CN106759766B - A kind of urban road rainwater retention purification system and construction method - Google Patents

A kind of urban road rainwater retention purification system and construction method Download PDF

Info

Publication number
CN106759766B
CN106759766B CN201611100089.4A CN201611100089A CN106759766B CN 106759766 B CN106759766 B CN 106759766B CN 201611100089 A CN201611100089 A CN 201611100089A CN 106759766 B CN106759766 B CN 106759766B
Authority
CN
China
Prior art keywords
rainwater
flood
relief channel
mounting rack
clear water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611100089.4A
Other languages
Chinese (zh)
Other versions
CN106759766A (en
Inventor
刘学应
毛建生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201611100089.4A priority Critical patent/CN106759766B/en
Publication of CN106759766A publication Critical patent/CN106759766A/en
Application granted granted Critical
Publication of CN106759766B publication Critical patent/CN106759766B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of urban road rainwater retention purification system and construction methods, the system includes rainwater flood-relief channel, conditioning tank and Flood Pondage Action pond, at least twice pollution cutting device is transversely provided in rainwater flood-relief channel, rainwater flood-relief channel is equipped with water inlet pipe, water inlet pipe is connected with spiral-flow filter, and spiral-flow filter is equipped with municipal pipeline and clear water outlet pipe.Construction method includes: the construction of (a) rainwater flood-relief channel;(b) pollution cutting device is installed in the rainwater flood-relief channel of main road;(c) pollution cutting device is rinsed;(d) conditioning tank and Flood Pondage Action pond pour;(e) spiral-flow filter is installed in the rainwater flood-relief channel of branch.The rainwater catchment of urban road is two-way by the present invention, rainwater is collected, filter, purify, store and is utilized, substantially increase the resource utilization efficiency of rainwater, the problem of turning waste into wealth, alleviating water resources shortage, construction procedure are simple, difficulty is low, construction quality is easily controllable, and construction cost is low, and the construction equipment being related to is few.

