CN106759535A - Pit retaining monitoring inclinometer pipe broken block plug device and broken block plug construction method - Google Patents

Pit retaining monitoring inclinometer pipe broken block plug device and broken block plug construction method Download PDF

Info

Publication number
CN106759535A
CN106759535A CN201611076826.1A CN201611076826A CN106759535A CN 106759535 A CN106759535 A CN 106759535A CN 201611076826 A CN201611076826 A CN 201611076826A CN 106759535 A CN106759535 A CN 106759535A
Authority
CN
China
Prior art keywords
pipe
rigidity
inclinometer
pipe fitting
inclinometer pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611076826.1A
Other languages
Chinese (zh)
Inventor
汪志锋
高进
任纪华
石昆鹏
周成丰
李丹
张家贺
王天梁
李柯
李光山
伍侃
饶荣华
彭明刚
杨关军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Railway Construction Co Ltd
Original Assignee
PowerChina Railway Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Railway Construction Co Ltd filed Critical PowerChina Railway Construction Co Ltd
Priority to CN201611076826.1A priority Critical patent/CN106759535A/en
Publication of CN106759535A publication Critical patent/CN106759535A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

Pit retaining monitoring inclinometer pipe broken block plug device and broken block plug construction method, device include rigidity pipe fitting and flexible pipe;One end of rigidity pipe fitting is connected by nipple with one end of flexible pipe, and the other end of rigidity pipe fitting forms broken block effect end, the other end connection water supply installation of flexible pipe;The length of rigidity pipe fitting is more than the length of blocked inclinometer pipe, and the external diameter of the external diameter less than blocked inclinometer pipe of rigidity pipe fitting is provided with controlled valve on rigidity pipe fitting near the one end being connected with flexible pipe.Construction method is:S1 connects rigidity pipe fitting and flexible pipe, and flexible pipe is connected with water supply installation, is closed controlled valve;From the upper end of blocked inclinometer pipe be inserted into inclinometer pipe rigidity pipe fitting by S2, and the tamper in inclinometer pipe is broken;S3 opens controlled valve, and the tamper broken in inclinometer pipe is gone out from the lower port of inclinometer pipe.It is broken block plug device simple structure, easy to use;Broken block plug construction method construction cost is low.

