CN106759934A - Steel plate concrete shear wall and beam sleeve for connection connector and its installation method - Google Patents

Steel plate concrete shear wall and beam sleeve for connection connector and its installation method Download PDF

Info

Publication number
CN106759934A
CN106759934A CN201710036775.8A CN201710036775A CN106759934A CN 106759934 A CN106759934 A CN 106759934A CN 201710036775 A CN201710036775 A CN 201710036775A CN 106759934 A CN106759934 A CN 106759934A
Authority
CN
China
Prior art keywords
steel plate
floor
shear wall
sleeve body
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710036775.8A
Other languages
Chinese (zh)
Inventor
贺志坚
刘卫辉
史庆轩
汪乐
贺晓晖
郭洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Architectural Design And Research Institute Co Ltd
Original Assignee
Shaanxi Architectural Design And Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Architectural Design And Research Institute Co Ltd filed Critical Shaanxi Architectural Design And Research Institute Co Ltd
Priority to CN201710036775.8A priority Critical patent/CN106759934A/en
Publication of CN106759934A publication Critical patent/CN106759934A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5825Connections for building structures in general of bar-shaped building elements with a closed cross-section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5825Connections for building structures in general of bar-shaped building elements with a closed cross-section
    • E04B2001/5856Connections for building structures in general of bar-shaped building elements with a closed cross-section using the innerside thereof

Abstract

The invention discloses a kind of steel plate concrete shear wall and beam sleeve for connection connector, including the sleeve body for being enclosed within steel plate concrete shear wall vertical steel pipe, sleeve body side wall sets the first floor and the second floor, and stirrup hole is opened up on the first floor and the second floor.The sleeve connector can improve the bonding strength of steel plate concrete shear wall and beam, moreover it is possible to realize the quick connection of steel plate concrete shear wall and beam.The invention also discloses a kind of steel plate concrete shear wall and the installation method of beam sleeve for connection connector, it includes that sleeve body is enclosed within the vertical steel pipe of steel plate concrete shear wall;First floor of sleeve connector is connected with the vertical steel crab bolt of steel plate concrete shear wall;By the second floor of sleeve connector and the shaped steel bolt connection inside beam and by the upper and lower reinforcing plate of sleeve body with the upper and lower edge of a wing of beam the corresponding step such as be welded to connect.The installation rate of the installation method is fast, shortens the duration.