Description

A kind of urban road rainwater retention purification system and construction method
Technical field
The invention belongs to sponge city water resources to utilize technical field, and in particular to a kind of urban road rainwater retention purification System and construction method.
Background technique
With the propulsion of Urbanization Construction, increasing for hardened ground changes original water regime, causes rainfall runoff Increase, the frequent ponding in road surface, the frequent large area ponding in urban, while rain flood peak value becomes larger, soil moisture content is reduced, underground Water level decreasing phenomenon aggravation etc..In addition, China's Urban Water Shortage Problem of Cities is got worse, and northern area resource-type water shortage, southern area Water quality type water shortage.In such a case, government puts forward to build the target in " sponge city ", gives in various aspects such as policy, finances To support.
Sponge city, as its name suggests, city is such as sponge, in duration of raining, can quickly absorb, accumulate, permeating, Purifying rainwater reduces rainwater and forms runoff, recharge of groundwater;Simultaneously when not raining, by a series for the treatment of measures and mating The water of accumulation is used pipe network facilities, so that rainwater resource be allowed preferably to be dissolved into the supply and drain water system in city.It makes Reasonable sponge urban water system, can both be effectively protected the original ecosystem in city, and can also slowly restore original Be destroyed the ecosystem, simultaneously for the Development control area of entire urbanization influence drop to it is lower.
Traditional sponge urban construction mode, is hard surface everywhere.Whenever heavy rain, " the ash such as pipe duct, pumping plant is relied primarily on Color " facility drains, and is controlled with " quickly excluding " and " end concentrations " as main planning and design concept, rainwater mainly passes through draining Facility is drained, and underground can not be penetrated into, and is often resulted in and is met rain flooded, drought and waterlogging racing does not meet the requirement of sponge urban construction.
Summary of the invention
Above-mentioned technical problem present in present invention aims to solve the prior art provides a kind of urban road rainwater section Purification system and construction method are stayed, is two-way by the rainwater catchment of urban road, rainwater is collected, filter, purify, is stored And utilize, the resource utilization efficiency of rainwater is substantially increased, the problem of turning waste into wealth, alleviate water resources shortage, construction step Rapid simple, difficulty is low, and construction quality is easily controllable, and construction cost is low, and the construction equipment being related to is few.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of urban road rainwater retention purification system, it is characterised in that: including rainwater flood-relief channel, conditioning tank and flood tune Reservoir, rainwater flood-relief channel connect conditioning tank, and conditioning tank connects Flood Pondage Action pond, and blowdown is equipped between conditioning tank and Flood Pondage Action pond Pipe;It is transversely provided at least twice pollution cutting device in rainwater flood-relief channel, pollution cutting device includes concrete base, mounting rack and blocks dirty lattice Grid, mounting rack are fixed on concrete base, and garbage grille is fixed on mounting rack, and mounting rack is equipped with collection frame, collection frame Set on the lower section of garbage grille;Rainwater flood-relief channel is equipped with water inlet pipe, and water inlet pipe is connected with spiral-flow filter, sets on spiral-flow filter There are municipal pipeline and clear water outlet pipe, clear water outlet pipe is connected with clear water water tank, is equipped with immersible pump in clear water water tank;The purification system The rainwater catchment of urban road is two-way by system, is collected, filters, purifies, stores and is utilized to rainwater, substantially increases rain The resource utilization efficiency of water, the problem of turning waste into wealth, alleviate water resources shortage.
Further, adjustable plate is equipped in conditioning tank, adjustable plate is rotationally connected on the inner wall of conditioning tank, and adjustable plate is set to row At the nozzle of dirty pipe, adjustable plate is equipped with traction rope, and traction rope is equipped with floating ball, the rainwater of conditioning tank is suspended in by floating ball In, adjustable plate is opened, the rainwater in conditioning tank can flow in Flood Pondage Action pond, according to the height of the rainwater of conditioning tank, change The angle that adjustable plate is opened, the rainwater controlled to adjust in pond flow to the flow in Flood Pondage Action pond, convenient for controlling to adjust pond moderate rain The water level of water.