Description

Pit retaining monitoring inclinometer pipe broken block plug device and broken block plug construction method
Technical field
The invention belongs to engineering construction Excavation Monitoring technical field, more particularly to pit retaining monitoring inclinometer pipe broken block plug Device and broken block plug construction method.
Background technology
In engineering construction Excavation Process, need to monitor the deformation of foundation pit enclosure structure at any time, according to the change of monitoring Shape value judges the safe coefficient of foundation ditch, and it is foundation pit enclosure structure to go along with sb. to guard him the monitoring of pile body (also referred to as retaining wall) deeply mixing cement-soil pile The main monitoring technology of deformation.
At present, pile body deeply mixing cement-soil pile monitoring method is:Inclinometer pipe and steel reinforcement cage bundle together with after-pouring in fender post In (wall), inclinometer is recycled to measure the deformation of building enclosure.In due to fender post casting process, inclinometer pipe is easily blocked Plug and destruction, after blocking or destroying, Monitoring Data will be unable to continue to gather, it is impossible to which the safety to foundation ditch is estimated, Conductive suggestion cannot be proposed to the problem constructed.At present, inclinometer pipe once occurs to block and destroy, typically in adjacent locations Benefit sets monitoring holes, is monitored by the detection hole that sets of benefit, and mend set detection hole have that construction cost is high, asking of wasting time and energy Topic.
The content of the invention
The present invention provides a kind of pit retaining monitoring inclinometer pipe broken block plug to solve technical problem present in known technology Device and broken block plug construction method, the broken block plug device simple structure, easy to use, the broken block plug construction method construction cost Problem that is low, can effectively releasing deviational survey blockage.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:
A kind of pit retaining monitoring inclinometer pipe broken block plug device, it is characterised in that:Used with rigidity pipe fitting and water delivery including broken block Flexible pipe;One end of rigidity pipe fitting is connected by nipple with one end of flexible pipe, and the other end of rigidity pipe fitting is formed Broken block acts on end, the other end connection water supply installation of flexible pipe;Length of the length of rigidity pipe fitting more than blocked inclinometer pipe Degree, the external diameter of the external diameter less than blocked inclinometer pipe of rigidity pipe fitting, near be connected with flexible pipe on rigidity pipe fitting End is provided with controlled valve.
Preferably:Plastic tube is fixed with the broken block effect end suit of rigidity pipe fitting.
Preferably:Impact head is also installed with the broken block effect end of rigidity pipe fitting, impact head is used by impact resistant tools Steel material is made, the tapered shape of impact head, and the inner chamber of apopore, the apopore and rigidity pipe fitting is provided with the center of impact head Connection.
Preferably:The rigidity pipe fitting is in charge of to be sequentially connected by external thread straight connector by multistage and is constituted.
A kind of pit retaining monitoring inclinometer pipe broken block plug construction method, it is characterised in that construction method uses above-mentioned broken block plug Device, construction procedure:
S1 will constitute rigidity pipe fitting and the flexible pipe connection of broken block plug, flexible pipe is connected with water supply installation, and make Controlled valve is closed;
From the upper end of blocked inclinometer pipe be inserted into inclinometer pipe rigidity pipe fitting by S2, transfers rigidity pipe fitting, steel tube Part glides along inclinometer pipe, when the lower end of rigidity pipe fitting or impact head are contacted with the tamper in inclinometer pipe, by rigidity pipe fitting Weight and the percussion of downslide, the tamper in inclinometer pipe are broken;When the tamper in inclinometer pipe is more or and inclinometer pipe When inwall connection is stronger, rigidity pipe fitting can be repeatedly extracted, and repeatedly be transferred, until the tamper in inclinometer pipe is complete Break;
Be lifted up for rigidity pipe fitting to be just inserted into survey to its lower end after the tamper in inclinometer pipe is broken completely by S3 State in inclined tube, is then turned on controlled valve, and water passes sequentially through flexible pipe and rigidity pipe fitting, is setting the situation of impact head Under, the apopore of impact head is also flowed through, finally it is flowed into inclinometer pipe, inclinometer pipe is rinsed, carried out to inclinometer pipe During flushing, rigidity pipe fitting is gradually inserted in inclinometer pipe, until being inserted into the lower end of inclinometer pipe, is broken in inclinometer pipe The tamper opened is gone out by current from the lower port of inclinometer pipe, realizes the broken plugging handling of inclinometer pipe.
The present invention has the advantages and positive effects that:
The broken block plug device is mainly connected and composed by rigidity pipe fitting and flexible pipe, with simple structure, easy to use Advantage.The broken block plug construction method impacts tamper by rigidity pipe fitting, and tamper is broken, and is washed away by water, by what is broken Tamper is flushed to the lower section of inclinometer pipe, so as to effectively relieve the blockage problem of inclinometer pipe, the broken block plug construction method has The low advantage of construction cost.
Brief description of the drawings
Fig. 1 is the structural representation of broken block plug device of the present invention.
In figure:1st, rigidity pipe fitting;2nd, flexible pipe;3rd, nipple;4th, controlled valve;5th, plastic tube;6th, impact head;6- 1st, apopore;7th, external thread straight connector.
Specific embodiment
For the content of the invention of the invention, feature and effect can be further appreciated that, following examples are hereby enumerated, and coordinate accompanying drawing Describe in detail as follows:
Refer to Fig. 1, a kind of pit retaining monitoring inclinometer pipe broken block plug device, including broken block rigidity pipe fitting 1 and water delivery is used Flexible pipe 2.One end of rigidity pipe fitting is connected by nipple 3 with one end of flexible pipe, specifically, the one of nipple End is connected through a screw thread with the port of rigidity pipe fitting, and the other end and the flexible pipe of nipple can be carried out by way of inserting Connection.The other end of rigidity pipe fitting forms broken block effect end.The other end connection water supply installation of flexible pipe, water supply installation is attached Do not illustrated in figure., more than the length of blocked inclinometer pipe, the external diameter of rigidity pipe fitting is less than blocked for the length of rigidity pipe fitting Inclinometer pipe external diameter.Controlled valve 4 is installed near the one end being connected with flexible pipe on rigidity pipe fitting.
In said structure, at the broken block effect end of rigidity pipe fitting, further suit is fixed with plastic tube 5.Plastic tube is set Purpose is:Prevent when broken block is carried out, the lower end destruction inclinometer pipe madial wall chute of rigidity pipe fitting plays protection to inclinometer pipe and makees With.
In said structure, impact head 5 is also installed with the broken block effect end of rigidity pipe fitting, the tapered shape of impact head, Impact head is made up of impact resistant tools of Steel material, and apopore 6-1 is provided with the center of impact head, described to go out to send hole and steel tube The inner space of part.Above-mentioned impact head is set up in the end of rigidity pipe fitting, the impact strength of tamper can be increased, be easy to break resistance Plug thing.
In said structure, the rigidity pipe fitting is in charge of to be sequentially connected by external thread straight connector 7 by multistage and is constituted.Steel tube The attachment structure that part is in charge of using multistage, can be according to the growth of the depth of inclinometer pipe or the length of reduction rigidity pipe fitting, to meet not With the use requirement of the inclinometer pipe of depth.
A kind of pit retaining monitoring inclinometer pipe broken block plug construction method, using above-mentioned broken block plug device, construction procedure:
S1 will constitute rigidity pipe fitting and the flexible pipe connection of broken block plug, flexible pipe is connected with water supply installation, and make Controlled valve is closed;
From the upper end of blocked inclinometer pipe be inserted into inclinometer pipe rigidity pipe fitting by S2, transfers rigidity pipe fitting, steel tube Part glides along inclinometer pipe, when the lower end of rigidity pipe fitting or impact head are contacted with the tamper in inclinometer pipe, by rigidity pipe fitting Weight and the percussion of downslide, the tamper in inclinometer pipe are broken;When the tamper in inclinometer pipe is more or and inclinometer pipe When inwall connection is stronger, rigidity pipe fitting can be repeatedly extracted, and repeatedly be transferred, until the tamper in inclinometer pipe is complete Break;
Be lifted up for rigidity pipe fitting to be just inserted into survey to its lower end after the tamper in inclinometer pipe is broken completely by S3 State in inclined tube, is then turned on controlled valve, and water passes sequentially through flexible pipe and rigidity pipe fitting, is setting the situation of impact head Under, the apopore of impact head is also flowed through, finally it is flowed into inclinometer pipe, inclinometer pipe is rinsed, carried out to inclinometer pipe During flushing, rigidity pipe fitting is gradually inserted in inclinometer pipe, until being inserted into the lower end of inclinometer pipe, is broken in inclinometer pipe The tamper opened is gone out by current from the lower port of inclinometer pipe, realizes the broken plugging handling of inclinometer pipe.
The broken plugging handling of inclinometer pipe is carried out using this broken block plug device, the blockage problem in inclinometer pipe can be effectively released, Compared to the existing mode mended and set monitoring holes, have the advantages that construction cost is low, in addition, also not resulted in brokenly to existing engineering It is bad.