Description

Steel plate concrete shear wall and beam sleeve for connection connector and its installation method
Technical field
The invention belongs to steel plate concrete shear wall and the interconnection technique field of beam, a kind of steel plate concrete is specifically related to Shear wall and beam sleeve for connection connector and its installation method.
Background technology
Under the background for creating " resource-conserving, environmentally friendly " society, from industrialization degree is low, speed of application delays Slowly the workshop-based mode of construction of traditional-handwork that, job site is seriously polluted, consumption resource is huge is to environmental protection and energy saving, speed of application Hurry up, can industrialized production batch production, standardization mode of construction transformation be building industry development inevitable requirement, assembled knot Structure is the main force for realizing this target.Wherein, assembling steel plate-concrete shear wall structure system is mainly by embedding steel plate Constituted with edge member (Vierendeel girder, post and plate of putting more energy into).Embedded steel plate constitutes lateral resisting after being generally connected with edge member Structural system because it has, construction is simple, speed is fast, efficiency high, can industrialized production, quality be easily controllable, ecological, environmental protective The advantages of, and it is widely used in high-rise and high-rise building.Meanwhile, Multitest research shows, assembling steel plate-mixed Solidifying soil shear wall structure has more preferable ductility, power consumption and shear resistance compared with reinforced concrete shear wall, meets structure and safely Ask.
But, there is more horizontal joint, vertical abutment joint and node in assembling steel plate concrete shear wall structure how So that firmly being connected into for the key of the performances such as limit structural globality, bearing capacity, shock resistance between prefabricated components.Mesh Before, the steel plate shear force wall connected mode in engineering is mostly using full welding or the connection of bolting and welding formula.
The shortcoming and deficiency that existing method is present are as follows:
(1), steel plate and end reinforcing bar be by all welding, cause welding manner to have that cost of labor is high, speed of application is slow, The problems such as the duration is more long, on-the-spot welding is difficult, weldquality is difficult to ensure, residual stress is excessive, govern steel plate-coagulation The development of native shear wall and application.
(2), by all bolting, pin-connected joint possesses prolong more more preferable than welding node in theory for steel plate and end reinforcing bar Property, the friction energy consumption part inputting seismic energy between bolt under big shake effect, but pin-connected joint is to component machining accuracy There are certain requirements, the inadequate steel plate shear force wall of precision is difficult to install in the later stage.Traditional bolt is also easy to occur " solution button " now As.
(3), in traditional assembly concrete shear wall structure, need to add after the completion of lifting component temporary support this Procedure, to ensure stabilization of the component in installation process, causes job site in disorder, and there is potential safety hazard.
The content of the invention
It is an object of the invention to overcome above-mentioned deficiency of the prior art, there is provided a kind of steel plate concrete shear wall and beam Sleeve for connection connector.The sleeve connector can improve the bonding strength of steel plate concrete shear wall and beam, moreover it is possible to real Existing steel plate concrete shear wall and the quick connection of beam, accelerate speed of application, shorten the duration.
To achieve the above object, the technical scheme of sleeve connector use of the present invention is:Steel plate concrete shear wall and beam Sleeve for connection connector, the vertical steel plate of the steel plate concrete shear wall is provided with vertical steel pipe near one end of beam, described The top of vertical steel pipe is provided with and pea gravel concreten is filled with supporting steel plate, the vertical steel pipe, it is characterised in that:The sleeve Connector includes the sleeve body for being enclosed within steel plate concrete shear wall vertical steel pipe, and the lower end of the sleeve body abuts On the supporting steel plate of the vertical steel pipe, sleeve body side wall is provided with for vertical with steel plate concrete shear wall Bolted first floor of steel plate and for beam inside bolted second floor of shaped steel, first floor and The stirrup hole for installing stirrup is offered on two floors.