Further, triangle fixed block is equipped between the side of mounting rack and the top surface of concrete base, triangle fixed block End and the side of mounting rack are welded and fixed, and the bottom of triangle fixed block and the top surface bolt of concrete base are fixed, and realize peace It shelves and is fixed on concrete base.
Further, the bottom of garbage grille is equipped with connecting plate, and connecting plate is welded in mounting rack, convenient for garbage grille Positioning action.
Further, the side of mounting rack is equipped with the first mounting base, and the side of garbage grille is equipped with guide post, and guide post is fixed In the first mounting base, realization garbage grille is fixedly connected with mounting rack.
Further, the side of mounting rack is equipped with the second mounting base, and the side of collection frame is equipped with welding block, and welding block is fixed on second In mounting base, realization collection frame is fixedly connected with mounting rack.
Further, the bottom surface of collection frame is equipped with buffer unit, and buffer unit is equipped with pressing plate, and the bottom surface of collection frame reports Alert button, alarm button is set to the lower section of pressing plate, and when the rubbish in collection frame reaches constant weight, pressing plate is pushed, buffer unit Deformation generates alarm signal when pressing plate touches alarm button, and sanitationman can in time carry out the rubbish in collection frame clear Reason, then under the elastic reaction of buffer unit, pressing plate is returned to initial position, convenient for carrying out in time to the rubbish in collection frame Processing.
Further, buffer unit includes including buffer board and buffing pad, and the bottom of buffer board is equipped with buffer bar, buffing pad Top is equipped with sleeve, and buffer bar is resiliently attached in sleeve, and structure is simple, and elastic buffer effect is obvious.
A kind of construction method of urban road rainwater retention purification system, it is characterised in that include the following steps:
(a) rainwater flood-relief channel is built: according to design working drawing, being excavated in such a way that excavator cooperates artificial grooving, first The rainwater flood-relief channel of main road is excavated, then excavates the rainwater flood-relief channel of branch, clears up rainwater flood-relief channel bottom, then sent with trolley Soil is banketed since the bottom of rainwater flood-relief channel with manually banketing, and place Min layers are filled out from bottom to top, then are tamped with ramming machine It bankets, keeps the gradient of rainwater flood-relief channel 2%~3%, then in the rainwater flood-relief channel of the rainwater flood-relief channel of main road and branch Between building block is laid at lap segment, the grey wire tag in the case where the bottom of the rainwater flood-relief channel of the rainwater flood-relief channel and branch of main road is made, Mark water storage clarifier-tank construction area;
(b) pollution cutting device is installed in the rainwater flood-relief channel of main road: according to the content of the pollutant in urban road rainwater, if Fixed a certain number of pollution cutting devices, measure in the rainwater flood-relief channel of main road and iris out the setting area of pollution cutting device, then use Wooden unit bed course is driven into the base of the setting area of pollution cutting device, then casting concrete, coagulation on every piece of wooden unit bed course Native bottom with a thickness of 80mm~120mm, then garbage grille is installed one by one, first punched on the concrete base poured, then The bolt fixing and mounting bracket at punching is then put into collection frame in the side of mounting rack, and collection frame is fixed, and then exists Rope is installed on binding clasp, then garbage grille is arranged on rope, according to the setting distance of collection frame, rope is made up and down With the distance between garbage grille and collection frame are controlled in 200~400mm, then rope is clamped with binding clasp, then dirt will be blocked Grid bolt be fixed to mounting rack on, then to garbage grille deflect 10 °~30 °, then with cutting ferrule lock garbage grille, then by A installation garbage grille;
(c) pollution cutting device is rinsed;
(d) conditioning tank and Flood Pondage Action pond pour;
(e) spiral-flow filter is installed in the rainwater flood-relief channel of branch: being first laid with water inlet pipe in the rainwater flood-relief channel of branch, Spiral-flow filter is linked on water inlet pipe again, then passes to clear water, protection liquid is rinsed well, to eddy flow mistake in flushing process Filter is rocked, until the foam box taste for not generating protection liquid in the clear water come out, then using laterally and vertical Staggered steel pipe fixation supports spiral-flow filter, then municipal pipeline and clear water outlet pipe are accessed on spiral-flow filter, so Clear water water tank is accessed in clear water outlet pipe afterwards.