Claims (5)

1. a kind of pit retaining monitoring inclinometer pipe broken block plug device, it is characterised in that:Including broken block with rigidity pipe fitting and water delivery with soft Property pipe fitting;One end of rigidity pipe fitting is connected by nipple with one end of flexible pipe, and the other end of rigidity pipe fitting is formed brokenly Stifled effect end, the other end connection water supply installation of flexible pipe;The length of rigidity pipe fitting is more than the length of blocked inclinometer pipe, The external diameter of rigidity pipe fitting is pacified on rigidity pipe fitting less than the external diameter of blocked inclinometer pipe near the one end being connected with flexible pipe Equipped with controlled valve.
2. pit retaining monitoring according to claim 1 inclinometer pipe broken block plug device, it is characterised in that:In the broken of rigidity pipe fitting Stifled effect end suit is fixed with plastic tube.
3. pit retaining monitoring according to claim 1 and 2 inclinometer pipe broken block plug device, it is characterised in that:In rigidity pipe fitting Broken block effect end be also installed with impact head, impact head is made up of impact resistant tools of Steel material, the tapered shape of impact head, The inner space of apopore, the apopore and rigidity pipe fitting is provided with the center of impact head.
4. pit retaining monitoring according to claim 1 inclinometer pipe broken block plug device, it is characterised in that:The rigidity pipe fitting by Multistage is in charge of and is sequentially connected composition by external thread straight connector.
5. a kind of pit retaining monitoring inclinometer pipe broken block plug construction method, it is characterised in that construction method is filled using above-mentioned broken block plug Put, construction procedure:
S1 will constitute rigidity pipe fitting and the flexible pipe connection of broken block plug, flexible pipe is connected with water supply installation, and make switch Valve is closed;
From the upper end of blocked inclinometer pipe be inserted into inclinometer pipe rigidity pipe fitting by S2, transfers rigidity pipe fitting, rigidity pipe fitting edge Inclinometer pipe glides, when the lower end of rigidity pipe fitting or impact head are contacted with the tamper in inclinometer pipe, by the weight of rigidity pipe fitting And the percussion for gliding, the tamper in inclinometer pipe broken;When the tamper in inclinometer pipe is more or with deviational survey inside pipe wall When connecting stronger, rigidity pipe fitting can be repeatedly extracted, and repeatedly be transferred, until the tamper in inclinometer pipe is broken completely Open;
Be lifted up for rigidity pipe fitting to be just inserted into inclinometer pipe to its lower end after the tamper in inclinometer pipe is broken completely by S3 Interior state, is then turned on controlled valve, and water passes sequentially through flexible pipe and rigidity pipe fitting, in the case where impact head is set, The apopore of impact head is also flowed through, is finally flowed into inclinometer pipe, inclinometer pipe is rinsed, be rinsed to inclinometer pipe During, rigidity pipe fitting is gradually inserted in inclinometer pipe, until being inserted into the lower end of inclinometer pipe, broken in inclinometer pipe Tamper is gone out by current from the lower port of inclinometer pipe, realizes the broken plugging handling of inclinometer pipe.
CN201611076826.1A 2016-11-29 2016-11-29 Pit retaining monitoring inclinometer pipe broken block plug device and broken block plug construction method Pending CN106759535A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611076826.1A CN106759535A (en) 2016-11-29 2016-11-29 Pit retaining monitoring inclinometer pipe broken block plug device and broken block plug construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611076826.1A CN106759535A (en) 2016-11-29 2016-11-29 Pit retaining monitoring inclinometer pipe broken block plug device and broken block plug construction method