Above-mentioned steel plate concrete shear wall and beam sleeve for connection connector, it is characterised in that:The sleeve body First floor and the second floor are stretched out in upper end, and the sleeve body stretches out first floor and the position of the second floor sets The upper reinforcing plate for being fixed on the sleeve body upper end is equipped with, first floor and second are stretched out in the lower end of the sleeve body Floor, the position that the sleeve body stretches out first floor and the second floor is provided with and is fixed on the sleeve body lower end Lower reinforcing plate.
Above-mentioned steel plate concrete shear wall and beam sleeve for connection connector, it is characterised in that:The sleeve body End is welded to connect with the vertical steel pipe.
Above-mentioned steel plate concrete shear wall and beam sleeve for connection connector, it is characterised in that:The sleeve body Lower surface offers the low groove for accommodating solder when the sleeve body and vertical steel pipe is welded to connect.
Above-mentioned steel plate concrete shear wall and beam sleeve for connection connector, it is characterised in that:The sleeve body Upper surface offers the upper groove for accommodating solder when the sleeve body and vertical steel pipe is welded to connect.
Above-mentioned steel plate concrete shear wall and beam sleeve for connection connector, it is characterised in that:First floor and Second floor is laid or first floor and the mutual angle in 90 ° of the second floor in yi word pattern.
Above-mentioned steel plate concrete shear wall and beam sleeve for connection connector, it is characterised in that:First floor and The quantity of the second floor is two, and two first floors and two second floors constitute cross laying.
Above-mentioned steel plate concrete shear wall and beam sleeve for connection connector, it is characterised in that:The sleeve body, One floor and the second floor are integrally formed formula structure.
It is mixed present invention also offers a kind of steel plate in order to quickly realize effective connection of steel plate concrete shear wall and beam The installation method of solidifying soil shear wall and beam sleeve for connection connector.To achieve these goals, installation method of the present invention is used Technical scheme be:A kind of installation method of steel plate concrete shear wall and beam sleeve for connection connector, it is characterised in that bag Include following steps:
Step one, sleeve body is enclosed within the vertical steel pipe of steel plate concrete shear wall from the top down, makes sleeve body Lower end be connected on the supporting steel plate of the vertical steel pipe, and the sleeve body is welded to connect with supporting steel plate;
Step 2, the first floor of sleeve connector is connected with the vertical steel crab bolt of steel plate concrete shear wall;
Step 3, by the shaped steel bolt connection inside second floor and beam of sleeve connector;
Step 4, by the upper reinforcing plate of sleeve body and beam inside shaped steel top flange be welded to connect, by sleeve body Lower reinforcing plate is welded to connect with the lower flange of beam inside shaped steel.
Above-mentioned installation method, it is characterised in that:After the completion of step 4, set above the steel plate concrete shear wall When putting one layer of steel plate concrete shear wall, the casting cement mortar first in the vertical steel pipe of the steel plate concrete shear wall of lower floor Inserts, then inserts the sleeve body and extrudes institute from top to bottom by the vertical steel pipe of the steel plate concrete shear wall on upper strata Stating cement mortar inserts carries out levelling, finally makes the vertical steel pipe of the steel plate concrete shear wall on sleeve body upper end and upper strata It is welded to connect.
The present invention has advantages below compared with prior art:
1st, sleeve connector of the present invention is connected by sleeve body with the vertical steel pipe inserted in it, and by the first floor With the vertical steel pipe bolt connection of steel plate concrete shear wall, by the shaped steel bolt connection inside the second floor and beam, use This connected mode, on the one hand can improve the bonding strength of steel plate concrete shear wall and beam, it is ensured that steel plate concrete Shear wall and the reliability of beam connecting node, on the other hand can realize the quick connection of steel plate concrete shear wall and beam, accelerate Speed of application, shortens the duration.