Further, in step (d), bolt fixes rotation seat in the conditioning tank for pouring completion, then is packed on rotation seat Adjustable plate, then floating ball is tied up on adjustable plate by traction rope, then the injected clear water into conditioning tank, observation adjustable plate are being adjusted The speed that clear water injects in deflection angle and Flood Pondage Action pond on pond, adjusts the length of traction rope.
The present invention is by adopting the above-described technical solution, have the advantages that
1, the rainwater catchment of urban road is two-way by the present invention, rains or when raining heavyly, rainwater divides through rainwater flood-relief channel Road is flowed into spiral-flow filter, and rainwater is drained into clear water water tank after spiral-flow filter filters by clear water outlet pipe, more Remaining rainwater is drained into municipal pipeline, and clear water water tank can provide water resource to urbanite water consumption;When heavy rain or heavy rain, rainwater warp The main road of rainwater flood-relief channel is flowed into conditioning tank, conditioning tank control rainwater water level, stormwater overflow into Flood Pondage Action pond, The floating materials such as the rubbish in middle rainwater are retained by multiple tracks pollution cutting device, and after rainwater is backed off, the rubbish in garbage grille is fallen to It in collection frame, is cleared up by sanitationman, while Flood Pondage Action pond itself can be filtered disinfection to rainwater, rainwater is carried out It purifies, the rainwater in Flood Pondage Action pond is for urban water supply demand.Urban road rainwater retention purification system in this way in the present invention System is collected rainwater, filters, purifies, stores and utilizes, and substantially increases the resource utilization efficiency of rainwater, change give up into Treasured, the problem of alleviating water resources shortage, reduce the influence of urban rainwater waterlogging.
2, in the construction process, it is two exhalant canals that rainwater flood-relief channel is excavated to the present invention, control rainwater flood-relief channel The gradient, then building block is laid at lap segment between the rainwater flood-relief channel of main road and the rainwater flood-relief channel of branch, increase rainwater flood discharge Road water-collecting capacity prevents rainwater flood-relief channel from collapsing phenomenon occur;When installing pollution cutting device, mounting rack is fixed on wooden unit bed course In the structure be combineding with each other with concrete base, prevent mounting rack from tilt phenomenon occur, when installing garbage grille and collection frame, Collection frame is first installed, then garbage grille is installed, by adjusting garbage grille and collection frame under the collective effect of binding clasp and rope Between setting distance, fallen in collection frame convenient for the garbage energy in garbage grille, be stuck in garbage grille prevented also from rubbish Between collection frame, so that rainwater is filtered for multiple times in multiple tracks pollution cutting device, filter effect is improved.Construction procedure of the present invention is simple, Difficulty is low, and construction quality is easily controllable, and construction cost is low, and the construction equipment being related to is few.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is a kind of structural schematic diagram of urban road rainwater retention purification system in the present invention;
Fig. 2 is the structural schematic diagram of pollution cutting device in the present invention;
Fig. 3 is the structural schematic diagram of garbage grille in the present invention;
Fig. 4 is the structural schematic diagram in the present invention inside collection frame;
Fig. 5 is the structural schematic diagram of buffer unit in the present invention.
Specific embodiment
As shown in Figures 1 to 5, purification system, including rainwater flood-relief channel are retained for urban road rainwater a kind of in the present invention 1, conditioning tank 2 and Flood Pondage Action pond 3, rainwater flood-relief channel 1 connect conditioning tank 2, and conditioning tank 2 connects Flood Pondage Action pond 3, conditioning tank 2 Sewage pipe 4 is equipped between Flood Pondage Action pond 3.Adjustable plate 16 is equipped in conditioning tank 2, adjustable plate 16 is rotationally connected with conditioning tank 2 Inner wall on, adjustable plate 16 is set at the nozzle of sewage pipe 4, and adjustable plate 16 is equipped with traction rope 17, and traction rope 17 is equipped with floating Ball 18 is suspended in the rainwater of conditioning tank 2 by floating ball 18, and adjustable plate 16 is opened, and the rainwater in conditioning tank 2 can flow to flood In storage pond 3, according to the height of the rainwater of conditioning tank 2, changes the angle that adjustable plate 16 is opened, control to adjust the rainwater in pond 2 The flow in Flood Pondage Action pond 3 is flowed to, convenient for controlling to adjust the water level of rainwater in pond 2.