Publications (1)

Publication Number Publication Date
CN106759535A true CN106759535A (en) 2017-05-31

Family

ID=58897907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611076826.1A Pending CN106759535A (en) 2016-11-29 2016-11-29 Pit retaining monitoring inclinometer pipe broken block plug device and broken block plug construction method

Country Status (1)

Country Link
CN (1) CN106759535A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035385A (en) * 2017-12-18 2018-05-15 武汉理工大学 A kind of inclinometer pipe blockage-removing device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100788884B1 (en) * 2006-12-27 2008-01-04 (재)한국건설시험연구소 The loading apparatus for pile load test
CN202045112U (en) * 2011-04-12 2011-11-23 长沙理工大学 Inclinometer pipe cleaning instrument
CN202194162U (en) * 2011-09-02 2012-04-18 中铁上海工程局有限公司 Unchoking device for acoustic pipe for drilled pile
CN203393177U (en) * 2013-06-04 2014-01-15 宝钢集团新疆八一钢铁有限公司 On-line cleaner for instrument tapping pipeline
CN103521486A (en) * 2013-09-30 2014-01-22 中国一冶集团有限公司 Method for quickly dredging ultrasonic testing tube of pile foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100788884B1 (en) * 2006-12-27 2008-01-04 (재)한국건설시험연구소 The loading apparatus for pile load test
CN202045112U (en) * 2011-04-12 2011-11-23 长沙理工大学 Inclinometer pipe cleaning instrument
CN202194162U (en) * 2011-09-02 2012-04-18 中铁上海工程局有限公司 Unchoking device for acoustic pipe for drilled pile
CN203393177U (en) * 2013-06-04 2014-01-15 宝钢集团新疆八一钢铁有限公司 On-line cleaner for instrument tapping pipeline
CN103521486A (en) * 2013-09-30 2014-01-22 中国一冶集团有限公司 Method for quickly dredging ultrasonic testing tube of pile foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035385A (en) * 2017-12-18 2018-05-15 武汉理工大学 A kind of inclinometer pipe blockage-removing device

Similar Documents

Publication Publication Date Title
CN106498989B (en) Cheat bottom pile foundation level carrying detection sensor conductive wire protection apparatus and method
CN110820732A (en) Cast-in-situ bored pile suitable for karst area with connectivity channel and pile forming method
CN110397451A (en) It is a kind of to form the construction method that cavity excavate cavern's pre-reinforcement using deep soft rock
CN107676120A (en) A kind of Anchor Agent feeder and application method
CN106759535A (en) Pit retaining monitoring inclinometer pipe broken block plug device and broken block plug construction method
CN106523006A (en) Glass fiber anchor rod and construction method
CN101492917B (en) Hollow anchor stock circulating pressure slip casting construction method and special slip casting system thereof
CN105863507B (en) Double-jacket tube drilling device
CN105274994B (en) Anti-suck sludge proof grouting process and grouting device in deep saturated sand
CN205805454U (en) The deslagging head of double-jacket tube rig
CN205805414U (en) Double-jacket tube rig
US20120325490A1 (en) Method for blocking outflow of petroleum or the like due to damage to subsea petroleum well steel pipe or the like
CN104264679B (en) A kind of electric power pylon basis heavy caliber Underwater pile construction method
CN213717603U (en) Cable junction box applied to vibroflotation equipment
CN214328854U (en) Recoverable anchor rod
CN204941579U (en) The pre-buried orifice tube of a kind of pit shaft borehole wall grouting
CN206681739U (en) Newly-built Coal Mine depth vertical pre grouting from the surface monitoring system under neighbouring existing wellbore conditions
CN210239641U (en) Oil pipe plug
JP6396226B2 (en) Micropile method
CN209100007U (en) A kind of drilling artesian water is synchronous to drain slip casting plugging device
CN202500136U (en) Anchor pipe
CN203640654U (en) Reversing process string for horizontal well
CN203412596U (en) Grouting device and grouting pipe for deep rock tunnel
CN213805324U (en) Novel grouting pipe
CN106640090B (en) Newly-built Coal Mine depth vertical pre grouting from the surface monitoring system under neighbouring existing wellbore conditions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531