2nd, sleeve connector of the present invention, can effectively by the first floor, by setting upper reinforcing plate and lower reinforcing plate Two floors and sleeve body are coupled together, and realize the reinforcing to the sleeve connector, effectively raise the first floor, second The rigidity of floor and sleeve body, can carry bigger load.
3rd, sleeve connector of the present invention opens up upper groove by the upper surface in sleeve body, in the lower surface of sleeve body Open up low groove, so as to facilitate be welded to connect state sleeve body and vertical steel pipe when, accommodate more solders, and then cause Weld seam is lengthened, and improves weld strength.
4th, sleeve connector of the present invention is integrally formed formula structure, energy by by sleeve body, the first floor and the second floor Enough integral rigidities and intensity for effectively improving the sleeve connector.
5th, the installation rate of installation method of the present invention is fast, relatively weld and bolt significantly reduces cost of labor, so as to reduce Cost, accelerates speed of application, shortens the duration.
Below by drawings and Examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is the use state schematic diagram of the sleeve connector in the embodiment of the present invention 1.
Fig. 2 is the profile of A-A in Fig. 1.
Fig. 3 is the structural representation of the middle sleeve connector of the embodiment of the present invention 1.
Fig. 4 is the cutaway view Amplified image of B-B in Fig. 3.
Fig. 5 is the position relationship schematic diagram when embodiment of the present invention 1 middle sleeve connector, two floors are mutually perpendicular to lay.
Position relationship schematic diagram when Fig. 6 is the cross laying of the embodiment of the present invention 1 middle sleeve connector, four floors.
Fig. 7 is the method flow diagram of installation method of the present invention.
Fig. 8 is the use state schematic diagram of the middle sleeve connector of the embodiment of the present invention 2.
Fig. 9 is the structural representation of the middle sleeve connector of the embodiment of the present invention 2.
Description of reference numerals:
1-steel plate concrete shear wall;1-1-vertical steel plate;
1-2-vertical steel pipe;1-3-supporting steel plate;
2-sleeve connector;2-1-sleeve body;
2-2-the first floor;2-3-the second floor;
2-4-upper reinforcing plate;2-5-lower reinforcing plate;
2-6-stirrup;2-7-upper groove;
2-8-stirrup hole;2-9-bolt hole;
2-10-low groove;3-beam;
3-1-shaped steel.
Specific embodiment
Embodiment 1
A kind of steel plate concrete shear wall and beam sleeve for connection connector 2 as shown in Figure 1, Figure 2, Figure 3 and Figure 4, should The vertical steel plate 1-1 of steel plate concrete shear wall 1 is provided with vertical steel pipe 1-2, the vertical steel pipe 1-2 near one end of beam 3 Top be provided with supporting steel plate 1-3, the vertical steel pipe 1-2 filled with pea gravel concreten, the sleeve connector 2 includes using In the sleeve body 2-1 being enclosed within the vertical steel pipe 1-2 of steel plate concrete shear wall 1, the lower end of the sleeve body 2-1 is connected to On the supporting steel plate 1-3 of the vertical steel pipe 1-2, the sleeve body 2-1 sides wall is provided with for being sheared with steel plate concrete The bolted first floor 2-2 of vertical steel plate 1-1 of wall 1 and for beam 3 inside bolted second ribs of shaped steel 3-1 The stirrup hole 2-8 for installing stirrup 2-6 is offered on plate 2-3, the first floor 2-2 and the second floor 2-3.
In the present embodiment, the sleeve connector 2 is connected by sleeve body 2-1 with the vertical steel pipe 1-2 inserted in it, and By the first floor 2-2 and the vertical steel pipe 1-2 bolt connections of steel plate concrete shear wall 1, by the second floor 2-3 and beam 3 Internal shaped steel 3-1 bolt connections, using this connected mode, on the one hand can improve steel plate concrete shear wall 1 and beam 3 Bonding strength, it is ensured that the reliability of steel plate concrete shear wall 1 and the connecting node of beam 3, on the other hand can realize that steel plate is mixed Solidifying soil shear wall 1 and the quick connection of beam 3, accelerate speed of application, shorten the duration.