At least twice pollution cutting device 5 is transversely provided in rainwater flood-relief channel 1, pollution cutting device 5 includes concrete base 6, installation Frame 7 and garbage grille 8, mounting rack 7 are fixed on concrete base 6, and garbage grille 8 is fixed on mounting rack 7, on mounting rack 7 Equipped with collection frame 9, collection frame 9 is set to the lower section of garbage grille 8.It is set between the side of mounting rack 7 and the top surface of concrete base 6 Have triangle fixed block 19, the end of triangle fixed block 19 and the side of mounting rack 7 are welded and fixed, the bottom of triangle fixed block 19 with The top surface bolt of concrete base 6 is fixed, and realizes that mounting rack 7 is fixed on concrete base 6.The bottom of garbage grille 8 is equipped with Connecting plate 20, connecting plate 20 are welded in mounting rack 7, convenient for the positioning action to garbage grille 8.The side of mounting rack 7 is equipped with The side of first mounting base 21, garbage grille 8 is equipped with guide post 22, and guide post 22 is fixed in the first mounting base 21, and realization is blocked Dirty grid 8 is fixedly connected with mounting rack 7.The side of mounting rack 7 is equipped with the second mounting base 23, and the side of collection frame 9 is equipped with weldering Block 24, welding block 24 are fixed in the second mounting base 23, and realization collection frame 9 is fixedly connected with mounting rack 7.The bottom surface of collection frame 9 It is equipped with buffer unit 25, buffer unit 25 is equipped with pressing plate 26, alarm button 27 on the bottom surface of collection frame 9, alarm button 27 Set on the lower section of pressing plate 26, when the rubbish in collection frame 9 reaches constant weight, pressing plate 26 is pushed, and pressure is worked as in 25 deformation of buffer unit When plate 26 touches alarm button 27, alarm signal is generated, sanitationman can in time clear up the rubbish in collection frame 9, Then under the elastic reaction of buffer unit 25, pressing plate 26 is returned to initial position, convenient in time to the rubbish in collection frame 9 into Row processing.Buffer unit 25 includes including buffer board 28 and buffing pad 29, and the bottom of buffer board 28 is equipped with buffer bar 30, buffing pad 29 top is equipped with sleeve 31, and buffer bar 30 is resiliently attached in sleeve 31, and structure is simple, and elastic buffer effect is obvious.
Rainwater flood-relief channel 1 is equipped with water inlet pipe 10, and water inlet pipe 10 is connected with spiral-flow filter 11, and spiral-flow filter 11 is equipped with Municipal pipeline 12 and clear water outlet pipe 13, clear water outlet pipe 13 are connected with clear water water tank 14, are equipped with immersible pump in clear water water tank 14 15。
The present invention by the rainwater catchment of urban road be two-way, rain or when raining heavyly, branch of the rainwater through rainwater flood-relief channel 1 It is flowed into spiral-flow filter 11, rainwater is drained into clear water water tank 14 by clear water outlet pipe 13 after the filtering of spiral-flow filter 11 In, extra rainwater is drained into municipal pipeline 12, and clear water water tank 14 can provide water resource to urbanite water consumption;Heavy rain or heavy rain When, rainwater is flowed into conditioning tank 2 through the main road of rainwater flood-relief channel 1, and conditioning tank 2 controls the water level of rainwater, stormwater overflow to flood In water storage pond 3, wherein the floating materials such as rubbish in rainwater are retained by multiple tracks pollution cutting device 5, after rainwater is backed off, garbage grille Rubbish on 8 is fallen in collection frame 9, is cleared up by sanitationman, while Flood Pondage Action pond 3 itself can carry out rainwater Filter disinfection, purifies rainwater, the rainwater in Flood Pondage Action pond 3 is for urban water supply demand.City in this way in the present invention Road rain water retention purification system is collected rainwater, filters, purifies, stores and utilizes, and substantially increases the resource of rainwater Change utilization efficiency, the problem of turning waste into wealth, alleviate water resources shortage, reduces the influence of urban rainwater waterlogging.
A kind of construction method of urban road rainwater retention purification system, includes the following steps:
