钢混凝土梁 |
CN205777091U (zh) * | 2016-05-21 | 2016-12-07 | 王大刚 | 一种设置有穿线孔的型钢混凝土组合梁 |
-
2017
- 2017-01-03 CN CN201810848913.7A patent/CN109057156B/zh active Active
- 2017-01-03 CN CN201810848914.1A patent/CN108972871B/zh active Active
- 2017-01-03 CN CN201810848920.7A patent/CN109057157B/zh active Active
- 2017-01-03 CN CN201810848908.6A patent/CN109057155B/zh active Active
- 2017-01-03 CN CN201710002695.0A patent/CN106760204B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60181457A (ja) * | 1984-02-28 | 1985-09-17 | 株式会社鴻池組 | Pcテンドンをx形に内蔵緊張したプレストレストコンクリート造柱 |
KR100625304B1 (ko) * | 2006-01-06 | 2006-09-18 | 우경건설 주식회사 | 파형강판을 복부로 설치한 조립식u형스틸거더를 이용한프리스트레스트u형스틸거더교 시공방법 |
CN102296751A (zh) * | 2011-06-01 | 2011-12-28 | 马人乐 | 预应力抗疲劳钢梁 |
CN203603362U (zh) * | 2013-10-24 | 2014-05-21 | 同济大学 | 双腹板预应力纤维增强复合材料组合梁 |
CN105649202A (zh) * | 2016-01-11 | 2016-06-08 | 安徽理工大学 | 预应力装配式框架节点结构及其施工方法 |
CN205604581U (zh) * | 2016-05-11 | 2016-09-28 | 北京城建建设工程有限公司 | 一种大跨度型钢预应力混凝土组合梁 |
Also Published As
Publication number | Publication date |
---|---|
CN109057156B (zh) | 2020-08-14 |
CN109057155B (zh) | 2020-08-07 |
CN108972871A (zh) | 2018-12-11 |
CN109057157B (zh) | 2021-01-08 |
CN109057157A (zh) | 2018-12-21 |
CN106760204B (zh) | 2018-12-21 |
CN109057155A (zh) | 2018-12-21 |
CN109057156A (zh) | 2018-12-21 |
CN108972871B (zh) | 2019-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103741582B (zh) | 一种波形钢腹板pc组合箱梁及其施工方法 | |
CN109707039B (zh) | 一种配式结构梁-梁人工塑性铰连接结点及其施工方法 | |
CN102086677A (zh) | 预制钢筋砼梁及钢筋砼柱与梁连接节点 | |
KR20010012496A (ko) | 철강/콘크리트 복합 칼럼 | |
CN100491639C (zh) | 箱型底板预应力混凝土变截面箱梁桥及其施工方法 | |
CN104674649B (zh) | 一种薄壁空心桥墩地震损伤控制体系 | |
CN106836482A (zh) | 一种加固钢结构梁或柱的施工方法 | |
CN102776829A (zh) | 一种钢管混凝土组合桁架桥 | |
CN101424105B (zh) | 斜钢支撑混凝土剪力墙组合连梁及其制作方法 | |
CN200985489Y (zh) | 内置斜腿刚架预应力混凝土变截面箱梁桥 | |
CN110700082A (zh) | 一种sma-ecc自复位圆钢管约束钢筋混凝土桥墩的柱脚节点 | |
CN106760204A (zh) | 一种提高抗扭承载力的混凝土梁或柱及其施工方法 | |
CN100491638C (zh) | 内置斜腿刚架预应力混凝土变截面箱梁桥及其施工方法 | |
CN110629882A (zh) | 一种利用v型构造板提升狗骨式节点的抗倒塌结构 | |
CN108222372B (zh) | 抗剪连接件及其制作方法和型钢混凝土柱及其浇注方法 | |
CN109898704A (zh) | 一种带钢筋桁架钢板组合剪力墙 | |
CN115772848A (zh) | 内置金属波纹管的单层配筋空心预制桥墩 | |
CN106760031B (zh) | 延性加气混凝土砌块组合墙 | |
CN102155051B (zh) | 混凝土肋梁和框架柱节点的连接方法及连接结构 | |
KR20100089178A (ko) | 강재 거더와 전단연결부가 일체로 형성된 강-콘크리트 합성거더 및 그 제조방법 | |
CN105256727B (zh) | 波形钢腹板组合梁的横向加强装置 | |
CN105887653A (zh) | 一种宽幅箱梁桥主梁底板结构及其施工方法 | |
CN201343782Y (zh) | 斜钢支撑混凝土剪力墙组合连梁 | |
CN105040828A (zh) | 一种圆钢管约束型钢混凝土柱与钢梁节点结构 | |
CN205501789U (zh) | 一种宽幅箱梁桥主梁底板结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171218 Address after: 234101 Anhui province Suzhou City Yongqiao District Fu Li Zhen Tong route No. 2 Applicant after: Wang Kun Address before: 050043 North Second Ring East Road, Shijiazhuang, Hebei Province, No. 17, office of architecture and art college, Shijiazhuang Railway University Applicant before: Gao Liqiang |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181107 Address after: 362010 first floor, 128 South Street, Wan An street, Luojiang District, Quanzhou, Fujian. Applicant after: Quanzhou Luojiang Kui Fang Cleaning Co., Ltd. Address before: 234101 2 Tong Jie Road, Fu Li Town, Anhui City, Suzhou. Applicant before: Wang Kun |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191126 Address after: 221300 Che Qian village, Che Fu Shan town, Pizhou City, Xuzhou, Jiangsu Patentee after: Xuzhou Shan Da Rui building materials Co., Ltd. Address before: 362010 First Floor, 128 South Street, Wan'an Street, Luojiang District, Quanzhou City, Fujian Province Patentee before: Quanzhou Luojiang Kui Fang Cleaning Co., Ltd. |
|