In the present embodiment, multiple bolt hole 2-9 are offered on the first floor 2-2 and the second floor 2-3.
As shown in Figure 3 and Figure 4, the first floor 2-2 and the second floor 2-3 is stretched out in the upper end of the sleeve body 2-1, The position that the sleeve body 2-1 stretches out the first floor 2-2 and the second floor 2-3 is provided with and is fixed on the sleeve body The first floor 2-2 and the second floor 2-3, institute are stretched out in the lower end of the upper reinforcing plate 2-4, the sleeve body 2-1 of 2-1 upper ends State sleeve body 2-1 and stretch out the position of the first floor 2-2 and the second floor 2-3 and be provided with and be fixed on the sleeve body 2- The lower reinforcing plate 2-5 of 1 lower end.
In the present embodiment, by setting upper reinforcing plate 2-4 and lower reinforcing plate 2-5, can effectively by the first floor 2-2, Second floor 2-3 and sleeve body 2-1 are coupled together, and realize the reinforcing to the sleeve connector 2, effectively raise first The rigidity of floor 2-2, the second floor 2-3 and sleeve body 2-1, can carry bigger load.Specifically, described above add Strong plate 2-4 and the first floor 2-2, the second floor 2-3 and sleeve body 2-1 are constituted and are welded to connect, similarly, the lower reinforcing plate 2- 5 are welded to connect with the first floor 2-2, the second floor 2-3 and sleeve body 2-1 composition.
In the present embodiment, the end of the sleeve body 2-1 is welded to connect with the vertical steel pipe 1-2.Specifically, described The lower end of sleeve body 2-1 is welded to connect with the vertical steel pipe 1-2, effectively raises sleeve body 2-1 and vertical steel pipe The bonding strength of 1-2.
As shown in figure 3, the upper surface of the sleeve body 2-1 is offered for being welded to connect the sleeve body 2-1 The upper groove 2-7 of solder is accommodated during with vertical steel pipe 1-2.
In the present embodiment, upper groove 2-7 is opened up by the upper surface of sleeve body 2-1, connected in welding so as to facilitate Connect when stating sleeve body 2-1 and vertical steel pipe 1-2, accommodate more solders, and then cause that weld seam is lengthened, improve welding strong Degree.
As shown in figure 4, the first floor 2-2 and the second floor 2-3 lays in yi word pattern.Now the first floor 2-2 and The position relationship of the second floor 2-3, is adapted to the situation parallel with steel plate concrete shear wall 1 of beam 3.
As shown in figure 5, the mutual angles in 90 ° of the first floor 2-2 and the second floor 2-3.Now the first floor 2-2 and The position relationship of two floor 2-3, is adapted to beam 3 and the perpendicular situation of steel plate concrete shear wall 1.
As shown in fig. 6, the quantity of the first floor 2-2 and the second floor 2-3 is two, two first floors 2-2 and two the second floor 2-3 constitutes cross laying.Now the position of the first floor 2-2 and the second floor 2-3 is closed System, is adapted to two beams 3 and two steel plate concrete shear walls 1 and two beams 3 and two steel plate concrete shear walls 1 constitute ten The situation of font.When actually used, can be according to beam 3 and the specific structure type of steel plate concrete shear wall 1, to first rib The position relationship of plate 2-2 and the second floor 2-3 carries out the setting of adaptability.
In the present embodiment, the sleeve body 2-1, the first floor 2-2 and the second floor 2-3 are integrally formed formula structure.It is logical Cross and sleeve body 2-1, the first floor 2-2 and the second floor 2-3 are integrally formed formula structure, can effectively improve sleeve company The integral rigidity and intensity of fitting 2.
A kind of steel plate concrete shear wall as shown in Figure 7 and the installation method of beam sleeve for connection connector, including with Lower step:
Step one, sleeve body 2-1 is enclosed within the vertical steel pipe 1-2 of steel plate concrete shear wall 1 from the top down, makes set The lower end of cylinder body 2-1 is connected on the supporting steel plate 1-3 of the vertical steel pipe 1-2, and makes the sleeve body 2-1 with supporting Steel plate 1-3 is welded to connect;
Step 2, the vertical steel plate 1-1 bolts by the first floor 2-2 of sleeve connector 2 and steel plate concrete shear wall 1 Connection;
Step 3, by the shaped steel 3-1 bolt connections inside the second floor 2-3 and beam 3 of sleeve connector 2;