(a) rainwater flood-relief channel 1 is built: according to design working drawing, being excavated in such a way that excavator cooperates artificial grooving.First The rainwater flood-relief channel of main road is excavated, then excavates the rainwater flood-relief channel of branch, clears up rainwater flood-relief channel bottom.It is sent again with trolley Soil is banketed since the bottom of rainwater flood-relief channel, place Min layers are filled out from bottom to top with manually banketing.It is tamped again with ramming machine It bankets, keeps the gradient of rainwater flood-relief channel 2%~3%.Then in the rainwater flood-relief channel of the rainwater flood-relief channel of main road and branch Between building block is laid at lap segment.The grey wire tag in the case where the bottom of the rainwater flood-relief channel of the rainwater flood-relief channel and branch of main road is made, Mark water storage clarifier-tank construction area.
(b) pollution cutting device 5 is installed in the rainwater flood-relief channel of main road: according to the content of the pollutant in urban road rainwater, Set a certain number of pollution cutting devices 5.The setting area of pollution cutting device 5 is measured and irises out in the rainwater flood-relief channel of main road, It is driven into again with wooden unit bed course in the base of setting area of pollution cutting device 5, then the casting concrete on every piece of wooden unit bed course, Concrete base 6 with a thickness of 80mm~120mm.Then garbage grille 8 is installed one by one, first on the concrete base 6 poured Punching, then the bolt fixing and mounting bracket 7 at punching.Then it is put into collection frame 9 in the side of mounting rack 7, and collection frame 9 is carried out It is fixed.Then rope is installed on binding clasp, then garbage grille 8 is arranged on rope.According to the setting distance of collection frame 9, Rope is acted on up and down, the distance between garbage grille 8 and collection frame 9 are controlled in 200~400mm, then pressed from both sides with binding clasp Guy tightening.8 bolt of garbage grille is fixed on mounting rack 7 again, 10 °~30 ° then are deflected to garbage grille 8, then use cutting ferrule Garbage grille 8 is locked, then garbage grille 8 is installed one by one.
(c) pollution cutting device 5 is rinsed using giant.
(d) conditioning tank 2 and Flood Pondage Action pond 3 pour: the bolt fixation rotation seat in the conditioning tank 2 for pouring completion, then It is packed into adjustable plate 16 on rotation seat, then floating ball 18 is tied up on adjustable plate 16 by rope.Then it is injected into conditioning tank 2 clear Water, observation adjustable plate 16 on conditioning tank 2 deflection angle and Flood Pondage Action pond 3 in clear water injection speed, adjust traction rope 17 length.
(e) in the rainwater flood-relief channel 1 of branch install spiral-flow filter 11: first be laid in the rainwater flood-relief channel 1 of branch into Water pipe 10, then spiral-flow filter 11 is linked on water inlet pipe 10.Clear water is then passed to, protection liquid is rinsed well, it is flushed Spiral-flow filter 11 is rocked in journey, until the foam box taste for not generating protection liquid in the clear water come out.Then Spiral-flow filter 11 is supported using laterally and vertically staggered steel pipe is fixed, then accesses municipal administration pipe on spiral-flow filter 11 Then road 12 and clear water outlet pipe 13 access clear water water tank 14 in clear water outlet pipe 13.Rainwater recycle ratio table is as shown in table 1:
Table 1
In the construction process, it is two exhalant canals that rainwater flood-relief channel 1 is excavated to the present invention, control rainwater flood-relief channel 1 The gradient, then building block is laid at lap segment between the rainwater flood-relief channel 1 of main road and the rainwater flood-relief channel 1 of branch, increase rainwater and lets out Big vast 1 water-collecting capacity of road, prevents rainwater flood-relief channel 1 from collapsing phenomenon occur;When installing pollution cutting device 5, mounting rack 7 is fixed on wood In the structure that block bed course and concrete base 6 be combined with each other, prevent mounting rack 7 from tilt phenomenon occur, in installation 8 He of garbage grille When collection frame 9, collection frame 9 is first installed, then garbage grille 8 is installed, by the way that under the collective effect of binding clasp and rope, dirt is blocked in adjustment Setting distance between grid 8 and collection frame 9, falls in collection frame 9 convenient for the garbage energy in garbage grille 8, prevented also from Rubbish is stuck between garbage grille 8 and collection frame 9, so that rainwater is filtered for multiple times in multiple tracks pollution cutting device 5, improves filter effect. Construction procedure of the present invention is simple, and difficulty is low, and construction quality is easily controllable, and construction cost is low, and the construction equipment being related to is few.
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (8)

1. a kind of urban road rainwater retains purification system, it is characterised in that: including rainwater flood-relief channel, conditioning tank and Flood Pondage Action Pond, the rainwater flood-relief channel connect the conditioning tank, and the conditioning tank connects the Flood Pondage Action pond, the conditioning tank with it is described Sewage pipe is equipped between Flood Pondage Action pond;At least twice pollution cutting device, described section of dirty dress are transversely provided in the rainwater flood-relief channel It sets including concrete base, mounting rack and garbage grille, the mounting rack is fixed on the concrete base, described to block dirty lattice Grid are fixed on the mounting rack, and the mounting rack is equipped with collection frame, and the collection frame is set to the lower section of the garbage grille; The bottom surface of the collection frame is equipped with buffer unit, and the buffer unit is equipped with pressing plate, alarms on the bottom surface of the collection frame Button, the alarm button are set to the lower section of the pressing plate, and the buffer unit includes buffer board and buffing pad, the buffer board Bottom be equipped with buffer bar, the top of the buffing pad is equipped with sleeve, and the buffer bar is resiliently attached in the sleeve;It is described Rainwater flood-relief channel is equipped with water inlet pipe, and the water inlet pipe is connected with spiral-flow filter, and the spiral-flow filter is equipped with municipal pipeline With clear water outlet pipe, the clear water outlet pipe is connected with clear water water tank, is equipped with immersible pump in the clear water water tank.
2. a kind of urban road rainwater according to claim 1 retains purification system, it is characterised in that: in the conditioning tank Equipped with adjustable plate, the adjustable plate is rotationally connected on the inner wall of the conditioning tank, and the adjustable plate is set to the sewage pipe At nozzle, the adjustable plate is equipped with traction rope, and the traction rope is equipped with floating ball.
3. a kind of urban road rainwater according to claim 1 retains purification system, it is characterised in that: the mounting rack Triangle fixed block, the end of the triangle fixed block and the mounting rack are equipped between side and the top surface of the concrete base Side be welded and fixed, the bottom of the triangle fixed block is fixed with the top surface bolt of the concrete base.
4. a kind of urban road rainwater according to claim 1 retains purification system, it is characterised in that: described to block dirt The bottom of grid is equipped with connecting plate, and the connecting plate is welded in the mounting rack.
5. a kind of urban road rainwater according to claim 1 retains purification system, it is characterised in that: the mounting rack Side is equipped with the first mounting base, and the side of the garbage grille is equipped with guide post, and the guide post is fixed on first installation In seat.
6. a kind of urban road rainwater according to claim 1 retains purification system, it is characterised in that: the mounting rack Side is equipped with the second mounting base, and the side of the collection frame is equipped with welding block, and the welding block is fixed in second mounting base.
7. a kind of construction method based on urban road rainwater described in claim 1 retention purification system, it is characterised in that packet Include following steps:
(a) rainwater flood-relief channel is built: according to design working drawing, being excavated in such a way that excavator cooperates artificial grooving, is first excavated The rainwater flood-relief channel of main road, then the rainwater flood-relief channel of branch is excavated, rainwater flood-relief channel bottom is cleared up, then send soil with trolley, with It manually banketing, bankets since the bottom of rainwater flood-relief channel, place Min layers are filled out from bottom to top, then with ramming machine compacted fill, It keeps the gradient of rainwater flood-relief channel 2%~3%, is then taken between the rainwater flood-relief channel of main road and the rainwater flood-relief channel of branch Laying building block at section is connect, the grey wire tag in the case where the bottom of the rainwater flood-relief channel of the rainwater flood-relief channel and branch of main road is made marks storage Water purifying tank construction area;
(b) pollution cutting device is installed in the rainwater flood-relief channel of main road: according to the content of the pollutant in urban road rainwater, setting one The pollution cutting device of fixed number amount measures in the rainwater flood-relief channel of main road and irises out the setting area of pollution cutting device, then uses wooden unit Bed course is driven into the base of the setting area of pollution cutting device, then casting concrete, concrete bottom on every piece of wooden unit bed course Layer with a thickness of 80mm~120mm, then garbage grille is installed one by one, first punched on the concrete base poured, then beating Bolt fixing and mounting bracket at hole is then put into collection frame in the side of mounting rack, and collection frame is fixed, and is then clamping Rope is installed on device, then garbage grille is arranged on rope, according to the setting distance of collection frame, rope is acted on up and down, it will The distance between garbage grille and collection frame are controlled in 200~400mm, then clamp rope with binding clasp, then by garbage grille Bolt is fixed on mounting rack, is then deflected 10 °~30 ° to garbage grille, then lock garbage grille with cutting ferrule, is then pacified one by one Fill garbage grille;
(c) pollution cutting device is rinsed;
(d) conditioning tank and Flood Pondage Action pond pour;
(e) spiral-flow filter is installed in the rainwater flood-relief channel of branch: being first laid with water inlet pipe in the rainwater flood-relief channel of branch, then will Spiral-flow filter is linked on water inlet pipe, then passes to clear water, protection liquid is rinsed well, to spiral-flow filter in flushing process It is rocked, until the foam box taste for not generating protection liquid in the clear water come out, then using lateral and vertical intersection Wrong steel pipe fixation supports spiral-flow filter, then municipal pipeline and clear water outlet pipe are accessed on spiral-flow filter, then exists Clear water outlet pipe accesses clear water water tank.
8. a kind of construction method of urban road rainwater retention purification system according to claim 7, it is characterised in that: step Suddenly in (d), bolt fixes rotation seat in the conditioning tank for pouring completion, then adjustable plate is packed on rotation seat, then floating ball is led to It crosses rope to tie up on adjustable plate, then the injected clear water into conditioning tank, observes deflection angle and flood of the adjustable plate on conditioning tank The speed that clear water injects in water storage pond, adjusts the length of traction rope.
CN201611100089.4A 2016-12-02 2016-12-02 A kind of urban road rainwater retention purification system and construction method Active CN106759766B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611100089.4A CN106759766B (en) 2016-12-02 2016-12-02 A kind of urban road rainwater retention purification system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611100089.4A CN106759766B (en) 2016-12-02 2016-12-02 A kind of urban road rainwater retention purification system and construction method