Step 4, the top flange of the upper reinforcing plate 2-4 of sleeve body 2-1 and the inside shaped steel 3-1 of beam 3 is welded to connect, will The lower flange of the inside shaped steel 3-1 of the lower reinforcing plate 2-5 of sleeve body 2-1 and beam 3 is welded to connect.
In the present embodiment, after step 4 terminates, then installed on the first floor 2-2 and the second floor 2-3 Stirrup 2-6, prepares the junction cast-in-place concrete to steel plate concrete shear wall 1 and beam 3.
In the installation method of the present embodiment, sleeve body 2-1 is enclosed within vertical steel pipe 1-2 first, it is right to be achieved in that The quick positioning of sleeve body 2-1;Then the vertical steel plate 1-1 bolts of the first floor 2-2 and steel plate concrete shear wall 1 are connected Connect, realize the quick connection of the first floor 2-2 and the vertical steel plate 1-1;Again by the type inside the second floor 2-3 and beam 3 Steel 3-1 bolt connections, realize the quick connection of the second floor 2-3 and beam 3.Finally by the upper reinforcing plate 2-4 with it is described The top flange of shaped steel 3-1 is welded to connect, and lower reinforcing plate 2-5 is welded to connect with the lower flange of the shaped steel 3-1 so that the set When mounted, existing bolt connection has what is be welded to connect to be rigidly connected, it is ensured that after the sleeve connector 2 is installed to cylinder connector 2 again It is firm.The speed of this installation method is fast, relatively welding and bolt significantly reduce cost of labor, so as to reduce cost, plus Fast speed of application, shortens the duration.
Embodiment 2
As shown in Figure 8 and Figure 9, the present embodiment is with the difference of embodiment 1:In the installation method of the present embodiment, After the completion of step 4, when the top of the steel plate concrete shear wall 1 sets one layer of steel plate concrete shear wall 1, exist first Casting cement mortar inserts in the vertical steel pipe 1-2 of the steel plate concrete shear wall 1 of lower floor, then by the steel plate coagulation on upper strata The vertical steel pipe 1-2 of native shear wall 1 inserts the sleeve body 2-1 and extrudes the cement mortar inserts and carries out from top to bottom It is levelling, sleeve body 2-1 upper ends is welded to connect with the vertical steel pipe 1-2 of the steel plate concrete shear wall 1 on upper strata.
In the installation method of the present embodiment, when the steel plate concrete shear wall 1 on upper strata is installed, the steel plate coagulation on upper strata After the vertical steel pipe 1-2 of native shear wall 1 inserts the sleeve body 2-1 from the top down, i.e., can be to the steel plate concrete on upper strata Shear wall 1 plays a part of support, saves a large amount of temporary supports in traditional assembled shearing structure construction, simplifies construction work Sequence, makes follow-up installment work simpler convenient and swift.Again by the form that is welded to connect, realize sleeve body 2-1 with The vertical steel pipe 1-2 of the steel plate concrete shear wall 1 on upper strata is firmly connected, while also achieving sleeve body 2-1 with lower floor The vertical steel pipe 1-2 of steel plate concrete shear wall 1 is firmly connected.And by by the vertical of the steel plate concrete shear wall 1 on upper strata Steel pipe 1-2 lower ends are inserted in the sleeve body 2-1 and extrude the cement mortar inserts to carry out levelling, so enables to The vertical steel pipe 1-2 of the steel plate concrete shear wall 1 on upper strata is rapid levelling in sleeve body 2-1 such that it is able to reduce construction Precision, it is to avoid the artificial levelling error brought.
As shown in figure 9, the present embodiment also differ in that with embodiment 1:Open the lower surface of the sleeve body 2-1 It is provided with the low groove 2-10 for accommodating solder when the sleeve body 2-1 and vertical steel pipe 1-2 is welded to connect.
In the present embodiment, low groove 2-10 is opened up by the lower surface of sleeve body 2-1, connected in welding so as to facilitate Connect when stating sleeve body 2-1 and vertical steel pipe 1-2, accommodate more solders, and then cause that weld seam is lengthened, improve welding strong Degree.
The above, is only presently preferred embodiments of the present invention, and not the present invention is imposed any restrictions, every according to the present invention Any simple modification, change and equivalent structure transformation that technical spirit is made to above example, still fall within skill of the present invention In the protection domain of art scheme.

Claims (10)

1. steel plate concrete shear wall and beam sleeve for connection connector, the vertical steel plate (1- of the steel plate concrete shear wall (1) 1) one end near beam (3) is provided with vertical steel pipe (1-2), and the top of the vertical steel pipe (1-2) is provided with supporting steel plate (1- 3) pea gravel concreten, is filled with the vertical steel pipe (1-2), it is characterised in that:The sleeve connector (2) is including for being enclosed within Sleeve body (2-1) on steel plate concrete shear wall (1) vertical steel pipe (1-2), the lower end of the sleeve body (2-1) abuts On the supporting steel plate (1-3) of the vertical steel pipe (1-2), sleeve body (2-1) side wall is provided with for mixed with steel plate Coagulate bolted first floor (2-2) of vertical steel plate (1-1) of soil shear wall (1) and for the shaped steel (3- internal with beam (3) 1) bolted second floor (2-3), offers for installing on first floor (2-2) and the second floor (2-3) The stirrup hole (2-8) of stirrup (2-6).
2. steel plate concrete shear wall according to claim 1 and beam sleeve for connection connector, it is characterised in that:It is described First floor (2-2) and the second floor (2-3) are stretched out in the upper end of sleeve body (2-1), and the sleeve body (2-1) is stretched out The position of first floor (2-2) and the second floor (2-3) be provided be fixed on the sleeve body (2-1) upper end upper plus Strong plate (2-4), first floor (2-2) and the second floor (2-3), the set are stretched out in the lower end of the sleeve body (2-1) The position that cylinder body (2-1) stretches out first floor (2-2) and the second floor (2-3) is provided with and is fixed on the sleeve body The lower reinforcing plate (2-5) of (2-1) lower end.
3. steel plate concrete shear wall according to claim 1 and beam sleeve for connection connector, it is characterised in that:It is described The end of sleeve body (2-1) is welded to connect with the vertical steel pipe (1-2).
4. steel plate concrete shear wall according to claim 3 and beam sleeve for connection connector, it is characterised in that:It is described The lower surface of sleeve body (2-1) is offered for holding when the sleeve body (2-1) and vertical steel pipe (1-2) is welded to connect Receive the low groove (2-10) of solder.
5. steel plate concrete shear wall according to claim 4 and beam sleeve for connection connector, it is characterised in that:It is described The upper surface of sleeve body (2-1) is offered for holding when the sleeve body (2-1) and vertical steel pipe (1-2) is welded to connect Receive the upper groove (2-7) of solder.
6. steel plate concrete shear wall according to claim 1 and beam sleeve for connection connector, it is characterised in that:It is described First floor (2-2) and the second floor (2-3) are in mutual yi word pattern laying or first floor (2-2) and the second floor (2-3) Angle in 90 °.
7. steel plate concrete shear wall according to claim 1 and beam sleeve for connection connector, it is characterised in that:It is described The quantity of the first floor (2-2) and the second floor (2-3) is two, two first floors (2-2) and two described Two floors (2-3) constitute cross laying.
8. steel plate concrete shear wall according to claim 1 and beam sleeve for connection connector, it is characterised in that:It is described Sleeve body (2-1), the first floor (2-2) and the second floor (2-3) are integrally formed formula structure.
9. the installation method of a kind of steel plate concrete shear wall as claimed in claim 2 and beam sleeve for connection connector, its It is characterised by, comprises the following steps:
Step one, sleeve body (2-1) is enclosed within the vertical steel pipe of steel plate concrete shear wall (1) (1-2) from the top down, made The lower end of sleeve body (2-1) is connected on the supporting steel plate of the vertical steel pipe (1-2) (1-3), and makes the sleeve body (2-1) is welded to connect with supporting steel plate (1-3);
Step 2, the vertical steel plate (1-1) by first floor (2-2) of sleeve connector (2) and steel plate concrete shear wall (1) Bolt connection;
Step 3, by internal shaped steel (3-1) bolt connection of second floor (2-3) of sleeve connector (2) and beam (3);
Step 4, the top flange welding company by the upper reinforcing plate (2-4) of sleeve body (2-1) and the internal shaped steel (3-1) of beam (3) Connect, the lower flange of the internal shaped steel (3-1) of the lower reinforcing plate (2-5) of sleeve body (2-1) and beam (3) is welded to connect.
10. installation method according to claim 9, it is characterised in that:After the completion of step 4, cut in the steel plate concrete When the top of power wall (1) sets one layer of steel plate concrete shear wall (1), first in the steel plate concrete shear wall (1) of lower floor The interior casting cement mortar inserts of vertical steel pipe (1-2), then by the vertical steel pipe of the steel plate concrete shear wall (1) on upper strata (1-2) inserts the sleeve body (2-1) and extrude the cement mortar inserts from top to bottom to carry out levelling, finally makes sleeve Body (2-1) upper end is welded to connect with the vertical steel pipe (1-2) of the steel plate concrete shear wall (1) on upper strata.
CN201710036775.8A 2017-01-18 2017-01-18 Steel plate concrete shear wall and beam sleeve for connection connector and its installation method Pending CN106759934A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710036775.8A CN106759934A (en) 2017-01-18 2017-01-18 Steel plate concrete shear wall and beam sleeve for connection connector and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710036775.8A CN106759934A (en) 2017-01-18 2017-01-18 Steel plate concrete shear wall and beam sleeve for connection connector and its installation method

Publications (1)

Publication Number Publication Date
CN106759934A true CN106759934A (en) 2017-05-31

Family

ID=58944085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710036775.8A Pending CN106759934A (en) 2017-01-18 2017-01-18 Steel plate concrete shear wall and beam sleeve for connection connector and its installation method

Country Status (1)

Country Link
CN (1) CN106759934A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02308028A (en) * 1989-05-23 1990-12-21 Taisei Corp Joining method of post or wall and precast beam
CN101608480A (en) * 2008-06-18 2009-12-23 黑龙江宇辉新型建筑材料有限公司 Precast concrete short-limb shear wall provided and the preparation method of band door and window
CN101769011A (en) * 2010-03-09 2010-07-07 河海大学 Circular steel tube concrete column and beam node connecting structure
CN202990151U (en) * 2012-10-16 2013-06-12 毛晨曦 Sleeve-type self-resetting shape memory alloy coupling beam damper
CN203080965U (en) * 2012-11-27 2013-07-24 邵天星 Intelligent steel structure anti-seismic villa
CN203878780U (en) * 2014-06-05 2014-10-15 杨红燕 Connecting joint of cylindrical rib penetrating type steel pipe concrete column and steel beam
CN204551483U (en) * 2015-02-03 2015-08-12 中国建筑股份有限公司 A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02308028A (en) * 1989-05-23 1990-12-21 Taisei Corp Joining method of post or wall and precast beam
CN101608480A (en) * 2008-06-18 2009-12-23 黑龙江宇辉新型建筑材料有限公司 Precast concrete short-limb shear wall provided and the preparation method of band door and window
CN101769011A (en) * 2010-03-09 2010-07-07 河海大学 Circular steel tube concrete column and beam node connecting structure
CN202990151U (en) * 2012-10-16 2013-06-12 毛晨曦 Sleeve-type self-resetting shape memory alloy coupling beam damper
CN203080965U (en) * 2012-11-27 2013-07-24 邵天星 Intelligent steel structure anti-seismic villa
CN203878780U (en) * 2014-06-05 2014-10-15 杨红燕 Connecting joint of cylindrical rib penetrating type steel pipe concrete column and steel beam
CN204551483U (en) * 2015-02-03 2015-08-12 中国建筑股份有限公司 A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication

Similar Documents

Publication Publication Date Title
CN106193336B (en) Connecting structure and its construction method with H-type slotted wall structure precast shear wall
CN106284655B (en) Precast concrete beam stud connects connecting node and connection method
CN107989227A (en) A kind of assembled steel reinforced concrete shear walls structure and its preparation and installation method
CN106567458B (en) Assembled steel-is mixed to combine Beam-post Frame Structure system
CN207739436U (en) A kind of assembled steel reinforced concrete shear walls structure
CN108412128A (en) A kind of connection structure of steel core concrete column
CN207959600U (en) A kind of precast shear wall horizontal joint connection structure with I-steel
CN108643602B (en) Outsourcing anchor steel reinforced structure suitable for concrete beam column node
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
CN107989228A (en) A kind of prefabricated steel reinforced concrete shear wall structure and its preparation and installation method
CN108775084B (en) Steel-concrete combined precast beam and precast column connecting structure and construction method
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN103790176B (en) A kind of construction method of pre-buried manomelia rod structure
CN106677340A (en) Flange plate type precast assembly type concrete hidden bracket dry type connecting system
CN106894557A (en) A kind of two-way steel plate concrete composite floor of built-in module truss
CN102286982A (en) Deep foundation pit precast building enclosure for constructing in low environment
CN110106977A (en) A kind of assembling type steel structure beam column grouting anchorage node
CN111456233B (en) Prefabricated assembled concrete beam column joint structure and construction method thereof
CN110130485B (en) Prefabricated assembly type beam column node with toothed plates and assembly method thereof
CN105735529B (en) A kind of stull formula steel frame steel plate shear wall structure being easily assembled
CN105275087A (en) A prefabricated assembled type concrete beam-column connecting structure
CN208762895U (en) Hinge seam bracing means
CN206418598U (en) Steel plate concrete shear wall and beam sleeve for connection connector
CN207934185U (en) A kind of detachably prefabricated assembled concrete-filled steel square tubular column and girder steel combined joint
CN106759934A (en) Steel plate concrete shear wall and beam sleeve for connection connector and its installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170531

WD01 Invention patent application deemed withdrawn after publication