Publications (2)

Publication Number Publication Date
CN106759766A CN106759766A (en) 2017-05-31
CN106759766B true CN106759766B (en) 2019-10-01

Family

ID=58883507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611100089.4A Active CN106759766B (en) 2016-12-02 2016-12-02 A kind of urban road rainwater retention purification system and construction method

Country Status (1)

Country Link
CN (1) CN106759766B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894298B (en) * 2018-06-20 2020-05-15 山东女子学院 Comprehensive sponge city ecological planning management device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329577A (en) * 2000-05-25 2001-11-30 Koken Sangyo Kk Rainwater storage utilization facility
CN201815169U (en) * 2010-10-21 2011-05-04 常洪哲 Sundries blocking grid plate for sewage treatment
CN204590215U (en) * 2015-02-10 2015-08-26 武汉圣禹排水系统有限公司 The urgent flood discharge of a kind of rain flood
CN204919663U (en) * 2015-07-30 2015-12-30 誊录企业有限公司 Torrential rain water storage infiltration system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9772609B2 (en) * 2013-05-24 2017-09-26 Optirtc, Inc. Optimized hydromodification management with active stormwater controls

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329577A (en) * 2000-05-25 2001-11-30 Koken Sangyo Kk Rainwater storage utilization facility
CN201815169U (en) * 2010-10-21 2011-05-04 常洪哲 Sundries blocking grid plate for sewage treatment
CN204590215U (en) * 2015-02-10 2015-08-26 武汉圣禹排水系统有限公司 The urgent flood discharge of a kind of rain flood
CN204919663U (en) * 2015-07-30 2015-12-30 誊录企业有限公司 Torrential rain water storage infiltration system

Also Published As

Publication number Publication date
CN106759766A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN103371069B (en) A kind of concatenation type pavement runoff collects the ecologic planting groove with purification utilization
CN104032793B (en) The anti-rain-impact system of garden type for residential quarter road
CN107503263A (en) A kind of multimode rainwater-collecting purification and the urban road of self-restraint greenbelt
CN202430056U (en) Green belt gutter constructed wetland device for treatment of road rainfall runoff pollution
CN105621617B (en) A kind of pavement runoff Integral purifier
CN205348354U (en) System that utilizes is handled to regional low rainwater that influences
CN102351316A (en) Green belt drainage channel artificial wetland device for treating rainfall runoff pollution of road
CN107354841A (en) A kind of road drainage filter structure system
CN107060034B (en) A kind of urban road integration row's infiltration system and its construction method
CN106638917B (en) Split type rainwater recycling, storing and adjusting system and construction method thereof
CN109577132A (en) Road sinks formula greenbelt and construction method
CN108330769A (en) A kind of plumbing utilization system
CN107354844A (en) Ecological pavement with water storage module and section dirty purified treatment
CN207314476U (en) System of regulating and storing with dmp filter purification and collecting function
CN107386054A (en) A kind of urban road filtration, purification and collection drainage systems
CN207727376U (en) A kind of urban road of multimode rainwater-collecting purification and self-restraint greenbelt
CN206467746U (en) A kind of concave herbaceous field Rainwater collection system
CN207597185U (en) Multi-functional ink storage draining and the urban ecology road surface for conserving lawn
CN208121939U (en) The device with processing is collected for road initial rainwater
CN203977495U (en) The anti-rainwater impact system of garden type for residential quarter road
CN106759766B (en) A kind of urban road rainwater retention purification system and construction method
CN106638919B (en) A kind of urban road rainwater recycling system and construction method
CN106759797B (en) A kind of sunk type greenery patches rain processing system and its construction method
CN211897679U (en) Novel sponge urban road system
CN207958057U (en) Rain processing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant